Expressway medial strip sinking water cut-off system

By designing a concrete water isolation wall, waterproof concrete layer, drainage layer and green layer sinking water cut-off system in the central separation zone of the highway, combined with intelligent monitoring devices, the problem of the existing drainage system being complicated and prone to siltation is solved, and effective Water removal and roadbed stability improvement.

CN118773984APending Publication Date: 2024-10-153RD CONSTRUCTION (SHENZHEN) CO LTD OF CHINA CONSTRUCTION 5TH ENGINEERING BUREAU
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411080032.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

The existing drainage system in the highway central divider is complex and costly to construct, and is prone to siltation, leading to water seepage problems, affecting the bearing capacity of the roadbed and increasing the risk of slippage.

Method used

A sinking water-cutting system including a concrete isolation wall, a waterproof concrete layer, a drainage layer and a greening layer was designed to drain water through transverse pipes, combined with intelligent monitoring devices to prevent water from penetrating into the roadbed and enhance the stability of the roadbed and slopes.

Benefits of technology

It can effectively prevent the infiltration of rainwater and irrigation water, reduce the moisture content of the roadbed, reduce the risk of slippage, improve the bearing capacity of the roadbed, and prevent road damage through intelligent monitoring and timely warning.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118773984A_ABST
    Figure CN118773984A_ABST
Patent Text Reader

Abstract

The invention provides an expressway medial strip sinking water cut-off system. The expressway medial strip sinking water cut-off system comprises an expressway roadbed and a medial strip arranged in the middle of the roadbed in the longitudinal direction of the roadbed. The medial strip comprises concrete cutoff walls, a waterproof concrete layer, a drainage layer and a greening layer, the two concrete cutoff walls are symmetrically arranged on the two side walls of the medial strip and define a separation groove, the waterproof concrete layer is arranged at the bottom of the separation groove, the drainage layer is arranged between the waterproof concrete layer and the greening layer, and the greening layer extends out of the road surface; a transverse pipeline arranged in the transverse direction of the roadbed is arranged in the roadbed, one end of the transverse pipeline is communicated with the drainage layer, the other end of the transverse pipeline sequentially penetrates through the concrete cutoff wall and the roadbed to extend out of the side slope of the roadbed, and the transverse pipeline is used for discharging water which is not absorbed by the greening layer out of the roadbed. According to the scheme, accumulated water can be prevented from infiltrating to be concentrated towards the low concave position, the potential slip surface slip sinking risk of the medial strip is reduced, and therefore the bearing capacity of the roadbed pavement is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of highway drainage, and in particular to a highway central dividing strip sinking water-cutting system. Background Art

[0002] The central median strip of the highway is usually planted with grass, shrubs and other plants for greening. Rainwater falling in the central median strip, water for plant irrigation, and water collected on the upper side of the super-elevated road section will all infiltrate into the central median strip to varying degrees. Built-in infiltration ditches are a more commonly used form of drainage design in the central median strip of highways. The infiltrated rainwater is introduced into the water collection well through the longitudinal infiltration ditch. However, the construction process of the infiltration ditch drainage system is relatively complicated, and the project cost is relatively high. The drainage system is prone to siltation over time. When the rainfall is too heavy or lasts too long, it is easy to cause water seepage problems in the central median strip. There are also many waterproofing procedures for the central dividing strip, especially since the roots of safety guardrail piles and green plants are likely to pierce the waterproof layer. The joints of the waterproof geotextile and the seams of the guardrail columns are difficult to completely seal. On the one hand, the infiltrated water continues to seep downward in the vertical direction, increasing the moisture content of the bottom roadbed; on the other hand, it migrates to the junction between the roadbed and pavement layers on both sides and concentrates in the depressions, increasing the risk of potential sliding surface sliding and sinking in the central dividing strip, which will directly affect the bearing capacity of the roadbed and pavement, thereby causing slope sliding. The infiltration water in the central dividing strip is an important factor causing damage to the road structure.

[0003] In the existing drainage scheme for the central median of highways, long-term rainfall will cause seepage water to flow into the roadbed and pavement structure layer through different pathways, which will have an adverse effect on the service life of the roadbed and pavement. Therefore, designing a system to solve the seepage problem in the central median of highways has become an urgent problem to be solved. Summary of the invention

[0004] The purpose of the present invention is to provide a highway central dividing strip sinking water cut-off system to solve the above technical problems.

[0005] The present invention provides a highway central dividing strip sinking water-cutting system, comprising a highway roadbed and a central dividing strip arranged in the middle of the roadbed along the longitudinal direction of the roadbed;

[0006] The central dividing strip includes a concrete water-retaining wall, a waterproof concrete layer, a drainage layer and a greening layer. The two concrete water-retaining walls are symmetrically arranged on the two side walls of the central dividing strip and surround a dividing groove. The bottom of the dividing groove is sunken into the roadbed, and the top of the dividing groove protrudes from the road surface. The waterproof concrete layer is arranged at the bottom of the dividing groove. The drainage layer is arranged between the waterproof concrete layer and the greening layer, and the greening layer protrudes from the road surface.

[0007] A transverse pipe is provided in the roadbed along the transverse direction of the roadbed, one end of the transverse pipe is connected to the drainage layer, and the other end of the transverse pipe passes through the concrete retaining wall and the roadbed in sequence to extend out of the slope of the roadbed. The transverse pipe is used to discharge the unabsorbed water of the greening layer out of the roadbed.

[0008] Optionally, a plurality of the transverse pipes are spaced apart in the roadbed, one end of each of the transverse pipes is anchored to the concrete retaining wall, and the other end of the transverse pipe is anchored to the slope of the roadbed, so as to enhance the stability of the roadbed and the slope.

[0009] Optionally, the outer wall of the concrete retaining wall is provided with an intelligent monitoring device, which includes a flexible anti-collision spherical photovoltaic cover, a flashing light and a road status monitor. The road status monitor is electrically connected to the spherical photovoltaic cover and the flashing light, respectively. The spherical photovoltaic cover is used to convert high-speed wind force generated by cars on the road surface into electrical energy, and the flashing light is used to turn on and send out an alarm signal when the road surface cracks and settles or / and the slope slides.

[0010] Optionally, the concrete water retaining wall includes a pavement portion protruding from the pavement and a roadbed portion disposed within the pavement, and a thickness of the roadbed portion is greater than a thickness of the pavement portion.

[0011] Optionally, the drainage layer includes a gravel layer and a permeable geotextile, the gravel layer is arranged on the waterproof concrete layer, the permeable geotextile is arranged between the gravel layer and the greening layer, and the transverse pipe is connected to the gravel layer.

[0012] Optionally, the central dividing strip also includes a longitudinal pipe, which is arranged in the greening layer along the longitudinal direction of the roadbed. The longitudinal pipe is connected to the transverse pipe and is used to discharge unabsorbed water in the greening layer to the transverse pipe. The longitudinal pipe is also used to transport water into the greening layer.

[0013] Optionally, the central dividing strip further comprises a water collection well opened in the transverse direction of the roadbed, the water collection well is formed in the height direction of the central dividing strip, the top opening of the water collection well is provided with a cover plate, which is at the same height as the top of the greening layer, and the bottom of the water collection well is at the same height as the bottom of the waterproof concrete layer. The water not absorbed by the greening layer can be discharged to the water collection well through the longitudinal pipe.

[0014] Optionally, the slope of the road surface on both sides of the central dividing strip extending toward the side slope gradually becomes lower, and the water flow on the road surface flows down to the outside of the side slopes on both sides.

[0015] Optionally, the slope of the road surface on one side of the central dividing strip extending in the direction of the slope gradually becomes lower, and the slope of the road surface on the other side of the central dividing strip extending in the direction of the slope gradually becomes higher. A water collecting pipe opened along the longitudinal direction of the roadbed is provided between the outer side of the dividing strip and the road surface on the other side. Water flowing on the road surface on one side flows down to the outside of the corresponding slope, and water flowing on the road surface on the other side flows down into the water collecting pipe and is discharged.

[0016] Optionally, the inner wall of the concrete watertight wall and the upper surface of the waterproof concrete layer are coated with emulsified asphalt for waterproofing.

[0017] The beneficial effects of this solution are:

[0018] When rainwater enters the system, the concrete waterproof layer and the waterproof concrete layer both have waterproof functions. They can prevent rainwater that falls in the central dividing strip for a long time, plant irrigation water, and water collected on the upper side of the super-elevated road section from infiltrating into the inner surface layer of the central dividing strip and the junction between the subgrade and pavement layers, and prevent the accumulated water from infiltrating and concentrating in the depressions. The transverse pipes are used for drainage, which reduces the water content of the subgrade in the bottom area and the risk of sliding and sinking of the potential sliding surface of the central dividing strip, thereby ensuring the bearing capacity of the subgrade and pavement. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the cross-sectional structure of the non-superelevated section of the central median;

[0020] Figure 2 This is a schematic diagram of the cross-sectional structure of the super-elevated section of the central median;

[0021] Figure 3 The schematic diagram of the partial cross-section structure of the central dividing strip;

[0022] Figure 4 This is a schematic diagram of the longitudinal section structure of the central dividing strip.

[0023] Description of reference numerals:

[0024] 10. Central median strip;

[0025] 11. Concrete water-blocking wall; 111. Pavement; 112. Roadbed; 12. Waterproof concrete layer; 13. Drainage layer; 131. Gravel layer; 132. Permeable geotextile; 14. Greening layer; 141. Soil cultivation; 142. Greening plants; 15. Horizontal pipeline; 16. Vertical pipeline; 17. Intelligent monitoring device; 18. Water collection well; 19. Water collection pipe;

[0026] 20. Roadbed; 21. Pavement; 22. Slope. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0028] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "front", "rear", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention; the terms "first", "second", and "third" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be a connection between the two components. For ordinary technicians in this field, the specific meanings of the terms in the present invention can be understood according to specific circumstances.

[0029] See also Figure 1-4 The present invention provides a highway central dividing strip 10 sinking water-cutting system, comprising a highway subgrade 20 and a central dividing strip 10 arranged in the middle of the subgrade 20 along the longitudinal direction of the subgrade 20; the central dividing strip 10 comprises a concrete water-blocking wall 11, a waterproof concrete layer 12, a drainage layer 13 and a greening layer 14, two concrete water-blocking walls 11 are symmetrically arranged on the two side walls of the central dividing strip 10 and are surrounded to form a dividing groove, the bottom of the dividing groove is sunk in the subgrade 20, the top of the dividing groove extends out of the road surface 21, the waterproof concrete layer 12 is arranged at the bottom of the dividing groove, the drainage layer 13 is arranged between the waterproof concrete layer 12 and the greening layer 14, and the greening layer 14 extends out of the road surface 21; a transverse pipe 15 is arranged in the subgrade 20 along the transverse direction of the subgrade 20, one end of the transverse pipe 15 is connected to the drainage layer 13, and the other end of the transverse pipe 15 passes through the concrete water-blocking wall 11 and the subgrade 20 in sequence to extend out of the slope 22 of the subgrade 20, and the transverse pipe 15 is used to discharge the unabsorbed water of the greening layer 14 out of the subgrade 20.

[0030] When rainwater enters the system, the concrete waterproof layer and the waterproof concrete layer 12 are both waterproof, which can prevent rainwater that has fallen in the central dividing strip 10 for a long time, plant irrigation water and water collected on the upper side of the super-elevated road section from infiltrating into the inner surface layer of the central dividing strip 10 and the junction between the roadbed 20 and the pavement 21 layers, and prevent the accumulated water from infiltrating and concave areas. The transverse pipes 15 are used for drainage, reducing the water content of the roadbed 20 in the bottom area, and reducing the risk of sliding and sinking of the potential sliding surface of the central dividing strip 10, thereby ensuring the bearing capacity of the roadbed 20 and the pavement 21.

[0031] In this embodiment, the drainage layer 13 includes a gravel layer 131 and a permeable geotextile 132 . The gravel layer 131 is disposed on the waterproof concrete layer 12 . The permeable geotextile 132 is disposed between the gravel layer 131 and the greening layer 14 . The transverse pipe 15 is connected to the gravel layer 131 .

[0032] The greening layer 14 includes soil 141 and green plants 142. The soil 141 and green plants 142 absorb rainwater from the central dividing strip 10, water for plant irrigation, and water collected from the upper side of the super-elevated road section. The part that cannot be absorbed evaporates and is discharged laterally through the transverse pipe 15 and the longitudinal pipe 16.

[0033] The inner wall of the concrete watertight wall 11 and the upper surface of the waterproof concrete layer 12 are coated with emulsified asphalt to enhance the waterproof effect and prevent the water flow in the central watertight strip from seeping into the roadbed 20.

[0034] Specifically, a plurality of transverse pipes 15 are arranged at intervals in the roadbed 20 according to design requirements, one end of each transverse pipe 15 is anchored to the concrete watertight wall 11, and the other end of the transverse pipe 15 is anchored to the slope 22 of the roadbed 20, so as to enhance the stability of the roadbed 20 and the slope 22. The transverse pipes 15 on both sides are anchored to the slopes 22 on both sides respectively, and the concrete watertight wall 11 is stably arranged in the central watertight belt, thereby enhancing the stability of the slope 22.

[0035] Furthermore, the central dividing strip 10 further includes a longitudinal pipe 16, which is arranged in the greening layer 14 along the longitudinal direction of the roadbed 20. The longitudinal pipe 16 is connected to the transverse pipe 15 and is used to discharge the unabsorbed water in the greening layer 14 to the transverse pipe 15, and the longitudinal pipe 16 is also used to transport water into the greening layer 14. The longitudinal pipe 16 is arranged at the connection between the inner side of the high-performance concrete water-retaining wall 11 and the transverse pipe 15. When the amount of rainwater reaches a certain height, the longitudinal pipe 16 can be automatically opened to drain water. In hot and dry weather, the longitudinal pipe 16 can also automatically discharge water to nourish the soil 141 and green plants 142 in the central dividing strip 10.

[0036] In this embodiment, the outer wall of the concrete water-retaining wall 11 is provided with an intelligent monitoring device 17, which includes a flexible anti-collision spherical photovoltaic cover, a flashing light, and a road state monitor. The road state monitor is electrically connected to the spherical photovoltaic cover and the flashing light respectively. The spherical photovoltaic cover is used to convert the high-speed wind force generated by the car on the road surface 21 into electrical energy. The road state monitor is used to sense in real time whether the road surface 21 is cracked and subsided and whether the slope 22 is sliding. The flashing light is used to turn on the light and send an alarm signal when the road surface 21 is cracked and subsided or / and the slope 22 is sliding. The road state monitor is composed of a liquid level centralized measuring device and a measuring point liquid container. It senses in real time whether the road surface is cracked and subsided and whether the slope is sliding through the liquid level difference in the measuring point liquid container.

[0037] The intelligent monitoring device 17 located on the central dividing strip 10 has a flexible anti-collision spherical photovoltaic cover on its surface and is equipped with a road status monitor. It can convert the high-speed wind force generated by cars passing on both sides of the central dividing strip 10 into electricity. It has a flashing light warning function and can monitor the road conditions and whether there is a slope 22 slip phenomenon and other data in real time, so as to avoid greater damage to the road in time. It has a wide range of promotion and use value.

[0038] In this embodiment, the concrete water-retaining wall 11 includes a road surface portion 111 protruding from the road surface 21 and a roadbed portion 112 disposed in the road surface 21, and the thickness of the roadbed portion 112 is greater than the thickness of the road surface portion 111. The roadbed portion 112 is used for stability, and a greater thickness is conducive to enhancing the installation stability of the concrete water-retaining wall 11 and avoiding tilting or collapse.

[0039] In this embodiment, the central dividing strip 10 further includes a water collection well 18 opened in the transverse direction of the roadbed 20. The water collection well 18 is formed in the height direction of the central dividing strip 10. The top opening of the water collection well 18 is provided with a cover plate, which is at the same height as the top of the greening layer 14, and the bottom of the water collection well 18 is at the same height as the bottom of the waterproof concrete layer 12. The water not absorbed by the greening layer 14 can be discharged to the water collection well 18 through the longitudinal pipe.

[0040] See also Figure 1 In one embodiment, the central dividing strip 10 of the present scheme is applied to a non-super-elevated road surface 21, and the slope of the road surface 21 on both sides of the central dividing strip 10 extending toward the side slope 22 gradually becomes lower, and the water flow on the road surface 21 flows down to the outside of the side slopes 22 on both sides.

[0041] See also Figure 2In another embodiment, the central dividing strip 10 of the present scheme is applied to the super-elevated road surface 21, and the slope of the road surface 21 on one side of the central dividing strip 10 extending toward the side slope 22 gradually becomes lower, and the slope of the road surface 21 on the other side of the central dividing strip 10 extending toward the side slope 22 gradually becomes higher. A water collecting pipe 19 opened along the longitudinal direction of the roadbed 20 is provided between the outer side of the dividing strip and the road surface 21 on the other side. The water on one side of the road surface 21 flows down to the outside of the corresponding side slope 22, and the water on the other side of the road surface 21 flows down to the water collecting pipe 19 for discharge.

[0042] The above embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention patent shall be subject to the attached claims.

Claims

1. A highway central median sinking water cut-off system, characterized in that: It includes a roadbed of an expressway and a central dividing strip arranged in the middle of the roadbed along the longitudinal direction of the roadbed; The central dividing strip includes a concrete water-retaining wall, a waterproof concrete layer, a drainage layer and a greening layer. The two concrete water-retaining walls are symmetrically arranged on the two side walls of the central dividing strip and surround a dividing groove. The bottom of the dividing groove is sunken into the roadbed, and the top of the dividing groove protrudes from the road surface. The waterproof concrete layer is arranged at the bottom of the dividing groove. The drainage layer is arranged between the waterproof concrete layer and the greening layer, and the greening layer protrudes from the road surface. A transverse pipe is provided in the roadbed along the transverse direction of the roadbed, one end of the transverse pipe is connected to the drainage layer, and the other end of the transverse pipe passes through the concrete retaining wall and the roadbed in sequence to extend out of the slope of the roadbed. The transverse pipe is used to discharge the unabsorbed water of the greening layer out of the roadbed.

2. The highway central dividing strip sinking water cut-off system according to claim 1 is characterized in that: A plurality of transverse pipes are arranged at intervals in the roadbed, one end of each transverse pipe is anchored to the concrete water retaining wall, and the other end of the transverse pipe is anchored to the slope of the roadbed, so as to enhance the stability of the roadbed and the slope.

3. The highway central dividing strip sinking water cut-off system according to claim 1, characterized in that: The outer wall of the concrete retaining wall is provided with an intelligent monitoring device, which includes a flexible anti-collision spherical photovoltaic cover, a flashing light and a road status monitor. The road status monitor is electrically connected to the spherical photovoltaic cover and the flashing light respectively. The spherical photovoltaic cover is used to convert the high-speed wind force generated by cars on the road surface into electrical energy, and the flashing light is used to turn on and send out an alarm signal when the road surface cracks and settles or / and the slope slides.

4. The highway central dividing strip sinking water cut-off system according to claim 1, characterized in that: The concrete water retaining wall comprises a pavement portion protruding from the pavement and a roadbed portion arranged in the pavement, and the thickness of the roadbed portion is greater than the thickness of the pavement portion.

5. The highway central dividing strip sinking water cut-off system according to claim 1, characterized in that: The drainage layer comprises a gravel layer and a water-permeable geotextile. The gravel layer is arranged on the waterproof concrete layer. The water-permeable geotextile is arranged between the gravel layer and the greening layer. The transverse pipe is connected to the gravel layer.

6. The highway central dividing strip sinking water cut-off system according to claim 5, characterized in that: The central dividing strip also includes a longitudinal pipe, which is arranged in the greening layer along the longitudinal direction of the roadbed. The longitudinal pipe is communicated with the transverse pipe and is used to discharge unabsorbed water in the greening layer to the transverse pipe. The longitudinal pipe is also used to transport water into the greening layer.

7. The highway central median sinking water cut-off system according to claim 1, characterized in that: The central dividing strip also includes a water collection well opened along the lateral direction of the roadbed. The water collection well is formed in the height direction of the central dividing strip. The top opening of the water collection well is provided with a cover plate, which is at the same height as the top of the green layer. The bottom of the water collection well is at the same height as the bottom of the waterproof concrete layer. Water not absorbed by the green layer can be discharged to the water collection well through the longitudinal pipe.

8. The highway central dividing strip sinking water cut-off system according to claim 1, characterized in that: The slope of the road surface on both sides of the central dividing strip extending toward the side slope gradually becomes lower, and the water flow on the road surface flows down to the outside of the side slopes on both sides.

9. The highway central dividing strip sinking water cut-off system according to claim 1, characterized in that: The slope of the road surface on one side of the central dividing strip gradually becomes lower as it extends in the direction of the side slope, while the slope of the road surface on the other side of the central dividing strip gradually becomes higher as it extends in the direction of the side slope. A water collecting pipe opened along the longitudinal direction of the roadbed is provided between the outer side of the dividing strip and the road surface on the other side. Water flowing on the road surface on one side flows down to the outside of the corresponding side slope, and water flowing on the road surface on the other side flows down into the water collecting pipe for discharge.

10. The highway central median sinking water cut-off system according to claim 1, characterized in that: The inner wall of the concrete watertight wall and the upper surface of the waterproof concrete layer are coated with emulsified asphalt for waterproofing.