Assembled reinforced concrete beam-column system with embedded pipes and method

By embedding the axial embedded pipe and vertical inspection holes in the prefabricated reinforced concrete beam and column system, combined with the design of connecting pipes and bent pipes, the problems of unreasonable layout of traditional embedded pipes and complex blasting and demolition are solved, and safety is achieved , efficient threading and blasting demolition have improved the economic and environmental benefits of the structure.

CN118187263BActive Publication Date: 2024-11-26HUBEI UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410267346.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-11-26
Estimated Expiration
2044-03-08

AI Technical Summary

Technical Problem

The layout of traditional prefabricated reinforced concrete beam and column embedded pipes is unreasonable, which affects the safety of the structure. The blasting and demolition process is complex and resource-consuming, which poses safety hazards.

Method used

设计一种有预埋管的装配式钢筋混凝土梁柱体系,通过在预制梁和预制柱中预埋轴向预埋管和垂直检查孔,利用连接管和弯管进行穿线和爆破拆除,实现全 The life design is safe, efficient and practical.

Benefits of technology

It reduces the use of drilling and detonators during blasting, reduces safety risks, saves manpower and material resources, improves the efficiency and safety of construction and demolition, and solves the threading and removal of embedded pipes in the beam and column system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118187263B_ABST
    Figure CN118187263B_ABST
Patent Text Reader

Abstract

The invention discloses an assembled reinforced concrete beam-column system with embedded pipes and a method thereof, comprising: arranging axial embedded pipes inside a prefabricated beam and prefabricated column structural system during the prefabrication period; the axial embedded pipes are bent out of the surface at any side of the beam or column through a fork, the axial embedded pipes in the beam or column are connected at the node through a straight pipe, or the axial embedded pipes in the beam and the column are connected to each other at the node through a bent pipe; a vertical inspection hole is connected to the axial embedded pipes in the beam or column near the beam-column node, or the axial embedded pipes in the beam or the column are disconnected at the node, or the axial embedded pipes in the beam and the column are not connected to each other at the node; and electric wires are arranged inside the embedded pipes and the connecting pipes; the invention takes into account the problems of blasting demolition and indoor circuit threading at the beginning of construction, uses the embedded pipes as blast holes for blasting demolition of the beam-column system in the future, and provides a variety of blasting technical solutions to achieve the purpose of safe, efficient and low-cost blasting demolition of assembled buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of utilization and blasting removal of pre-buried pipes of concrete beams and columns of assembled buildings, in particular to an assembled reinforced concrete beam-column system with pre-buried pipes and a method thereof. Background Art

[0002] In prefabricated projects, the conventional method of pre-embedded pipes is to embed the pre-embedded pipes in the cast-in-place layer of the composite slab in a concealed manner. There are many crosses, which will damage the protective layer of the prefabricated reinforced concrete and affect the safety of the prefabricated structure, and the use of pre-embedded pipes in beams and columns is not considered. The traditional reinforced concrete pre-embedded pipes are arranged on single beams and columns for relevant applications, but they lack the concept of beam-column system and do not bring into play the advantages of pre-embedded pipes in beams and columns. On the other hand, when blasting and demolishing beams and columns, more blastholes are required, and a lot of detonators and blocking materials are required. A large number of drillings will affect the safety of the prefabricated structure. The workload of blasting blocking and blasting network connection operations is very large, and it is easy to make mistakes. Therefore, at the beginning of the prefabrication design of the prefabricated component factory, considering the construction, use and removal of the pre-embedded pipes in the beam-column system will bring good economic and environmental benefits. Summary of the invention

[0003] The object of the present invention is to overcome the above-mentioned shortcomings and to provide an assembled reinforced concrete beam-column system and method with embedded pipes. The arrangement and threading of embedded pipes are taken into consideration at the beginning of the design of assembled prefabricated beams and prefabricated columns. The embedded pipes of prefabricated beams and prefabricated columns are embedded in the assembled factory. The prefabricated beams and prefabricated columns are connected or disconnected through cast-in-place connecting pipes to form embedded pipes for threading in the future, and the embedded blasting holes are removed and blasted after the service life ends, so as to achieve the purpose of a safe, efficient and practical assembled beam-column system with embedded pipes under the full life design concept.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: an assembled reinforced concrete beam-column system with embedded pipes, including axial embedded pipes arranged in prefabricated beams and prefabricated columns, and connecting pipes and vertical inspection holes near the beam-column nodes, wherein the axial embedded pipes are bent out at any surface of the beam or column through a fork and open to the surface; at least two end surface openings of the axial embedded pipe at the node are connected to each other; and the vertical inspection hole is connected to the axial embedded pipe near the beam-column node.

[0005] An assembled reinforced concrete beam-column system with embedded pipes comprises axial embedded pipes arranged in prefabricated beams and prefabricated columns and vertical inspection holes near beam-column nodes, wherein the axial embedded pipes are bent out at any surface of the beam or column through forks and open to the surface; the end surface openings of the axial embedded pipes at the nodes are all disconnected from each other; and the vertical inspection holes are connected to the axial embedded pipes near the beam-column nodes.

[0006] The present invention discloses a method for assembling a prefabricated reinforced concrete beam-column system with embedded pipes on site, and the construction steps of any beam-column node are as follows:

[0007] Step 1): Install the precast beam on the top of the column, place the bottom of one end of one or two or more precast beams on the top of the precast column, and overlap and fix the longitudinal reinforcement of the lower part of the precast beam and the axial reinforcement of the precast column;

[0008] Step 2): Remove the axial embedded pipe plugging holes of the prefabricated beams and prefabricated columns, and clean the notches at the ends with a high-pressure blower;

[0009] Step 3): Use a two-way straight pipe or a curved pipe to connect two or more axial pre-buried pipes at the openings of the beam-column end faces at the node;

[0010] Step 4): Pour concrete to form the cast-in-place part.

[0011] Further, the first two steps remain unchanged, and another method of step 3) is: use a connecting pipe to connect two or more axial pre-buried pipes at the openings of the end faces of beams and columns at the nodes; and the end of the connecting pipe connecting the straight axial pre-buried pipes in the columns or the connecting pipe connecting the bent axial pre-buried pipes in the beams extends out of the upper surface of the prefabricated beam and blocks the pipe opening;

[0012] Step 4): pouring concrete to form a cast-in-place part;

[0013] Step 5): Clear the pipe mouth blockage extending from the upper surface of the precast beam in step 3), insert it into the notch of the upper precast column, and at the same time insert the lap steel bars into the steel sleeve at the bottom of the upper precast column and grout.

[0014] The present invention discloses an on-site assembly method of another assembled reinforced concrete beam-column system with pre-buried pipes, and the construction steps of any beam-column node are as follows:

[0015] Step 1): Install the precast beam on the top of the column, place the bottom of one end of one or two or more precast beams on the top of the precast column, and overlap and fix the longitudinal reinforcement of the lower part of the precast beam and the axial reinforcement of the precast column;

[0016] Step 2): Pour concrete to form the cast-in-place part.

[0017] Furthermore, there is step 3): installing the upper layer of prefabricated columns, specifically by aligning and overlapping the steel sleeves of the upper prefabricated columns with the overlapping steel bars at the top of the lower prefabricated columns, and then grouting.

[0018] In addition, the present invention also discloses a method for threading wires by using the embedded pipes in the assembled reinforced concrete beams and columns, which comprises the following steps:

[0019] Main line threading steps:

[0020] Step 1): Find the axial embedded pipe and inspection hole, and clean them with a high-pressure blower;

[0021] Step 2): Arrange the main line in any connecting pipe composed of axial pre-buried pipe and connecting pipe, and use the threading machine to thread the main line from one end to the other end; until all the main line threading is completed; branch line threading steps:

[0022] Step 3): Arrange the branch line in any connecting pipe consisting of an unwired axial pre-buried pipe, an axial pre-buried pipe with a main line, a connecting pipe and an inspection hole, or arrange the branch line in any connecting pipe consisting of an unwired axial pre-buried pipe, an axial pre-buried pipe with a main line and an inspection hole, use a threading machine to pass the branch line from the opening of the unwired axial pre-buried pipe to the inspection hole, use wire to pull the branch line and the main line out of the inspection hole, connect the branch line to the main line, and wrap it firmly with electrical tape, loosen the wire, tighten the main line to retract the joint from the inspection hole into the pipe.

[0023] Finally, the present invention also discloses a method for blasting demolition using the axial embedded pipes of the assembled reinforced concrete beam-column system, comprising the following steps: the axial embedded pipes are used as blast holes, and blasting is performed on site or the pipes are cut on site and transported to a different location for demolition blasting.

[0024] Beneficial effects of the present invention:

[0025] 1. The present invention provides an assembled reinforced concrete beam-column with embedded pipes under a full-life design concept. In the prefabrication stage of the prefabricated beams or columns, the layout of the embedded pipes of the assembled reinforced concrete prefabricated beams and columns, the threading of the indoor local pipelines during the service life cycle, and the blasting and demolition problems after the end of the service life cycle are considered.

[0026] 2. The arrangement of the embedded pipes of the assembled reinforced concrete beams and columns provided by the present invention is that during the overlapping process of the prefabricated beams and prefabricated columns, the embedded pipes are arranged individually or in combination in the beam-column system in a "cross" shape, a "T" shape, an "L" shape, etc.

[0027] 3. The embedded pipe solution for prefabricated beams and prefabricated columns provided by the present invention embeds pipes during prefabrication in the factory. The embedded pipes can be made of PVC plastic pipes with good insulation performance and high temperature resistance. During the use of the prefabricated building, a rope threading machine can be used to thread the axial embedded pipes, bent pipes, inspection holes or beam or column cross-section embedded pipes to solve the indoor wiring problem.

[0028] 4. The embedded pipe scheme for prefabricated beams and prefabricated columns provided by the present invention ensures the potential safety hazards caused by slotting and embedding during the secondary structure construction of prefabricated buildings. The embedded pipe can be used as an embedded blast hole, and different blasting and demolition schemes such as charging blasting or off-site cutting and demolition blasting can be implemented on site. At the same time, drilling operations are avoided during the blasting and demolition process, and the number of blast holes and detonators is reduced, the consumption of explosives and detonators is reduced, the potential safety hazards are reduced, manpower and material resources are saved, and the noise pollution caused by drilling construction is avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a schematic diagram of the embedded pipe connection of the "cross" beam-column at the node of the assembled reinforced concrete beam-column system in any plane;

[0030] Figure 2 It is a schematic diagram of the embedded pipe connection of the "T"-shaped beam-column at the node of the assembled reinforced concrete beam-column system in any plane;

[0031] Figure 3 It is a schematic diagram of the embedded pipe connection of the "L"-shaped beam-column at the node of the assembled reinforced concrete beam-column system in any plane;

[0032] Figure 4 for Figure 8 Schematic diagram of the cross-section structure at the node of the beam-column system at position AA;

[0033] Figure 5 for Figure 7 The first cross-sectional structural diagram at the beam-column system node at position AA;

[0034] Figure 6 for Figure 7 The second cross-sectional structural diagram at the beam-column system node at position AA;

[0035] Figure 7 for Figure 6 Schematic diagram of the cross-section structure at the node of the beam-column system at position BB;

[0036] Figure 8 for Figure 4 Schematic diagram of the cross-section structure at the node of the beam-column system at position BB;

[0037] Fig. 9 for Figure 4 Schematic diagram of the cross-sectional structure of the CC position;

[0038] Fig.10 for Figure 4 DD position cross-sectional structure diagram;

[0039] Fig.11 for Fig. 9 and Fig.10 Schematic cross-sectional view of the arrangement of the axial double-tube embedded pipes of the prefabricated beam and column;

[0040] Fig.12 for Figure 4 Schematic cross-section of the EE location;

[0041] Fig.13 It is a schematic diagram of the charge arrangement of the axial pre-buried blastholes of prefabricated beams and columns using the beam-column system nodes;

[0042] Fig.14 This is a schematic diagram of the first type of charge arrangement using axially embedded blastholes in prefabricated beams at the nodes of the beam-column system;

[0043] Fig.15 It is a schematic diagram of the second type of charge arrangement using axially embedded blastholes in prefabricated beams at the nodes of the beam-column system;

[0044] Fig.16 It is a detailed drawing of the embedded pipe connection joints and notches of the assembled reinforced concrete beam-column system;

[0045] In the figure, precast beam 1; precast column 2; inspection hole 3; axial embedded pipe 4; precast beam axial embedded pipe 4.1; precast column axial embedded pipe 4.2; inspection pipe 5; notch 6; connecting pipe 7; axial steel bar 8; precast beam stirrup reinforcement densification area 9; precast beam stirrup non-densification area 10; longitudinal steel bar 11; groove 12; cast-in-place part 13; detonating cord 14; long bag of explosive 15; gun mud 16; detonator 17; fuse 18; steel sleeve 19; precast beam longitudinal reinforcement 20. DETAILED DESCRIPTION

[0046] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0047] like Figure 1 , Figure 2 and Figure 3 As shown, the present invention discloses a schematic diagram of the connection of the embedded pipes of the beams and columns at the nodes of the assembled reinforced concrete beam-column system in any plane, which can be divided into "X" type, "T" type, "L" type, etc. The layout of the embedded pipes can be arranged in any direction or in any plane, not limited to Figure 1 , 2 , 3 layouts, and combination diagrams Figure 1 , 2 , 3's three-dimensional layout, and the layout of the embedded pipes in beams or columns is also applicable to the next level of construction process.

[0048] like Figure 1 (4), (5), (6) and Figure 2As shown in (1) and (4), when there are curved pipes, straight pipes or multi-way connecting pipes and bifurcations, the straight pipe part is the main line and the curved pipe part is the branch line. To facilitate threading, it is assumed that the vertical inspection hole 3, as shown in the dotted line part in the figure, is set near the straight pipe, curved pipe connecting pipe or multi-way connecting pipe at the beam-column node. The following steps are used for threading: the main line can be threaded in any direction of the pre-buried pipe opening. Figure 1 As shown in (4), the branch line is introduced into the main line pipe from the upper and lower ends of the two elbow connecting pipes respectively, and the line is pulled out with wire at the position of the inspection hole 3 and the branch line is connected to the main line; Figure 1 As shown in (5), thread the line at any inspection hole 3, pass the line into the bent pipe, and pull the line out from the inspection hole 3 at the other end with a wire and connect it to the main line. Figure 1 (6) So it is; Figure 2 As shown in (4), the line is inserted into the lower part of the "T"-shaped pre-buried pipe, and the line entry position is adjusted at the inspection hole 3 at the bend, so that the line of the branch line enters the upper straight pipe main line, and the line is pulled out with a wire at the position of the inspection hole 3 and the branch line is connected to the main line. In particular, the inspection hole 3 near the bend at the beam-column node can be arranged in any direction or on any side, and any two or more openings at the node are connected or not connected through a bend, straight pipe or multi-way connecting pipe.

[0049] In addition, the embedded pipe arrangement structure applicable to a prefabricated reinforced concrete beam column with embedded pipes according to the present invention has the following embodiments: Figure 4 The cross-sectional schematic diagram shown can be expanded to two beams and one column, three beams and one column, or four beams and one column.

[0050] like Figure 4 Shown: is the use of Figure 2 (1) Schematic diagram of the cross-sectional structure of the embedded pipes arranged at the beam-column system node. It includes the axial embedded pipes 4 in the precast beams 1 and precast columns 2 and the inspection holes 3 at the ends of the precast beams; at the beam-column node, two precast beams 1 and one precast column 2 are connected through the connecting pipe 7, and the bottom of the corresponding precast column 2 has a steel sleeve 19 that is aligned with the lap axial steel bars 8 at the top of the precast column 2 in the lower layer.

[0051] like Figure 5 Shown: is the use of Figure 1 (3) Schematic diagram of the cross-sectional structure of the embedded pipe arrangement at the beam-column system node. It includes the axial embedded pipe 4 in the precast beam 1 and the precast column 2 and the inspection pipe 5 at the end of the precast beam; the precast beams 1 opposite to each other at the beam-column node are connected to each other through the connecting pipe 7, the axial embedded pipes of the precast column are connected through the connecting pipe and staggered with the precast beam connecting pipe, the embedded pipe extends out of the pipe opening on the upper surface of the precast beam and is blocked so that it is inserted into the notch 6 of the upper precast column, and the lap steel bar is inserted into the bottom sleeve of the upper precast column.

[0052] like Figure 6 Shown: is the use of Figure 1 (7) and Figure 2 (4) Schematic diagram of the cross-sectional structure of the embedded pipe arrangement at the beam-column system node. It includes the axial embedded pipe 4 in the precast beam 1 and the precast column 2 and the inspection hole 3 at the end of the precast beam 1; at the beam-column node, the two opposing precast beams are connected to the embedded pipes in the lower and upper precast columns respectively through the curved pipe connecting pipe, and the curved pipe connecting pipe connecting the upper layer extends out of the upper surface of the precast beam so that it is inserted into the notch 6 of the upper precast column, and at the same time, the lap steel bar is inserted into the steel bar sleeve 19 at the bottom of the upper precast column; when the upper precast column 2 is not installed, the curved pipe connecting pipe connecting the upper layer extends out of the upper surface of the precast beam 1 and is blocked. In particular, the embedded pipe has a curved pipe bent out on any surface of the precast column.

[0053] like Figure 7 Shown: is the use of Figure 1 (3) Schematic diagram of the cross-sectional structure of the embedded pipe arrangement of four beams and one column at the beam-column joint. It includes the axial embedded pipe 4 in the precast beam 1 and the precast column 2, the inspection pipe 5 at the end of the precast beam, and the axial steel bars 8 and longitudinal steel bars 11 of the precast column and the precast beam; four adjacent precast beams 1 are overlapped on the precast column 2, and each relative precast beam 1 is connected through a straight pipe connection pipe.

[0054] like Figure 8 Shown: is the use of Figure 2 (2) Schematic diagram of the cross-sectional structure of the embedded pipe arrangement of three beams and one column at the beam-column joint. It includes the axial embedded pipe 4 in the precast beam 1 and the precast column 2, the inspection pipe 5 at the end of the precast beam, and the axial steel bars 8 and longitudinal steel bars 11 of the precast column and the precast beam; three adjacent precast beams 1 are overlapped on the precast column 2, and the opposite precast beams 1 are connected through straight pipe connecting pipes, and the other beams and columns are connected through curved pipe connecting pipes.

[0055] like Fig. 9 and Fig.10 As shown in the figure, they are schematic cross-sectional views of the axial embedded pipes of the assembled reinforced concrete prefabricated columns and prefabricated beams, including two axial embedded pipes 4.1 of the prefabricated beams 1 and two axial embedded pipes 4.2 of the prefabricated columns 2; one axial embedded pipe 4 is arranged in the prefabricated beams 1 and the prefabricated columns 2, and the axial embedded pipes 4 in the prefabricated beams and columns can be arranged according to Figure 1 , 2 In any plan layout shown in 3, the end surface opening at the beam-column node is connected or not connected with the axial embedded pipes of adjacent or opposite prefabricated beams and columns through connecting pipes.

[0056] like Fig.11FIG. 1 is a schematic cross-sectional view of the arrangement of double-tube axial embedded pipes of prefabricated reinforced concrete beams and columns, including two prefabricated beam axial embedded pipes 4.1 in the prefabricated beam 1 and two prefabricated column axial embedded pipes 4.2 in the prefabricated column 2; two mutually parallel axial embedded pipes 4 are arranged in the prefabricated beam 1 and the prefabricated column 2, and the upper and lower embedded pipes of the prefabricated beam and column can be arranged according to Figure 1 , 2 In any plan layout shown in 3, the end surface opening at the beam-column node is connected or not connected with the upper and lower embedded pipes in the adjacent or opposite precast columns or precast beams through connecting pipes.

[0057] like Fig.12 As shown, it is a schematic diagram of the embedded pipes in the axial horizontal direction of the assembled reinforced concrete composite beam, including the axial embedded pipes 4 of the beams and columns of one span and the inspection hole 3 at the end of the prefabricated beam 1; the beam and column are connected by a connecting pipe 7 at the beam-column node.

[0058] like Fig.16 The figure shows a cross-sectional schematic diagram of the connecting pipe opening and the groove of an implementation example of the axial embedded pipe of the assembled reinforced concrete beam-column system, including a prefabricated column and a cast-in-place part. The embedded pipe at the end of the prefabricated column is provided with a groove of the same diameter as the connecting pipe to facilitate interface connection and prevent mortar from being poured in.

[0059] The reinforced concrete floor embedded pipe according to the present invention also has the following embodiments as a blasthole structure:

[0060] like Fig.13 As shown, it is the use of Figure 8 Provided embedded pipes, find the inspection holes of the precast beams and the bent embedded pipe ends of the precast columns, clean them up, and then proceed to blasting and dismantle the charging diagram. Use a rope threading machine to pass the rope line from one end of the inspection hole of the precast beam to the end of the embedded pipe of the precast column; load the explosive rolls in the long bag with intervals, arrange the detonating cord in the parallel direction of the long bag and wrap them together with tape; take out the rope threading line, use tape to tie one end of the long bag containing the emulsion explosive rolls to the rope threading line, start the rope threading machine, and drag the long bag into the blast hole; at the embedded blast hole at the bottom of the precast column, when the long bag is completely dragged into the hole, leave 2-3 sections of medicine rolls, insert the detonator into the medicine rolls and tie them together with the detonating cord and then drag them all into the hole, lead the detonator lead out of the hole, and finally use the sealing material to block it; the charging and Fig. 9 The charge case shown is similar.

[0061] Fig.14 and Fig.15 As shown, it is the use of Fig.12For the provided embedded pipes, find the bent ends of the precast beam inspection holes and precast column embedded pipes, clean them up, and then proceed with the blasting and dismantling of the charging diagram. Use a rope threading machine to pass the rope line from one end of the precast beam inspection hole to the end of the precast column embedded pipe; load the explosive rolls in the long charging bag at intervals, arrange the detonating cord in parallel with the long charging bag and wrap them together with tape; take out the rope threading line, use tape to tie one end of the long charging bag containing the emulsion explosive roll to the rope threading line, start the rope threading machine, and drag the long charging bag into the blast hole; at the embedded blast hole at the bottom of the column, when all the explosive rolls are dragged into the hole, leave 2-3 sections of the medicine rolls, insert the detonator into the medicine rolls and tie them together with the detonating cord and then drag them all into the hole, lead the detonator lead out of the hole, and finally use the sealing material to block it; Fig.14 The charging method shown is relatively Fig.12 Before charging, there is an additional step of chiseling the concrete protective layer at the upper end of the precast column, and blasting the precast beam and precast column separately. The rest of the steps are the same.

[0062] The explosive pack is emulsion explosive or emulsion explosive. The pre-buried pipe and connecting pipe are made of high temperature resistant PVC pipe with good insulation performance.

[0063] In addition, the specific threading and blasting demolition scheme embodiments of the present invention are as follows:

[0064] Embodiment 1:

[0065] The cross-sectional dimensions of the prefabricated reinforced concrete columns are 0.45m×0.45m, and the cross-sectional dimensions of the prefabricated beams are 0.25m×0.6m. During the prefabrication of the prefabricated prefabricated beams and columns, a 32mm diameter PVC prefabricated pipe is pre-buried in the axial direction inside the prefabricated beams; a 32mm diameter three-way PVC prefabricated pipe is arranged at the axial position of the end of the prefabricated beams to connect with a 36mm diameter three-way PVC connecting pipe, and the other two ends of the PVC connecting pipe are respectively connected with the 32mm diameter PVC prefabricated pipe of the prefabricated column and the 32mm diameter PVC prefabricated pipe at the end of the adjacent prefabricated beams; a 32mm diameter PVC inspection hole is provided at the end near the prefabricated beams;

[0066] According to the arrangement of the above-mentioned embedded pipes, the threading method of the present invention comprises the following steps: main line threading step:

[0067] Step 1: Select all the main line PVC pre-buried pipes and clean the blast holes with a high-pressure blower;

[0068] Step 2: Arrange the lines in the connecting pipe composed of the embedded pipe and the connecting pipe in the prefabricated beam, use a threading machine to pass the threading rope from one end to the other end, take the end of the threading rope, tie the threading rope and the wires and put them into the embedded pipe; until all the main line threading is completed.

[0069] Branch line threading steps:

[0070] Step 3: Arrange the lines in the connecting pipe composed of the embedded pipes, connecting pipes and inspection holes of beams and columns, use a threading machine to penetrate the 32mm diameter PVC embedded pipe at the bottom of the prefabricated column to the 32mm diameter PVC inspection hole, use wire to pull out the threading rope at the 32mm diameter PVC inspection hole, and then drag the wire into the 32mm diameter embedded pipe; or at the same time, connect the 32mm diameter PVC embedded pipes and connecting pipe embedded lines of beams and columns at the 32mm diameter PVC inspection holes, wrap them together with electrical tape, tighten both ends of the wires, tighten the pulled and connected wires and drag them into the 32mm diameter PVC embedded pipes; turn on the circuit.

[0071] According to the arrangement of the pre-buried blastholes and the blasthole charge structure, the present invention uses a method for blasting demolition, which includes the following steps:

[0072] Step 1: Select all PVC pre-buried pipes as blastholes;

[0073] Step 2: Disconnect the line, extract the wires in the blast hole, and clean the blast hole with a high-pressure blower;

[0074] Step 3: Use a rope threading machine to pass the rope wire from one end of the prefabricated beam blasthole to the end of the prefabricated column blasthole; load emulsion explosive rolls with a diameter of 25mm and a length of 0.5m in intervals in the long bag, arrange detonating cords in parallel directions in the long bag and wrap them together with tape; take out the threading wire, tie one end of the emulsion explosive roll to the threading wire with tape, start the threading machine, and drag the explosive roll into the blasthole; at the pre-buried blasthole at the bottom of the column, insert the detonator into the roll and tie it together with the detonating cord, lead the detonator lead out of the opening, and finally use the blocking material to block it, with a blocking height of 0.4m;

[0075] Step 4: Connect the fuse to the blasting network and detonate.

[0076] Embodiment 2:

[0077] The cross-sectional dimensions of the prefabricated reinforced concrete columns are 0.6m×0.6m, and the cross-sectional dimensions of the prefabricated beams are 0.35m×0.7m. The cross-sectional dimensions of the prefabricated beams are 0.35m×0.6m, and the rest are cast-in-place parts. The depth of the notch section at the end of the prefabricated beams is 45mm, and the thickness of the notch edge is 55mm. During the prefabrication of the prefabricated prefabricated beams and columns, a 40mm diameter PVC pre-buried pipe is pre-buried in the axial direction inside them; a 40mm diameter PVC pre-buried pipe is arranged at the axial position of the end of a prefabricated beam and connected to a 45mm diameter PVC connecting pipe, and the other end of the PVC connecting pipe is connected to the 40mm diameter PVC pre-buried pipe of the prefabricated column; a 30mm diameter PVC inspection hole is provided near the end of the prefabricated beam.

[0078] According to the arrangement of the above-mentioned embedded pipes, the method for threading the wires of the present invention comprises the following steps:

[0079] Step 1: Select all the main line PVC pre-buried pipes and clean the blast holes with a high-pressure blower;

[0080] Step 2: Arrange the lines in the connecting pipe composed of the embedded pipes and connecting pipes in the prefabricated beams and prefabricated columns, use a threading machine to pass the threading rope from one end to the other end, take the end of the threading rope, tie the threading rope and the wires together and put them into the embedded pipe.

[0081] According to the arrangement of the pre-buried blastholes and the blasthole charge structure, the present invention uses a method for blasting demolition, which includes the following steps:

[0082] 1) Select all PVC pre-buried pipes as blastholes;

[0083] 2) Disconnect the line and extract the wires in the blasthole; chisel the concrete covering the embedded pipe at the upper end of the prefabricated column, cut the embedded pipe, expose the end of the embedded pipe, which can be divided into one or more sections of embedded blastholes, and clean the blastholes with a high-pressure fan;

[0084] 3) Use a rope threading machine to pass the rope wire from one end of the prefabricated beam and prefabricated column blastholes to the other end of the blastholes; load emulsion explosive rolls with a diameter of 32mm and a length of 0.6m at intervals, place the emulsion explosive rolls in a long charge bag, arrange the detonating cord in a parallel direction and wrap them together with tape; take out the rope threading wire, use tape to tie one end of the long charge bag containing the emulsion explosive roll to the rope threading wire, start the rope threading machine, and drag the long charge bag into the blasthole; at the end of the prefabricated beam and the bottom of the prefabricated column blasthole, insert the detonator into the charge roll and tie it together with the detonating cord, lead the detonator lead out of the opening, and finally use the blocking material to block it;

[0085] 4) Connect the fuse to the blasting network and detonate.

[0086] Embodiment 3:

[0087] The cross-sectional dimensions of the prefabricated reinforced concrete columns are 0.5m×0.5m, and the cross-sectional dimensions of the prefabricated beams are 0.4m×0.8m, of which the cross-sectional dimensions of the prefabricated beams are 0.4m×0.7m, and the rest are cast-in-place parts. The cross-sectional depth of the notch at the end of the prefabricated beams is 55mm, and the thickness of the notch edge is 65mm. During the prefabrication of the prefabricated prefabricated beams and columns, a 50mm diameter PVC pre-buried pipe is pre-buried in the axial direction inside them; a 50mm diameter PVC elbow connecting pipe is arranged at the beam-column node position and connected to the 50mm diameter PVC pre-buried pipe at the bottom end of the upper prefabricated column; a 35mm diameter PVC inspection hole is provided near the end of the prefabricated beam.

[0088] According to the arrangement of the above-mentioned embedded pipes, the method for threading the wires of the present invention comprises the following steps:

[0089] Step 1: Select the main line PVC pre-buried pipe and clean the blasthole with a high-pressure blower;

[0090] Step 2: Arrange the line in the connecting pipe composed of the embedded pipe and the inspection pipe in the prefabricated beam, use a threading machine to pass the threading rope from one end to the other end, take the end of the threading rope, tie the threading rope and the wires and put them into the embedded pipe;

[0091] According to the arrangement of the pre-buried blastholes and the blasthole charge structure, the present invention uses a method for blasting demolition, which includes the following steps:

[0092] Step 1: Select the PVC embedded pipe of the prefabricated column or prefabricated beam as the blasthole;

[0093] Step 2: Disconnect the line and extract the wires in the blasthole; chisel the concrete covering the embedded pipe at the upper end of the prefabricated column, cut the embedded pipe, expose the end of the embedded pipe, which can be divided into one or more sections of embedded blastholes, and clean the blastholes with a high-pressure blower;

[0094] Step 3: Use a rope threading machine to pass the rope transmission line from one end of the chiseled hole at the lower end of the prefabricated column, and pass it out through a PVC connecting pipe with a diameter of 50mm. Similarly, pass the rope threading line from one end of the inspection hole of the prefabricated beam to the other end and pass it out; load the emulsion explosive rolls with a diameter of 34mm and a length of 0.5m at intervals, place the emulsion explosive rolls in a long charge bag, arrange the detonating cord in a parallel direction and wrap them together with tape; take out the rope threading line, use tape to tie one end of the long charge bag containing the emulsion explosive roll to the rope threading line, start the rope threading machine, and drag the long charge bag into the blast hole; at the blast hole at the bottom end of the prefabricated column, insert the detonator into the charge roll and tie it together with the detonating cord, lead the detonator lead out of the opening, and finally use the blocking material to block it;

[0095] Step 4: Connect the fuse to the blasting network and detonate.

[0096] Embodiment 4:

[0097] The cross-sectional dimensions of the prefabricated reinforced concrete columns are 0.5m×0.8m, of which the cross-sectional dimensions of the prefabricated beams are 0.4m×0.6m, and the rest are cast-in-place parts. The cross-sectional depth of the notch at the end of the prefabricated beam is 60mm, and the thickness of the notch edge is 70mm. During the prefabrication of the prefabricated prefabricated beams, a PVC pre-buried pipe with a diameter of 40mm is pre-buried in the axial direction inside the prefabricated beams; a PVC pre-buried pipe with a diameter of 40mm is arranged in the axial position at the lower part of the notch of the prefabricated beams and connected to a PVC connecting pipe with a diameter of 45mm. The other end of the PVC connecting pipe is bent down to connect with the PVC pre-buried pipe with a diameter of 40mm for the prefabricated column, and the interval with the upper pre-buried pipe is 4mm; the PVC pre-buried pipe is bent out 0.12m to the side in the prefabricated beams and prefabricated columns respectively; a PVC inspection hole with a diameter of 40mm is provided at the end near the prefabricated beams.

[0098] According to the arrangement of the above-mentioned embedded pipes, the threading method of the present invention comprises the following steps: main line threading step:

[0099] Step 1: Select all the main line PVC pre-buried pipes and clean the blast holes with a high-pressure blower;

[0100] Step 2: Arrange the lines in the connecting pipe composed of the embedded pipes, inspection holes and connecting pipes in the precast beams and columns, use a threading machine to pass the threading rope from one end to the other end, take the end of the threading rope, tie the threading rope and the wires together and put them into the embedded pipe; until all the main line threading is completed.

[0101] According to the arrangement of the pre-buried blastholes and the blasthole charge structure, the present invention uses a method for blasting demolition, which includes the following steps:

[0102] Step 1: Select all PVC pre-buried pipes as blastholes;

[0103] Step 2: Disconnect the line and extract the wires in the blasthole; chisel the concrete covering the embedded pipe at the upper end of the prefabricated column, cut the embedded pipe, expose the end of the embedded pipe, which can be divided into one or more sections of embedded blastholes, and clean the blastholes with a high-pressure blower;

[0104] Step 3: Use a rope threading machine to pass the rope transmission line from one end of the prefabricated beam and prefabricated column blastholes to the other end of the blastholes; load emulsion explosive rolls with a diameter of 25 mm and a length of 0.4 m at intervals, place the emulsion explosive rolls in a long charge bag, arrange the detonating cord in a parallel direction and wrap them together with tape; take out the rope threading line, use tape to tie one end of the long charge bag containing the emulsion explosive roll to the rope threading line, start the rope threading machine, and drag the long charge bag into the blasthole; at the end of the prefabricated beam and the bottom of the prefabricated column blasthole, insert the detonator into the charge roll and tie it together with the detonating cord, lead the detonator lead out of the opening, and finally use the blocking material to block it;

[0105] Step 4: Connect the fuse to the blasting network and detonate.

[0106] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions described in the claims, including equivalent replacement solutions of the technical features in the technical solutions described in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A method for assembling a prefabricated reinforced concrete beam-column system with embedded pipes on site, the prefabricated reinforced concrete beam-column system comprising axial embedded pipes (4) arranged in prefabricated beams (1) and prefabricated columns (2), and connecting pipes (7) and vertical inspection holes (3) near beam-column nodes, characterized in that: The axial embedded pipe (4) is bent out on any surface of the beam or column through a fork and opens on the surface; at least two end openings of the axial embedded pipe (4) at the beam-column node are connected to each other through the fork of the axial embedded pipe (4); the vertical inspection hole (3) is connected to the axial embedded pipe (4) near the beam-column node; the axial embedded pipe (4) is used for threading during the use of the prefabricated building; the axial embedded pipe (4) is also used for blasting holes for demolishing the beam-column system; the construction steps of any beam-column node are as follows: Step 1): Install the precast beam (1) on the top of the column, and place the bottom of one end of one or two or more precast beams (1) on the top of the precast column (2), and the longitudinal steel bars (11) at the bottom of the precast beam (1) and the axial steel bars (8) of the precast column (2) are overlapped and fixed to each other; Step 2): Take out the axial embedded pipes (4) of the prefabricated beams (1) and prefabricated columns (2) to plug the holes, and clean the notches (6) at the ends with a high-pressure blower; Step 3): Use a two-way straight pipe or curved pipe connecting pipe (7) to connect two or more axial pre-buried pipes (4) at the openings of the end surfaces of beams and columns at the nodes; Step 4): Pour concrete to form the cast-in-place part (13).

2. The method for assembling a prefabricated reinforced concrete beam-column system with embedded pipes on site according to claim 1, characterized in that: The first two steps remain unchanged, and another method of step 3) is: use a connecting pipe (7) to connect two or more axial pre-buried pipes (4) at the openings of the end surfaces of beams and columns at the nodes; and the end of the connecting pipe (7) connecting the axial pre-buried pipe (4) in the column and the straight pipe or the connecting pipe (7) connecting the axial pre-buried pipe (4) in the beam and the bent pipe extends out of the upper surface of the prefabricated beam (1) and blocks the pipe opening; Step 4): pouring concrete to form a cast-in-place part (13); Step 5): remove the pipe opening blockage extending from the upper surface of the precast beam (1) in step 3), insert the pipe into the notch (6) of the upper precast column (2), and insert the lap steel bar into the steel bar sleeve (19) at the bottom of the upper precast column (2), and grouting.

3. A method for threading a wire using an axially embedded pipe in the assembled reinforced concrete beam-column system of claim 1, characterized in that: It includes the following steps: Main line threading steps: Step 1): Find the axial embedded pipe (4) and the inspection hole (3), and clean them with a high-pressure blower; Step 2): Arrange the main line in any connecting pipe consisting of the axial pre-buried pipe (4) and the connecting pipe (7), and use a threading machine to thread the main line from one end to the other end until all the main line threading is completed; branch line threading steps: Step 3): Arrange a branch line in any one of the connecting pipes consisting of an unwired axial pre-buried pipe (4), a section of the axial pre-buried pipe (4) with the main line arranged, a connecting pipe (7) and an inspection hole (3), or arrange a branch line in any one of the connecting pipes consisting of an unwired axial pre-buried pipe (4), a section of the axial pre-buried pipe (4) with the main line arranged and an inspection hole (3), use a threading machine to pass the branch line from the opening of the unwired axial pre-buried pipe (4) to the inspection hole (3), use wire to pull the branch line and the main line out of the inspection hole (3), connect the branch line to the main line, and wrap it firmly with electrical tape, loosen the wire, tighten the main line so that the joint is retracted from the inspection hole (3) into the pipe.

4. A method for blasting and demolition using the axial pre-buried pipe of the assembled reinforced concrete beam-column system according to claim 1, characterized in that: The method comprises the following steps: the axial pre-buried pipe (4) is used as a blast hole, and explosives are charged and blasted on site, or the blasting and demolition scheme is carried out by cutting the pipe on site and transporting the pipe to another site for demolition and blasting.