Underground water in-situ remediation efficiency prediction and optimization method and system
By obtaining groundwater pollutant concentration data, determining anomalies in controllable factors and generating candidate remediation plans, the problem of low monitoring frequency and reduced equipment operation efficiency in the groundwater in-situ remediation system is solved, and real-time monitoring and optimization of groundwater remediation equipment are realized, improving Improve repair efficiency.
Patent Information
- Application Number
- CN202410499889.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-22
- Publication Date
- 2024-10-01
AI Technical Summary
In terms of monitoring and optimization, existing groundwater in-situ remediation systems have problems such as low monitoring frequency, untimely data, and reduced equipment operating efficiency or difficulty in resolving faults, resulting in low remediation efficiency.
By obtaining target pollutant concentration data, determining anomalies in controllable factors, generating candidate remediation plans and conducting simulation predictions, analyzing multiple groups of predicted remediation cycles, sorting and testing to determine the best remediation plan, and achieving prediction and optimization of groundwater in-situ remediation efficiency. .
It achieves real-time monitoring and optimization of groundwater remediation equipment, improves remediation efficiency, provides scientific and reliable remediation solutions, and promotes the development of the field of groundwater remediation.
Smart Images

Figure CN118735149A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of groundwater remediation, and in particular to a method and system for predicting and optimizing the efficiency of groundwater in-situ remediation. Background Art
[0002] The integrated groundwater in-situ remediation system is an advanced technology that integrates a variety of remediation technologies, equipment and methods. It aims to directly remove and degrade pollutants in groundwater through a series of physical, chemical and biological processes without large-scale excavation and soil disturbance. Remediation technologies include but are not limited to in-situ bioventilation, bioaugmentation technology, in-situ chemical oxidation, electrokinetic remediation, thermal remediation technology, permeable reaction barrier technology, groundwater circulation well technology, etc.
[0003] In the integrated system of groundwater in-situ remediation, the well group consisting of monitoring wells, disposal wells and auxiliary wells is the key to achieving effective groundwater remediation. Monitoring wells are mainly used to monitor the quality and level of groundwater, as well as changes during the remediation process. By installing sensors and other monitoring equipment in the monitoring wells, the distribution of pollutants, concentration changes and the effectiveness of remediation measures can be tracked in real time. These data are crucial for evaluating the applicability and efficiency of remediation technologies. Disposal wells can be equipped with a variety of remediation technologies, such as stripping, air injection, gas phase extraction, thermal remediation technology, bioremediation and chemical oxidation, etc. Auxiliary wells are used to inject remediation and, such as chemical reagents, biological agents or oxygen nanobubbles, into the ground to promote the degradation or stabilization of pollutants. Among them, thermal remediation technologies such as in-situ thermal desorption or thermal desorption usually require auxiliary facilities that may include heating wells, extraction wells, etc. The heating wells are used to transfer heat energy to the contaminated soil to reach a sufficient temperature to release the pollutants from the soil. The extraction wells are used to extract the pollutant vapor that has been heated to an evaporation state for subsequent treatment. Through dynamic monitoring of observation wells, remediation wells and auxiliary wells, real-time control of the groundwater remediation process can be achieved. For example, by adjusting the equipment being disposed of, the flow direction, speed and treatment time of the pollutants can be changed to optimize the remediation effect. However, for example, most circulating well equipment needs to be buried underground and faces problems such as screen blockage, component damage, and difficult maintenance. The remediation efficiency strongly depends on the operating health of each unit equipment. Given the complexity of the integrated system structure and the degradation mechanism of each component, it is a challenging task to interpret and evaluate the operating conditions of the equipment relying solely on existing monitoring data and technology.
[0004] In the related technologies, the monitoring of groundwater in-situ remediation equipment mainly relies on periodic detection and manual inspections, which has problems such as low monitoring frequency and untimely monitoring data. At the same time, due to the complexity of the groundwater environment, the equipment is easily affected by various environmental factors during operation, resulting in reduced equipment efficiency or failure. It is also difficult to find the required solutions for the reduced equipment efficiency or failure. In view of the defects of the related technologies, there is an urgent need for a method that can realize integrated system efficiency prediction and provide optimization solutions. Summary of the invention
[0005] In view of this, the present invention provides a method and system for predicting and optimizing the efficiency of in-situ groundwater remediation.
[0006] In a first aspect, the present invention provides a method for predicting and optimizing the efficiency of in-situ groundwater remediation, the method comprising:
[0007] Obtain target pollutant concentration data;
[0008] According to the target pollutant concentration data, the controllable factors are judged to be abnormal. The controllable factors include the factors that affect the remediation efficiency;
[0009] If the controllable factors are abnormal, the controllable factor data is obtained;
[0010] Generate candidate repair plans based on controllable factor data, and simulate and predict the candidate repair plans to obtain multiple groups of predicted repair cycles corresponding to the candidate repair plans;
[0011] Conducting test analysis on multiple groups of predicted repair cycles to obtain analysis results;
[0012] Sort multiple groups of predicted repair cycles according to the analysis results to obtain sorting results;
[0013] According to the sorting results and multiple groups of expected repair costs corresponding to multiple groups of predicted repair cycles, a target repair plan is obtained.
[0014] In an optional embodiment, the abnormality determination of controllable factors based on target pollutant concentration data specifically includes: obtaining the initial conditions of the target pollutant, and obtaining an expected repair curve of the target pollutant based on the initial conditions of the target pollutant; randomizing the expected repair curve to obtain randomized data; grouping the randomized data to obtain a data control chart; comparing the target pollutant concentration data with the data control chart to obtain the number of abnormal target pollutant concentration data; obtaining a data abnormality probability based on the number of abnormal target pollutant concentration data; when the data abnormality probability exceeds a preset threshold, it is determined that the controllable factor is abnormal.
[0015] In an optional embodiment, the generation of candidate repair solutions based on controllable factor data includes: generating candidate repair solutions corresponding to the number of controllable factor data based on the number of controllable factor data; and simulating and predicting the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the candidate repair solutions, specifically including: establishing a physical model; obtaining multiple groups of simulation conditions corresponding to the number of candidate repair solutions based on the number of candidate repair solutions; obtaining the number of simulation predictions; inputting the multiple groups of simulation conditions into the physical model to simulate and predict the candidate repair solutions, and obtaining multiple groups of predicted repair cycles corresponding to the multiple groups of simulation conditions, wherein the number of predicted repair cycles in each group of predicted repair cycles corresponds to the number of simulation predictions.
[0016] In an optional embodiment, the test analysis of multiple groups of predicted repair cycles to obtain analysis results specifically includes: performing hypothesis testing between multiple groups of predicted repair cycles to obtain initial F distribution values of multiple groups of predicted repair cycles, the hypothesis test includes a null hypothesis and an alternative hypothesis; obtaining the significance level between multiple groups of predicted repair cycles and the degrees of freedom between multiple groups of predicted repair cycles; performing a one-way analysis of variance on the initial F distribution values of multiple groups of predicted repair cycles and rejecting the null hypothesis of the hypothesis test based on the significance level between multiple groups of predicted repair cycles, and obtaining the final F distribution values of multiple groups of predicted repair cycles based on the initial F distribution values; obtaining the F distribution critical value in the F distribution table based on the degrees of freedom between multiple groups of predicted repair cycles; if the final F distribution values of multiple groups of predicted repair cycles are greater than the F distribution critical value, there are significant differences between the multiple groups of predicted repair cycles.
[0017] In an optional embodiment, the method of sorting multiple groups of predicted repair cycles according to the analysis results to obtain sorting results specifically includes: performing multiple comparisons on multiple groups of predicted repair cycles to obtain specific levels of significant differences between each group of predicted repair cycles; obtaining an average value of each group of predicted repair cycles based on each group of predicted repair cycles; and sorting the average values of each group of predicted repair cycles according to the specific level to obtain sorting results between each group of predicted repair cycles.
[0018] In an optional embodiment, the target repair plan is obtained based on the sorting results and multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods, specifically including: obtaining multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods; performing mean normalization processing on the multiple groups of predicted repair periods and the multiple groups of expected repair costs according to the sorting results to obtain a normalized result; if the normalized result meets a preset condition, obtaining the target repair plan based on the candidate repair plans.
[0019] In a second aspect, the present invention provides a groundwater in-situ remediation efficiency prediction and optimization system, the system comprising:
[0020] A first acquisition module is used to acquire target pollutant concentration data;
[0021] An abnormality determination module, used to determine abnormalities of controllable factors according to target pollutant concentration data, and controllable factors include factors that affect remediation efficiency;
[0022] The second acquisition module is used to acquire controllable factor data if an abnormality occurs in the controllable factor;
[0023] A simulation prediction module is used to generate candidate repair solutions based on controllable factor data, and simulate and predict the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the candidate repair solutions;
[0024] The inspection and analysis module is used to inspect and analyze multiple groups of predicted repair cycles to obtain analysis results;
[0025] A sorting module, used to sort the multiple groups of predicted repair cycles according to the analysis results to obtain a sorting result;
[0026] The processing module is used to obtain a target repair plan according to the sorting results and multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods.
[0027] In an optional embodiment, the abnormality determination of controllable factors based on target pollutant concentration data specifically includes: obtaining the initial conditions of the target pollutant, and obtaining an expected repair curve of the target pollutant based on the initial conditions of the target pollutant; randomizing the expected repair curve to obtain randomized data; grouping the randomized data to obtain a data control chart; comparing the target pollutant concentration data with the data control chart to obtain the number of abnormal target pollutant concentration data; obtaining a data abnormality probability based on the number of abnormal target pollutant concentration data; when the data abnormality probability exceeds a preset threshold, it is determined that the controllable factor is abnormal.
[0028] In an optional embodiment, the generation of candidate repair solutions based on controllable factor data includes: generating candidate repair solutions corresponding to the number of controllable factor data based on the number of controllable factor data; and simulating and predicting the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the candidate repair solutions, specifically including: establishing a physical model; obtaining multiple groups of simulation conditions corresponding to the number of candidate repair solutions based on the number of candidate repair solutions; obtaining the number of simulation predictions; inputting the multiple groups of simulation conditions into the physical model to simulate and predict the candidate repair solutions, and obtaining multiple groups of predicted repair cycles corresponding to the multiple groups of simulation conditions, wherein the number of predicted repair cycles in each group of predicted repair cycles corresponds to the number of simulation predictions.
[0029] In an optional embodiment, the test analysis of multiple groups of predicted repair cycles to obtain analysis results specifically includes: performing hypothesis testing between multiple groups of predicted repair cycles to obtain initial F distribution values of multiple groups of predicted repair cycles, the hypothesis test includes a null hypothesis and an alternative hypothesis; obtaining the significance level between multiple groups of predicted repair cycles and the degrees of freedom between multiple groups of predicted repair cycles; performing a one-way analysis of variance on the initial F distribution values of multiple groups of predicted repair cycles and rejecting the null hypothesis of the hypothesis test based on the significance level between multiple groups of predicted repair cycles, and obtaining the final F distribution values of multiple groups of predicted repair cycles based on the initial F distribution values; obtaining the F distribution critical value in the F distribution table based on the degrees of freedom between multiple groups of predicted repair cycles; if the final F distribution values of multiple groups of predicted repair cycles are greater than the F distribution critical value, there are significant differences between the multiple groups of predicted repair cycles.
[0030] In an optional embodiment, the method of sorting multiple groups of predicted repair cycles according to the analysis results to obtain sorting results specifically includes: performing multiple comparisons on multiple groups of predicted repair cycles to obtain specific levels of significant differences between each group of predicted repair cycles; obtaining an average value of each group of predicted repair cycles based on each group of predicted repair cycles; and sorting the average values of each group of predicted repair cycles according to the specific level to obtain sorting results between each group of predicted repair cycles.
[0031] In an optional embodiment, the target repair plan is obtained based on the sorting results and multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods, specifically including: obtaining multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods; performing mean normalization processing on the multiple groups of predicted repair periods and the multiple groups of expected repair costs according to the sorting results to obtain a normalized result; if the normalized result meets a preset condition, obtaining the target repair plan based on the candidate repair plans.
[0032] In a third aspect, the present invention provides a computer device comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to execute a system method for predicting and optimizing the efficiency of in-situ groundwater remediation according to the first aspect or any corresponding embodiment thereof.
[0033] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute a system method for predicting and optimizing the efficiency of in-situ groundwater remediation according to the first aspect or any corresponding embodiment thereof.
[0034] The disclosed embodiments provide a method for predicting and optimizing the efficiency of in-situ remediation of groundwater. By acquiring target pollutant concentration data, the pollutant situation of groundwater can be known in real time. Controllable factors include factors that affect the remediation efficiency. The controllable factors can be used to know which factors in groundwater affect the remediation efficiency. By making an abnormality judgment on the controllable factors based on the target pollutant concentration data, it can be known whether the controllable factors are abnormal. If the controllable factors are abnormal, it is necessary to obtain the controllable factor data in the groundwater, generate candidate remediation plans for the groundwater based on the controllable factor data, and simulate and predict the candidate remediation plans to obtain multiple groups of predicted remediation cycles corresponding to the candidate remediation plans. The predicted remediation efficiency of the in-situ remediation equipment for groundwater can be known through the multiple groups of predicted remediation cycles, and the predicted remediation efficiency can be effectively grasped. The rationality of the measurement is determined, and multiple groups of predicted repair cycles are tested and analyzed to obtain analysis results. Through the analysis results, it can be known whether there are differences between the multiple groups of predicted repair cycles. According to the analysis results, the multiple groups of predicted repair cycles are sorted to obtain sorting results. Through the sorting results, the gaps between the multiple groups of predicted repair cycles can be known. According to the sorting results and the multiple groups of expected repair costs corresponding to the multiple groups of predicted repair cycles, the target repair plan is obtained. Through the target repair plan, the best plan for repairing the groundwater in-situ repair equipment can be known, which is convenient for adopting the best repair plan to repair the groundwater in-situ repair equipment, which can provide a more scientific and reliable means for the repair of groundwater pollution, and can play a positive role in environmental protection and sustainable utilization of resources, and promote the development of the field of groundwater remediation. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0036] Figure 1 It is a flow chart of a method for predicting and optimizing the efficiency of in-situ remediation of groundwater provided by an embodiment of the present invention;
[0037] Figure 2 It is a structural block diagram of a groundwater in-situ remediation efficiency prediction and optimization system provided by an embodiment of the present invention;
[0038] Figure 3 It is a schematic diagram of the structure of a computer device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0040] refer to Figure 1 , which shows a flow chart of a method for predicting and optimizing the efficiency of in-situ groundwater remediation provided by an embodiment of the present disclosure, which method can be executed by a computer device.
[0041] Step S101, obtaining target pollutant concentration data.
[0042] Among them, if there are pollutants in the groundwater, the target pollutant concentration data can be collected every hour through the concentration sensor and the target pollutant concentration data can be transmitted to the computer equipment.
[0043] Step S102, performing abnormality determination on controllable factors according to target pollutant concentration data, where the controllable factors include factors that affect the repair efficiency.
[0044] Among them, the controllable factors include multiple factors that affect the remediation efficiency of groundwater in-situ remediation equipment. By making an abnormal judgment on the controllable factors based on the collected target pollutant concentration data, it can be determined whether the controllable factors have abnormalities.
[0045] Step S103: if the controllable factor is abnormal, the controllable factor data is obtained.
[0046] Among them, if the result of abnormal judgment of controllable factors based on target pollutant concentration data is that the controllable factors are abnormal, it is necessary to obtain the controllable factor data in the groundwater.
[0047] Step S104, generating candidate repair solutions according to the controllable factor data, and performing simulation prediction on the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the candidate repair solutions.
[0048] Among them, multiple candidate remediation schemes corresponding to multiple controllable factors can be generated according to multiple controllable factors. Multiple candidate remediation schemes are alternative schemes for repairing groundwater in-situ remediation equipment. By simulating and predicting the candidate remediation schemes, multiple groups of predicted remediation cycles corresponding to the candidate remediation schemes can be obtained. The time taken to repair the groundwater in-situ remediation equipment can be predicted by predicting the remediation cycle.
[0049] Step S105, performing inspection and analysis on multiple groups of predicted repair cycles to obtain analysis results.
[0050] Among them, multiple groups of predicted repair cycles are tested and analyzed to obtain analysis results. Through the analysis results, it can be known whether there are differences between the multiple groups of predicted repair cycles, which is convenient for comparing the multiple groups of predicted repair cycles.
[0051] Step S106, sorting the multiple groups of predicted repair periods according to the analysis result to obtain a sorting result.
[0052] Among them, through the analysis results, it is known that there are differences between multiple groups of predicted repair cycles. The multiple groups of predicted repair cycles are sorted to obtain the sorting results. Through the sorting results, the specific gaps between the multiple groups of predicted repair cycles can be known.
[0053] Step S107, obtaining a target repair solution according to the sorting results and the multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods.
[0054] Among them, the target remediation plan needs to refer to the predicted remediation cycle and the expected remediation cost. Through multiple groups of expected remediation costs corresponding to multiple groups of predicted remediation cycles, the expected cost of repairing the groundwater in-situ remediation equipment can be obtained. The predicted remediation cycle and the expected remediation cost are processed according to the sorting results to obtain the target remediation plan. Through the target remediation plan, the best plan for repairing the groundwater in-situ remediation equipment can be obtained, which is convenient for adopting the best remediation plan to repair the groundwater in-situ remediation equipment. It can provide a more scientific and reliable means for the remediation of groundwater pollution, and can play a positive role in environmental protection and sustainable utilization of resources, and promote the development of the field of groundwater remediation.
[0055] In an optional embodiment, the abnormality determination of controllable factors based on target pollutant concentration data specifically includes: obtaining the initial conditions of the target pollutant, and obtaining an expected repair curve of the target pollutant based on the initial conditions of the target pollutant; randomizing the expected repair curve to obtain randomized data; grouping the randomized data to obtain a data control chart; comparing the target pollutant concentration data with the data control chart to obtain the number of abnormal target pollutant concentration data; obtaining a data abnormality probability based on the number of abnormal target pollutant concentration data; when the data abnormality probability exceeds a preset threshold, it is determined that the controllable factor is abnormal.
[0056] In the embodiment of the present disclosure, the initial condition of the target pollutant can be the remediation condition of the target pollutant under an ideal state. The initial condition of the target concentration pollutant is input into the simulation software model for modeling, and an expected remediation curve of the target pollutant under the initial condition can be obtained. The expected remediation curve is randomized using random number generation software to obtain randomized data X. 1 ······X n, based on the randomized data X 1 ······X n Determine the grouping boundaries. In this embodiment, the groups are: the first group has 0 to 1 days, the second group has 1 to 2 days, the third group has 2 to 3 days, and so on, the nth group has n-1 to n days, and calculate the average within the group The mean between groups Standard deviation S, standard deviation mean The upper control limit UCL and the lower control limit LCL, the data control chart generated by the software can be Control chart, where the within-group mean The mean between groups Standard Deviation Standard Deviation Mean Upper control limit Lower Control Limit A 3 Depends on the sample size.
[0057] The collected n target pollutant concentration data are compared with Control charts are used for comparison. If the collected target pollutant concentration data is outside the upper control limit UCL and the lower control limit LCL, the target pollutant concentration data is abnormal and recorded as 1. If the collected target pollutant concentration data is within the upper control limit UCL and the lower control limit LCL, the target pollutant concentration data is normal and recorded as 0. According to the Bayesian principle, a preset threshold M is first set. Among the n target pollutant concentration data, the data abnormality probability, that is, the probability that the target pollutant concentration data is abnormal, is calculated. Each time an abnormal target pollutant concentration data is obtained, the current data abnormality probability is updated. When the data abnormality probability exceeds the preset threshold M, it is judged that the controllable factors affecting the remediation efficiency of the groundwater in-situ remediation equipment have an abnormality.
[0058] In an optional embodiment, the generation of candidate repair solutions based on controllable factor data includes: generating candidate repair solutions corresponding to the number of controllable factor data based on the number of controllable factor data; and simulating and predicting the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the candidate repair solutions, specifically including: establishing a physical model; obtaining multiple groups of simulation conditions corresponding to the number of candidate repair solutions based on the number of candidate repair solutions; obtaining the number of simulation predictions; inputting the multiple groups of simulation conditions into the physical model to simulate and predict the candidate repair solutions, and obtaining multiple groups of predicted repair cycles corresponding to the multiple groups of simulation conditions, wherein the number of predicted repair cycles in each group of predicted repair cycles corresponds to the number of simulation predictions.
[0059] In the embodiment of the present disclosure, the controllable factors are collected by a sensor set, and the sensor set includes sensors such as water level, water temperature, pH value, conductivity, screen pipe blockage degree, coupling equipment efficiency, pumping and injection water flow, etc. There are K kinds of controllable factors collected, and 2 K Experimental design method 2 K Candidate repair solutions, based on 2 K Candidate repair solutions, 2 K There are n sets of simulation conditions, each of which contains K parameters related to controllable factors. The number of simulation predictions is n. K The group conditions are introduced into the physical model to simulate and predict the candidate repair solutions n times, and 2 K Group prediction and repair cycles, each group of prediction and repair cycles contains n simulated prediction and repair cycles, a total of 2 K ×n prediction and repair cycles.
[0060] As an example, the controllable factors selected in the embodiment of the present disclosure are the blockage degree of the screen tube, the efficiency of the coupling device, and the pumping and injection water flow rate, a total of 3 types, using 2 K The experimental design method lists 8 candidate repair schemes. Based on the 8 candidate repair schemes, 8 groups of conditions are obtained. Each group of simulation conditions contains relevant parameters of 3 controllable factors, and the relevant parameters of the 3 controllable factors in each group of simulation conditions are different. The number of simulation predictions is 5 times, which is convenient for ensuring the accuracy of the simulation predictions. The 8 groups of simulation conditions are respectively brought into the physical model to carry out 5 simulation predictions on the candidate repair schemes, and 8 groups of predicted repair cycles can be obtained. Each group of predicted repair cycles contains 5 predicted repair cycles, and there are 40 predicted repair cycles in total.
[0061] In an optional embodiment, the test analysis of multiple groups of predicted repair cycles to obtain analysis results specifically includes: performing hypothesis testing between multiple groups of predicted repair cycles to obtain initial F distribution values of multiple groups of predicted repair cycles, the hypothesis test includes a null hypothesis and an alternative hypothesis; obtaining the significance level between multiple groups of predicted repair cycles and the degrees of freedom between multiple groups of predicted repair cycles; performing a one-way analysis of variance on the initial F distribution values of multiple groups of predicted repair cycles and rejecting the null hypothesis of the hypothesis test based on the significance level between multiple groups of predicted repair cycles, and obtaining the final F distribution values of multiple groups of predicted repair cycles based on the initial F distribution values; obtaining the F distribution critical value in the F distribution table based on the degrees of freedom between multiple groups of predicted repair cycles; if the final F distribution values of multiple groups of predicted repair cycles are greater than the F distribution critical value, there are significant differences between the multiple groups of predicted repair cycles.
[0062] In the disclosed embodiment, a hypothesis test is performed between 8 groups of predicted repair cycles to obtain the initial F distribution values of the 8 groups of predicted repair cycles. The hypothesis test includes a null hypothesis (H0) and an alternative hypothesis (H1). The null hypothesis is that the means of the predicted repair cycles of each group are equal, and the alternative hypothesis is that the mean of at least one group of predicted repair cycles is different from that of other groups. Through the significance level P (usually 0.05) between the specific 8 groups of predicted repair cycles and the given degrees of freedom between the 8 groups of predicted repair cycles, a one-way analysis of variance is performed on the initial F distribution values of the 8 groups of predicted repair cycles, and the null hypothesis rejection judgment is performed on the hypothesis test according to the significance level between the 8 groups of predicted repair cycles to obtain the final F distribution values of the 8 groups of predicted repair cycles. The expression of the final F distribution value is: Among them, SSB represents the sum of squares, SSE represents the sum of squares between groups, dfB represents the degrees of freedom between groups, and dfE represents the degrees of freedom between groups of the sum of squares of the error. Then, the final F distribution values of the 8 groups of predicted repair cycles and the F distribution critical value found according to the F distribution table are compared. If the final F distribution value is greater than the F distribution critical value, it means that there are significant differences between the multiple groups of predicted repair cycles. In the disclosed embodiment, the data does not meet the variance homogeneity test, and the Welch method is used when the single-factor variance is unequal. The robust test table for equality of mean values can be generated by the data analysis software to correct the single-factor variance results when the variance is unequal.
[0063] In an optional embodiment, the method of sorting multiple groups of predicted repair cycles according to the analysis results to obtain sorting results specifically includes: performing multiple comparisons on multiple groups of predicted repair cycles to obtain specific levels of significant differences between each group of predicted repair cycles; obtaining an average value of each group of predicted repair cycles based on each group of predicted repair cycles; and sorting the average values of each group of predicted repair cycles according to the specific level to obtain sorting results between each group of predicted repair cycles.
[0064] In the disclosed embodiment, the Tammany method is used to perform multiple comparisons on multiple groups of predicted repair cycles, and the specific levels of significance differences between the results of the multiple groups of predicted repair cycles can be obtained. In the disclosed embodiment, the Tammany method is used to perform pairwise comparisons on 8 groups of predicted repair cycles, and the significance levels P are all less than 0.05, indicating that there are statistical differences in the predicted repair cycles compared pairwise. The average values of the predicted repair cycles of each group are sorted according to the specific level of significance difference, and the gaps and advantages and disadvantages between the 8 groups of predicted repair cycles can be obtained.
[0065] In an optional embodiment, the target repair plan is obtained based on the sorting results and multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods, specifically including: obtaining multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods; performing mean normalization processing on the multiple groups of predicted repair periods and the multiple groups of expected repair costs according to the sorting results to obtain a normalized result; if the normalized result meets the preset conditions, the target repair plan is obtained based on the candidate repair plans.
[0066] In the embodiment of the present disclosure, when obtaining the target remediation scheme, it is necessary to consider the predicted remediation cycle of the candidate remediation scheme and the expected remediation cost of the candidate remediation scheme. When obtaining multiple groups of expected remediation costs, the situation of the groundwater in-situ remediation equipment can be referred to. In the embodiment of the present disclosure, 8 groups of expected remediation costs are obtained, and the 8 groups of expected remediation costs correspond to the 8 groups of predicted remediation cycles one by one. Each group of predicted remediation cycles includes 5 predicted remediation cycles, and each group of expected remediation costs includes 5 expected remediation costs. The 5 predicted remediation cycles correspond to the 5 expected remediation costs one by one. The average value of each group of expected remediation costs, the maximum value of each group of expected remediation costs, and the minimum value of each group of expected remediation costs can be obtained through the 5 predicted remediation costs in each group of expected remediation costs. The average value of each group of predicted remediation cycles, the maximum value of each group of predicted remediation cycles, and the minimum value of each group of predicted remediation cycles can be obtained through the 5 predicted remediation cycles in each group of predicted remediation cycles. The predicted remediation cycle of each group and the corresponding expected remediation cost of each group are averaged and normalized by sorting the predicted remediation cycles of each group in the sorting result, and the loss loss function is adopted. The expression of the loss function is: Among them, X i represents the i-th predicted repair cycle, X mean represents the average value of the predicted repair cycle, X max Indicates the maximum value of the predicted repair cycle, X min Represents the minimum value of the predicted repair cycle, C i represents the expected repair cost of the ith item, C mean represents the average expected repair cost, C max represents the maximum expected repair cost, C min represents the minimum expected repair cost, k 1 represents the weight of the predicted repair cycle, k 2 The weight representing the expected repair cost, the weight of the predicted repair cycle and the weight of the expected repair cost need to be set in advance. The preset condition can be the minimum loss function. Through calculation, it can be known which of the 8 groups of predicted repair cycles and the corresponding expected repair costs meets the preset conditions, that is, it can be known which of the 8 candidate repair schemes meets the preset conditions, and the candidate repair scheme that meets the preset conditions is determined as the target repair scheme.
[0067] In this embodiment, a groundwater in-situ remediation efficiency prediction and optimization system is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware for a predetermined function. Although the system described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0068] refer to Figure 2 , which shows that the embodiment of the present disclosure provides a groundwater in-situ remediation efficiency prediction and optimization system, the system comprising:
[0069] The first acquisition module 201 is used to acquire target pollutant concentration data;
[0070] An abnormality determination module 202 is used to determine abnormalities of controllable factors according to target pollutant concentration data, and controllable factors include factors that affect repair efficiency;
[0071] The second acquisition module 203 is used to acquire controllable factor data if an abnormality occurs in the controllable factor;
[0072] The simulation prediction module 204 is used to generate candidate repair solutions according to the controllable factor data, and simulate and predict the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the candidate repair solutions;
[0073] The inspection and analysis module 205 is used to inspect and analyze multiple groups of predicted repair cycles to obtain analysis results;
[0074] A sorting module 206 is used to sort the multiple groups of predicted repair periods according to the analysis result to obtain a sorting result;
[0075] The processing module 207 is used to obtain a target repair solution according to the sorting results and the multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods.
[0076] In an optional embodiment, the abnormality determination of controllable factors based on target pollutant concentration data specifically includes: obtaining the initial conditions of the target pollutant, and obtaining an expected repair curve of the target pollutant based on the initial conditions of the target pollutant; randomizing the expected repair curve to obtain randomized data; grouping the randomized data to obtain a data control chart; comparing the target pollutant concentration data with the data control chart to obtain the number of abnormal target pollutant concentration data; obtaining a data abnormality probability based on the number of abnormal target pollutant concentration data; when the data abnormality probability exceeds a preset threshold, it is determined that the controllable factor is abnormal.
[0077] In an optional embodiment, the generation of candidate repair solutions based on controllable factor data includes: generating candidate repair solutions corresponding to the number of controllable factor data based on the number of controllable factor data; and simulating and predicting the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the candidate repair solutions, specifically including: establishing a physical model; grouping the candidate repair solutions according to the number of candidate repair solutions to obtain condition groups corresponding to the number of candidate repair solutions; obtaining the number of simulation predictions; inputting the condition groups into the physical model to simulate and predict the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the number of condition groups and the number of simulation predictions.
[0078] In an optional embodiment, the test analysis of multiple groups of predicted repair cycles to obtain analysis results specifically includes: performing hypothesis testing between multiple groups of predicted repair cycles to obtain initial F distribution values of multiple groups of predicted repair cycles, the hypothesis test includes a null hypothesis and an alternative hypothesis; obtaining the significance level between multiple groups of predicted repair cycles and the degrees of freedom between multiple groups of predicted repair cycles; performing a one-way analysis of variance on the initial F distribution values of multiple groups of predicted repair cycles and rejecting the null hypothesis of the hypothesis test based on the significance level between multiple groups of predicted repair cycles, and obtaining the final F distribution values of multiple groups of predicted repair cycles based on the initial F distribution values; obtaining the F distribution critical value in the F distribution table based on the degrees of freedom between multiple groups of predicted repair cycles; if the final F distribution values of multiple groups of predicted repair cycles are greater than the F distribution critical value, there are significant differences between the multiple groups of predicted repair cycles.
[0079] In an optional embodiment, the method of sorting multiple groups of predicted repair cycles according to the analysis results to obtain sorting results specifically includes: performing multiple comparisons on multiple groups of predicted repair cycles to obtain specific levels of significant differences between each group of predicted repair cycles; obtaining an average value of each group of predicted repair cycles based on each group of predicted repair cycles; and sorting the average values of each group of predicted repair cycles according to the specific level to obtain sorting results between each group of predicted repair cycles.
[0080] In an optional embodiment, the target repair plan is obtained based on the sorting results and multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods, specifically including: obtaining multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods; performing mean normalization processing on the multiple groups of predicted repair periods and the multiple groups of expected repair costs according to the sorting results to obtain a normalized result; if the normalized result meets a preset condition, obtaining the target repair plan based on the candidate repair plans.
[0081] The further functional description of each of the above modules is the same as that of the above corresponding embodiments and will not be repeated here.
[0082] A groundwater in-situ remediation efficiency prediction and optimization system in this embodiment is presented in the form of functional modules, where the modules refer to ASIC (Application Specific Integrated Circuit) circuits, processors and memories that execute one or more software or fixed programs, and / or other devices that can provide the above functions.
[0083] refer to Figure 3 , which shows a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. The various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process instructions executed in the computer device, including instructions stored in or on the memory to display graphical information of the GUI on an external input / output device (such as a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides part of the necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system).
[0084] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0085] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0086] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0087] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0088] The computer device further includes an input device 30 and an output device 40. The processor 10, the memory 20, the input device 30 and the output device 40 may be connected via a bus or other means, and FIG. X takes the bus connection as an example.
[0089] The input device 30 can receive input digital or character information, and generate key signal input related to the user settings and function control of the computer device, such as a touch screen, a keypad, a mouse, a track pad, a touch pad, an indicator bar, one or more mouse buttons, a trackball, a joystick, etc. The output device 40 may include a display device, an auxiliary lighting device (e.g., an LED) and a tactile feedback device (e.g., a vibration motor), etc. The above-mentioned display device includes but is not limited to a liquid crystal display, a light emitting diode, a display and a plasma display. In some optional embodiments, the display device can be a touch screen.
[0090] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0091] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for predicting and optimizing the efficiency of in-situ groundwater remediation, characterized in that: The method comprises: Obtain target pollutant concentration data; According to the target pollutant concentration data, the controllable factors are judged to be abnormal. The controllable factors include the factors that affect the remediation efficiency; If the controllable factors are abnormal, the controllable factor data is obtained; Generate candidate repair plans based on controllable factor data, and simulate and predict the candidate repair plans to obtain multiple groups of predicted repair cycles corresponding to the candidate repair plans; Conducting test analysis on multiple groups of predicted repair cycles to obtain analysis results; Sort multiple groups of predicted repair cycles according to the analysis results to obtain sorting results; According to the sorting results and multiple groups of expected repair costs corresponding to multiple groups of predicted repair cycles, a target repair plan is obtained.
2. A method for predicting and optimizing groundwater in-situ remediation efficiency according to claim 1, characterized in that: The abnormal determination of controllable factors according to the target pollutant concentration data specifically includes: Obtaining the initial conditions of the target pollutant, and obtaining an expected remediation curve of the target pollutant according to the initial conditions of the target pollutant; Performing random processing on the expected repair curve to obtain randomized data; The randomized data are processed in groups to obtain a data control chart; Compare the target pollutant concentration data with the data control chart to obtain the number of abnormal target pollutant concentration data; Obtain data abnormality probability according to the number of abnormal target pollutant concentration data; When the probability of data anomaly exceeds the preset threshold, it is determined that the controllable factor is abnormal.
3. A method for predicting and optimizing groundwater in-situ remediation efficiency according to claim 2, characterized in that: Generating candidate repair solutions according to controllable factor data includes: According to the quantity of controllable factor data, generating candidate repair solutions corresponding to the quantity of controllable factor data; And simulate and predict the candidate repair solutions to obtain multiple sets of predicted repair cycles corresponding to the candidate repair solutions, including: Build physical models; According to the number of candidate repair solutions, multiple groups of simulation conditions corresponding to the number of candidate repair solutions are obtained; Get the number of simulation predictions; Multiple groups of simulation conditions are input into the physical model to simulate and predict the candidate repair solutions, and multiple groups of predicted repair cycles corresponding to the multiple groups of simulation conditions are obtained. The number of predicted repair cycles in each group of predicted repair cycles corresponds to the number of simulation predictions.
4. A method for predicting and optimizing groundwater in-situ remediation efficiency according to claim 3, characterized in that: The testing and analysis of the multiple groups of predicted repair cycles to obtain analysis results specifically includes: Conduct hypothesis testing between multiple groups of predicted repair cycles to obtain initial F distribution values of multiple groups of predicted repair cycles. The hypothesis testing includes null hypothesis and alternative hypothesis. Obtain the significance level and degrees of freedom between multiple groups of predicted repair cycles; Perform one-way ANOVA on the initial F distribution values of multiple groups of predicted repair cycles, and reject the null hypothesis of hypothesis test according to the significance level between multiple groups of predicted repair cycles. According to the initial F distribution values, obtain the final F distribution values of multiple groups of predicted repair cycles. Obtaining the F distribution critical value in the F distribution table according to the degrees of freedom between multiple groups of predicted repair cycles; If the final F distribution value of multiple groups of predicted repair periods is greater than the F distribution critical value, there are significant differences between the multiple groups of predicted repair periods.
5. A method for predicting and optimizing groundwater in-situ remediation efficiency according to claim 4, characterized in that: The step of sorting the multiple groups of predicted repair cycles according to the analysis results to obtain the sorting results specifically includes: Multiple comparisons were made on multiple groups of predicted repair cycles to obtain the specific levels of significant differences between the predicted repair cycles of each group; According to the predicted repair period of each group, an average value of the predicted repair period of each group is obtained; The average values of the predicted repair periods of each group are sorted according to the specific level to obtain the sorting results between the predicted repair periods of each group.
6. A method for predicting and optimizing groundwater in-situ remediation efficiency according to claim 5, characterized in that: The method of obtaining a target repair solution according to the sorting results and the multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods specifically includes: Obtain multiple groups of expected repair costs corresponding to multiple groups of predicted repair cycles; According to the sorting results, the multiple groups of predicted repair cycles and the multiple groups of expected repair costs are normalized by means to obtain normalized results; If the normalized result meets the preset conditions, the target repair solution is obtained based on the candidate repair solutions.
7. A groundwater in-situ remediation efficiency prediction and optimization system, characterized in that: The system comprises: A first acquisition module is used to acquire target pollutant concentration data; An abnormality determination module, used to determine abnormalities of controllable factors according to target pollutant concentration data, and controllable factors include factors that affect remediation efficiency; The second acquisition module is used to acquire controllable factor data if an abnormality occurs in the controllable factor; A simulation prediction module is used to generate candidate repair solutions based on controllable factor data, and simulate and predict the candidate repair solutions to obtain multiple groups of predicted repair cycles corresponding to the candidate repair solutions; The inspection and analysis module is used to inspect and analyze multiple groups of predicted repair cycles to obtain analysis results; A sorting module, used to sort the multiple groups of predicted repair cycles according to the analysis results to obtain a sorting result; The processing module is used to obtain a target repair plan according to the sorting results and multiple groups of expected repair costs corresponding to the multiple groups of predicted repair periods.
8. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes a method for predicting and optimizing the efficiency of in-situ groundwater remediation as claimed in any one of claims 1 to 6 by executing the computer instructions.
9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute a method for predicting and optimizing the efficiency of in-situ groundwater remediation according to any one of claims 1 to 6.
Citation Information
Cited By
Intelligent monitoring method and system for groundwater remediation process based on multi-modal monitoring
CN121032002A
Soil remediation target dynamic formulation method based on protection of underground water conservation function
CN121365889A
