Multi-track variable load traversing turnout system and method
By integrating the combination of the gantry crane's movable rails and the horizontal and longitudinal rails on the trolley, the problem that the precast beam transfer equipment cannot be moved laterally in the existing technology is solved, and the flexible transfer and efficient production of the precast beams are realized, reducing costs and improving efficiency.
Patent Information
- Application Number
- CN202411200978.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-10-01
AI Technical Summary
Existing precast beam transfer equipment cannot realize lateral movement of carrying precast beams without relying on lifting equipment, which limits the flexibility and efficiency of the transfer process.
A multi-track variable load transverse turnout system is designed. The trolley is integrated with the movable track of the gantry crane, which can be connected with the fixed track of the gantry crane on the ground. The trolley is both a carrier and a platform for temporarily carrying the gantry crane. Through the lateral shift The combination with longitudinal shifting rails enables flexible transfer of prefabricated beams.
It realizes the convenient movement of the gantry crane and the efficient transfer of prefabricated beams, reduces the cost of earthworks, improves production efficiency, and ensures the stability and constant acceleration of the beam transport process through the control of the limit seat and variable frequency motor.
Smart Images

Figure CN118723458A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated beam transportation, and in particular to a multi-track variable load transverse turnout system and method. Background Art
[0002] The transportation of precast beams is an important link in the production process of precast components. After completion, special equipment, such as a beam transport vehicle, is required to rotate them. This process requires strict control of the transportation speed to ensure stability during the transportation process.
[0003] The existing prefabricated beam transfer equipment uses a sunken double-deck rail ferry flat car to lift the top and move the chassis horizontally to achieve operation. The trolley is used in the prefabrication area and tensioning area of the beam yard. After the beam is lifted away, the flat car transports the pedestal to the revolving track, and the beam transfer pedestal rotates to the prefabrication area to continue transporting the beam. The horizontal movement of the mobile pedestal can be achieved without affecting the tensioning operation. However, the premise of this mode of operation is that the gantry crane or beam lifting machine lifts the beam from the mobile pedestal, and the mobile pedestal moves horizontally without load. This method is dependent on the lifting equipment and cannot achieve horizontal movement with the prefabricated beam. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention develops a multi-track variable load transverse shifting turnout system and method. The trolley carries a movable track for the gantry crane, which is docked with a fixed track for the gantry crane set on the ground, thus facilitating the movement of the gantry crane. The trolley can be used as a vehicle for transporting the mobile pedestal and also has the function of temporarily carrying the gantry crane. It has comprehensive functions and low construction and use costs.
[0005] The technical solution to the technical problem solved by the present invention is: a multi-track variable load transverse turnout system, including a prefabrication area, a beam storage area, a transverse tensioning area, a transverse unit, a longitudinal unit and a gantry crane, wherein the transverse unit is arranged in the transverse tensioning area, including a transverse track and a trolley, wherein the transverse track array is arranged, and when laying, it is necessary to ensure that the transverse tracks are parallel to each other and have a uniform elevation, wherein the trolley adopts an assembled structure, which is spliced in four sections and connected by bolts, and can be adjusted according to the required length, wherein the trolley includes a movable base and a movable The track and the movable track of the gantry crane, the movable track of the mobile pedestal and the movable track of the gantry crane are connected into a whole by steel sections, the movable track of the mobile pedestal is connected to the transverse track, the longitudinal movement part includes a fixed track of the mobile pedestal, a return track and a mobile pedestal, the fixed track of the mobile pedestal is connected to the transverse movement part, the return track is connected to the transverse movement part, the mobile pedestal is connected to the fixed track of the mobile pedestal, the beam storage area is provided with a fixed track of the gantry crane, and the gantry crane is connected to the fixed track of the gantry crane.
[0006] Preferably, the longitudinal displacement parts are arranged in an array.
[0007] Preferably, the movable track of the movable pedestal and the movable track of the gantry crane include a first main beam, a first driving wheel and a first driven wheel, the first driving wheel and the first driven wheel are arranged on the first main beam, the first driving wheel is driven by a first motor, and the first driving wheel and the first driven wheel are rollingly connected to the transverse track.
[0008] Preferably, the mobile pedestal includes a second main beam, a second driving wheel, a second driven wheel and a limit seat, the second driving wheel and the second driven wheel are arranged on the second main beam, the limit seat is arranged on the side of the second main beam close to the transverse movement part, the second driving wheel is driven by a second motor, and the second driving wheel and the second driven wheel are rollingly connected to the fixed track of the mobile pedestal.
[0009] Preferably, the second motor is a variable frequency motor.
[0010] A multi-track variable load transverse shifting method, using the multi-track variable load transverse shifting turnout system to move prefabricated beams, comprises the following steps: Step 1: The trolley moves unloaded to the position where the movable track of the mobile pedestal is docked with the fixed track of the mobile pedestal; Step 2: Place the precast beam on the mobile pedestal, then move the mobile pedestal to the top of the trolley and temporarily fix it; Step 3: The trolley drives the movable pedestal and the prefabricated beam to move to the beam storage area, and docks the movable rail of the gantry crane with the fixed rail of the gantry crane. The gantry crane moves from the fixed rail of the gantry crane to the movable rail of the gantry crane; Step 4: After the tensioning operation is completed, the gantry crane lifts the precast beam off the movable platform, the trolley moves to the return track, and the gantry crane moves back to the gantry crane fixed track; Step 5: The trolley moves to the position where the movable rail of the mobile pedestal is docked with the return rail; Step 6: After the mobile pedestal moves to the return track, the trolley moves empty to the joint between the movable track of the mobile pedestal and the fixed track of the mobile pedestal, and repeats the next cycle operation.
[0011] Preferably, in step 2, after the prefabricated beam is placed on the movable pedestal, the side close to the transverse moving part is clamped on the limit seat.
[0012] Preferably, the movable platform is driven by a second motor, and the second motor is a variable frequency motor. The movable platform is controlled to move slowly during beam transport and to move quickly during return.
[0013] The effects provided in the content of the invention are only the effects of the embodiments, rather than all the effects of the invention. The above technical solution has the following advantages or beneficial effects: 1. The trolley of the present invention carries a movable rail for the gantry crane, which can be used as a passage rail for the gantry crane and docked with the fixed rail for the gantry crane on the ground, so as to facilitate the longitudinal movement of the gantry crane. The ground excavation is only located in the tensioning and transverse movement area, thus avoiding excessive earthwork and reducing temporary construction costs. 2. The trolley acts as a "bridge" and has the function of carrying the mobile pedestal and prefabricated beams. It also has the function of temporarily carrying the load-bearing gantry crane. The equipment has comprehensive functions and can be used for multiple purposes. 3. By setting the limit seat, the prefabricated beam can be prevented from displacement when the mobile pedestal moves; 4. By using a variable frequency motor as the second motor, the mobile platform is controlled to move slowly during beam transport and quickly during return, which can also ensure constant acceleration during beam transport and reduce the impact on the beam body; 5. By setting up the longitudinal shifting part array, multiple production lines can be formed, and operations can be started from other production lines immediately after one group of production lines is completed, thereby improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 A top view of the movable track of the mobile platform of the present invention docking with the fixed track of the mobile platform; Figure 2 It is a top view of the connection between the movable rail of the gantry crane and the fixed rail of the gantry crane of the present invention; Figure 3 This is the front view of the mobile pedestal; Figure 4 It is the right side view of the mobile platform; Figure 5 is a top view of the trolley; Figure 6 It is the left view of the trolley; Figure 7 This is the position status diagram of each component in step 1; Figure 8 This is the position status diagram of each component in step 2; Fig. 9 This is the position status diagram of each component in step 3; Fig.10 This is the position status diagram of each component in step 4; Fig.11 This is the position status diagram of each component in step 5; Fig.12 This is the position status diagram of each component in step 6.
[0015] Among them: 1. Prefabrication area; 2. Beam storage area; 3. Transverse tensioning area; 4. Transverse track; 5. Trolley; 51. Movable track of mobile pedestal; 511. First main beam; 512. First driving wheel; 513. First driven wheel; 514. First motor; 52. Movable track of gantry crane; 6. Fixed track of mobile pedestal; 7. Return track; 8. Mobile pedestal; 81. Second main beam; 82. Second driving wheel; 83. Second driven wheel; 84. Limit seat; 85. Second motor; 9. Fixed track of gantry crane; 10. Gantry crane. DETAILED DESCRIPTION
[0016] In order to clearly illustrate the technical features of the present invention, the present invention is described in detail below through specific implementation methods and in conjunction with the accompanying drawings.
[0017] Example 1 See also Figures 1 to 12 A multi-track variable load transverse turnout system comprises a prefabrication area 1, a beam storage area 2, a transverse tensioning area 3, a transverse portion, a longitudinal portion and a gantry crane 10, wherein the transverse portion is arranged in the transverse tensioning area 3, and comprises a transverse track 4 and a trolley 5, wherein the transverse track 4 is arranged in an array, the trolley 5 comprises a movable track 51 of a mobile pedestal and a movable track 52 of a gantry crane, wherein the movable track 51 of the mobile pedestal and the movable track 52 of the gantry crane are connected as a whole by steel sections, the movable track 51 of the mobile pedestal is connected to the transverse track 4, the longitudinal portion comprises a fixed track 6 of a mobile pedestal, a return track 7 and a mobile pedestal 8, the fixed track 6 of the mobile pedestal is connected to the transverse portion, the return track 7 is connected to the transverse portion, the mobile pedestal 8 is connected to the fixed track 6 of the mobile pedestal, the beam storage area 2 is provided with a fixed track 9 of a gantry crane, and the gantry crane 10 is connected to the fixed track 9 of the gantry crane.
[0018] like Figure 1 and Figure 2 As shown, the longitudinal moving parts are arranged in an array.
[0019] like Figure 1 , Figure 5 and Figure 6 As shown, the movable track 51 of the mobile pedestal and the movable track 52 of the gantry crane include a first main beam 511, a first driving wheel 512 and a first driven wheel 513, the first driving wheel 512 and the first driven wheel 513 are arranged on the first main beam 511, the first driving wheel 512 is driven by a first motor 514, and the first driving wheel 512 and the first driven wheel 513 are rollingly connected to the transverse track 4.
[0020] like Figure 1 , Figure 3 and Figure 4As shown, the mobile platform 8 includes a second main beam 81, a second driving wheel 82, a second driven wheel 83 and a limit seat 84. The second driving wheel 82 and the second driven wheel 83 are arranged on the second main beam 81. The limit seat 84 is arranged on the side of the second main beam 81 close to the transverse movement part. The second driving wheel 82 is driven by a second motor 85. The second driving wheel 82 and the second driven wheel 83 are rollingly connected to the fixed rail 6 of the mobile platform; the second motor 85 adopts a variable frequency motor.
[0021] like Figures 7 to 12 As shown, a multi-track variable load transverse shifting method uses the multi-track variable load transverse shifting turnout system to move the precast beam, comprising the following steps: Step 1: First, start the first motor 514 of the trolley 5 to drive the first driving wheel 512 to rotate, and drive the trolley 5 to move unloaded along the transverse track 4 to the position where the movable track 51 of the mobile platform is precisely connected with the fixed track 6 of the mobile platform; Step 2: Place the precast beam on the mobile pedestal 8, and clamp the side of the precast beam close to the transverse moving part on the limit seat 84. At this time, the limit seat 84 on the mobile pedestal 8 can play a good positioning and fixing role to prevent the precast beam from shifting or sliding during the movement. Then, start the second motor 85 of the mobile pedestal 8 to drive the second driving wheel 82 to rotate, and drive the mobile pedestal 8 to slowly move along the mobile pedestal fixed track 6 to the top of the trolley 5. During the movement of the mobile pedestal 8, the control system needs to adjust the speed and torque of the second motor 85 in real time according to the weight of the precast beam and the operating status of the mobile pedestal 8 to ensure that the mobile pedestal 8 can move smoothly to the top of the trolley 5 and be temporarily fixed. When the mobile pedestal 8 moves to the top of the trolley 5, the mobile pedestal 8 is temporarily fixed on the trolley 5; Step 3: Start the first motor 514 of the trolley 5, drive the trolley 5 to drive the movable pedestal 8 and the precast beam to move along the transverse track 4 to the beam storage area 2. When the trolley 5 moves to the beam storage area 2, the gantry crane movable track 52 is accurately docked with the gantry crane fixed track 9. Then, the gantry crane 10 moves along the gantry crane fixed track 9 to the gantry crane movable track 52; Step 4: tension the precast beam. After the tensioning operation is completed, start the gantry crane 10 to lift the precast beam off the mobile pedestal 8. After the gantry crane 10 lifts the precast beam off the mobile pedestal 8, it moves back to the gantry crane fixed track 9, and the trolley 5 starts to move toward the return track 7. At the same time, the gantry crane 10 lifts the precast beam along the gantry crane fixed track 9 to the designated storage location or performs the next construction operation; Step 5: The trolley 5 continues to move along the return track 7 until it moves to the position where the movable track 51 of the movable platform docks with the return track 7; Step 6: Start the second motor 85 of the mobile platform 8, control it to reverse, and drive the mobile platform 8 to move along the return track 7 toward the prefabrication area 1. The second motor 85 uses a variable frequency motor, which controls the mobile platform 8 to move slowly when transporting beams and controls the mobile platform 8 to move quickly when returning. During the return process of the mobile platform 8, the speed of the second motor 85 can be adjusted as needed to make it move quickly to improve work efficiency. After the mobile platform 8 moves to the prefabrication area 1, the trolley 5 moves unloaded to the joint between the movable track 51 of the mobile platform and the fixed track 6 of the mobile platform, waiting for the loading and transfer operation of the next prefabricated beam.
[0022] How it works The system mainly realizes efficient transverse and longitudinal movement of precast beams through the coordinated operation of various parts. The transverse track 4 of the transverse movement part serves as the basic support, and the movable track 51 of the mobile platform of the trolley 5 and the movable track 52 of the gantry crane are connected into a whole through steel sections. With the help of the first driving wheel 512 driven by the first motor 514 and the cooperation of the first driven wheel 513, it can move smoothly along the transverse track 4, thereby driving the mobile platform 8 and the precast beam connected thereon to adjust the lateral position. The fixed track 6 and the return track 7 of the mobile platform of the longitudinal movement part are responsible for the longitudinal movement of the mobile platform 8. The second driving wheel 82 of the mobile platform 8 driven by the second motor 85 and the cooperation of the second driven wheel 83 can perform precise longitudinal displacement along the fixed track 6 and the return track 7 of the mobile platform. The gantry crane 10 realizes the lifting and transfer operation of the precast beam by switching between the fixed track 9 of the gantry crane and the movable track 52 of the gantry crane. The entire system realizes the flexible transportation of precast beams between the precast area 1, the beam storage area 2 and the transverse tensioning area 3 through the coordination of various tracks.
[0023] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Based on the technical solution of the present invention, various modifications or variations that can be made by those skilled in the art without creative work are still within the scope of protection of the present invention.
Claims
1. A multi-track variable load traverse turnout system, characterized in that: The invention comprises a prefabrication area (1), a beam storage area (2), a transverse movement tensioning area (3), a transverse movement part, a longitudinal movement part and a gantry crane (10), wherein the transverse movement part is arranged in the transverse movement tensioning area (3), comprises a transverse movement track (4) and a trolley (5), wherein the transverse movement track (4) is arranged in an array, and the trolley (5) comprises a movable track of a movable pedestal (51) and a movable track of a gantry crane (52), wherein the movable track of the movable pedestal (51) and the movable track of the gantry crane (52) are connected to form a whole through a steel section, and ... The movable rail (51) of the movable pedestal is connected to the transverse rail (4); the longitudinal movement part comprises a movable pedestal fixed rail (6), a return rail (7) and a movable pedestal (8); the movable pedestal fixed rail (6) is connected to the transverse movement part; the return rail (7) is connected to the transverse movement part; the movable pedestal (8) is connected to the movable pedestal fixed rail (6); the beam storage area (2) is provided with a gantry crane fixed rail (9); and the gantry crane (10) is connected to the gantry crane fixed rail (9).
2. A multi-track variable load traverse turnout system according to claim 1, characterized in that: The longitudinal shifting parts are arranged in an array.
3. A multi-track variable load traverse turnout system according to claim 2, characterized in that: The movable platform movable track (51) and the gantry crane movable track (52) comprise a first main beam (511), a first driving wheel (512) and a first driven wheel (513); the first driving wheel (512) and the first driven wheel (513) are arranged on the first main beam (511); the first driving wheel (512) is driven by a first motor (514); and the first driving wheel (512) and the first driven wheel (513) are rollingly connected to the transverse track (4).
4. A multi-track variable load traverse turnout system according to claim 3, characterized in that: The movable platform (8) comprises a second main beam (81), a second driving wheel (82), a second driven wheel (83) and a limit seat (84); the second driving wheel (82) and the second driven wheel (83) are arranged on the second main beam (81); the limit seat (84) is arranged on a side of the second main beam (81) close to the transverse portion; the second driving wheel (82) is driven by a second motor (85); and the second driving wheel (82) and the second driven wheel (83) are rollingly connected to a fixed track (6) of the movable platform.
5. A multi-track variable load traverse turnout system according to claim 4, characterized in that: The second motor (85) is a variable frequency motor.
6. A multi-track variable load transverse shifting method, using the multi-track variable load transverse shifting turnout system of claim 5 to move precast beams, characterized in that: The following steps are involved: Step 1: The trolley (5) moves unloaded to a position where the movable rail (51) of the mobile pedestal is docked with the fixed rail (6) of the mobile pedestal; Step 2: Place the prefabricated beam on the movable pedestal (8), and then move the movable pedestal (8) to the top of the trolley (5) and temporarily fix it; Step 3: The trolley (5) drives the movable pedestal (8) and the prefabricated beam to move to the beam storage area (2), and docks the gantry crane movable rail (52) with the gantry crane fixed rail (9), and the gantry crane (10) moves from the gantry crane fixed rail (9) to the gantry crane movable rail (52); Step 4: After the tensioning operation is completed, the gantry crane (10) lifts the prefabricated beam off the movable platform (8), the trolley (5) moves to the return track (7), and the gantry crane (10) moves back to the gantry crane fixed track (9); Step 5: The trolley (5) moves to a position where the movable rail (51) of the movable pedestal is docked with the return rail (7); Step 6: After the movable platform (8) moves to the return track (7), the trolley (5) moves unloaded to the joint between the movable track (51) of the movable platform and the fixed track (6) of the movable platform, and repeats the next cycle operation.
7. A multi-track variable load traverse method according to claim 6, characterized in that: In step 2, after the prefabricated beam is placed on the movable platform (8), the side close to the transverse movement portion is clamped on the limit seat (84).
8. A multi-track variable load traverse method according to claim 6, characterized in that: The movable platform (8) is driven by a second motor (85), and the second motor (85) is a variable frequency motor. The movable platform (8) is controlled to move slowly during beam transport, and is controlled to move quickly during return.
Citation Information
Cited By
Transverse moving ferry vehicle with gantry crane track, working method of transverse moving ferry vehicle, precast beam production line and precast beam transferring method
CN118992438A
Travelling transfer car with portal crane track, working method thereof, precast beam production line and precast beam transfer method
CN118992438B