A gas-fired dragon kiln for firing Jianzhan

By introducing arched doors and adjustment components into the gas-fired Jianzhan Dragon Kiln, the problem of uncontrollable opening sizes on both sides of the kiln body is solved, and the precise adjustment of temperature and oxygen in the kiln is achieved, which reduces gas consumption and increases Frying efficiency and quality.

CN118640684BActive Publication Date: 2024-11-22NANPING JIANYANG JINYOUDI JIANZHAN CERAMICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411112636.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-22
Estimated Expiration
2044-08-14

AI Technical Summary

Technical Problem

During the firing process, the existing gas-type Jianzhan firing dragon kiln cannot control the size of the openings on both sides of the kiln body, resulting in the inlet and outflow of oxygen and temperature that cannot be controlled, affecting the firing quality. At the same time, the kiln body is a long strip-shaped integrated structure. , resulting in gas waste and low firing efficiency.

Method used

A dragon kiln including arched doors and adjustment components is designed. The partition and temperature control of the kiln body are realized through arched doors and control parts, adjust the oxygen inlet and outlet, reduce gas consumption, and improve firing efficiency.

Benefits of technology

It realizes precise control of the temperature in the kiln, reduces gas waste, and improves the firing quality of Jianzhan and the utilization efficiency of kiln.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118640684B_ABST
    Figure CN118640684B_ABST
Patent Text Reader

Abstract

The invention relates to a gas-fired dragon kiln for firing Jianzhan, and relates to the technical field of dragon kilns; the dragon kiln comprises a dragon kiln, the dragon kiln is composed of a dragon head, a kiln body and a dragon tail, a firing cavity is arranged in the dragon kiln, a plurality of observation windows and a storage port for storing Jianzhan are arranged on the side wall of the dragon kiln, an opening and closing portion and a combustion component are also arranged in the dragon kiln, the opening and closing portion comprises an arched door and an arched frame for partitioning the kiln body; the invention can solve the following problems existing in the prior art: in the prior art, the observation windows on both sides of the kiln body cannot control the opening and closing size, resulting in the inability to control the amount of oxygen entering and exiting the dragon kiln during firing, thereby failing to control the temperature in the dragon kiln; secondly, the dragon kiln is a long strip structure, if the number of Jianzhan fired is limited, only a part of the dragon kiln needs to be used, while the prior art needs to preheat the entire dragon kiln to a specified temperature each time, so no matter how many Jianzhan are fired, a large amount of gas consumption will be caused, resulting in gas waste, and affecting the firing efficiency of Jianzhan.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of dragon kilns, and in particular to a gas-fired dragon kiln for firing Jianzhan porcelain. Background Art

[0002] A dragon kiln is a traditional kiln that is usually used to fire ceramics and porcelain. Jianzhan is a traditional Chinese tea set that is usually used to brew tea and hold tea. The firing technique of Jianzhan is a traditional craft with a long history, and one of its core links is firing in a dragon kiln.

[0003] The Jianzhan firing technique needs to be carried out in a dragon kiln. The existing Jianzhan firing dragon kiln has two fuels: firewood and gas. Among them, the gas-fired Jianzhan firing dragon kiln is more environmentally friendly and efficient than the traditional firewood firing, which can reduce energy consumption and air pollution. The gas-fired Jianzhan firing dragon kiln achieves precise firing of Jianzhan by controlling the flow and temperature of the gas.

[0004] In the prior art, a Chinese patent with publication number CN215491043U discloses a gas-fired Jianzhan dragon kiln, including a kiln body, a step and a gas assembly. The kiln body includes a kiln head, a kiln body and a kiln tail, and a plurality of openings are provided on both sides of the kiln body. The steps are arranged on both sides of the kiln body and gradually rise as the kiln body rises. The gas assembly includes a gas pipeline and a gas flamethrower. The gas pipeline includes a main pipe and a branch pipe, and there are two branch pipes, which are respectively distributed along the kiln body. The main pipe connects the two branch pipes and is connected to the gas source outlet. Each opening is provided with a gas flamethrower, the feed port of the gas flamethrower is connected to the branch pipe, and the flamethrower of the gas flamethrower extends into the interior of the firing corridor. It adopts a gas firing method, which is low-carbon and environmentally friendly, saves costs, has a long service life, is easy to operate, saves labor, has a uniform temperature in the kiln, and greatly improves the firing quality. The fired Jianzhan is close to or equivalent to the quality of wood-fired Jianzhan, but the yield rate is much higher than that of wood-fired.

[0005] However, the above-mentioned gas-fired Jianzhan firing dragon kiln has some shortcomings in actual use:

[0006] 1. In the above-mentioned prior art, gas firing is adopted, which is low-carbon and environmentally friendly, saves costs, has a long service life, is easy to operate, saves labor, has a uniform temperature in the kiln, and greatly improves the firing quality; however, during the firing process of the dragon kiln, the openings on both sides of the kiln body cannot control the size of their openings and closing, resulting in the inability to control the amount of oxygen entering and leaving the dragon kiln during the gas firing process, further resulting in the inability to control the temperature in the dragon kiln, affecting the firing quality of the Jianzhan in the dragon kiln.

[0007] 2. Secondly, in the prior art, the dragon cellar is a long, integrated, through-structure. When it is working, if the number of Jianzhans to be fired is limited, only a part of the dragon cellar is needed. However, the prior art requires the entire dragon cellar to be operated each time and the interior of the dragon cellar to be preheated to a specified temperature. Therefore, no matter how many Jianzhans are fired, a large amount of gas will be consumed, which will seriously cause a waste of gas and affect the firing efficiency of Jianzhan.

[0008] Therefore, based on the above-stated viewpoints, there is still room for improvement in the existing gas-fired dragon kilns for firing Jianzhan. Summary of the invention

[0009] In order to solve the above problems, the present invention provides a gas-fired dragon kiln for firing Jianzhan.

[0010] A gas-fired dragon kiln for firing Jianzhan, a static dragon cellar, the dragon cellar consisting of a dragon head, a cellar body and a dragon tail, a firing cavity for firing Jianzhan is arranged in the dragon cellar, and a plurality of observation windows and a storage port for storing Jianzhan are also arranged on the side walls of the dragon cellar.

[0011] It includes an opening and closing part, which is arranged at equal intervals in the firing cavity of the dragon pit and isolates or connects the space of the firing cavity of the dragon pit. The opening and closing part includes an arched door for separating the cellar body of the dragon pit and an arched frame matched with the arched door. The arched frame is integrated and arranged on the dragon pit at equal intervals, and the arched door is rotatably arranged on the inner wall of the dragon pit at equal intervals. The arched door rotates from the side wall close to the dragon pit to the middle of the dragon pit and rests on the arched frame.

[0012] A combustion component is also provided at the observation port on the side wall of the dragon pit.

[0013] The combustion components include a gas delivery pipeline, a flame spray gun, a gas extension pipeline and an adjustment component for adjusting the oxygen intake of an observation window and a storage port. The gas delivery pipeline is symmetrically arranged on both sides of the dragon pit in the width direction. The gas extension pipelines are arranged on the gas delivery pipeline at equal intervals, and one end of the gas extension pipeline away from the gas delivery pipeline extends toward the dragon pit observation window. The flame spray gun is arranged at the observation window, and the flame spray gun is connected to the gas extension pipeline.

[0014] The adjustment component is arranged at the observation window and the storage port.

[0015] Preferably, the interior of the dragon pit is provided with a trapezoidal soil block for placing Jianzhan and integrally connected to the dragon pit, and the exterior of the dragon pit is symmetrically provided with external steps.

[0016] Preferably, a control member for facilitating the opening and closing of the arched door is further provided between the arched door and the inner wall of the dragon kiln. The control member includes an arc-shaped frame, a control gear, a control handwheel, a reversing gear, a synchronous pulley and a synchronous belt. Arc-shaped frames are symmetrically installed on the back side of the arched door. One side of the arc-shaped frame is a rack structure. The arc-shaped frame slidably penetrates through the trapezoidal soil block in the dragon kiln and extends towards a control window opened on the inner wall of the dragon kiln. The control gear is rotatably arranged in the control window opened on the inner wall of the dragon kiln and meshes with the arc-shaped frame.

[0017] The reversing gear is rotatably arranged on the control gear on one side. The synchronous pulleys are respectively arranged at the bottoms of the control gear and the reversing gear away from the reversing gear. The synchronous belt is sleeved between the two synchronous pulleys in the width direction of the dragon kiln.

[0018] The control handwheel is arranged at the upper end of the control gear to facilitate driving the control gear to rotate.

[0019] Preferably, a main smoke exhaust pipe for exhausting the dust generated during the firing of Jianzhan from bottom to top is integrally provided at the dragon tail of the dragon kiln. A secondary smoke exhaust pipe arranged at the top of the dragon kiln is integrally installed on one side of the main smoke exhaust pipe. Secondary smoke exhaust pipes are installed at equal intervals between the bottom of the secondary smoke exhaust pipe and the inside of the dragon kiln.

[0020] Preferably, a linkage component for opening and closing is provided between the secondary smoke exhaust pipe and the arched door. The linkage component includes an arc-shaped baffle, a linkage compression spring and a U-shaped rod. The arc-shaped baffle is slidably arranged on the inner wall of the dragon kiln, and a chute for the arc-shaped baffle to slide is opened on the dragon kiln. A linkage compression spring is arranged between the arc-shaped baffle and the chute on the dragon kiln, so that the arc-shaped baffle always has a tendency to approach the secondary smoke exhaust pipe through the linkage compression spring. The U-shaped rod is installed at one end of the arc-shaped baffle away from the linkage compression spring. The side of the U-shaped rod away from the arc-shaped baffle penetrates through the top of the arched frame and is in movable contact with the arched door.

[0021] Preferably, the adjusting component includes a rotating sealing door and a sliding sealing door. The rotating sealing door is rotatably installed at the storage opening of the dragon kiln through an auxiliary rotating shaft. The sliding sealing door is slidably arranged at the observation window of the dragon kiln. The opening area of the observation window is controlled by the sliding sealing door to adjust the oxygen intake.

[0022] Preferably, a plurality of air inlets are arranged at equal intervals at the dragon head position of the dragon kiln. An adjusting door is slidably installed at the air inlet at the dragon head of the dragon kiln.

[0023] Preferably, an inclined adjustment rack is slidably arranged at the position of the dragon cellar observation window, and adjustment gears corresponding to the sliding sealing door are evenly spaced on the outer wall of the dragon cellar. The sliding sealing door is provided with a strip groove, and extrusion springs are evenly spaced in the strip groove on the sliding sealing door. A fixed rack is installed on the extrusion spring, and the fixed rack is slidably arranged in the strip groove on the sliding sealing door.

[0024] Preferably, the arched door includes a square door, a fan-shaped door and a lifting spring, a lifting groove is provided at the upper end of the square door, the square door is rotatably arranged on the trapezoidal soil block of the dragon cellar, the fan-shaped door is slidably arranged in the lifting groove of the square door, and a lifting spring is provided between the fan-shaped door and the square door.

[0025] In summary, the present application includes at least one of the following beneficial technical effects:

[0026] 1. The opening and closing part of the present invention can control the opening and closing size of a plurality of observation windows on both sides of the kiln body during the firing process in the dragon kiln, control the amount of oxygen entering and leaving the dragon kiln, and further realize the control of the temperature in the dragon kiln, thereby indirectly improving the firing quality of the Jianzhan in the dragon kiln.

[0027] Second, the present invention realizes the opening and closing of the observation window through a sliding sealed door, which not only ensures the observation through the observation window, but also controls the size of the observation window to indirectly adjust the amount of oxygen entering the dragon cellar from the outside air. Secondly, controlling the size of the observation window can also synchronously control the movement of the sliding sealed doors outside several observation windows, thereby reducing manual participation and improving the timeliness of oxygen control. If the sliding sealed doors outside the observation window are opened and closed one by one, not only is the efficiency slow, but the amount of oxygen entering the dragon cellar cannot be controlled in time, thereby affecting the control of the temperature inside the dragon cellar.

[0028] 3. The opening and closing part of the present invention can separate the positions at different distances in the dragon cellar according to the number of Jianzhan to be processed. When firing different numbers of Jianzhan, dragon cellars of corresponding lengths can be used to avoid the need to use the entire dragon cellar, which greatly improves the utilization efficiency of the dragon cellar. At the same time, it can also ensure the quality of Jianzhan firing and save gas usage. At the same time, the opening and closing part is simple to operate and can quickly separate the dragon cellar. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0030] Figure 1 It is a schematic diagram of the main structure of the present invention.

[0031] Figure 2 It is a schematic diagram of the exterior of the dragon pit and part of its internal structure.

[0032] Figure 3 It is a schematic diagram of the internal structure of the dragon kiln of the present invention.

[0033] Figure 4 It is a schematic perspective structure diagram between the arched door and the linkage component of the present invention.

[0034] Figure 5 It is a schematic structure diagram among the arched door, the control component and the linkage component of the present invention.

[0035] Figure 6 It is an exploded view of the structure of the control component of the present invention.

[0036] Figure 7 It is a schematic structure diagram between the combustion component and the adjustment component of the present invention.

[0037] Figure 8 It is the present invention Figure 7 Partial enlarged view of part A in.

[0038] Fig. 9 It is a schematic structure diagram of the combustion component of the present invention.

[0039] In the figure, 1. Dragon kiln; 10. Dragon head; 11. Kiln body; 12. Dragon tail; 13. Observation window; 14. Storage opening; 2. Opening and closing part; 20. Arched door; 21. Arched frame; 3. Combustion component; 23. Square door; 24. Sector door; 25. Lifting spring; 15. Trapezoidal soil block; 16. External step; 4. Control component; 40. Arc frame; 41. Control gear; 42. Control handwheel; 43. Reversing gear; 44. Synchronous belt pulley; 45. Synchronous belt; 50. Main smoke exhaust pipe; 51. Auxiliary smoke exhaust pipe; 52. Secondary smoke exhaust pipe; 53. Linkage component; 530. Arc baffle; 531. Linkage compression spring; 532. C-shaped rod; 30. Gas transmission pipe; 31. Flame spraying gun; 32. Gas extension pipe; 33. Adjustment component; 330. Rotating sealing door; 331. Sliding sealing door; 100. Air inlet; 102. Adjustment door; 60. Adjustment rack; 61. Adjustment gear; 62. Extrusion spring; 63. Fixed rack. Detailed implementation mode

[0040] The following will Figure 1-Figure 9 be described in detail with reference to the embodiments of the present invention. However, the present invention can be implemented in many different ways defined and covered by the claims.

[0041] The embodiment of the present application discloses a gas-fired dragon kiln for firing Jianzhan; it is explained that the gas-fired dragon kiln for firing Jianzhan is mainly used in the process of firing Jianzhan; in the prior art, the openings on both sides of the kiln body cannot control the size of their opening and closing, which easily leads to the inability to control the amount of oxygen entering and leaving the dragon kiln 1 during the gas firing process, further resulting in the temperature in the dragon kiln 1 being unable to be controlled, affecting the firing quality of the Jianzhan in the dragon kiln 1.

[0042] Secondly, in the prior art, the cellar body 11 of the dragon cellar 1 is a long integrated structure. If the dragon cellar 1 is not full of Jianzhan tea leaves, part of the cellar body 11 of the dragon cellar 1 cannot be heated, and the prior art cannot control the firing length of the cellar body 11 of the dragon cellar 1. The entire cellar body 11 of the dragon cellar 1 needs to be preheated to a specified temperature each time, which greatly increases the cost of gas consumption. In addition, the heat in the dragon cellar 1 is dispersed, which can easily lead to uneven temperature distribution of the cellar body 11 where Jianzhan tea leaves are piled up, affecting its quality.

[0043] Therefore, the embodiment of the present application discloses a gas-fired dragon kiln for firing Jianzhan. Embodiment 1

[0044] Reference Figure 1 As shown, a gas-fired dragon kiln for firing Jianzhan includes a static dragon cellar 1, which is composed of a dragon head 10, a cellar body 11 and a dragon tail 12. The dragon cellar 1 is provided with a firing cavity for firing Jianzhan. The side walls of the dragon cellar 1 are also provided with a number of observation windows 13 and a storage port 14 for storing Jianzhan.

[0045] The dragon cellar 1 is an existing known structure, with two symmetrically distributed observation windows 13 on both sides of the dragon cellar 1, and storage openings 14 equally spaced on one side of the dragon cellar 1, wherein the storage openings 14 are mainly for operators to take and put Jianzhan, and the observation windows 13 are mainly used to observe the internal conditions during the firing of Jianzhan.

[0046] The dragon tail 12 of the dragon pit 1 is mainly used to remove dust and debris generated by Jianzhan during firing, and the dragon head 10 is mainly used for the entry and exit of oxygen.

[0047] Reference Figure 2 and Figure 3 As shown, the cellar body 11 of the dragon cellar 1 is partitioned at different distances according to the number of Jianzhan fired in the present invention; specifically, the opening and closing part 2 is arranged in the firing cavity of the dragon cellar 1 at equal intervals, and isolates or connects the space of the firing cavity of the dragon cellar 1, the opening and closing part 2 includes an arched door 20 for partitioning the cellar body 11 of the dragon cellar 1 and an arched frame 21 matched with the arched door 20, the arched frame 21 is integrally arranged on the dragon cellar 1 at equal intervals, the arched door 20 is rotatably arranged on the inner wall of the dragon cellar 1 at equal intervals, and the arched door 20 rotates from the side wall close to the dragon cellar 1 to the middle of the dragon cellar 1 and abuts against the arched frame 21.

[0048] The dragon cellar 1 is integrally formed and made of high temperature resistant material. The heightening of the cellar body 11 is to expand the firing cavity space and increase the capacity of Jianzhan firing. At the same time, it is convenient to open the storage port 14, so as to facilitate the kiln workers to load and unload the kiln and improve the labor efficiency.

[0049] A number of arched doors 20 are arranged at equal intervals inside the dragon pit 1, and the arched doors 20 can be opened and closed inside the dragon pit 1. When the entire dragon pit 1 only needs to fire part of the Jianzhan, the Jianzhan can be concentrated in one position, and then the other parts of the entire dragon pit 1 can be closed through the arched doors 20. In this way, when using gas to heat the dragon pit 1, it is only necessary to ensure that the area of ​​the pit body 11 where the Jianzhan is placed is heated to the specified temperature, which can greatly reduce the waste and consumption of gas, and at the same time can also ensure the quality of firing the Jianzhan.

[0050] A combustion component 3 is also provided at the observation port on the side wall of the dragon pit 1, and the combustion component 3 uses fuel gas as the main combustion source.

[0051] The opening and closing part 2 in the present invention can realize the partition of positions at different distances within the dragon cellar 1 according to the number of Jianzhan that need to be processed. When firing different numbers of Jianzhan, the dragon cellar 1 of corresponding length can be used to avoid the need to use the entire dragon cellar 1, which greatly improves the utilization efficiency of the dragon cellar 1. At the same time, it can also ensure the quality of Jianzhan firing and save gas usage. At the same time, the opening and closing part 2 is simple to operate and can quickly partition the dragon cellar 1.

[0052] Look again Figure 2 and Figure 3 As shown, it is a schematic diagram of the structure inside the dragon pit 1; the dragon pit 1 is provided with a trapezoidal soil block 15 for placing Jianzhan and integrally connected with the dragon pit 1. The outside of the dragon pit 1 is symmetrically provided with external steps 16, and the movement of the operator is achieved through the external steps 16. The trapezoidal soil block 15 is mainly used for placing Jianzhan, and the trapezoidal soil block 15 is made of high temperature resistant material. Ensure that the entire dragon pit 1 and the trapezoidal soil block 15 can withstand the invasion of high temperatures.

[0053] Reference Figure 4 , Figure 5 and Figure 6 As shown, that is, a schematic diagram of the structure for partitioning the cellar body 11 of the dragon cellar 1 in this embodiment; specifically, a control component 4 for controlling the opening and closing of the arch door 20 is also provided between the arch door 20 and the inner wall of the dragon cellar 1, and the control component 4 includes an arc frame 40, a control gear 41, a control wheel 42, a reversing gear 43, a synchronous pulley 44 and a synchronous belt 45.

[0054] In the initial state, the arch door 20 is made of high-temperature resistant refractory clay and can rotate; and in the initial state, the arch door 20 is against the inner walls on both sides of the dragon pit 1, so that the entire dragon pit 1 is in a smooth state from beginning to end.

[0055] An arc frame 40 is symmetrically installed on the back side of the arched door 20. One side of the arc frame 40 is a rack structure. The arc frame 40 slides through the trapezoidal soil block 15 in the dragon pit 1 and extends to the control window opened on the inner wall of the dragon pit 1. The control gear 41 is rotatably arranged in the control window opened on the inner wall of the dragon pit 1 and meshes with the arc frame 40; the control rocker 42 is arranged at the upper end of the control gear 41 to facilitate driving the control gear 41 to rotate.

[0056] When the dragon cellar 1 needs to be activated, first calculate the required length of the dragon cellar 1 according to the number of Jianzhan to be fired, and then cut off the cellar body 11 of the dragon cellar 1 that is not needed; specifically, rotate the control wheel 42, and the control wheel 42 drives the control gear 41 to rotate, and then the control gear 41 drives the arched door 20 connected to it to rotate around the hinge point through the arc frame 40, until the arched door 20 rests on the arched frame 21 integrated with the dragon cellar 1. At this time, the entire dragon cellar 1 is isolated from the designated position through the cooperation between the arched frame 21 and the arched door 20.

[0057] Therefore, a part of the dragon pit 1 will put the Jianzhan to be fired into the trapezoidal soil block 15 in the dragon pit 1 through the storage port 14 on the dragon pit 1 in sequence, ensuring that the Jianzhan will not touch each other and are placed in the order of installation; and the other part of the dragon pit 1 is directly isolated by the arch door 20, and at the same time, only the combustion components 3 of the dragon pit 1 where the Jianzhan are placed are started, which reduces the internal volume of the dragon pit 1, ensures its heating efficiency, and can further achieve the saving of gas in the combustion component 3.

[0058] See also Figure 6 As shown; wherein, the reversing gear 43 is rotatably arranged on the control gear 41 on one side, the synchronous pulleys 44 are respectively arranged at the control gear 41 away from the reversing gear 43 and the bottom of the reversing gear 43, and the synchronous belt 45 is sleeved between the two synchronous pulleys 44 in the width direction of the dragon pit 1.

[0059] It should be noted that when the control wheel 42 is rotated, the reversing gear 43 at the bottom of the control wheel 42, the control gear 41 and the control gear 41 which is symmetrical in the dragon cellar 1 and located on the other side of the dragon cellar 1 cooperate with the synchronous pulley 44 and the synchronous belt 45 to achieve the synchronous rotation of the two control gears 41. It should be noted that the reversing gear 43 can ensure that the rotation directions of the two control gears 41 symmetrical in the width direction of the dragon cellar 1 are always opposite, so as to ensure the synchronous extension and retraction of the two arc frames 40.

[0060] When the arch frame 21 at a certain position in the dragon pit 1 is closed, the interior of the dragon pit 1 can be heated up through the combustion component 3. When the interior of the dragon pit 1 reaches the specified temperature, it is maintained for a certain period of time until the Jianzhan in the dragon pit 1 can be fired. During this process, a certain amount of impurities and smoke will appear on the Jianzhan in the entire dragon pit 1 and the inner wall of the dragon pit 1, so they need to be removed in time.

[0061] Reference Figure 2 , Figure 3 and Figure 5 As shown, that is, a schematic diagram of the structure for handling dust in the present invention; specifically, a main smoke exhaust duct 50 is integrated at the dragon tail 12 of the dragon pit 1 for discharging dust generated during the firing of Jianzhan from bottom to top, and an auxiliary smoke exhaust duct 51 arranged on the top of the dragon pit 1 is integrated on one side of the main smoke exhaust duct 50, and a secondary smoke exhaust duct 52 is installed at the bottom of the auxiliary smoke exhaust duct 51 and at an equal distance from the inside of the dragon pit 1.

[0062] When the entire dragon cellar 1 is filled with a large number of Jianzhan, there is no need to partition the dragon cellar 1. At this time, the smoke and dust can be directly discharged through the main smoke exhaust duct 50. During the firing process of Jianzhan, oxygen enters into the dragon cellar 1 from the faucet 10 of the dragon cellar 1 and the observation window 13 opened on the side wall of the dragon cellar 1, so as to supply the dragon cellar 1 with oxygen and ensure that the gas can burn to heat up the interior of the dragon cellar 1.

[0063] When the entire dragon pit 1 is separated by the arch door 20, only part of the dragon pit 1 is filled with the Jianzhan to be fired. Therefore, due to the closure of the arch door 20, the main smoke exhaust duct 50 cannot discharge the smoke through the tail of the dragon pit 1. At this time, the secondary smoke exhaust duct 52 in front of the closed arch door 20 is opened to allow the smoke to pass through the corresponding secondary smoke exhaust duct 52, the auxiliary smoke exhaust duct 51 and then enter the main smoke exhaust duct 50 for discharge.

[0064] It should be noted that, in the initial state, several secondary smoke exhaust ducts 52 on the top of the dragon pit 1 are in a closed state. When the arch door 20 is closed, the corresponding secondary smoke exhaust ducts 52 are opened. The above steps can be achieved through the linkage component 53, and when the corresponding arch door 20 is closed, the corresponding secondary smoke exhaust duct 52 can be automatically opened through the linkage component 53 without manual opening and closing, as shown below.

[0065] See also Figure 4 and Figure 5As shown in the figure, a linkage component 53 for opening and closing is provided between the secondary smoke exhaust pipe 52 and the arched door 20. The linkage component 53 includes an arc-shaped baffle 530, a linkage compression spring 531, and a C-shaped rod 532. The arc-shaped baffle 530 is slidably arranged on the inner wall of the dragon kiln 1, and a chute for the arc-shaped baffle 530 to slide is opened on the dragon kiln 1. A linkage compression spring 531 is arranged between the arc-shaped baffle 530 and the chute on the dragon kiln 1. Through the linkage compression spring 531, the arc-shaped baffle 530 always has a tendency to approach the secondary smoke exhaust pipe 52. The C-shaped rod 532 is installed at one end of the arc-shaped baffle 530 away from the linkage compression spring 531. One side of the C-shaped rod 532 away from the arc-shaped baffle 530 penetrates through the top of the arched frame 21 and is in movable contact with the arched door 20.

[0066] In the initial state, due to the elastic force of the linkage compression spring 531, the arc-shaped baffle 530 always abuts against the smoke exhaust opening of the secondary smoke exhaust pipe 52, blocking the secondary smoke exhaust pipe 52 and preventing it from exhausting smoke.

[0067] When the arched door 20 is closed, the arched door 20 needs to abut against the corresponding arched frame 21. The C-shaped rod 532 is slidably arranged on the arched frame 21. When the arched door 20 approaches the arched frame 21 during rotation, the arched door 20 first abuts against the C-shaped rod 532, and then drives the C-shaped rod 532 to move synchronously. After the arched door 20 abuts against the outer wall of the arched frame 21, the C-shaped rod 532 drives the connected arc-shaped baffle 530 to move away from the secondary smoke exhaust pipe 52 until the smoke exhaust opening of the secondary smoke exhaust pipe 52 is opened. At this time, a part of the kiln body 11 of the dragon kiln 1 is in communication with the secondary smoke exhaust pipe 52, the auxiliary smoke exhaust pipe 51, and the main smoke exhaust pipe 50. When the inside of the dragon kiln 1 is heated, the soot can form a passage through the secondary smoke exhaust pipe 52, the auxiliary smoke exhaust pipe 51, and the main smoke exhaust pipe 50, facilitating its discharge. The air circulation and cycle between the inside of the dragon kiln 1 and the outside are realized.

[0068] Look again Figure 4 and Figure 5 As shown in the figure, it is a schematic structural diagram of the arched door 20; the arched door 20 includes a square door 23, a fan-shaped door 24, and a lifting spring 25. A lifting groove is provided at the upper end of the square door 23. The square door 23 is rotatably arranged on the trapezoidal soil block 15 of the dragon kiln 1. The fan-shaped door 24 is slidably arranged in the lifting groove of the square door 23. A lifting spring 25 is arranged between the fan-shaped door 24 and the square door 23.

[0069] When closing the arched door 20, the fan-shaped door 24 extends out of the lifting groove of the square door 23; when opening the arched door 20, the fan-shaped door 24 contracts into the lifting groove of the square door 23, and its contraction is mainly completed by being squeezed between the inner wall of the top of the dragon kiln 1.

[0070] Refer to Figure 8 and Fig. 9As shown, it is a structural schematic diagram of the combustion component 3 in the present invention; specifically, the combustion component 3 includes a gas delivery pipeline 30, a flame spray gun 31, a gas extension pipeline 32 and an adjustment component 33 for adjusting the oxygen intake amount for the observation window 13 and the storage port 14, the gas delivery pipeline 30 is symmetrically arranged on both sides of the dragon pit 1 in the width direction, the gas extension pipelines 32 are arranged on the gas delivery pipeline 30 at equal intervals, and the gas extension pipeline 32 extends from one end of the gas delivery pipeline 30 toward the observation window 13 of the dragon pit 1, the flame spray gun 31 is arranged at the observation window 13, and the flame spray gun 31 is connected to the gas extension pipeline 32; the adjustment component 33 is arranged at the observation window 13 and the storage port 14.

[0071] It should be noted that the flame spray gun 31 is a known structure, which can use gas to generate flames and then heat and roast the inside of the dragon pit 1.

[0072] The function of the gas extension pipe 32 is to prevent the gas transmission pipe 30 from being too close to the dragon pit 1. Because when the dragon pit 1 is firing Jianzhan, its temperature is as high as more than 1,300 degrees or even higher. Therefore, the area around the dragon pit 1 will also be affected to a certain extent by the high temperature, resulting in its surrounding temperature being higher than other locations. Gas is flammable and explosive. Operators need to work around the dragon pit 1 to avoid damage to the gas transmission pipe 30 and set it away from the dragon pit 1. The gas extension pipe 32 can avoid the risk of gas explosion. At the same time, the gas extension pipe 32 is set in the external steps, which can further avoid the risk of being stepped on and subjected to high temperatures.

[0073] The flame spray gun 31 is arranged at the position of the observation window 13. When it is necessary to fire the Jianzhan, the flame spray gun 31 is started, and then the flame spray gun 31 sprays fire to the inside of the dragon pit 1 to accelerate the rise of its internal temperature. At the same time, the operator can observe the internal situation through the observation port, and the adjustment component 33 can control the size of the observation window 13 and the size of the air inlet 100 at the position of the faucet 10 of the dragon pit 1, so as to adjust the oxygen supply inside the dragon pit 1, thereby indirectly adjusting its internal temperature and the size of the flame sprayed by the flame spray gun 31. The flame spray gun 31 is an existing known structure and can also adjust its size, which will not be elaborated here.

[0074] See also Figure 7 As shown, it is a structural schematic diagram of adjusting the size of the air inlet 100 and the observation window 13 of the faucet 10 of the dragon cellar 1 in the present invention; the adjustment component 33 includes a rotating sealing door 330 and a sliding sealing door 331, the rotating sealing door 330 is rotatably installed at the storage port 14 of the dragon cellar 1 through an auxiliary rotating shaft, and the sliding sealing door 331 is slidably set at the observation window 13 of the dragon cellar 1, and the area of ​​the observation window 13 is controlled by moving the sliding sealing door 331 to achieve the adjustment of the oxygen intake.

[0075] A plurality of air inlets 100 are arranged at equal intervals at the position of the faucet 10 of the dragon cellar 1 , and an adjusting door 102 is slidably installed at the air inlet 100 at the faucet 10 of the dragon cellar 1 .

[0076] In the initial state, the rotary sealing door 330 rotates and closes at the position of the storage opening 14 of the dragon cellar 1 to close the storage opening 14. When the Jianzhan needs to be placed or taken out, the rotary sealing door 330 can be opened to take out the Jianzhan through the storage opening 14 of the dragon cellar 1.

[0077] The sliding sealed door 331 slides and closes at the observation port of the dragon cellar 1. When it is necessary to observe the situation inside the dragon cellar 1, the sliding sealed door 331 can be pushed to observe the situation inside the dragon cellar 1; when it is necessary to control the temperature inside the dragon cellar 1, the temperature inside the dragon cellar 1 can be indirectly controlled by controlling the amount of oxygen entering the dragon cellar 1.

[0078] The air inlet 100 at the faucet 10 of the dragon cellar 1 can also control the amount of oxygen by controlling the position of the regulating door 102 to change the size of the air inlet 100. Embodiment 2

[0079] Reference Figure 8 As shown, on the basis of the first embodiment, in order to further ensure the movement efficiency of the sliding sealing door 331 at the observation port, the present invention further proposes an adjustment rack 60, which can synchronously move a plurality of sliding sealing doors 331 on the side wall of the dragon cellar 1.

[0080] Specifically, the rotating sealing door 330, the sliding sealing door 331 and the adjusting door 102 are provided with refractory clay.

[0081] The refractory clay in the present invention is used for high temperature resistance and fire prevention, ensuring the connection stability between the refractory clay and the rotating sealing door 330, the sliding sealing door 331 and the adjusting door 102, while playing the role of isolating high temperature.

[0082] An inclined adjustment rack 60 is slidably arranged at the position of the observation window 13 of the dragon pit 1, and adjustment gears 61 corresponding to the sliding sealing door 331 are evenly spaced on the outer wall of the dragon pit 1. The sliding sealing door 331 is provided with a strip groove, and extrusion springs 62 are evenly spaced in the strip groove. A fixed rack 63 is installed on the extrusion spring 62, and the fixed rack 63 is slidably arranged in the strip groove on the sliding sealing door 331.

[0083] During the specific implementation process, when the operator needs to control the entire sliding sealing door 331, the operator moves the adjustment rack 60, the adjustment rack 60 drives several adjustment gears 61 to rotate synchronously, and the adjustment gear 61 drives the sliding sealing door 331 engaged at its bottom to move, thereby realizing the movement of several sliding sealing doors 331.

[0084] However, it should be noted that only the part of the adjusting rack 60 close to the sliding seal door 331 is in the form of a rack, and the other parts are mainly replaced by integrally connected rods, aiming to save costs.

[0085] When it is necessary to move a sliding seal door 331 alone, just press down the fixed rack 63 on the sliding seal door 331.

[0086] During operation: In the first step, when it is necessary to activate the Longyao 1, first calculate how long the Longyao 1 is needed according to the number of Jianzhan to be fired, and calculate the placement position of the Jianzhan based on the existing Longyao 1.

[0087] In the second step: Subsequently, it is necessary to rotate the arched door 20 at the corresponding position to partition the Longyao 1; rotate the control handwheel 42, and the control handwheel 42 drives the control gear 41 to rotate. Then, the control gear 41 drives the arched door 20 connected thereto to rotate around the hinge point through the arc-shaped frame 40 until the arched door 20 abuts against the arched frame 21 integrally provided with the Longyao 1. At this time, the entire Longyao 1 is isolated from the designated position through the cooperation between the arched frame 21 and the arched door 20.

[0088] In the third step: After the Longyao 1 is isolated, place the Jianzhan to be fired into the partitioned Longyao 1 through the storage port 14 of the Longyao 1, then close the storage port 14 of the Longyao 1. Subsequently, heat up the interior of the Longyao 1 through the flame spray gun 31. When the interior of the Longyao 1 reaches the designated temperature, maintain it for a certain period of time until the Jianzhan in the Longyao 1 can be fired.

[0089] In the fourth step: When the arched door 20 is closed, the arched door 20 needs to abut against the corresponding arched frame 21, and a U-shaped rod 532 is slidably arranged on the arched frame 21. When the arched door 20 approaches the arched frame 21 during rotation, the arched door 20 first abuts against the U-shaped rod 532, and then drives the U-shaped rod 532 to move synchronously. After the arched door 20 abuts against the outer wall of the arched frame 21, the U-shaped rod 532 drives the connected arc-shaped baffle 530 to move away from the secondary smoke exhaust pipe 52 until the smoke exhaust port of the secondary smoke exhaust pipe 52 is opened. At this time, a part of the kiln body 11 of the Longyao 1 is in communication with the secondary smoke exhaust pipe 52, the auxiliary smoke exhaust pipe 51, and the main smoke exhaust pipe 50. When the interior of the Longyao 1 is heated up, the soot can form a channel through the secondary smoke exhaust pipe 52, the auxiliary smoke exhaust pipe 51, and the main smoke exhaust pipe 50, facilitating its discharge and realizing the circulation of the air inside the Longyao 1 and the outside air.

[0090] In the fifth step: When the Jianzhan is fired and the entire Longyao 1 is cooled, take out the fired Jianzhan.

[0091] It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, from any point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the appended claims rather than the above description, and therefore it is intended that all changes within the meaning and scope of the equivalent elements of the claims are included in the present invention, and any figure marks in the claims should not be regarded as limiting the claims involved.

[0092] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A gas-fired dragon kiln for firing Jianzhan, a stationary dragon cellar (1), the dragon cellar (1) consisting of a dragon head (10), a cellar body (11) and a dragon tail (12), a firing inner cavity for firing Jianzhan being provided in the dragon cellar (1), a plurality of observation windows (13) and a storage port (14) for storing Jianzhan being provided on the side wall of the dragon cellar (1), Features: include An opening and closing portion (2) is arranged at equal intervals in the firing cavity of the dragon pit (1) and isolates or connects the space of the firing cavity of the dragon pit (1). The opening and closing portion (2) comprises an arched door (20) for isolating the cellar body (11) of the dragon pit (1) and an arched frame (21) matched with the arched door (20). The arched frame (21) is integrally arranged on the dragon pit (1) at equal intervals, and the arched door (20) is rotatably arranged on the inner wall of the dragon pit (1) at equal intervals. The arched door (20) rotates from the side wall close to the dragon pit (1) to the middle of the dragon pit (1) and abuts against the arched frame (21). A combustion component (3) is also arranged at the observation window (13) on the side wall of the dragon pit (1); The combustion component (3) comprises a gas delivery pipeline (30), a flame spray gun (31), a gas extension pipeline (32), and an adjustment component (33) for adjusting the oxygen intake amount for the observation window (13) and the storage port (14); the gas delivery pipeline (30) is symmetrically arranged on both sides of the dragon pit (1) in the width direction; the gas extension pipeline (32) is arranged on the gas delivery pipeline (30) at equal intervals, and one end of the gas extension pipeline (32) away from the gas delivery pipeline (30) extends in the direction of the observation window (13) of the dragon pit (1); the flame spray gun (31) is arranged at the observation window (13), and the flame spray gun (31) is connected to the gas extension pipeline (32); the adjustment component (33) is arranged at the observation window (13) and the storage port (14); the adjustment component (33) comprises a rotating sealing door (330) and a sliding sealing door (331); An inclined adjustment rack (60) is slidably arranged at the position of the observation window (13) of the dragon pit (1); adjustment gears (61) corresponding to the sliding sealing door (331) are arranged at equal intervals on the outer wall of the dragon pit (1); a strip groove is opened on the sliding sealing door (331); extrusion springs (62) are arranged at equal intervals in the strip groove on the sliding sealing door (331); a fixed rack (63) is installed on the extrusion spring (62); and the fixed rack (63) is slidably arranged in the strip groove on the sliding sealing door (331); A main smoke exhaust pipe (50) for exhausting dust generated during the firing of Jianzhan lamps is integrated at the dragon tail (12) of the dragon pit (1), and a secondary smoke exhaust pipe (51) arranged on the top of the dragon pit (1) is integrated on one side of the main smoke exhaust pipe (50), and a secondary smoke exhaust pipe (52) is installed at the bottom of the secondary smoke exhaust pipe (51) at an equal distance from the inside of the dragon pit (1); A linkage component (53) for opening and closing is provided between the secondary exhaust duct (52) and the arched door (20). The linkage component (53) includes an arc-shaped baffle (530), a linkage compression spring (531), and a C-shaped rod (532). The arc-shaped baffle (530) is slidably arranged on the inner wall of the dragon kiln (1), and a sliding groove for the arc-shaped baffle (530) to slide is provided on the dragon kiln (1). A linkage compression spring (531) is arranged between the arc-shaped baffle (530) and the sliding groove on the dragon kiln (1). The arc-shaped baffle (530) is always urged to approach the secondary exhaust duct (52) by the linkage compression spring (531). The C-shaped rod (532) is installed at one end of the arc-shaped baffle (530) away from the linkage compression spring (531). One side of the C-shaped rod (532) away from the arc-shaped baffle (530) penetrates through the top of the arched frame (21) and is in movable contact with the arched door (20).

2. A gas-fired dragon kiln for firing Jianzhan according to claim 1, characterized in that: A trapezoidal soil block (15) for placing Jianzhan and integrally connected to the dragon kiln (1) is arranged inside the dragon kiln (1), and external steps (16) are symmetrically arranged outside the dragon kiln (1).

3. A gas-fired dragon kiln for firing Jianzhan according to claim 2, characterized in that: A control member (4) for facilitating the control of the opening and closing of the arched door (20) is further arranged between the arched door (20) and the inner wall of the dragon kiln (1). The control member (4) includes an arc-shaped frame (40), a control gear (41), a control handwheel (42), a reversing gear (43), a synchronous belt pulley (44), and a synchronous belt (45). Arc-shaped frames (40) are symmetrically installed on the back side of the arched door (20). One side of the arc-shaped frame (40) is a rack structure. The arc-shaped frame (40) slidably penetrates through the trapezoidal soil block (15) inside the dragon kiln (1) and extends towards a control window opened on the inner wall of the dragon kiln (1). The control gear (41) is rotatably arranged in the control window opened on the inner wall of the dragon kiln (1) and meshes with the arc-shaped frame (40); The reversing gear (43) is rotatably arranged on one of the control gears (41). The synchronous belt pulleys (44) are respectively arranged at the bottoms of the control gear (41) and the reversing gear (43) away from the reversing gear (43). The synchronous belt (45) is sleeved between the two synchronous belt pulleys (44) in the width direction of the dragon kiln (1); The control handwheel (42) is arranged at the upper end of the control gear (41) to facilitate driving the control gear (41) to rotate.

4. A gas-fired dragon kiln for firing Jianzhan according to claim 1, characterized in that: The rotating sealing door (330) is rotatably installed at the storage opening (14) of the dragon kiln (1) through an auxiliary rotating shaft. The sliding sealing door (331) is slidably arranged at the observation window (13) of the dragon kiln (1). The opening area of the observation window (13) is controlled by the sliding sealing door (331) to adjust the oxygen intake.

5. A gas-fired dragon kiln for firing Jianzhan according to claim 1, characterized in that: A plurality of air inlets (100) are arranged at equal intervals at the position of the faucet (10) of the dragon cellar (1), and an adjustable door (102) is slidably installed at the air inlet (100) at the faucet (10) of the dragon cellar (1).

6. A gas-fired dragon kiln for firing Jianzhan according to claim 2, Features: The arched door (20) comprises a square door (23), a fan-shaped door (24) and a lifting spring (25); a lifting groove is provided at the upper end of the square door (23); the square door (23) is rotatably arranged on a trapezoidal soil block (15) of the dragon pit (1); the fan-shaped door (24) is slidably arranged in the lifting groove of the square door (23); and a lifting spring (25) is provided between the fan-shaped door (24) and the square door (23).