Method and equipment for realizing multi-line safety test run by sharing test run line, and medium
By setting unified outdoor trackside equipment layout principles and one-click switching operations on the test line, the problem of different line signaling systems sharing the test line is solved, safe and efficient multi-line test is achieved, and investment and maintenance costs are reduced.
Patent Information
- Application Number
- CN202411090951.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-10-15
AI Technical Summary
In urban rail transit, it is difficult for signaling systems of different lines to share a test line, and existing interconnection methods have high investment costs and complexity, and fail to effectively solve the problem of sharing trackside equipment.
By setting unified outdoor trackside equipment layout principles on the test line, sharing some outdoor equipment, and realizing the back-cutting of signal equipment cables through one-click switching operations, real-time monitoring of the back-cutting equipment status and depot test authority ensures that different lines Time-sharing safety test of the signaling system.
It realizes the safe test running of different lines on the same test line, reduces equipment investment and maintenance workload, improves the safety and operation convenience of the system, and reduces the cost of external power grid transformation.
Smart Images

Figure CN118770329A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a train signal control system, and in particular to a method, equipment and medium for realizing multi-line safety test by sharing a test line. Background Art
[0002] During the construction of new urban rail transit lines, a test line is usually set up in the vehicle depot to carry out static and dynamic testing of the signal system. It is also used for new trains and trains after maintenance to undergo necessary debugging on the test line before being authorized to carry passengers, so as to ensure the reliability and safety of new trains.
[0003] For newly built unmanned urban rail transit lines, since the track area of the new line is handed over later and the debugging time of the main line's EMUs cannot meet the requirements of all fully automatic functions and scenario tests, an outdoor test line is usually set up, and the fully automatic operation-related system equipment is configured to be consistent with the main line. Before the main line debugging begins, actual measurements on the outdoor test line can be carried out in advance to verify the interfaces of the fully automatic operation systems and the functions of the fully automatic operation systems, to ensure that the system interfaces and functions meet the requirements of design, scenario and operation, and to create better conditions for the main line EMU debugging.
[0004] In order to save investment costs, no matter it is the test line or the field test line, there is a need for different lines to share one test line, so as to make full use of the existing test line conditions, power supply resources, and equipment space resources, save equipment investment, site investment, construction investment and the workload of later equipment maintenance.
[0005] If different lines and signal systems of different standards are to share a test line, it is necessary to consider the compatibility of different signal systems of different manufacturers with the shared trackside signal equipment, as well as the authority conversion between the test line and the vehicle depot during the test. Under the premise of the interconnection interface standard, it is relatively easy to share a test line because all companies comply with the unified interface specifications. For example, CN115892149A discloses a system and method for sharing a test line for interconnected lines, the system comprising: an indoor signal device corresponding to each interconnected line, the indoor signal device is located on the same test line, and the indoor signal device is used by the corresponding interconnected line; a first outdoor signal device corresponding to each interconnected line, the first outdoor signal device is located on the test line, and the first outdoor signal device is used by the corresponding interconnected line; a second outdoor signal device, the second outdoor signal device is located on the test line, and the second outdoor signal device is used by each interconnected line; an LTE device, the LTE device is located on the test line, and the LTE device is used for vehicle-to-ground communication for each interconnected line; an interlocking device corresponding to each interconnected line, the interlocking device is located on the test line, and the interlocking device is used by the corresponding interconnected line.
[0006] However, considering the complexity of interconnection in terms of functions, interfaces, risks, indoor verification, and post-debugging, and the actual operational needs are simply to achieve common line test operations, from this perspective, interconnection is obviously a choice with poor investment returns. In addition, the above method only shares passive transponders, long beacons for sleep and wake-up, and LTE equipment, requiring each line to independently set up a set of active transponders, signal machines, axle counters and other trackside equipment, and does not consider the sharing of all trackside equipment. Summary of the invention
[0007] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a method, equipment and medium for realizing safe testing of multiple lines on a shared test line. Different lines do not have interconnection interfaces. The switching of signal equipment cables shared by multiple lines can be completed by one-key switching. The test safety is ensured by real-time monitoring of the switching equipment status and the uniqueness of the vehicle section test authority, so that safe testing of different line signal systems on the same test line can be realized in time-sharing.
[0008] The purpose of the present invention can be achieved by the following technical solutions:
[0009] According to a first aspect of the present invention, a method for realizing safe testing of multiple lines by using a shared test line is provided, wherein indoor equipment is respectively arranged on different lines, and at the same time, some outdoor equipment on the same test line is shared, and the shared signal equipment cables are reversed to the lines requiring testing through a one-key switching operation, and the test safety is ensured through real-time monitoring of the reversed equipment status and the uniqueness of the test authority of the vehicle depot, thereby realizing the use scenario of time-sharing safe testing of signal systems of different lines on the same test line, wherein the outdoor equipment shared by different lines includes outdoor beacons, axle counters, signal machines, LTE wireless equipment, switches and platform doors.
[0010] As a preferred technical solution, the method described requires the establishment of a unified outdoor trackside equipment layout principle and compatibility with the system characteristics of different signal manufacturers, wherein the corresponding platforms are arranged based on the length of the test line and the test function requirements; the basic layout principles are set according to the specification documents, and the outdoor signal machines, axle counters, switch machines, beacons and trackside test-related buttons are all set according to the unified basic layout principles; for different systems, corresponding equipment is added according to the system characteristics and line function requirements.
[0011] As a preferred technical solution, among the outdoor equipment, the equipment that needs to be reversed includes at least one of a signal, an axle occupancy / track clearing relay, unmanned driving related function buttons, an active beacon, a platform door interface, a turnout indication, and a request / approval test run button, wherein the unmanned driving related function buttons include an SPKS button, a departure confirmation button, a linked door reopening button, and an emergency stop button; the equipment that does not need to be reversed includes separate outdoor test run equipment that is additionally set up for different lines due to different user needs, or trackside equipment that needs to be added due to different system characteristics.
[0012] As a preferred technical solution, for equipment that does not require reverse cutting, the cables of the corresponding additional outdoor equipment are directly connected to the corresponding line indoor cabinet.
[0013] As an optimal technical solution, for equipment that requires reverse cutting, a reverse cutting cabinet is set in the signal room of the corresponding line, and the cables that require reverse cutting equipment outdoors are reverse cut by a reverse cutting device composed of a relay, a mechanical switch or an electronic switch, and the reverse cutting device and the gear setting are selected according to the number of lines that need to be tested. After the reverse cutting is completed, the outdoor cable is electrically completely isolated by the reverse cutting device to ensure that the cable is safely and reliably connected to the line that needs to be tested after the reverse cutting. The reverse cutting device is required to operate safely and reliably, and a reverse cutting status indicator light is set.
[0014] As a preferred technical solution, the method described in the invention realizes the control of the reverse cutting device through the reverse cutting switch.
[0015] Assume that there are a lines involved in the test run and n cables need to be switched. Then the number of switch i is the one that satisfies the condition 2. i ≥a is the smallest integer. When the reverse switch is closed, the combination of the opening and closing of the reverse switch can obtain 2 i A control logic, each control logic controls a line;
[0016] The control loop where each reverse cutting switch is located includes b parallel reverse cutting devices, each reverse cutting device includes c groups of nodes, each reverse cutting switch includes a first switch and a second switch, and the two ends of the reverse cutting device are respectively connected to the first switch and the second switch; the first switch and the second switch are kept open or closed at the same time. When the first switch and the second switch are operated at the same time, all the parallel reverse cutting devices and their corresponding nodes in the control loop are operated at the same time, so as to realize the simultaneous reverse cutting control of n cables that need to be reversed.
[0017] As a preferred technical solution, the reverse switch is implemented by using an interlocking controlled relay node, or by using a PLC to control a motor to drive a mechanical switch.
[0018] As a preferred technical solution, the method described above retrieves the position of the reverse switch, specifically in the following manner: a group of nodes are reserved for all reverse switching devices, and the reserved nodes of all reverse switching devices are connected to the interlocking of the corresponding line to determine the consistency between the test run status and the reverse switching device; if the reverse switch has been switched to the corresponding line, but any group of nodes of the reverse switching device has not moved to the corresponding position, the interlocking determines that the reverse switch does not match the position of the reverse switching device, turns all signals on the test run line to red lights, and sends a restricted movement authorization to the train, prohibiting the test run from continuing; in addition, the position of the reverse switch is matched according to the status of the reverse switching device node, so as to accurately determine the specific position of the faulty reverse switching device.
[0019] As an optimal technical solution, the messages of passive transponders and sleep-wake-up long beacons are designed according to a preset standard protocol. If the messages designed by different systems do not meet the standard protocol, a set of transponder equipment is independently set up on the test line for the corresponding line.
[0020] As a preferred technical solution, independent LEU devices are set up for different lines, and the use requirements of outdoor active transponders of the test lines shared by different lines are realized by cutting the outdoor cables of active beacons.
[0021] As a preferred technical solution, only one set of axle counting equipment is provided on the test line.
[0022] If the axle counter and interlocking adopt a hard-wired interface solution, the interface cables corresponding to the axle counter track relay, pre-reset instruction, and pre-reset success status information are reversed to meet the requirement of sharing one set of axle counter equipment for different lines;
[0023] If the axle counter and interlocking adopt a network interface solution and use the RSSPI or RSSPII general safety protocol for the data security interface of occupancy clearance and pre-reset information, the axle counter must support the requirements of simultaneous digital communication for multi-line interlocking.
[0024] As a preferred technical solution, in the network interface solution, the problem that the axle counter may receive pre-reset instructions from different lines at the same time, resulting in the axle counter section being reset incorrectly, is solved by one of the following methods:
[0025] Method 1: The signal system adds safety card control, and only when the depot agrees to the test run status, the axle counter pre-reset command is allowed to be output;
[0026] Method 2: The position information of the reverse cut switch is transmitted to the axle counter. The axle counter system determines the position of the reverse cut switch and adds a safety card control that only responds to the pre-reset request of the test line.
[0027] As a preferred technical solution, before the start of the test run, the test line and the vehicle depot complete the handover of test run authority, wherein the vehicle depot only provides one test run interface information to each line; according to the test run operation requirements, the test run reverse switch is turned to the corresponding line position in the test line control room, and according to the position of the test line reverse switch, the corresponding interface cable is connected to the interlocking device of the corresponding test run line through the reverse contact of the reverse switch cabinet, so that the request for test run of the corresponding line and the consent for test run of the vehicle depot can interact normally; if the test run consent information of the vehicle depot is lost during the test run, the signal system adds a safety card control, immediately closes the train signal on the test run line, and stops the test run.
[0028] As an optimal technical solution, if the test line and the main line share the same set of core network equipment, the test line does not deploy A and B network core networks separately, and each line shares a set of RRU and BBU equipment. The DCS networks of the test lines of different lines access the train-to-ground communication information through the shared control center core network to achieve the train-to-ground transmission service requirements when testing different lines; the logical channels between the test lines and between the test lines and the main line are completely isolated through GRE tunnels.
[0029] As a preferred technical solution, if the test line is equipped with independent core network equipment, each line shares a set of RRU, BBU, and core network equipment, and the DCS equipment of different test lines is connected to the common LTE wireless equipment to meet the vehicle-to-ground transmission service requirements during the test of different lines.
[0030] As a preferred technical solution, the shared test line is designed with physical isolation measures from the vehicle depot or other adjacent lines, or the test line and other areas use a different frequency solution to avoid interference in wireless communication.
[0031] As a preferred technical solution, the method described above adopts a time-sharing power supply solution. The power panel is provided with a master switch with an interlocking function for the power supply equipment of different lines. Only one line can be powered on at the same time. At the same time, the equipment that must be powered for the test run of each line is designed to be uninterrupted. Among them, the equipment that must be powered includes outdoor shared equipment, LTE wireless equipment, axle counting equipment, and reverse cutting cabinets.
[0032] According to a second aspect of the present invention, there is provided an electronic device, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.
[0033] According to a third aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described above when executed by a processor.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] 1. The trackside signal arrangement of the present invention is based on the principle of interconnected trackside arrangement, and is designed to be compatible with trackside signal equipment arrangements of various manufacturers, thereby reducing equipment investment, site investment, and the workload of later equipment maintenance.
[0036] 2. The present invention can determine the number of inverted switching gears, the selection of inverted switching equipment, and the outdoor equipment that needs to be inverted according to the number of lines that need to be tested, the actual functional requirements of the lines, and the characteristics of the signal system. Finally, the access cables of the outdoor equipment are connected through inverted switching equipment such as relay combinations, mechanical switches, and electronic switches. While achieving complete test functions, it also ensures safe and reliable access to outdoor equipment.
[0037] 3. In order to facilitate the operation of the test personnel, the present invention sets a reverse cutting button in the test control room, sets a switching button on the ATS interface or the PLC control interface, and matches the designed circuit to complete the reverse cutting of all outdoor cables with one click, which provides great convenience for the switching of different line test operations.
[0038] 4. In order to reflect the real state of the reverse-cutting equipment and ensure the safety of the test run, the present invention can retrieve the switch position of the reverse-cutting equipment. When the interlocking detects that any group of nodes of the switching device has not moved to the corresponding position, the system will turn all the signal lights on the test line to red lights and send a restricted movement authorization to the train to ensure the safety of the test run. In addition, in order to avoid the risks of collisions and squeezes caused by different lines obtaining test run permissions at the same time, the vehicle depot only gives one test run approval signal at the same time to ensure the uniqueness of the test run, and completes the switching of the test run request approval information of this line through reverse cutting, ensuring that only the line under test can obtain the test run approval signal of the vehicle depot, further improving the safety of the system.
[0039] 5. The present invention proposes different outdoor equipment sharing solutions for key equipment such as outdoor active transponders, passive transponders, axle counters, LTE, etc., to ensure the integrity of the test function as much as possible, while maximizing the degree of sharing of different line equipment.
[0040] 6. Taking into account the professional capacity limitations of the external power grid, the external power grid may not be able to bear the power supply capacity of multiple lines at the same time. The present invention designs a time-sharing power supply solution. The power panel is respectively provided with a total circuit breaker with an interlocking function for the power supply equipment of different lines. Only one line can be powered at the same time to ensure that the power supply capacity does not exceed the capacity limit of the external power grid. Therefore, it also greatly saves the investment in the transformation of the external power grid.
[0041] 7. Considering that the non-test line cannot collect the status of outdoor equipment and may cause false alarms and error displays, the present invention collects the reverse switch status to filter related alarms and error status displays, reducing the workload of maintenance and operating personnel.
[0042] 8. In the present invention, when outdoor equipment shares a set of equipment, problems such as control authority transfer between multiple lines, conflict in trackside equipment installation, and mutual interference of the same equipment are solved by setting up only one set of outdoor equipment. Fewer devices are required, and the control method is simple and easy to implement. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A schematic diagram of implementing cable cutting by a relay method in an embodiment;
[0044] Figure 2 A schematic diagram of implementing cable inverse cutting by means of a mechanical coaxial switch in an embodiment;
[0045] Figure 3 It is a schematic diagram of the back-cut control principle of the present invention;
[0046] Figure 4 It is the schematic diagram of the power interlock design of the present invention;
[0047] Figure 5 is a layout diagram of trackside signal equipment in one embodiment;
[0048] Figure 6 is a diagram of the reverse cutting system architecture in one embodiment;
[0049] Figure 7 Schematic diagram of the undercutting principle in one embodiment. DETAILED DESCRIPTION
[0050] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0051] This embodiment provides a method for realizing multi-line safe test run by sharing a test run line. Different lines are provided with indoor equipment, including but not limited to indoor ZC (zone controller), DSU (data storage unit), CI (computer interlocking system), DCS (data communication system), MSS (maintenance subsystem). At the same time, some outdoor equipment on the same test run line is shared, such as outdoor beacons, axle counters, signal machines, LTE wireless equipment, switches, platform doors, etc. The cables of shared signal equipment such as outdoor active beacons, signal machines, platform doors, switch indications, request / consent test runs, axle counter status and reset instructions, and unmanned function test buttons are reversed to the lines that need to be tested through a one-key switching operation. The safety of the test run is ensured by real-time monitoring of the reversed equipment status and the uniqueness of the vehicle depot test run authority, so as to realize the use scenario of completing time-sharing safe test runs of signal systems of different lines on the same test run line. The implementation of this method includes the following steps:
[0052] S1. Establish unified outdoor trackside equipment layout principles and be compatible with the system characteristics of different signal manufacturers.
[0053] In this embodiment, the corresponding platform can be designed at a suitable location based on the length of the test line and the test function requirements. The layout principle can be based on the "(09 Technical Standard) T_CAMET 04013.1-2018-Urban Rail Transit Communication-based Train Operation Control System (CBTC) Interconnection Engineering Specification Part 1 Engineering Design". Outdoor signal machines, axle counters, switch machines, beacons and trackside test-related buttons are all set according to a unified principle. Some equipment that may need to be added according to system characteristics and line function requirements can be added in combination with system layout requirements.
[0054] S2. Identify the equipment that needs backcutting and the equipment that does not need backcutting.
[0055] Most of the outdoor equipment and related indoor function buttons are shared as needed. Typical equipment that needs to be switched back includes signals, axle occupancy / track clearing relays, unmanned driving related function buttons (SPKS (operator protection switch) button, departure confirmation button, linkage door reopening button, emergency stop button, etc.), active beacons, platform door interfaces, turnout indications and request / approval trial run buttons, etc., which are determined according to the actual situation of the line.
[0056] At the same time, different lines may require additional outdoor test equipment due to different user needs, or additional trackside equipment may be required due to system characteristics. For this part of the outdoor equipment, it can be designed as equipment that does not require inverted cutting, and the cables of the corresponding additional outdoor equipment can be directly connected to the corresponding line indoor cabinet.
[0057] S3. Set up the reverse cutting device to realize the control for the equipment that needs reverse cutting.
[0058] For equipment that needs to be reversed, a reverse-cut cabinet is set up in the signal room of the corresponding line. The outdoor cables that need to be reversed are reversed through the reverse-cut equipment composed of relays, mechanical switches or electronic switches, and the reverse-cut equipment and gear settings are selected according to the number of lines that need to be tested. The reverse-cut equipment is required to operate safely and reliably, and a reverse-cut status indicator light is set. After the reverse-cut is completed, the outdoor cable is completely electrically isolated through the reverse-cut equipment to ensure that the cable is safely and reliably connected to the line that needs to be tested after the reverse-cut.
[0059] like Figure 1 As shown in the figure, it is a schematic diagram of cable reverse cutting of three lines by relay mode. When reverse cutting relay 1 falls, A1-C1 line is turned on and reverse cutting is carried out to indoor cable of line 1; when reverse cutting relay 1 is sucked up, A1-B1 line is turned on. If reverse cutting relay 2 is sucked up at this time, A2-B2 line is turned on and reverse cutting is carried out to indoor cable of line 2. If reverse cutting relay 2 falls down, A2-C2 line is turned on and reverse cutting is carried out to indoor cable of line 3.
[0060] like Figure 2 The figure shows a schematic diagram of cable reverse cutting of three cables by mechanical coaxial switch. When the mechanical switch is switched to different points, it can be reversed to different lines respectively. For example, when the CA line is turned on, it is reversed to the indoor cable of Line 1, when the CB line is turned on, it is reversed to the indoor cable of Line 2, and when the CD line is turned on, it is reversed to the indoor cable of Line 3.
[0061] like Figure 3 The figure shows the principle of the reverse cutting control of the present invention. The present invention realizes the control of the reverse cutting device through the reverse cutting switch. Assuming that there are a lines involved in the test run and n cables to be reversed, the number of reverse cutting switches i is taken to satisfy the condition 2 i ≥a is the smallest integer. When the reverse switch is closed, the combination of the opening and closing of the reverse switch can obtain 2 i A control logic, each control logic controls a line;
[0062] The control loop where each reverse cutting switch is located includes b parallel reverse cutting devices, each reverse cutting device includes c groups of nodes, the nodes in each reverse cutting device are operated simultaneously, and each node is responsible for controlling a cable. Each reverse cutting switch includes a first switch and a second switch, and the two ends of the reverse cutting device are connected to the first switch and the second switch respectively; the first switch and the second switch are kept open or closed at the same time, and when the first switch and the second switch are operated at the same time, all parallel reverse cutting devices in the control loop are operated at the same time, so as to realize the simultaneous reverse cutting control of n cables to be reversed.
[0063] This embodiment is described in detail by taking 3 lines as an example, that is, a=3, then i=2. Therefore, Figure 3As shown, reverse switch 1 and reverse switch 2 are set in the test control room. The control circuit of reverse switch 1 has reverse relays 1_1, 1_2, ... 1_n connected in parallel, and the control circuit of reverse switch 2 has reverse relays 2_1, 2_2, ... 2_n connected in parallel. According to the open and closed states of reverse switches 1 and 2, 4 different combinations can be obtained, such as reverse switches 1 and 2 are both closed, corresponding to control logic 11, reverse switches are both open, corresponding to control logic 00, reverse switches 1 and 2 are one open and one closed, corresponding to control logic 01 and 10. You can choose 3 of them, according to Figure 1 The cable reverse cutting control circuit is constructed in this way to realize the switching control of the three lines. For the n cables that need to be switched in the three lines, they are controlled by each reverse cutting relay. When switches 1 and 2 in the reverse cutting switch 1 are closed, the reverse cutting relays 1_1, 1_2, ... 1_n are all sucked up; when switches 1 and 2 in the reverse cutting switch 1 are opened, the reverse cutting relays 1_1, 1_2, ... 1_n are all dropped. The control method of the reverse cutting switch 2 is similar to that of the reverse cutting switch 1, and this embodiment will not be repeated here. Then, for example, when the reverse cutting switches 1 and 2 are closed, the reverse cutting relays 1_1, 1_2, ... 1_n, 2_1, 2_2, ... 2_n are all in the sucked up state, that is, the reverse cutting relays 1_1 and 2_1 of the control cable 1 are sucked up, and so on, then, the n reverse cutting relay nodes of the control cables 1 to n can switch in a consistent manner, thereby realizing one-button control switching of all cables that need to be switched in the same line. Since in this embodiment, each switching relay reserves a group of nodes, the number of switching relays and the number of control cables satisfy the relationship: b*(c-1)≥n.
[0064] When more lines need to be controlled, such as 8 lines, a similar method can be used. Figure 3 The control method is realized by using three reverse cut-off switches. By analogy, more test lines can be connected.
[0065] In addition, in order to facilitate the operation of the test personnel in the test control room, a circuit can be designed to complete the reverse cutting of all outdoor cables with one click, and a reverse cutting switch can be set in the test control room or a switching switch can be set on the ATS interface or PLC control interface to complete the test cable reverse cutting function of different lines with one click. Figure 3The control principle of the reverse switch is shown in the figure. By setting reverse switches 1 and 2, the two reverse switch positions can be operated to achieve the purpose of all reverse devices moving to the specified position at the same time. Further consideration is that reverse switches 1 and 2 can be replaced by relay nodes controlled by interlocking. The ATS (automatic train supervision system) issues control commands, and the interlocking drive controls the relay to move, and finally achieves the purpose of switching all cables to the corresponding test line with one click. Similarly, the PLC can also control the motor to drive the mechanical switch to achieve the control purpose of one-click switching.
[0066] S4, reverse cut switch position recovery
[0067] In order to reflect the real state of the reverse cutting device and ensure the safety of the test run, the present invention requires the position of the reverse cutting switch to be retrieved. The specific method is: a group of nodes are reserved for all reverse cutting devices, and the reserved nodes of all reverse cutting devices are connected to the interlocking of the corresponding line to judge the consistency of the test run state and the reverse cutting device; if the reverse cutting switch has been switched to the corresponding line, but any group of nodes of the reverse cutting device has not moved to the corresponding position, the interlocking judges that the reverse cutting switch does not match the position of the reverse cutting device, and all the signal machines on the test run line are turned red, and a restricted state movement authorization is sent to the train, and the test run is not allowed to continue, so as to ensure the safety of the system. In addition, the position of the reverse cutting switch is matched according to the state of the reverse cutting device node, so as to accurately judge the specific position of the faulty reverse cutting device, and facilitate maintenance personnel to intervene in time to troubleshoot the fault.
[0068] S5, passive transponder and sleep-wake-up long beacon design
[0069] Passive balises and long sleep and wake-up beacons are preferably designed according to mainstream European balises, and messages are designed according to the standard of "T_CAMET04011.1-2018-Urban Rail Transit Communication-Based Train Operation Control System (CBTC) Interoperability Interface Specification Part 1 Balise Message". This can meet the needs of passive balises and long sleep and wake-up beacons for test lines shared by different lines. If the standard protocol is not met, it is recommended that the corresponding manufacturer develop the corresponding message, otherwise the corresponding line needs to independently set up a set of balise equipment on the test line.
[0070] S6. Active transponder settings
[0071] Active balises involve dynamic calculations of LEU software data and train movement authorization for different lines. In order to avoid different lines using interoperable software and data from other manufacturers, which brings too much design coupling and unnecessary software data version management, laboratory testing, field testing, safety certification, and confirmation of the impact of different line upgrades, etc., different lines should be equipped with independent LEUs (Lineside Electronic Units). By cutting the outdoor cables of active beacons, the use of outdoor active balises on the test lines shared by different lines can be realized.
[0072] S7, Axle counting equipment settings
[0073] There is only one set of axle counting equipment on the test line:
[0074] If axle counting and interlocking use a hard-wired interface solution, the interface cables corresponding to the axle counting track relay, pre-reset instruction, pre-reset success status and other information are reversed to meet the requirement of sharing one set of axle counting equipment for different lines.
[0075] If the axle counter and interlocking adopt a network interface solution, general safety protocols such as RSSPI or RSSPII can be used for data security interface of occupancy clearance, pre-reset and other information. The axle counter needs to support the requirements of simultaneous digital communication of multi-line interlocking.
[0076] For the network interface solution, the axle counter may receive pre-reset instructions from different lines at the same time, causing the axle counter section to be reset incorrectly, thereby causing a safety accident. This embodiment can be solved by one of the following methods:
[0077] Method 1: The signal system adds safety card control, and only when the depot agrees to the test run status, the axle counter pre-reset command is allowed to be output;
[0078] Method 2: The position information of the reverse cut switch is transmitted to the axle counter. The axle counter system determines the position of the reverse cut switch and adds a safety card control that only responds to the pre-reset request of the test line.
[0079] S8. Check before test start
[0080] Before the test begins, the test line and the vehicle depot complete the handover of test authority. In order to avoid the risk of collision, squeezing and other risks caused by different lines obtaining test authority at the same time, the vehicle depot only provides one test interface information to each line. According to the test operation requirements, the test reverse switch is turned to the corresponding line position in the test line control room. According to the position of the test line reverse switch, the corresponding interface cable is connected to the interlocking device of the corresponding test line through the reverse contact of the reverse switch cabinet. The corresponding line's request for test and the vehicle depot's consent to test information can interact normally. If the vehicle depot's test consent information is lost during the test, the signal system adds safety card control, immediately turns off the train signal on the test line, and stops the test to avoid dangerous scenarios.
[0081] S9, Core Network Settings
[0082] If the test line and the main line share the same set of core network equipment, the test line does not deploy A and B network core networks separately. Each line shares a set of RRU and BBU equipment. The DCS networks of the test lines of different lines access the train-to-ground communication information through the shared control center core network to meet the train-to-ground transmission service requirements when testing different lines. The logical channels between the test lines and between the test line and the main line are completely isolated through the GRE (Generic Routing Encapsulation Tunnel) tunnel method to ensure that the data information does not interfere with each other. When the LTE equipment of the test line fails, it will not affect the core network equipment of the main line.
[0083] If the test line is equipped with independent core network equipment, each line shares a set of RRU, BBU, and core network equipment. The DCS equipment of different test lines is connected to the common LTE wireless equipment to meet the vehicle-to-ground transmission service requirements during the test of different lines.
[0084] In addition, in order to avoid wireless interference between the test line and the vehicle depot or other adjacent lines, physical isolation measures are designed for the shared test line and the vehicle depot or other adjacent lines, or the test line and other areas use different frequency solutions to avoid interference in wireless communications and affect the normal operation of the test or other areas.
[0085] S10, time-sharing power supply
[0086] Considering the professional capacity limitation of the external power grid, the external power grid may not be able to bear the power supply capacity of multiple lines at the same time. The present invention designs a time-sharing power supply solution. The power panel is respectively provided with a master switch with an interlocking function for the power supply equipment of different lines. Only one line can be powered at the same time to ensure that the power supply capacity does not exceed the capacity of the external power grid. At the same time, for the equipment that must be powered for the test run of each line, such as outdoor shared equipment, LTE equipment, axle counting equipment, and reverse cutting cabinets, the design is based on uninterrupted power supply.
[0087] like Figure 4As shown in the figure, the input power of the power panel comes from the external power grid. The LTE / axle counter / reverse cutting cabinet and other uninterruptible power supplies are configured in the uninterruptible power panel cabinet, and the remaining power supplies are divided into power panel cabinets according to the lines. In the figure, QF6-QF8 adopts mechanical interlocking to ensure that only one can be closed, thereby ensuring that only one line is powered at the same time, solving the problem of external power grid capacity limitation.
[0088] S11. Test run
[0089] During the test run, the outdoor cables are connected to the signal equipment of the test run line through the reverse cutting equipment. The non-test run line cannot collect the status of the shared signal equipment such as outdoor signal machines and turnouts. The axle occupancy and clearance on the test run line cannot be unlocked according to the logic of the normal open signal. Therefore, wrong status displays and alarms will appear on the terminal interfaces such as interlocking, ATS, and MSS. This solution collects the reverse cutting switch status. If the reverse cutting switch is not on this line, the system will process the corresponding alarms and abnormal status to avoid unnecessary operations caused by the test run attendant due to erroneous alarms and status displays, and minimize unnecessary maintenance operations.
[0090] This embodiment takes a city subway line 1 and line 2 sharing a depot as an example for detailed description, where line 1 is a common manned line and line 2 is a newly built unmanned line. Considering the investment cost, only one test line is set up on line 1 to realize the conventional 1 and 2 test functions, and consider the test requirements of the unmanned remote test line of line 2.
[0091] Step 1: Figure 5 As shown, the outdoor equipment (signals, axle counters, active transponders, platform doors, emergency stop buttons, request / approval test runs, LTE equipment, etc.) is provided by Line 1 and shared with Line 2. The outdoor signal equipment layout of the two lines is designed according to unified standards, and is confirmed to meet the test runs and field test requirements of the two lines.
[0092] Step 2: If Figure 6 As shown in the figure, it is clear what equipment needs to be cut back and what equipment does not need to be cut back. Line 2 is a newly built unmanned line, so SPKS, departure confirmation, and door re-opening are equipment required for unmanned driving unique to Line 2. The cables of these equipment do not need to be cut back and can be directly connected to the indoor of Line 2. The axle counting magnetic head connected to the outdoor area is shared by Lines 1 and 2. However, after the outdoor magnetic head line is connected to the axle counting system, it can directly cut back the indoor axle counting occupancy clearing status and pre-reset information, so that the purpose of using a set of axle counting equipment for two lines can be achieved.
[0093] Step 3: If Figure 7The reverse cutting principle is shown in the figure. For reverse cutting between two lines, only two reverse cutting devices need to be set. Here, a safety relay is selected as the reverse cutting device. The front and rear nodes of the reverse cutting relay are respectively connected to the indoor combination cabinets of Lines 1 and 2. The reverse cutting switch in the test control room is connected in series to the power supply circuit of the reverse cutting relay to control the relay to be sucked up or down, and finally the purpose of reverse cutting of all common equipment on Lines 1 and 2 is achieved with one button.
[0094] Step 4: To correctly reflect the reverse cutting status, all reverse cutting relays reserve 2 groups of nodes. One group of nodes connects the front nodes in series, representing that the reverse cutting switch is placed in the test state of Line 2. The other group of nodes connects the rear nodes in series, representing that the reverse cutting switch is placed in the test state of Line 1. The DCC room of Line 1 sets reverse cutting indicator lights for Lines 1 and 2 for the two states (green light for Line 1 test, yellow light for Line 2 test), and sends these two reverse cutting states to the interlocking of Lines 1 and 2. When the interlocking determines that the current switching switch position is inconsistent with the test state, the test is not allowed to continue. At the same time, the reverse cutting state indicator lights are set on the ATS interface of Lines 1 and 2 to display the current reverse cutting switch state.
[0095] Step 5: Before the test begins, the test line and the depot must complete the handover of test authority. During the test, the depot only provides one interface information to the interlocking device of the Line 1 or Line 2 test line. According to the position of the test line reverse switch, the corresponding interface cable passes through the reverse node of the reverse cabinet to connect the interlocking device of Line 1 or Line 2, ensuring that only the line under test can obtain the test consent signal from the depot, thereby improving the safety of the system.
[0096] Step 6: The two test lines and the main line share the same set of control center core network equipment. The test lines are equipped with an independent set of RRU and BBU equipment. The test line DCS networks of Lines 1 and 2 are connected to the train-to-ground communication information through the shared Line 1 control center core network. The two test lines and the test line and the main line are completely isolated from each other through the GRE tunnel method, and the data information does not interfere with each other. In order to avoid wireless interference between the test line and the depot or other adjacent lines, the test line and other areas use a different frequency solution to avoid interference in wireless communication and affect the normal operation of the test or other areas.
[0097] Step 7: The capacity of the power grid outside Lines 1 and 2 is sufficient, so the power supply panel of Line 1 can directly supply power to the signal equipment of both lines at the same time, reducing the initialization delay of powering on the equipment.
[0098] Step 8: Considering that the non-test line cannot collect the status of outdoor equipment and may result in false alarms and error displays, both Line 1 and Line 2 collect the reverse switch status to filter out related alarms and error status displays, reducing the workload of maintenance and operating personnel.
[0099] The electronic device of the present invention includes a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.
[0100] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.
[0101] The processing unit performs the various methods and processes described above, such as methods S1 to S11. For example, in some embodiments, the above methods S1 to S11 may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program may be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into the RAM and executed by the CPU, one or more steps of the methods S1 to S11 described above may be performed. Alternatively, in other embodiments, the CPU may be configured to execute the above methods S1 to S11 in any other appropriate manner (e.g., by means of firmware).
[0102] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.
[0103] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.
[0104] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.
[0105] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.
Claims
1. A method for realizing multi-line safety test by sharing a test line, characterized in that: Different lines are equipped with their own indoor equipment, and at the same time, share some outdoor equipment on the same test line. Through one-touch switching operation, the shared signal equipment cables are cut back to the line that needs to be tested. The test safety is ensured by real-time monitoring of the status of the cut-back equipment and the uniqueness of the vehicle depot test authority, so as to achieve the use scenario of time-sharing safe testing of signal systems of different lines on the same test line. Among them, the outdoor equipment shared by different lines includes outdoor beacons, axle counters, signal machines, LTE wireless equipment, switches and platform doors.
2. The method for realizing multi-line safety test by using a shared test line according to claim 1, characterized in that: The method described requires the establishment of a unified outdoor trackside equipment layout principle and compatibility with the system characteristics of different signal manufacturers. The corresponding platforms are arranged based on the length of the test line and the test function requirements; the basic layout principles are set according to the specification documents, and the outdoor signal machines, axle counters, switch machines, beacons and trackside test-related buttons are all set according to the unified basic layout principles; for different systems, corresponding equipment is added according to the system characteristics and line function requirements.
3. The method for realizing multi-line safety test by using a shared test line according to claim 1, characterized in that: Among the outdoor equipment, the equipment that needs to be cut back includes at least one of a signal, an axle occupancy / track clearing relay, unmanned driving related function buttons, an active beacon, a platform door interface, a switch indication, and a request / approval test run button, wherein the unmanned driving related function buttons include an SPKS button, a departure confirmation button, a linked door reopening button, and an emergency stop button; the equipment that does not need to be cut back includes separate outdoor test run equipment that is additionally set up for different lines due to different user needs, or trackside equipment that needs to be added due to different system characteristics.
4. The method for realizing multi-line safety test by using a shared test line according to claim 1, characterized in that: For equipment that does not require reverse cutting, the cables of the corresponding additional outdoor equipment are directly connected to the corresponding line indoor cabinet.
5. The method for realizing multi-line safety test by using a common test line according to claim 1, characterized in that: For equipment that requires reverse cutting, a reverse cutting cabinet is set up in the signal room of the corresponding line. The reverse cutting equipment composed of relays, mechanical switches or electronic switches is used to reverse cut the cables that require reverse cutting outdoors. The reverse cutting equipment and gear settings are selected according to the number of lines that need to be tested. After the reverse cutting is completed, the outdoor cables are electrically completely isolated through the reverse cutting equipment to ensure that the cables are safely and reliably connected to the lines that need to be tested after reverse cutting. The reverse cutting equipment is required to operate safely and reliably, and a reverse cutting status indicator light is set.
6. The method for realizing multi-line safety test by using a common test line according to claim 5, characterized in that: The method described herein realizes the control of the reverse cutting device through the reverse cutting switch. Assume that there are a lines involved in the test run and n cables need to be switched. Then the number of switch i is the one that satisfies the condition 2. i ≥a is the smallest integer. When the reverse switch is closed, the combination of the opening and closing of the reverse switch can obtain 2 i A control logic, each control logic controls a line; The control loop where each reverse cutting switch is located includes b parallel reverse cutting devices, each reverse cutting device includes c groups of nodes, each reverse cutting switch includes a first switch and a second switch, and the two ends of the reverse cutting device are respectively connected to the first switch and the second switch; the first switch and the second switch are kept open or closed at the same time. When the first switch and the second switch are operated at the same time, all the parallel reverse cutting devices and their corresponding nodes in the control loop are operated at the same time, so as to realize the simultaneous reverse cutting control of n cables that need to be reversed.
7. The method for realizing multi-line safety test by using a common test line according to claim 6, characterized in that: The reverse cut-off switch is realized by adopting a relay node of interlock control, or by adopting a PLC-controlled motor to drive a mechanical switch to operate.
8. The method for realizing multi-line safety test by sharing a test line according to claim 6, characterized in that: The method described above retrieves the position of the reverse switch, and the specific method is: a group of nodes are reserved for all reverse cutting devices, and the reserved nodes of all reverse cutting devices are connected to the interlocking of the corresponding line to determine the consistency between the test state and the reverse cutting device; if the reverse cutting switch has been switched to the corresponding line, but any group of nodes of the reverse cutting device has not moved to the corresponding position, the interlocking determines that the reverse cutting switch does not match the position of the reverse cutting device, and turns all signals on the test line to red lights, and sends a restricted state movement authorization to the train, and does not allow the test to continue; in addition, the position of the reverse cutting switch is matched according to the state of the reverse cutting device node, so as to accurately determine the specific position of the faulty reverse cutting device.
9. The method for realizing multi-line safety test by using a shared test line according to claim 1, characterized in that: The messages of passive transponders and sleep-wake-up long beacons are designed according to preset standard protocols. If the messages designed by different systems do not meet the standard protocols, a set of transponder equipment is independently set on the test line for the corresponding line.
10. The method for realizing multi-line safety test by sharing a test line according to claim 1, characterized in that: Independent LEU equipment is set up for different lines, and the use requirements of outdoor active transponders of the test lines shared by different lines are realized by cutting the outdoor cables of active beacons.
11. The method for realizing multi-line safety test by using a common test line according to claim 1, characterized in that: The test line is equipped with only one set of axle counting equipment. If the axle counter and interlocking adopt a hard-wired interface solution, the interface cables corresponding to the axle counter track relay, pre-reset instruction, and pre-reset success status information are reversed to meet the requirement of sharing one set of axle counter equipment for different lines; If the axle counter and interlocking adopt a network interface solution and use the RSSPI or RSSPII general safety protocol for the data security interface of occupancy clearance and pre-reset information, the axle counter must support the requirements of simultaneous digital communication for multi-line interlocking.
12. A method for realizing multi-line safety test by sharing a test line according to claim 11, characterized in that: In the network interface solution, the problem that the axle counter may receive pre-reset instructions from different lines at the same time, resulting in the axle counter section being reset incorrectly, is solved by one of the following methods: Method 1: The signal system adds safety card control, and only when the depot agrees to the test run status, the axle counter pre-reset command is allowed to be output; Method 2: The position information of the reverse cut switch is transmitted to the axle counter. The axle counter system determines the position of the reverse cut switch and adds a safety card control that only responds to the pre-reset request of the test line.
13. The method for realizing multi-line safety test by sharing a test line according to claim 1, characterized in that: Before the test begins, the test line and the vehicle depot complete the handover of test authority, in which the vehicle depot only provides one test interface information to each line; according to the test operation requirements, the test reverse switch is turned to the corresponding line position in the test line control room. According to the position of the test line reverse switch, the corresponding interface cable is connected to the interlocking device of the corresponding test line through the reverse contact of the reverse switch cabinet, and the corresponding line's request for test and the vehicle depot's consent to test information can interact normally; if the vehicle depot's test consent information is lost during the test, the signal system adds safety card control, immediately closes the train signal on the test line, and stops the test.
14. The method for realizing multi-line safety test by using a common test line according to claim 1, characterized in that: If the test line and the main line share the same set of core network equipment, the test line does not deploy A and B network core networks separately. Each line shares a set of RRU and BBU equipment. The DCS networks of the test lines of different lines access the train-to-ground communication information through the shared control center core network to meet the train-to-ground transmission business needs when testing different lines. The logical channels between the test lines and between the test lines and the main line are completely isolated through GRE tunnels.
15. The method for realizing multi-line safety test by sharing a test line according to claim 1, characterized in that: If the test line is equipped with independent core network equipment, each line shares a set of RRU, BBU, and core network equipment. The DCS equipment of different test lines is connected to the common LTE wireless equipment to meet the vehicle-to-ground transmission service requirements during the test of different lines.
16. The method for realizing multi-line safety test by sharing a test line according to claim 1, characterized in that: The shared test line is designed with physical isolation measures from the vehicle depot or other adjacent lines, or the test line and other areas use different frequency solutions to avoid interference in wireless communication.
17. The method for realizing multi-line safety test by sharing a test line according to claim 1, characterized in that: The method described adopts a time-sharing power supply solution. The power panel is provided with a master control switch with an interlocking function for the power supply equipment of different lines. Only one line can be powered on at the same time. At the same time, the equipment that must be powered for the test run of each line is designed to be uninterrupted. Among them, the equipment that must be powered includes outdoor shared equipment, LTE wireless equipment, axle counting equipment, and reverse cutting cabinets.
18. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the program, the method according to any one of claims 1 to 17 is implemented.
19. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 17 is implemented.
Citation Information
Patent Citations
System and method for interconnecting and interworking lines to share test run line
CN115892149A
Cited By
Test run control method and device based on sharing of test run line and vehicle depot signal equipment
CN120646075A