Multi-factor optimization method and system applicable to carbon emissions and transmission and distribution

Through the multi-factor optimization method of the power system, combining geographical regions and line attributes, the power network is divided and data processed, and a carbon emission and economic model is constructed, the traditional scheduling method is solved inadequate calculation accuracy and flexibility in the new energy environment. The problem of this has achieved efficient, low-carbon and economical scheduling of the power system.

CN118504940BActive Publication Date: 2024-12-06STATE GRID ZHEJIANG ELECTRIC POWER CO LTD JINHUA POWER SUPPLY CO +1
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410954639.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-12-06
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

Traditional power system economic scheduling faces challenges in computing accuracy and flexibility, especially with the increase of new energy equipment, the complexity and coupling are increasing, and the transmission and distribution strategies that cannot effectively deal with carbon emissions and regional differences.

Method used

Using a multi-factor optimization method suitable for integrating carbon emissions and transmission and distribution, the power network is carefully divided based on geographical regions and line attributes, and power data is obtained and classified, carbon emissions and economic processing models are constructed, and optimization information is generated for Scheduling of transmission and distribution networks.

Benefits of technology

It realizes more accurate and flexible power system scheduling, meets power demand while minimizing carbon emissions and economic costs, adapts to the differences in economic levels and energy structures in different regions, and improves the adaptability and environmental friendliness of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118504940B_ABST
    Figure CN118504940B_ABST
Patent Text Reader

Abstract

The present invention provides a multi-factor optimization method and system suitable for carbon emission and transmission and distribution integration. The power supply network of the target area is divided and processed based on the geographical area relationship and the line attribute relationship to obtain the corresponding transmission network and distribution network, and the boundary node group connected to the transmission network and the distribution network is determined; the corresponding carbon emission processing model, optimization model, and economic processing model are constructed, and the carbon emission sub-information and transmission and distribution economic sub-information are processed based on the carbon emission processing model, optimization model, and economic processing model to obtain the optimization information of each boundary node group; based on the optimization information of all boundary node groups, the transmission network and the distribution network are optimized for transmission control. The present invention takes into account the coupling of the transmission and distribution system and the differences in carbon emissions and economic efficiency between different regions. It can comprehensively process carbon emissions and economic efficiency, and conduct more flexible dispatch control in combination with geographical regions.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to data technology, and in particular to a multi-factor optimization method and system suitable for carbon emission and transmission and distribution integration. Background Art

[0002] Economic dispatch of power systems is an essential means to coordinate various energy equipment to ensure safe, stable and economical operation of power systems. Traditional economic dispatch of power systems is usually carried out independently in the transmission system or distribution system, ignoring the coupling relationship between the two. However, with the increasing penetration of new energy equipment such as wind turbines and photovoltaics in the power system, the initiative of the distribution system has been greatly enhanced, and the coupling of the transmission and distribution system has been further enhanced. The traditional economic dispatch of power systems faces huge challenges in calculation accuracy.

[0003] The main goal of traditional power system economic dispatch is to reduce power generation costs and grid losses. However, with the widespread application of new energy (such as wind power and photovoltaics), the complexity and coupling of power systems have increased significantly. This complexity challenges the calculation accuracy and flexibility of traditional dispatch methods. At the same time, the power system not only needs to consider economic efficiency, but also must strictly control carbon emissions. Taking into account the differences in economic levels and energy structures in different cities and regions, different transmission and distribution strategies may be set. The traditional power system only considers economic dispatch or only considers overall carbon emissions, resulting in a relatively simple transmission and distribution strategy that is not flexible enough and cannot adapt to regional differences. Summary of the invention

[0004] The present invention provides a multi-factor optimization method and system applicable to carbon emissions and transmission and distribution, which can comprehensively process carbon emissions and economic efficiency, and perform more flexible scheduling control in combination with geographical regions.

[0005] The first aspect of the present invention provides a multi-factor optimization method applicable to carbon emission and transmission and distribution integration, comprising:

[0006] S1, dividing the power supply network of the target area based on the geographical area relationship and the line attribute relationship, obtaining the corresponding transmission network and distribution network, and determining the boundary node group connected to the transmission network and distribution network;

[0007] S2, acquiring and classifying the power data of the transmission network, the distribution network and the boundary node group, and obtaining the carbon emission calculation data and the transmission and distribution economic data of each boundary node group, wherein the carbon emission calculation data includes the carbon emission sub-information, and the transmission and distribution economic data includes the transmission and distribution economic sub-information;

[0008] S3, constructing corresponding carbon emission processing models, optimization models, and economic processing models, and processing carbon emission sub-information and transmission and distribution economic sub-information based on the carbon emission processing models, optimization models, and economic processing models to obtain optimization information for each boundary node group;

[0009] S4, optimize the transmission control of the transmission network and the distribution network based on the optimization information of all boundary node groups.

[0010] Optionally, in a possible implementation manner of the first aspect, the specific step of S1 includes:

[0011] S11, acquiring geographical area information of all power supply units in the geographical area relationship of the target area, and adding a first power supply tag to the corresponding power supply unit based on the geographical area information;

[0012] S12, obtaining a first line label of an administrative area corresponding to a power supply line in a power supply network of a target area, wherein the power supply network includes a transmission line and a distribution line;

[0013] S13: Screen all power supply units based on the first line label and the first power supply label, and determine a set of power supply units corresponding to each boundary node group.

[0014] Optionally, in a possible implementation manner of the first aspect, screening all power supply units based on the first line label and the first power supply label, and determining a set of power supply units corresponding to each boundary node group includes:

[0015] Based on the first line label, the distribution lines are counted to obtain first distribution lines, and the first power supply labels of the power supply units directly connected to each first distribution line are counted as first power supply units;

[0016] Counting all the first power supply units to obtain a first power supply unit set, and making the first power supply unit set correspond to a boundary node group of the same administrative area;

[0017] The other power supply units other than the first power supply unit set are counted to obtain the second power supply units, and all the second power supply units are counted to obtain the second power supply unit set.

[0018] Optionally, in a possible implementation manner of the first aspect, the specific step of S2 includes:

[0019] S21, obtaining a first electricity-carbon coefficient of each first power supply unit according to a first power generation attribute of each first power supply unit, wherein the first power generation attribute includes a clean energy power generation attribute and an energy-consuming power generation attribute, and each first electricity-carbon coefficient is a carbon emission sub-information;

[0020] S22, obtaining a first kilowatt-hour cost of each first power supply unit according to a first economic attribute of each first power supply unit, wherein the first economic attribute includes a power generation amount and a power generation cost, and each first kilowatt-hour cost is a transmission and distribution economic sub-information;

[0021] S23, obtaining second electricity-carbon coefficients of all second power supply units according to second power generation attributes of all second power supply units, wherein the second power generation attributes include clean energy power generation attributes and energy-consuming power generation attributes, and each second electricity-carbon coefficient is a carbon emission sub-information;

[0022] S24, obtaining a second kilowatt-hour cost of each second power supply unit according to a second economic attribute of each second power supply unit, wherein the second economic attribute includes a power generation amount and a power generation cost, and each second kilowatt-hour cost is a transmission and distribution economic sub-information;

[0023] S25, obtaining carbon emission calculation data based on the first electricity carbon coefficient of the first power supply unit and the second electricity carbon coefficient of the second power supply unit, and obtaining transmission and distribution economic data based on the first kilowatt-hour cost and the second kilowatt-hour cost.

[0024] Optionally, in a possible implementation manner of the first aspect, the specific steps of S3 include:

[0025] S31, inputting the carbon emission sub-information of each boundary node group into a pre-configured carbon emission processing model, and calculating based on the carbon emission processing model to obtain a corresponding carbon emission function;

[0026] S32, inputting the transmission and distribution economic sub-information of each boundary node group into a pre-configured economic processing model, and calculating based on the economic processing model to obtain a corresponding economic function;

[0027] S33, processing the carbon emission function and the economic function based on the optimization model to obtain optimization information of the comprehensive carbon emission dimension and the economic dimension of each boundary node group.

[0028] Optionally, in a possible implementation manner of the first aspect, inputting the carbon emission sub-information of each boundary node group into a preconfigured carbon emission processing model, and calculating based on the carbon emission processing model to obtain a corresponding carbon emission function includes:

[0029] The carbon emission processing model sorts all the first power supply units and the second power supply units in ascending order based on the first electric carbon coefficient and the second electric carbon coefficient of the carbon emission sub-information to obtain an electric carbon sorting sequence;

[0030] The carbon emission processing model obtains the maximum power consumption peak and the minimum power consumption peak of the administrative area corresponding to the boundary node group within a preset time period, and obtains the power consumption peak segment based on the maximum power consumption peak and the minimum power consumption peak;

[0031] The carbon emission processing model offsets the electricity consumption peak segment according to a preset ratio to obtain the offset electricity consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the electricity-carbon sorting sequence based on the offset electricity consumption peak segment to obtain the corresponding carbon emission function.

[0032] Optionally, in a possible implementation of the first aspect, the carbon emission processing model performs an offset processing on the electricity consumption peak segment according to a preset ratio to obtain an offset electricity consumption peak segment, and selects and calculates a first power supply unit and a second power supply unit in an electricity-carbon sorting sequence based on the offset electricity consumption peak segment to obtain a corresponding carbon emission function, including:

[0033] The carbon emission processing model amplifies the original maximum power consumption peak by a preset ratio to obtain a first maximum power consumption peak, and the carbon emission processing model reduces the original minimum power consumption peak by a preset ratio to obtain a first minimum power consumption peak;

[0034] Based on the first maximum power consumption peak value and the first minimum power consumption peak value, a power consumption peak segment is obtained; based on a preset number, the power consumption peak segment is equally divided into a plurality of power consumption equal division value points, wherein the power consumption equal division value points include the first maximum power consumption peak value, the first minimum power consumption peak value and the equal division points;

[0035] The carbon emission processing model determines the corresponding carbon emission value based on the electricity consumption equal value points, obtains the two-dimensional coordinate value based on the electricity consumption equal value points and the carbon emission value, and obtains the corresponding carbon emission function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing.

[0036] Optionally, in a possible implementation manner of the first aspect, the carbon emission processing model determines corresponding carbon emission values ​​based on the electricity consumption equal value points, obtains two-dimensional coordinate values ​​based on the electricity consumption equal value points and the carbon emission values, and obtains a corresponding carbon emission function by statistically analyzing the two-dimensional coordinate values ​​corresponding to the electricity consumption peak segments after the offset processing, including:

[0037] The carbon emission processing model selects the first power supply unit and the second power supply unit in the electric carbon sorting sequence in turn, and extracts the rated power supply value of each first power supply unit and the second power supply unit and adds them up to obtain the sum of the power supply values;

[0038] After the sum of the power supply values ​​is greater than or equal to the power consumption equalization point, the selection of the first power supply unit and the second power supply unit is stopped, the last selected first power supply unit or second power supply unit is eliminated, and the remaining first power supply units and / or second power supply units are determined;

[0039] A first carbon emission value is calculated according to the rated power supply value of the remaining first power supply unit and / or the second power supply unit, the first electric carbon coefficient and the second electric carbon coefficient;

[0040] The second carbon emission value is calculated based on the supplementary power generation value corresponding to the last selected first power supply unit or second power supply unit, the first carbon coefficient or the second carbon coefficient, wherein the supplementary power generation value is the power consumption value at the power consumption equal value point minus the sum of the rated power supply values ​​of all the remaining first power supply units and / or second power supply units;

[0041] Based on the numerical value and carbon emission value of each electricity consumption equal value point, a two-dimensional coordinate value is obtained. After statistical offset processing, the two-dimensional coordinate value corresponding to the electricity consumption peak segment is used to obtain the corresponding carbon emission function, where the horizontal coordinate of the carbon emission function is the electricity value and the vertical coordinate is the carbon emission value.

[0042] Optionally, in a possible implementation manner of the first aspect, inputting the transmission and distribution economic sub-information of each boundary node group into a preconfigured economic processing model, and calculating based on the economic processing model to obtain a corresponding economic function includes:

[0043] The economic processing model sorts all the first power supply units and the second power supply units in ascending order based on the first kilowatt-hour cost and the second kilowatt-hour cost of the transmission and distribution economic sub-information to obtain a kilowatt-hour sorting sequence;

[0044] The economic processing model obtains the maximum power consumption peak and the minimum power consumption peak of the administrative area corresponding to the boundary node group within a preset time period, and obtains the power consumption peak segment based on the maximum power consumption peak and the minimum power consumption peak;

[0045] The economic processing model offsets the power consumption peak segment according to a preset ratio to obtain the offset power consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the kilowatt-hour ordering sequence based on the offset power consumption peak segment to obtain the corresponding economic function.

[0046] Optionally, in a possible implementation manner of the first aspect, the economic processing model performs an offset processing on the power consumption peak segment according to a preset ratio to obtain an offset power consumption peak segment, and selects and calculates a first power supply unit and a second power supply unit in a kilowatt-hour ordering sequence based on the offset power consumption peak segment to obtain a corresponding economic function, including:

[0047] The economic processing model amplifies the original maximum power consumption peak by a preset ratio to obtain a first maximum power consumption peak, and the economic processing model reduces the original minimum power consumption peak by a preset ratio to obtain a first minimum power consumption peak;

[0048] Based on the first maximum power consumption peak value and the first minimum power consumption peak value, a power consumption peak segment is obtained; based on a preset number, the power consumption peak segment is equally divided into a plurality of power consumption equal division value points, wherein the power consumption equal division value points include the first maximum power consumption peak value, the first minimum power consumption peak value and the equal division points;

[0049] The economic processing model determines the corresponding cost value based on the electricity consumption equal-value points, obtains the two-dimensional coordinate value based on the electricity consumption equal-value points and the cost value, and obtains the corresponding economic function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing.

[0050] Optionally, in a possible implementation of the first aspect, the economic processing model determines corresponding cost values ​​based on the electricity consumption equal-value points, obtains two-dimensional coordinate values ​​based on the electricity consumption equal-value points and the cost values, and obtains corresponding economic functions by statistically analyzing the two-dimensional coordinate values ​​corresponding to the electricity consumption peak segments after the offset processing, including:

[0051] The economic processing model sequentially selects the first power supply unit and the second power supply unit in the power sorting sequence, and extracts the rated power supply value of each first power supply unit and the second power supply unit and adds them together to obtain the sum of the power supply values;

[0052] After the sum of the power supply values ​​is greater than or equal to the power consumption equalization point, the selection of the first power supply unit and the second power supply unit is stopped, the last selected first power supply unit or second power supply unit is eliminated, and the remaining first power supply units and / or second power supply units are determined;

[0053] A first cost value is calculated according to the rated power supply value of the remaining first power supply unit and / or the second power supply unit, the first kilowatt-hour cost, and the second kilowatt-hour cost;

[0054] The second cost value is calculated according to the supplementary power generation value corresponding to the last selected first power supply unit or second power supply unit, the first kilowatt-hour cost or the second kilowatt-hour cost, wherein the supplementary power generation value is the power consumption value at the power consumption equal-value point minus the sum of the rated power supply values ​​of all the remaining first power supply units and / or second power supply units;

[0055] Based on the numerical value and cost value of each electricity consumption equal value point, a two-dimensional coordinate value is obtained. After statistical offset processing, the two-dimensional coordinate value corresponding to the electricity consumption peak segment is used to obtain a corresponding economic function, wherein the horizontal coordinate of the economic function is the electricity value and the vertical coordinate is the cost value.

[0056] Optionally, in a possible implementation manner of the first aspect, the processing the carbon emission function and the economic function based on the optimization model to obtain optimization information of the comprehensive carbon emission dimension and the economic dimension of each boundary node group includes:

[0057] The optimization model obtains the electricity consumption values ​​of each boundary node group at the corresponding electricity consumption points and inputs them into the carbon emission function and the economic function respectively to obtain the corresponding carbon emission values ​​and economic values;

[0058] Correspondingly storing the carbon emission value and the economic value of the same boundary node group at the same electricity consumption score point to obtain a first group to be analyzed, and calculating the analysis ratio of the carbon emission value and the economic value in the first group to be analyzed;

[0059] Counting the analysis proportions of all the first to-be-analyzed groups in all boundary node groups, and performing mean calculation to obtain the mean proportion;

[0060] Based on the mean ratio, the carbon emission dimension and the economic dimension in the first group to be analyzed are optimized and analyzed to obtain optimization information of the comprehensive carbon emission dimension and the economic dimension.

[0061] Optionally, in a possible implementation manner of the first aspect, the optimizing analysis of the carbon emission dimension and the economic dimension in the first group to be analyzed based on the mean ratio to obtain optimized information of the comprehensive carbon emission dimension and the economic dimension includes:

[0062] The analysis proportion and the mean proportion of each first group to be analyzed are processed in the economic dimension in a proportional manner. Even if the proportion values ​​of the economic dimension in the analysis proportion and the mean proportion are the same, the proportion values ​​of the carbon emission dimension in the analysis proportion and the mean proportion are simultaneously amplified.

[0063] If the difference between the ratio value of the carbon emission dimension in the amplified analysis ratio and the ratio value of the carbon emission dimension in the mean ratio is greater than a first preset value, a carbon emission introduction label is added;

[0064] If the difference between the ratio value of the carbon emission dimension in the amplified analysis ratio and the ratio value of the carbon emission dimension in the mean ratio is less than or equal to the first preset value, the carbon emission introduction label is not added.

[0065] Optionally, in a possible implementation manner of the first aspect, the optimizing analysis of the carbon emission dimension and the economic dimension in the first group to be analyzed based on the mean ratio to obtain optimized information of the comprehensive carbon emission dimension and the economic dimension includes:

[0066] Performing proportional processing on the carbon emission dimension for the analysis ratio and the mean ratio of each first group to be analyzed, even if the ratio values ​​of the carbon emission dimension in the analysis ratio and the mean ratio are the same, the ratio values ​​of the economic dimension in the analysis ratio and the mean ratio are simultaneously amplified;

[0067] If the difference between the ratio value of the economic dimension in the zoomed-in analysis ratio and the ratio value of the economic dimension in the mean ratio is greater than a second preset value, then an economic introduction label is added;

[0068] If the difference between the ratio value of the economic dimension in the zoomed-in analysis ratio and the ratio value of the economic dimension in the mean ratio is less than or equal to a second preset value, the economic introduction label is not added.

[0069] Optionally, in a possible implementation manner of the first aspect, the specific step of S4 includes:

[0070] S41, obtaining a power distribution basis sequence of a control terminal corresponding to a boundary node group, wherein the power distribution basis sequence is one of an electricity carbon ranking sequence or a kWh ranking sequence;

[0071] S42, if the power distribution sequence is an electricity carbon ranking sequence, selecting the first power supply unit and / or the second power supply unit in the electricity carbon ranking sequence based on the load demand and determining the corresponding electricity consumption equal value points according to the load value;

[0072] S43, if the electricity consumption score points are added with corresponding economic introduction tags, then based on the kilowatt-hour ranking sequence, the first power supply unit and / or the second power supply unit with the lowest subsequent economic cost is selected for power distribution; or,

[0073] S44, if the power distribution sequence is a kilowatt-hour ordering sequence, selecting a first power supply unit and / or a second power supply unit in the kilowatt-hour ordering sequence based on load demand and determining a corresponding power consumption equal value point according to the load value;

[0074] S45: If the electricity consumption score points are added with corresponding carbon emission introduction labels, the first power supply unit and / or the second power supply unit with the lowest subsequent carbon emission are selected for power distribution based on the electricity-carbon ranking sequence.

[0075] The second aspect of the present invention provides a multi-factor optimization system applicable to carbon emission and transmission and distribution, comprising:

[0076] A division module is used to divide the power supply network of the target area based on the geographical area relationship and the line attribute relationship, obtain the corresponding transmission network and distribution network, and determine the boundary node group connected to the transmission network and distribution network;

[0077] An acquisition module, used to acquire and classify the power data of the transmission network, the distribution network and the boundary node group, and obtain the carbon emission calculation data and transmission and distribution economic data of each boundary node group, wherein the carbon emission calculation data includes carbon emission sub-information, and the transmission and distribution economic data includes transmission and distribution economic sub-information;

[0078] A construction module is used to construct corresponding carbon emission processing models, optimization models, and economic processing models, and to process carbon emission sub-information and transmission and distribution economic sub-information based on the carbon emission processing models, optimization models, and economic processing models to obtain optimization information for each boundary node group;

[0079] The optimization module is used to optimize the transmission control of the transmission network and the distribution network based on the optimization information of all boundary node groups.

[0080] Beneficial effects:

[0081] Through the method of the present invention, the power network is divided in detail based on geographical area relationships and line attributes, relevant power data is obtained and classified, and carbon emission processing models, optimization models and economic processing models are constructed. In each boundary node group, optimization information is generated based on carbon emissions and economic information, making the scheduling of transmission networks and distribution networks more accurate and flexible. For example, by sorting and optimizing the carbon coefficients and kilowatt-hour costs of different power supply units, carbon emissions and economic costs can be minimized while meeting power demand.

[0082] This optimization method fully considers the differences in economic levels and energy structures of different cities and regions, and can formulate different transmission and distribution strategies in a targeted manner. By statistically analyzing and calculating the power generation and economic attributes of each power supply unit in the region, generating their respective carbon emissions and economic functions, and optimizing and controlling the transmission and distribution strategies based on these functions, differentiated scheduling between regions can be achieved. This differentiated scheduling not only improves the adaptability and flexibility of the system, but also enables carbon emissions control within the region.

[0083] By comprehensively processing carbon emissions and economic benefits, the optimization method of the present invention can achieve a balance between the two during the power system dispatch process. Specifically, during the dispatch process, the system processes the carbon emission function and the economic function based on the optimization model to obtain comprehensive optimization information for each boundary node group. In actual operation, by selecting the optimal power supply unit, economic benefits can be maximized while effectively reducing carbon emissions. This not only meets the requirements of the dual carbon goals, but also significantly improves the economy and environmental friendliness of the power system. For example, by finely calculating and optimizing the peak power consumption in different time periods, carbon emissions during peak hours can be greatly reduced and the overall economic benefits can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] Figure 1 A flowchart of a multi-factor optimization method applicable to carbon emission and transmission and distribution integration provided by the present invention;

[0085] Figure 2 This is a schematic diagram of the structure of a multi-factor optimization system suitable for carbon emission and transmission and distribution integration provided by the present invention. DETAILED DESCRIPTION

[0086] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0087] The technical solution of the present invention is described in detail with specific embodiments below. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.

[0088] like Figure 1 As shown, it is a flow chart of a multi-factor optimization method applicable to carbon emission and transmission and distribution provided by the present invention, wherein the implementation steps of the multi-factor optimization method applicable to carbon emission and transmission and distribution include:

[0089] S1, based on the geographical area relationship and line attribute relationship, the power supply network of the target area is divided and processed to obtain the corresponding transmission network and distribution network, and the boundary node group connected to the transmission network and distribution network is determined.

[0090] The present disclosure divides the power supply network of the target area by using the geographical area relationship and the line attribute relationship. The geographical area relationship refers to the relative positions of the power supply units in the spatial distribution, while the line attribute relationship refers to the power supply lines.

[0091] In some embodiments, the specific implementation of step S1 includes:

[0092] S11, obtaining geographical area information of all power supply units in the geographical area relationship of the target area, and adding a first power supply tag to the corresponding power supply unit based on the geographical area information.

[0093] The target area may be a province, the geographical area information may be a city or county, and the solution may add a first power supply tag to a power supply unit in a city. It is understandable that the first power supply tag may represent the city or county where the corresponding power supply unit is located.

[0094] S12, obtaining a first line label of an administrative area corresponding to a power supply line in a power supply network of a target area, wherein the power supply network includes a transmission line and a distribution line.

[0095] The present disclosure can divide the power supply network into a transmission network and a distribution network, which play different roles in the power system. The transmission network is responsible for efficiently transmitting electricity over long distances. For example, the transmission network corresponds to a province and is generally connected to a power plant; while the distribution network distributes electricity to end users. For example, the distribution network corresponds to a city or county.

[0096] S13: Screen all power supply units based on the first line label and the first power supply label, and determine a set of power supply units corresponding to each boundary node group.

[0097] Finally, all power supply units are screened based on the first line label and the first power supply label to determine the set of power supply units corresponding to each boundary node group. The boundary node is the key point where the transmission network and the distribution network are connected. In the prior art, an integrated transmission and distribution system is divided into a transmission system part, a distribution system part and a boundary part. The boundary part is composed of boundary nodes connected to the transmission system and the distribution system, and this boundary node is also the root node of the distribution system. The coverage area of ​​the transmission system part is generally a larger area, such as a province, while the coverage area of ​​each distribution part is generally a smaller area, such as a city, a county, etc. The generators connected to the transmission system part are generally distributed in different small areas of a larger area (such as different cities and counties in a province), while the generators and distributed power sources connected to each distribution system part are only distributed in a small area (such as a city or county).

[0098] In some embodiments, a specific implementation of step S13 (screening all power supply units based on the first line tag and the first power supply tag, and determining a set of power supply units corresponding to each boundary node group) includes:

[0099] S131: Count the distribution lines based on the first line tags to obtain first distribution lines, and count the first power supply tags of the power supply units directly connected to each first distribution line as the first power supply units.

[0100] The distribution lines are screened using the first line tags to determine those distribution lines belonging to a specific administrative area, which are referred to as first distribution lines. For each first distribution line, all directly connected power supply units are counted and the first power supply tags of these power supply units are recorded. These power supply units constitute the first power supply unit.

[0101] S132: Count all the first power supply units to obtain a first power supply unit set, and associate the first power supply unit set with a boundary node group of the same administrative area.

[0102] Collect all the first power supply units to form a set, called the first power supply unit set, and match the first power supply unit set with the boundary node group located in the same administrative area to ensure that each boundary node group corresponds to the corresponding first power supply unit set. For example, one city corresponds to one boundary node group, and one boundary node group corresponds to one first power supply unit set.

[0103] S133, counting other power supply units outside the first power supply unit set to obtain a second power supply unit, and counting all the second power supply units to obtain a second power supply unit set.

[0104] Identify and count other power supply units that are not in the first power supply unit set, which are called second power supply units. Collect all second power supply units to form another set, called the second power supply unit set. It can be understood that since the first power supply unit set corresponds to cities and counties, the second power supply unit set can be the power supply units corresponding to the province. Through this process, the power supply network can be better organized and optimized to ensure a more efficient and reliable power supply. The classification of the set can help power companies or grid operators to manage and plan power supply units more finely, while improving the stability of the power grid and the effect of energy conservation and emission reduction.

[0105] S2, acquiring and classifying the power data of the transmission network, distribution network and boundary node group, and obtaining the carbon emission calculation data and transmission and distribution economic data of each boundary node group, wherein the carbon emission calculation data includes carbon emission sub-information, and the transmission and distribution economic data includes transmission and distribution economic sub-information.

[0106] This solution requires understanding the carbon emission data and economic benefits of different power supply units, so as to support decision makers in making more informed choices between balancing environmental protection and economic efficiency. By calculating the carbon coefficient of each power supply unit, its environmental impact can be determined; the calculation of the cost per kilowatt-hour reflects the economic efficiency of power transmission and distribution. These data provide important information for optimizing grid operations and power planning.

[0107] In some embodiments, the specific implementation of step S2 includes:

[0108] S21, obtaining a first electricity-carbon coefficient of each first power supply unit according to the first power generation attribute of each first power supply unit, wherein the first power generation attribute includes a clean energy power generation attribute and an energy-consuming power generation attribute, and each first electricity-carbon coefficient is a carbon emission sub-information.

[0109] The present disclosure calculates the first electric carbon coefficient of each first power supply unit based on the power generation attributes (including clean energy power generation attributes and energy-consuming power generation attributes) of each first power supply unit, and the coefficient is the carbon emission sub-information. Among them, the clean energy power generation attribute can correspond to clean power generation, such as wind power generation, photovoltaic power generation, etc., and the corresponding first electric carbon coefficient can be 0. The energy-consuming power generation attribute can correspond to energy-consuming power generation, such as thermal power generation, etc., and the corresponding first electric carbon coefficient can be 0.5, 1, etc.

[0110] S22, obtaining a first kilowatt-hour cost of each first power supply unit according to a first economic attribute of each first power supply unit, wherein the first economic attribute includes a power generation amount and a power generation cost, and each first kilowatt-hour cost is a transmission and distribution economic sub-information.

[0111] The present disclosure obtains the first kilowatt-hour cost of each first power supply unit according to the economic attributes of each first power supply unit (including power generation amount and power generation cost), which is the transmission and distribution economic sub-information.

[0112] S23, obtaining the second carbon coefficient of all the second power supply units according to the second power generation attributes of all the second power supply units, wherein the second power generation attributes include clean energy power generation attributes and energy-consuming power generation attributes, and each second carbon coefficient is a carbon emission sub-information.

[0113] A similar analysis is performed on all second power supply units, and the second electricity carbon coefficients of all second power supply units are calculated according to their power generation attributes (including clean energy power generation attributes and energy-consuming power generation attributes), which is also used as carbon emission sub-information.

[0114] S24, obtaining a second kilowatt-hour cost of each second power supply unit according to a second economic attribute of each second power supply unit, wherein the second economic attribute includes a power generation amount and a power generation cost, and each second kilowatt-hour cost is a transmission and distribution economic sub-information.

[0115] A similar process is performed on each second power supply unit, and the second cost per kilowatt-hour of each second power supply unit is calculated according to its economic attributes (including power generation amount and power generation cost), which is also used as the transmission and distribution economic sub-information.

[0116] S25, obtaining carbon emission calculation data based on the first electricity carbon coefficient of the first power supply unit and the second electricity carbon coefficient of the second power supply unit, and obtaining transmission and distribution economic data based on the first kilowatt-hour cost and the second kilowatt-hour cost.

[0117] Finally, the carbon emission calculation data of the boundary node group is obtained by combining the first electricity carbon coefficient of the first power supply unit and the second electricity carbon coefficient of the second power supply unit. The transmission and distribution economic data of the boundary node group is obtained by combining the first kilowatt-hour cost and the second kilowatt-hour cost.

[0118] S3, construct corresponding carbon emission processing models, optimization models, and economic processing models, and process the carbon emission sub-information and transmission and distribution economic sub-information based on the carbon emission processing models, optimization models, and economic processing models to obtain the optimization information of each boundary node group.

[0119] In order to reduce the carbon emissions of the power system and optimize its economic performance, three models were constructed and applied: carbon emission processing model, optimization model and economic processing model. Subsequently, the three models were combined to process the carbon emission sub-information and transmission and distribution economic sub-information to obtain the optimization information of each boundary node group to meet the user's optimization needs.

[0120] In some embodiments, the specific implementation of step S3 includes:

[0121] S31, inputting the carbon emission sub-information of each boundary node group into a pre-configured carbon emission processing model, and performing calculation based on the carbon emission processing model to obtain a corresponding carbon emission function.

[0122] The carbon emission sub-information of each boundary node group is input into a pre-configured carbon emission processing model. The carbon emission processing model is used to calculate a corresponding carbon emission function, which reflects the carbon emission in the operation of the power system.

[0123] In some embodiments, the specific implementation of step S31 (inputting the carbon emission sub-information of each boundary node group into a pre-configured carbon emission processing model, and calculating the corresponding carbon emission function based on the carbon emission processing model) includes:

[0124] S311, the carbon emission processing model sorts all the first power supply units and the second power supply units in ascending order based on the first electricity-carbon coefficient and the second electricity-carbon coefficient of the carbon emission sub-information to obtain an electricity-carbon sorting sequence.

[0125] First, this scheme sorts all first power supply units and second power supply units in ascending order according to the first electric carbon coefficient and the second electric carbon coefficient of each boundary node group, and generates an electric carbon sorting sequence sorted by carbon emissions. The first electric carbon coefficient and the second electric carbon coefficient refer to the carbon emissions generated per unit of electricity by these power supply units. The higher the ranking in the electric carbon sorting sequence, the lower the first electric carbon coefficient and the second electric carbon coefficient, and the less the corresponding carbon emission data.

[0126] S312, the carbon emission processing model obtains the maximum power consumption peak and the minimum power consumption peak of the administrative area corresponding to the boundary node group within a preset time period, and obtains the power consumption peak segment based on the maximum power consumption peak and the minimum power consumption peak.

[0127] The model obtains the maximum and minimum peak power consumption of the administrative area where the boundary node group is located in the preset time period. Based on these two peak values, a peak power consumption segment is determined, which represents the range of power consumption in the area in a specific time period. For example, it is 50 kWh to 2000 kWh.

[0128] S313, the carbon emission processing model offsets the electricity consumption peak segment according to a preset ratio to obtain the offset electricity consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the electricity-carbon sorting sequence based on the offset electricity consumption peak segment to obtain the corresponding carbon emission function.

[0129] The model will offset the peak power consumption segment according to the preset ratio, that is, adjust the range of the peak power consumption segment to adapt to possible changes in power consumption. This offset processing can help the model take into account the power consumption fluctuations that may occur in actual operations, making the model more in line with the actual situation.

[0130] In some embodiments, the specific implementation of step S313 (the carbon emission processing model performs offset processing on the electricity consumption peak segment according to a preset ratio to obtain an offset electricity consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the electricity-carbon sorting sequence based on the offset electricity consumption peak segment to obtain a corresponding carbon emission function) includes:

[0131] S3131, the carbon emission processing model amplifies the original maximum power consumption peak by a preset ratio to obtain a first maximum power consumption peak, and the carbon emission processing model reduces the original minimum power consumption peak by a preset ratio to obtain a first minimum power consumption peak.

[0132] The enlargement preset ratio may be, for example, 1.2 times, and the reduction preset ratio may be, for example, 0.8 times. The model multiplies the original maximum power consumption peak by a preset ratio to obtain a new first maximum power consumption peak, and reduces the original minimum power consumption peak by another preset ratio to obtain a new first minimum power consumption peak. This step is to take into account possible power consumption fluctuations in the future.

[0133] S3132, obtaining a power consumption peak segment based on the first maximum power consumption peak and the first minimum power consumption peak, and equally dividing the power consumption peak segment based on a preset number to obtain a plurality of power consumption equal division value points, wherein the power consumption equal division value points include the first maximum power consumption peak, the first minimum power consumption peak and equal division points.

[0134] A new peak power consumption segment is determined based on the first maximum peak power consumption and the first minimum peak power consumption obtained in the above steps. This new peak power consumption segment is divided into equal parts according to a preset number to obtain a plurality of equal power consumption value points, which include the first maximum peak power consumption, the first minimum peak power consumption and the equal points therein. It is understandable that, for example, 50 kWh to 2000 kWh can be divided into 50 equal parts to obtain a plurality of equal points. These equal points are used for subsequent carbon emission calculations and represent different electricity consumption data.

[0135] S3133, the carbon emission processing model determines the corresponding carbon emission value based on the electricity consumption equal value points, obtains the two-dimensional coordinate value based on the electricity consumption equal value points and the carbon emission value, and obtains the corresponding carbon emission function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing.

[0136] The model will determine the corresponding carbon emission values ​​based on the electricity consumption points. These carbon emission values ​​can be calculated using existing data or models, representing the carbon emissions of the power supply unit at different electricity consumption points. Then, the model uses the electricity consumption points and the corresponding carbon emission values ​​to generate two-dimensional coordinate values. Finally, the corresponding carbon emission function can be obtained by using the two-dimensional coordinate values ​​corresponding to the peak electricity consumption segment after statistical offset processing. This function can express the carbon emission data of the system under different electricity consumption conditions.

[0137] In some embodiments, the specific implementation of step S3133 (the carbon emission processing model determines the corresponding carbon emission value based on the electricity consumption equal value points, obtains the two-dimensional coordinate value based on the electricity consumption equal value points and the carbon emission value, and obtains the corresponding carbon emission function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing) includes:

[0138] S31331, the carbon emission processing model selects the first power supply unit and the second power supply unit in the electric carbon sorting sequence in turn, and extracts the rated power supply value of each first power supply unit and the second power supply unit and adds them up to obtain the sum of the power supply values.

[0139] The carbon emission processing model selects the first power supply unit and the second power supply unit from the electric carbon sorting sequence in turn, extracts the rated power supply value of each selected power supply unit, and adds them together to obtain the total power supply value.

[0140] S31332, after the sum of the power supply values ​​is greater than or equal to the power consumption equalization point, stop selecting the first power supply unit and the second power supply unit, eliminate the last selected first power supply unit or second power supply unit, and determine the remaining first power supply units and / or second power supply units.

[0141] When the sum of the accumulated power supply values ​​is greater than or equal to the current power consumption equalization point, stop selecting the power supply unit and remove the last selected power supply unit to determine the remaining power supply units. For example, the first power consumption equalization point is 50 kWh, the first power supply unit is 20 kWh, the second is 20 kWh, and the third is 20 kWh. Since the sum of the first three is greater than 50 kW, this solution will delete the third power supply unit.

[0142] S31333: Calculate a first carbon emission value according to the rated power supply value of the remaining first power supply unit and / or the second power supply unit, the first electric carbon coefficient and the second electric carbon coefficient.

[0143] Afterwards, the first carbon emission value is calculated using the rated power supply values ​​of the remaining power supply units and the corresponding carbon coefficients (the first carbon coefficient or the second carbon coefficient).

[0144] S31334, calculate the second carbon emission value based on the supplementary power generation value corresponding to the last selected first power supply unit or second power supply unit, the first carbon coefficient or the second carbon coefficient, wherein the supplementary power generation value is the power consumption value at the power consumption equalization point minus the sum of the rated power supply values ​​of all the remaining first power supply units and / or second power supply units.

[0145] For the last selected power supply unit, calculate its corresponding supplementary power generation value (i.e. the power consumption value at the power consumption equalization point minus the sum of the rated power supply values ​​of all remaining power supply units), for example 10 kWh, and use the supplementary power generation value and the corresponding electricity carbon coefficient to calculate the second carbon emission value.

[0146] S31335, based on the numerical value and carbon emission value of each electricity consumption equal value point, a two-dimensional coordinate value is obtained, and the corresponding carbon emission function is obtained based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing. The horizontal coordinate of the carbon emission function is the electricity value and the vertical coordinate is the carbon emission value.

[0147] The electricity consumption value of each electricity consumption equal-value point and the calculated carbon emission value are used to generate two-dimensional coordinate values. By counting these two-dimensional coordinate values, a carbon emission function can be plotted, with the horizontal axis being the electricity value and the vertical axis being the carbon emission value. Through these steps, a function that reflects the carbon emissions under different electricity consumption situations can be obtained. This function helps to evaluate and optimize the power generation mix to reduce the carbon emissions of the entire system. For example, at a specific electricity consumption equal-value point, the overall carbon emission level of the system can be reduced by selecting more power supply units with low electricity-carbon coefficients (i.e., low carbon emissions).

[0148] S32, inputting the transmission and distribution economic sub-information of each boundary node group into a pre-configured economic processing model, and calculating based on the economic processing model to obtain a corresponding economic function.

[0149] The transmission and distribution economic sub-information of each boundary node group is input into a pre-configured economic processing model. The economic processing model is used to calculate the corresponding economic function, which reflects the economic cost of power system operation.

[0150] In some embodiments, the specific implementation of step S32 (the step of inputting the transmission and distribution economic sub-information of each boundary node group into a pre-configured economic processing model, and calculating the corresponding economic function based on the economic processing model) includes:

[0151] S321, the economic processing model sorts all the first power supply units and the second power supply units in ascending order based on the first kilowatt-hour cost and the second kilowatt-hour cost of the transmission and distribution economic sub-information to obtain a kilowatt-hour sorting sequence.

[0152] Similar to the principle of constructing the carbon emission function mentioned above, the economic processing model uses the first and second kilowatt-hour costs in the transmission and distribution economic sub-information to sort all the first and second power supply units in ascending order to form a kilowatt-hour sorting sequence. This means that power supply units with higher costs will be ranked at the end of the sequence, while power supply units with lower costs will be ranked at the front of the sequence.

[0153] S322, the economic processing model obtains the maximum power consumption peak and the minimum power consumption peak of the administrative area corresponding to the boundary node group within a preset time period, and obtains the power consumption peak segment based on the maximum power consumption peak and the minimum power consumption peak.

[0154] The model obtains the maximum and minimum peak power consumption of the administrative area where the boundary node group is located in the preset time period. Based on these two peak values, a peak power consumption segment is determined, which represents the range of power consumption in the area in a specific time period. For example, it is 50 kWh to 2000 kWh.

[0155] S323, the economic processing model performs offset processing on the power consumption peak segment according to a preset ratio to obtain the offset power consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the kilowatt-hour ordering sequence based on the offset power consumption peak segment to obtain the corresponding economic function.

[0156] The model will offset the peak power consumption segment according to the preset ratio, that is, adjust the range of the peak power consumption segment to adapt to possible changes in power consumption. This offset processing can help the model take into account the power consumption fluctuations that may occur in actual operations, making the model more in line with the actual situation.

[0157] In some embodiments, the specific implementation of step S323 (the economic processing model performs offset processing on the power consumption peak segment according to a preset ratio to obtain the offset power consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the kilowatt-hour ordering sequence based on the offset power consumption peak segment to obtain the corresponding economic function) includes:

[0158] S3231, the economic processing model amplifies the original maximum power consumption peak by a preset ratio to obtain a first maximum power consumption peak, and the economic processing model reduces the original minimum power consumption peak by a preset ratio to obtain a first minimum power consumption peak.

[0159] The enlargement preset ratio may be, for example, 1.2 times, and the reduction preset ratio may be, for example, 0.8 times. The model multiplies the original maximum power consumption peak by a preset ratio to obtain a new first maximum power consumption peak, and reduces the original minimum power consumption peak by another preset ratio to obtain a new first minimum power consumption peak. This step is to take into account possible power consumption fluctuations in the future.

[0160] S3232, obtaining a power consumption peak segment based on the first maximum power consumption peak and the first minimum power consumption peak, and equally dividing the power consumption peak segment based on a preset number to obtain a plurality of power consumption equal division value points, wherein the power consumption equal division value points include the first maximum power consumption peak, the first minimum power consumption peak and equal division points.

[0161] A new peak power consumption segment is determined based on the first maximum peak power consumption and the first minimum peak power consumption obtained in the above steps. This new peak power consumption segment is divided into equal parts according to a preset number to obtain a plurality of equal power consumption value points, which include the first maximum peak power consumption, the first minimum peak power consumption and the equal points therein. It is understandable that, for example, 50 kWh to 2000 kWh can be divided into 50 equal parts to obtain a plurality of equal points. These equal points are used for subsequent carbon emission calculations and represent different electricity consumption data.

[0162] S3233, the economic processing model determines the corresponding cost value based on the electricity consumption equal-value points, obtains the two-dimensional coordinate value based on the electricity consumption equal-value points and the cost value, and obtains the corresponding economic function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing.

[0163] The model determines the corresponding cost value based on the electricity consumption points. These cost values ​​can be calculated using existing data or models, representing the cost value of the power supply unit at different electricity consumption points. Then, the model uses the electricity consumption points and the corresponding cost values ​​to generate two-dimensional coordinate values. Finally, the corresponding economic function can be obtained by statistically offsetting the two-dimensional coordinate values ​​corresponding to the peak power consumption segment. This economic function can express the cost data of the system under different power consumption conditions.

[0164] In some embodiments, the specific implementation of step S3233 (the economic processing model determines the corresponding cost value based on the electricity consumption equal-value points, obtains the two-dimensional coordinate value based on the electricity consumption equal-value points and the cost value, and obtains the corresponding economic function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing) includes:

[0165] S32331, the economic processing model selects the first power supply unit and the second power supply unit in the power sorting sequence in turn, and extracts the rated power supply value of each of the first power supply unit and the second power supply unit and adds them up to obtain the sum of the power supply values.

[0166] The economic processing model selects the first power supply unit and the second power supply unit in turn from the electric carbon ranking sequence, extracts the rated power supply value of each selected power supply unit, and adds them together to obtain the total power supply value.

[0167] S32332, after the sum of the power supply values ​​is greater than or equal to the power consumption equalization point, stop selecting the first power supply unit and the second power supply unit, eliminate the last selected first power supply unit or second power supply unit, and determine the remaining first power supply units and / or second power supply units.

[0168] When the sum of the accumulated power supply values ​​is greater than or equal to the current power consumption equalization point, stop selecting the power supply unit and remove the last selected power supply unit to determine the remaining power supply units. For example, the first power consumption equalization point is 50 kWh, the first power supply unit is 20 kWh, the second is 20 kWh, and the third is 20 kWh. Since the sum of the first three is greater than 50 kW, this solution will delete the third power supply unit.

[0169] S32333: Calculate a first cost value according to the rated power supply value of the remaining first power supply unit and / or the second power supply unit, the first kilowatt-hour cost, and the second kilowatt-hour cost.

[0170] Afterwards, the first cost value is calculated using the rated power supply values ​​of the remaining power supply units and the corresponding first kilowatt-hour cost and second kilowatt-hour cost.

[0171] S32334, calculate the second cost value based on the supplementary power generation value corresponding to the last selected first power supply unit or second power supply unit, the first kilowatt-hour cost or the second kilowatt-hour cost, wherein the supplementary power generation value is the power consumption value at the power consumption equal-value point minus the sum of the rated power supply values ​​of all the remaining first power supply units and / or second power supply units.

[0172] For the last selected power supply unit, calculate its corresponding supplementary power generation value (i.e., the power consumption value at the power consumption equalization point minus the sum of the rated power supply values ​​of all remaining power supply units), for example, 10 kWh, and use the supplementary power generation value and the corresponding first kilowatt-hour cost or second kilowatt-hour cost to calculate the second cost value.

[0173] S32335, based on the numerical value and cost value of each electricity consumption equal value point, a two-dimensional coordinate value is obtained, and the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing is obtained to obtain a corresponding economic function, wherein the horizontal coordinate of the economic function is the electricity value and the vertical coordinate is the cost value.

[0174] The two-dimensional coordinate values ​​are generated using the electricity consumption values ​​of each electricity consumption equal value point and the calculated cost value. By counting these two-dimensional coordinate values, an economic function can be drawn, with the horizontal axis being the electricity value and the vertical axis being the cost value. Through these steps, a function that reflects the cost situation under different electricity consumption situations can be obtained. This function helps to evaluate and optimize the power generation combination to reduce the cost of the entire system.

[0175] S33, processing the carbon emission function and the economic function based on the optimization model to obtain optimization information of the comprehensive carbon emission dimension and the economic dimension of each boundary node group.

[0176] This solution uses an optimization model to comprehensively process the carbon emission function and economic function obtained above. The model aims to find the optimization point so that the power system can be optimized in terms of carbon emission and economic dimensions. This solution aims to obtain optimization information for each boundary node group, which can help decision makers find the optimal point between reducing environmental impact and reducing costs. Optimization models usually need to consider multiple objectives and constraints, such as carbon emission data and economic data.

[0177] In some embodiments, the specific implementation of step S33 (processing the carbon emission function and the economic function based on the optimization model to obtain the optimization information of the comprehensive carbon emission dimension and the economic dimension of each boundary node group) includes:

[0178] S331, the optimization model obtains the electricity consumption value of each boundary node group at the corresponding electricity consumption score point and inputs it into the carbon emission function and the economic function respectively to obtain the corresponding carbon emission value and economic value.

[0179] The optimization model first receives the electricity consumption values ​​of the boundary node groups at their respective electricity consumption equal points. These electricity consumption values ​​are input into the carbon emission function and the economic function respectively, and the corresponding carbon emission values ​​and economic values ​​are calculated respectively.

[0180] S332, storing the carbon emission values ​​and economic values ​​of the same boundary node group at the same electricity consumption equal score point correspondingly to obtain a first group to be analyzed, and calculating the analysis ratio of the carbon emission values ​​and economic values ​​in the first group to be analyzed.

[0181] The carbon emission values ​​and economic values ​​of the same boundary node group at the same electricity consumption equal score point are paired and stored to form a first group to be analyzed. The analysis ratio of the carbon emission values ​​and economic values ​​in these first groups to be analyzed is calculated, which can help understand the relative weights of carbon emissions and economic costs under specific electricity consumption values. For example, the analysis ratio of one of the first groups to be analyzed can be 1:5.

[0182] S333, counting the analysis proportions of all boundary node groups including all first groups to be analyzed, and performing mean calculation processing to obtain the mean proportion.

[0183] The analysis ratios of all boundary node groups are counted, and the average of these analysis ratios is calculated to obtain a mean ratio. For example, the mean ratio is 2:3. This mean ratio represents the average carbon emission and economic value relationship of all boundary node groups, providing a benchmark for the subsequent optimization analysis.

[0184] S334, based on the mean ratio, optimizing and analyzing the carbon emission dimension and the economic dimension in the first group to be analyzed to obtain optimization information of the comprehensive carbon emission dimension and the economic dimension.

[0185] Based on the calculated mean ratio, the values ​​in the first group to be analyzed are optimized in terms of carbon emission and economic dimensions. The purpose of this step is to balance the relationship between carbon emission reduction and economic cost.

[0186] Based on the above embodiment, step S334 includes two different optimization analysis methods, namely, geometric processing based on economic dimension (A3341-A3343) and geometric processing based on carbon emission dimension (B3341-B3343).

[0187] In some embodiments, the specific implementation of step S334 (the optimization analysis of the carbon emission dimension and the economic dimension in the first group to be analyzed based on the mean ratio to obtain optimization information of the comprehensive carbon emission dimension and the economic dimension) includes:

[0188] A3341, perform proportional processing on the economic dimension of the analysis proportion and the mean proportion of each first group to be analyzed, even if the proportion values ​​of the economic dimension in the analysis proportion and the mean proportion are the same, the proportion values ​​of the carbon emission dimension in the analysis proportion and the mean proportion are simultaneously amplified.

[0189] The economic dimension parts of the analysis ratio and mean ratio of each first group to be analyzed are adjusted so that their ratio values ​​are the same. At the same time, the ratio values ​​of the carbon emission dimension in the analysis ratio and mean ratio are enlarged to keep the ratio of the two in the economic dimension unchanged. For example, 1:5 is adjusted to 3:15, and the mean ratio 2:5 is adjusted to 6:15.

[0190] A3342, if the difference between the ratio value of the carbon emission dimension in the amplified analysis ratio and the ratio value of the carbon emission dimension in the mean ratio is greater than a first preset value, a carbon emission introduction label is added.

[0191] If the difference between the ratio of the carbon emission dimension in the amplified analysis ratio and the ratio of the carbon emission dimension in the mean ratio is greater than the first preset value, a carbon emission introduction label is added to the group to be analyzed. This indicates that the carbon emission of the group to be analyzed is high and measures need to be taken to reduce carbon emissions.

[0192] A3343, if the difference between the ratio value of the carbon emission dimension in the amplified analysis ratio and the ratio value of the carbon emission dimension in the mean ratio is less than or equal to the first preset value, the carbon emission introduction label is not added.

[0193] For example, 6 in the above step is greater than 3. This means that the carbon emissions of the group to be analyzed are within an acceptable range. In some embodiments, the specific implementation of step S334 (the optimization analysis of the carbon emission dimension and the economic dimension in the first group to be analyzed based on the mean ratio to obtain the optimization information of the comprehensive carbon emission dimension and the economic dimension) includes:

[0194] B3341, perform proportional processing on the carbon emission dimension for the analysis proportion and mean proportion of each first group to be analyzed. Even if the proportion values ​​of the carbon emission dimension in the analysis proportion and the mean proportion are the same, the proportion values ​​of the economic dimension in the analysis proportion and the mean proportion are simultaneously amplified.

[0195] Adjust the carbon emission dimension in the analysis ratio and mean ratio of each first group to be analyzed so that their ratio values ​​are the same. At the same time, amplify the ratio of the economic dimension in the analysis ratio and mean ratio to keep the ratio of the two in the carbon emission dimension unchanged. For example, adjust 1:5 to 2:10. Since the mean ratio is 2:5, the ratio is consistent in the carbon emission dimension, so the adjusted mean ratio is still 2:5.

[0196] B3342, if the difference between the ratio value of the economic dimension in the zoomed-in analysis ratio and the ratio value of the economic dimension in the mean ratio is greater than a second preset value, an economic introduction label is added.

[0197] If the difference between the ratio of the economic dimension in the zoomed-in analysis ratio and the ratio of the economic dimension in the mean ratio is greater than a second preset value, for example, 10 is greater than 5, an economic introduction label is added to the group to be analyzed. This indicates that the economic cost of the group to be analyzed is high, and measures need to be taken to reduce the cost.

[0198] B3343, if the difference between the ratio value of the economic dimension in the zoomed-in analysis ratio and the ratio value of the economic dimension in the mean ratio is less than or equal to the second preset value, the economic introduction label is not added.

[0199] If the difference between the ratio of the economic dimension in the amplified analysis ratio and the ratio of the economic dimension in the mean ratio is less than or equal to the second preset value, the economic introduction label is not added. This means that the economic cost of the group to be analyzed is within an acceptable range. Through these two methods, the optimization model can focus on the optimization of economic costs and carbon emissions respectively, and introduce a label mechanism to indicate which groups to be analyzed need special attention to achieve a balance in the two dimensions. This helps decision makers adjust the operation strategy of each boundary node group according to the optimization goal (such as reducing carbon emissions or economic costs).

[0200] S4, optimize the transmission control of the transmission network and the distribution network based on the optimization information of all boundary node groups.

[0201] In some embodiments, the specific implementation of step S4 includes:

[0202] S41, obtaining a power distribution basis sequence of a control terminal corresponding to a boundary node group, wherein the power distribution basis sequence is one of an electricity carbon ranking sequence and a kilowatt-hour ranking sequence.

[0203] It is understandable that the distribution sequence can be a electricity-carbon ranking sequence, focusing on carbon emissions, or a kilowatt-hour ranking sequence, focusing on economic costs.

[0204] S42: If the power distribution sequence is an electricity carbon ranking sequence, the first power supply unit and / or the second power supply unit in the electricity carbon ranking sequence is selected based on the load demand and the corresponding electricity consumption equal value points are determined according to the load value.

[0205] If the power distribution sequence is the electric carbon ranking sequence, the first power supply unit and / or the second power supply unit is selected according to the actual load demand. The equal distribution point of power consumption is determined according to the load value, which means that the power demand is equally distributed to different power supply units.

[0206] S43: If the electricity consumption score points are added with corresponding economic introduction tags, the first power supply unit and / or the second power supply unit with the lowest subsequent economic cost is selected for power distribution based on the electricity sorting sequence.

[0207] If the electricity consumption score point is added with an economic introduction tag, which means that economic efficiency needs to be considered, the power supply unit with the lowest subsequent cost will be selected for power distribution based on the electricity sorting sequence. This is to ensure that economic costs are taken into account while meeting electricity demand.

[0208] S44, or, if the power distribution sequence is a kilowatt-hour ordering sequence, the first power supply unit and / or the second power supply unit in the kilowatt-hour ordering sequence is selected based on the load demand and the corresponding power consumption equal value points are determined according to the load value.

[0209] If the power distribution sequence is a kilowatt-hour sequence, the first power supply unit and / or the second power supply unit are selected according to the actual load demand. Similarly, the equal distribution points of power consumption are determined according to the load value.

[0210] S45: If the electricity consumption score points are added with corresponding carbon emission introduction labels, the first power supply unit and / or the second power supply unit with the lowest subsequent carbon emission are selected for power distribution based on the electricity-carbon ranking sequence.

[0211] If the electricity consumption score point is labeled with carbon emission, it means that carbon emission needs to be considered. Then the power supply unit with the lowest carbon emission will be selected for distribution based on the electricity-carbon ranking sequence. This can ensure that carbon emission can be minimized while controlling economic cost. Through such a strategy, the transmission and distribution network can be optimized to meet the demand for electricity supply and strike a balance between carbon emission and economic cost.

[0212] like Figure 2 As shown, it is a structural schematic diagram of a multi-factor optimization system for carbon emission and transmission and distribution provided by the present invention, wherein the multi-factor optimization system for carbon emission and transmission and distribution includes:

[0213] A division module is used to divide the power supply network of the target area based on the geographical area relationship and the line attribute relationship, obtain the corresponding transmission network and distribution network, and determine the boundary node group connected to the transmission network and distribution network;

[0214] An acquisition module, used to acquire and classify the power data of the transmission network, the distribution network and the boundary node group, and obtain the carbon emission calculation data and transmission and distribution economic data of each boundary node group, wherein the carbon emission calculation data includes carbon emission sub-information, and the transmission and distribution economic data includes transmission and distribution economic sub-information;

[0215] A construction module is used to construct corresponding carbon emission processing models, optimization models, and economic processing models, and to process carbon emission sub-information and transmission and distribution economic sub-information based on the carbon emission processing models, optimization models, and economic processing models to obtain optimization information for each boundary node group;

[0216] The optimization module is used to optimize the transmission control of the transmission network and the distribution network based on the optimization information of all boundary node groups.

[0217] The present invention also provides a storage medium, in which a computer program is stored. When the computer program is executed by a processor, it is used to implement the methods provided by the various embodiments described above.

[0218] Among them, the storage medium can be a computer storage medium or a communication medium. The communication medium includes any medium that facilitates the transmission of a computer program from one place to another. The computer storage medium can be any available medium that can be accessed by a general-purpose or special-purpose computer. For example, the storage medium is coupled to the processor so that the processor can read information from the storage medium and write information to the storage medium. Of course, the storage medium can also be a component of the processor. The processor and the storage medium can be located in an application-specific integrated circuit (Application Specific Integrated Circuits, referred to as: ASIC). In addition, the ASIC can be located in a user device. Of course, the processor and the storage medium can also exist in a communication device as discrete components. The storage medium can be a read-only memory (ROM), a random access memory (RAM), a CD-ROM, a magnetic tape, a floppy disk, and an optical data storage device, etc.

[0219] The present invention also provides a program product, which includes an execution instruction, which is stored in a storage medium. At least one processor of a device can read the execution instruction from the storage medium, and at least one processor executes the execution instruction so that the device implements the methods provided in the above various embodiments.

[0220] In the above-mentioned terminal or server embodiments, it should be understood that the processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), etc. A general-purpose processor may be a microprocessor or any conventional processor. The steps of the method disclosed in the present invention may be directly implemented as being executed by a hardware processor, or may be executed by a combination of hardware and software modules in the processor.

[0221] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A multi-factor optimization method applicable to carbon emissions and transmission and distribution, characterized in that: include: S1, dividing the power supply network of the target area based on the geographical area relationship and the line attribute relationship, obtaining the corresponding transmission network and distribution network, and determining the boundary node group connected to the transmission network and distribution network; S2, acquiring and classifying the power data of the transmission network, the distribution network and the boundary node group, and obtaining the carbon emission calculation data and the transmission and distribution economic data of each boundary node group, wherein the carbon emission calculation data includes the carbon emission sub-information, and the transmission and distribution economic data includes the transmission and distribution economic sub-information; S3, constructing corresponding carbon emission processing models, optimization models, and economic processing models, and processing carbon emission sub-information and transmission and distribution economic sub-information based on the carbon emission processing models, optimization models, and economic processing models to obtain optimization information for each boundary node group; S4, optimizing transmission control of the transmission network and the distribution network based on the optimization information of all boundary node groups; The specific steps of S1 include: S11, acquiring geographical area information of all power supply units in the geographical area relationship of the target area, and adding a first power supply tag to the corresponding power supply unit based on the geographical area information; S12, obtaining a first line label of an administrative area corresponding to a power supply line in a power supply network of a target area, wherein the power supply network includes a transmission line and a distribution line; S13, screening all power supply units based on the first line label and the first power supply label, and determining a set of power supply units corresponding to each boundary node group; The screening of all power supply units based on the first line label and the first power supply label, and determining a set of power supply units corresponding to each boundary node group, includes: Based on the first line label, the distribution lines are counted to obtain first distribution lines, and the first power supply labels of the power supply units directly connected to each first distribution line are counted as first power supply units; Count all the first power supply units to obtain a first power supply unit set, and Corresponding to the group of boundary nodes of the same administrative region; Counting other power supply units outside the first power supply unit set to obtain a second power supply unit, and counting all the second power supply units to obtain a second power supply unit set; The specific steps of S2 include: S21, obtaining a first electricity-carbon coefficient of each first power supply unit according to a first power generation attribute of each first power supply unit, wherein the first power generation attribute includes a clean energy power generation attribute and an energy-consuming power generation attribute, and each first electricity-carbon coefficient is a carbon emission sub-information; S22, obtaining a first kilowatt-hour cost of each first power supply unit according to a first economic attribute of each first power supply unit, wherein the first economic attribute includes a power generation amount and a power generation cost, and each first kilowatt-hour cost is a transmission and distribution economic sub-information; S23, obtaining second electricity-carbon coefficients of all second power supply units according to second power generation attributes of all second power supply units, wherein the second power generation attributes include clean energy power generation attributes and energy-consuming power generation attributes, and each second electricity-carbon coefficient is a carbon emission sub-information; S24, obtaining a second kilowatt-hour cost of each second power supply unit according to a second economic attribute of each second power supply unit, wherein the second economic attribute includes a power generation amount and a power generation cost, and each second kilowatt-hour cost is a transmission and distribution economic sub-information; S25, obtaining carbon emission calculation data based on the first electricity carbon coefficient of the first power supply unit and the second electricity carbon coefficient of the second power supply unit, and obtaining transmission and distribution economic data based on the first kilowatt-hour cost and the second kilowatt-hour cost; The specific steps of S3 include: S31, inputting the carbon emission sub-information of each boundary node group into a pre-configured carbon emission processing model, and calculating based on the carbon emission processing model to obtain a corresponding carbon emission function; S32, inputting the transmission and distribution economic sub-information of each boundary node group into a pre-configured economic processing model, and calculating based on the economic processing model to obtain a corresponding economic function; S33, processing the carbon emission function and the economic function based on the optimization model to obtain optimization information of the comprehensive carbon emission dimension and the economic dimension of each boundary node group; The step of inputting the carbon emission sub-information of each boundary node group into a pre-configured carbon emission processing model and calculating the corresponding carbon emission function based on the carbon emission processing model includes: The carbon emission processing model sorts all the first power supply units and the second power supply units in ascending order based on the first electric carbon coefficient and the second electric carbon coefficient of the carbon emission sub-information to obtain an electric carbon sorting sequence; The carbon emission processing model obtains the maximum power consumption peak and the minimum power consumption peak of the administrative area corresponding to the boundary node group within a preset time period, and obtains the power consumption peak segment based on the maximum power consumption peak and the minimum power consumption peak; The carbon emission processing model performs an offset processing on the electricity consumption peak segment according to a preset ratio to obtain an offset electricity consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the electricity-carbon sorting sequence based on the offset electricity consumption peak segment to obtain a corresponding carbon emission function; The carbon emission processing model performs an offset processing on the electricity consumption peak segment according to a preset ratio to obtain an offset electricity consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the electricity-carbon sorting sequence based on the offset electricity consumption peak segment to obtain a corresponding carbon emission function, including: The carbon emission processing model amplifies the original maximum power consumption peak by a preset ratio to obtain a first maximum power consumption peak, and the carbon emission processing model reduces the original minimum power consumption peak by a preset ratio to obtain a first minimum power consumption peak; Based on the first maximum power consumption peak value and the first minimum power consumption peak value, a power consumption peak segment is obtained; based on a preset number, the power consumption peak segment is equally divided into a plurality of power consumption equal division value points, wherein the power consumption equal division value points include the first maximum power consumption peak value, the first minimum power consumption peak value and the equal division points; The carbon emission processing model determines the corresponding carbon emission value based on the electricity consumption equal value points, obtains the two-dimensional coordinate value based on the electricity consumption equal value points and the carbon emission value, and obtains the corresponding carbon emission function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing; The carbon emission processing model determines the corresponding carbon emission value based on the electricity consumption equal value points, obtains the two-dimensional coordinate value based on the electricity consumption equal value points and the carbon emission value, and obtains the corresponding carbon emission function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing, including: The carbon emission processing model selects the first power supply unit and the second power supply unit in the electric carbon sorting sequence in turn, and extracts the rated power supply value of each first power supply unit and the second power supply unit and adds them up to obtain the sum of the power supply values; After the sum of the power supply values ​​is greater than or equal to the power consumption equalization point, the selection of the first power supply unit and the second power supply unit is stopped, the last selected first power supply unit or second power supply unit is eliminated, and the remaining first power supply units and / or second power supply units are determined; A first carbon emission value is calculated according to the rated power supply value of the remaining first power supply unit and / or the second power supply unit, the first electric carbon coefficient and the second electric carbon coefficient; The second carbon emission value is calculated based on the supplementary power generation value corresponding to the last selected first power supply unit or second power supply unit, the first carbon coefficient or the second carbon coefficient, wherein the supplementary power generation value is the power consumption value at the power consumption equal value point minus the sum of the rated power supply values ​​of all the remaining first power supply units and / or second power supply units; Based on the numerical value and carbon emission value of each electricity consumption equal value point, a two-dimensional coordinate value is obtained, and the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing is used to obtain a corresponding carbon emission function, wherein the abscissa of the carbon emission function is the electricity value and the ordinate is the carbon emission value; The step of inputting the transmission and distribution economic sub-information of each boundary node group into a pre-configured economic processing model and calculating the corresponding economic function based on the economic processing model includes: The economic processing model sorts all the first power supply units and the second power supply units in ascending order based on the first kilowatt-hour cost and the second kilowatt-hour cost of the transmission and distribution economic sub-information to obtain a kilowatt-hour sorting sequence; The economic processing model obtains the maximum power consumption peak and the minimum power consumption peak of the administrative area corresponding to the boundary node group within a preset time period, and obtains the power consumption peak segment based on the maximum power consumption peak and the minimum power consumption peak; The economic processing model performs an offset processing on the power consumption peak segment according to a preset ratio to obtain an offset power consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the kilowatt-hour ordering sequence based on the offset power consumption peak segment to obtain a corresponding economic function; The carbon emission function and economic function are processed based on the optimization model to obtain optimization information of the comprehensive carbon emission dimension and economic dimension of each boundary node group, including: The optimization model obtains the electricity consumption values ​​of each boundary node group at the corresponding electricity consumption points and inputs them into the carbon emission function and the economic function respectively to obtain the corresponding carbon emission values ​​and economic values; Correspondingly storing the carbon emission value and the economic value of the same boundary node group at the same electricity consumption score point to obtain a first group to be analyzed, and calculating the analysis ratio of the carbon emission value and the economic value in the first group to be analyzed; Counting the analysis proportions of all the first to-be-analyzed groups in all boundary node groups, and performing mean calculation to obtain the mean proportion; Based on the mean ratio, the carbon emission dimension and the economic dimension in the first group to be analyzed are optimized and analyzed to obtain optimization information of the comprehensive carbon emission dimension and the economic dimension.

2. The multi-factor optimization method applicable to carbon emission and transmission and distribution integration according to claim 1 is characterized in that: The economic processing model performs an offset processing on the power consumption peak segment according to a preset ratio to obtain an offset power consumption peak segment, and selects and calculates the first power supply unit and the second power supply unit in the kilowatt-hour ordering sequence based on the offset power consumption peak segment to obtain a corresponding economic function, including: The economic processing model amplifies the original maximum power consumption peak by a preset ratio to obtain a first maximum power consumption peak, and the economic processing model reduces the original minimum power consumption peak by a preset ratio to obtain a first minimum power consumption peak; Based on the first maximum power consumption peak value and the first minimum power consumption peak value, a power consumption peak segment is obtained; based on a preset number, the power consumption peak segment is equally divided into a plurality of power consumption equal division value points, wherein the power consumption equal division value points include the first maximum power consumption peak value, the first minimum power consumption peak value and the equal division points; The economic processing model determines the corresponding cost value based on the electricity consumption equal-value points, obtains the two-dimensional coordinate value based on the electricity consumption equal-value points and the cost value, and obtains the corresponding economic function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing.

3. The multi-factor optimization method applicable to carbon emission and transmission and distribution integration according to claim 2 is characterized in that: The economic processing model determines the corresponding cost value based on the electricity consumption equal value points, obtains the two-dimensional coordinate value based on the electricity consumption equal value points and the cost value, and obtains the corresponding economic function based on the two-dimensional coordinate value corresponding to the electricity consumption peak segment after statistical offset processing, including: The economic processing model sequentially selects the first power supply unit and the second power supply unit in the power sorting sequence, and extracts the rated power supply value of each first power supply unit and the second power supply unit and adds them together to obtain the sum of the power supply values; After the sum of the power supply values ​​is greater than or equal to the power consumption equalization point, the selection of the first power supply unit and the second power supply unit is stopped, the last selected first power supply unit or second power supply unit is eliminated, and the remaining first power supply units and / or second power supply units are determined; A first cost value is calculated according to the rated power supply value of the remaining first power supply unit and / or the second power supply unit, the first kilowatt-hour cost, and the second kilowatt-hour cost; The second cost value is calculated according to the supplementary power generation value corresponding to the last selected first power supply unit or second power supply unit, the first kilowatt-hour cost or the second kilowatt-hour cost, wherein the supplementary power generation value is the power consumption value at the power consumption equal-value point minus the sum of the rated power supply values ​​of all the remaining first power supply units and / or second power supply units; Based on the numerical value and cost value of each electricity consumption equal value point, a two-dimensional coordinate value is obtained. After statistical offset processing, the two-dimensional coordinate value corresponding to the electricity consumption peak segment is used to obtain a corresponding economic function, wherein the horizontal coordinate of the economic function is the electricity value and the vertical coordinate is the cost value.

4. The multi-factor optimization method applicable to carbon emission and transmission and distribution integration according to claim 1 is characterized in that: The optimizing analysis of the carbon emission dimension and the economic dimension in the first group to be analyzed based on the mean ratio to obtain the optimized information of the comprehensive carbon emission dimension and the economic dimension includes: The analysis proportion and the mean proportion of each first group to be analyzed are processed in the economic dimension in a proportional manner. Even if the proportion values ​​of the economic dimension in the analysis proportion and the mean proportion are the same, the proportion values ​​of the carbon emission dimension in the analysis proportion and the mean proportion are simultaneously amplified. If the difference between the ratio value of the carbon emission dimension in the amplified analysis ratio and the ratio value of the carbon emission dimension in the mean ratio is greater than a first preset value, a carbon emission introduction label is added; If the difference between the ratio value of the carbon emission dimension in the amplified analysis ratio and the ratio value of the carbon emission dimension in the mean ratio is less than or equal to the first preset value, the carbon emission introduction label is not added.

5. The multi-factor optimization method applicable to carbon emission and transmission and distribution integration according to claim 1 is characterized in that: The optimizing analysis of the carbon emission dimension and the economic dimension in the first group to be analyzed based on the mean ratio to obtain the optimized information of the comprehensive carbon emission dimension and the economic dimension includes: Performing proportional processing on the carbon emission dimension for the analysis ratio and the mean ratio of each first group to be analyzed, even if the ratio values ​​of the carbon emission dimension in the analysis ratio and the mean ratio are the same, the ratio values ​​of the economic dimension in the analysis ratio and the mean ratio are simultaneously amplified; If the difference between the ratio value of the economic dimension in the zoomed-in analysis ratio and the ratio value of the economic dimension in the mean ratio is greater than a second preset value, then an economic introduction label is added; If the difference between the ratio value of the economic dimension in the zoomed-in analysis ratio and the ratio value of the economic dimension in the mean ratio is less than or equal to a second preset value, the economic introduction label is not added.

6. The multi-factor optimization method applicable to carbon emission and transmission and distribution integration according to any one of claims 4 or 5, characterized in that: The specific steps of S4 include: S41, obtaining a power distribution basis sequence of a control terminal corresponding to a boundary node group, wherein the power distribution basis sequence is one of an electricity carbon ranking sequence or a kWh ranking sequence; S42, if the power distribution sequence is an electricity carbon ranking sequence, selecting the first power supply unit and / or the second power supply unit in the electricity carbon ranking sequence based on the load demand and determining the corresponding electricity consumption equal value points according to the load value; S43, if the electricity consumption score points are added with corresponding economic introduction tags, then based on the kilowatt-hour ranking sequence, the first power supply unit and / or the second power supply unit with the lowest subsequent economic cost is selected for power distribution; or, S44, if the power distribution sequence is a kilowatt-hour ordering sequence, selecting a first power supply unit and / or a second power supply unit in the kilowatt-hour ordering sequence based on load demand and determining a corresponding power consumption equal value point according to the load value; S45: If the electricity consumption score points are added with corresponding carbon emission introduction labels, the first power supply unit and / or the second power supply unit with the lowest subsequent carbon emission are selected for power distribution based on the electricity-carbon ranking sequence.

7. A multi-factor optimization system for carbon emission and transmission and distribution integrated with the multi-factor optimization method for carbon emission and transmission and distribution integrated with any one of claims 1 to 6, characterized in that: include: A division module is used to divide the power supply network of the target area based on the geographical area relationship and the line attribute relationship, obtain the corresponding transmission network and distribution network, and determine the boundary node group connected to the transmission network and distribution network; An acquisition module, used to acquire and classify the power data of the transmission network, the distribution network and the boundary node group, and obtain the carbon emission calculation data and transmission and distribution economic data of each boundary node group, wherein the carbon emission calculation data includes carbon emission sub-information, and the transmission and distribution economic data includes transmission and distribution economic sub-information; A construction module is used to construct corresponding carbon emission processing models, optimization models, and economic processing models, and to process carbon emission sub-information and transmission and distribution economic sub-information based on the carbon emission processing models, optimization models, and economic processing models to obtain optimization information for each boundary node group; The optimization module is used to optimize the transmission control of the transmission network and the distribution network based on the optimization information of all boundary node groups.

Citation Information

Patent Citations

  • Low-carbon optimal scheduling method for power system

    CN114243691A

  • Novel power system low-carbon economic regulation and control method

    CN114744684A