A slope deep pre-splitting drilling construction device and drill cuttings processing method

By introducing cleaning push plates, receiving pipes, conveying components and dust collection components into the drilling construction device, the problems of rock chip accumulation and flying during drilling construction are solved, and drilling efficiency and environmental quality are improved.

CN118793386BActive Publication Date: 2024-11-19SINOHYDRO BEREAU 10 CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411275421.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-19
Estimated Expiration
2044-09-12

AI Technical Summary

Technical Problem

During the construction of deep pre-cracking drilling on the slope, the rock chips and soil discharged from the drill bit accumulate in the protective cover, increasing drilling resistance, reducing efficiency, and may cause the protective cover to deform or rupture.

Method used

A drilling construction device including cleaning push plates, receiving tubes, conveying components, clumping components and dust collection components is designed to push and convey rock chips through motor-driven gears and piston systems, combined with water tank spraying and dust collection. Function to achieve effective cleaning and condensation and discharge of rock chips.

Benefits of technology

It effectively reduces the accumulation and flying of rock chips in the protective cover, improves drilling speed and efficiency, reduces the risk of damage to the protective cover, and improves the air quality of the working environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118793386B_ABST
    Figure CN118793386B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of blasting construction equipment, specifically, a slope deep pre-splitting drilling construction equipment and a method for processing drill cuttings. The equipment includes a drilling rig body, a drill rod and a protective cover, and also includes a cleaning push plate, which is rotatably installed inside the protective cover and is used to push the rock cuttings inside the protective cover, a receiving tube, the receiving tube is connected to the protective cover, and a discharge port is opened at the bottom of the receiving tube, a conveying component is arranged inside the receiving tube, and is used to convey the rock cuttings entering the receiving tube to the discharge port for discharge, and a clumping component is arranged on the receiving tube, and is used to condense the dust and cuttings entering the receiving tube. Through the coordinated use of the above structures, the accumulation of rock cuttings inside the protective cover, which causes damage to the protective cover, can be effectively avoided. This allows the drilling rig body to maintain a stable working state during drilling into the soil layer, is not prone to failure, and improves construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of blasting construction devices, in particular to a slope deep pre-splitting drilling construction device and a drill cuttings processing method. Background Art

[0002] Slope pre-splitting blasting construction is a construction technology that arranges dense blastholes along the excavation boundary during the slope excavation process, adopts uncoupled charging or loading low-power explosives and detonates, thereby forming pre-cracks between the blasting area and the retained area. These cracks can significantly reduce the impact of vibration and impact generated by blasting the main blastholes on the retained rock mass, ensuring a smooth excavation surface.

[0003] When a down-the-hole drill is drilling into soil or rock, the drill bit breaks the soil or rock through rotation and impact, generating rock cuttings and mud. At this time, the rock cuttings, mud, etc. are effectively discharged through the scraper conveyor, penetration mud pump and compressed air system installed inside the down-the-hole drill. The protective cover installed on the down-the-hole drill can effectively block the discharged rock cuttings and mud, thereby reducing the operational risk. However, the continuously discharged rock cuttings and mud will accumulate in the protective cover. The accumulation of mud and sand will increase the resistance of the drill bit and drilling tools during the drilling process, slowing down the drilling speed and reducing the operational efficiency. It will also cause the protective cover to deform or rupture. Summary of the invention

[0004] In order to make up for the deficiencies of the prior art and solve at least one technical problem raised in the background technology, the present invention provides a slope deep pre-splitting drilling construction device and a drill cuttings processing method.

[0005] The technical solution adopted by the present invention to solve the technical problem is as follows: a slope deep pre-splitting drilling construction device described in the present invention comprises a drilling machine body, a drill rod and a protective cover;

[0006] It also includes a cleaning push plate, which is rotatably installed inside the protective cover and is used to push the rock cuttings inside the protective cover;

[0007] A receiving tube, the receiving tube is connected to the protective cover, and a discharge port is provided at the bottom of the receiving tube;

[0008] A conveying assembly is arranged inside the receiving pipe and is used to convey the rock cuttings entering the receiving pipe to the discharge port for discharge;

[0009] A clumping assembly is provided on the receiving tube and is used to condense the dust entering the receiving tube;

[0010] The dust collecting assembly includes a first connecting tube, a conductive toothed ring arranged in a cavity, a dust collecting hole and an air vent, wherein one end of the first connecting tube extends to the interior of the transfer cylinder, the conductive toothed ring is rotatably installed inside the protective cover, the cleaning push plate is fixedly installed at the bottom end of the conductive toothed ring, the cleaning push plate is connected to the inner cavity of the conductive toothed ring through the air vent, the other end of the first connecting tube is connected to the interior of the conductive toothed ring, and the dust collecting hole is opened on the side wall of the cleaning push plate.

[0011] The conveying assembly includes a first motor and an auger. The first motor is fixedly installed on one side of the receiving tube, the auger is rotatably installed inside the receiving tube, and one end of the auger is fixedly connected to the output shaft of the first motor.

[0012] The clustering assembly includes a transfer cylinder, a piston, a third connecting pipe, a water tank and a second connecting pipe. The piston is slidably mounted inside the transfer cylinder. One end of the second connecting pipe and the third connecting pipe are both connected to the transfer cylinder. The other end of the third connecting pipe is connected to the water tank. The other end of the second connecting pipe extends to the inside of the receiving pipe.

[0013] One-way valves are arranged on the first connecting pipe, the second connecting pipe and the third connecting pipe.

[0014] A moving ring is rotatably mounted on the top of the conducting toothed ring, and one end of the first communicating tube penetrates the moving ring and is communicated with the inner cavity of the conducting toothed ring.

[0015] A second motor is fixedly mounted on the top of the protective cover, a transmission rod is fixedly mounted on the output shaft of the second motor, a first gear is fixedly mounted on the transmission rod, and the first gear is meshed with the transmission gear ring.

[0016] A threaded ring is rotatably installed inside the protective cover, a reciprocating threaded rod is threadedly connected inside the threaded ring, one end of the reciprocating threaded rod is fixedly connected to the piston, a third gear is fixedly installed on the outer wall of the threaded ring, a second gear is fixedly installed on the transmission rod, and the second gear is meshed with the third gear.

[0017] A first bevel gear is elastically installed inside the cleaning push plate through a coil spring, a second bevel gear is rotatably installed inside the cleaning push plate, a threaded rod is fixedly installed on the second bevel gear, and a push plate is connected to the threaded rod through threads.

[0018] The top end of the first bevel gear is fixedly mounted with a fourth gear, the outer wall of the drill rod is fixedly mounted with a sector gear, and the fourth gear is meshed with the sector gear.

[0019] A drill cuttings processing method comprises the following steps:

[0020] S1: First, the drilling rig body is moved to the desired construction location, and the drilling construction is performed on the surface by controlling the drill rod;

[0021] S2: Secondly, by starting the second motor, the cleaning push plate is driven to rotate inside the protective cover under the cooperation of the first gear and the transmission gear ring, and the accumulated dust is pushed into the inside of the receiving tube and discharged;

[0022] S3: Finally, through the cooperation of the second gear and the third gear, the piston is controlled to slide back and forth up and down inside the transfer cylinder. At this time, the rock cuttings in the protective cover and the clean water in the water tank can be sucked into the interior of the transfer cylinder, and then transported to the interior of the receiving tube through the second connecting pipe, so that the rock cuttings are condensed and discharged.

[0023] The beneficial effects of the present invention are as follows:

[0024] 1. A slope deep pre-splitting drilling construction device and a drill cuttings processing method described in the present invention, wherein a second motor is provided to drive a transmission rod to rotate, thereby causing the first gear to drive a transmission gear ring to rotate, and controlling the cleaning push plate to rotate inside the protective cover to push the rock cuttings. At the same time, with the cooperation of the second gear and the third gear, the piston slides up and down on the inner wall of the transfer cylinder, thereby sucking the dust inside the protective cover and the clean water in the water tank into the interior of the transfer cylinder, and finally sending them into the interior of the receiving tube to agglomerate the rock cuttings, and pushing the rock cuttings to the discharge port for discharge through the auger. At this time, the rock cuttings agglomerated into agglomerates will reduce the problem of flying rock cuttings.

[0025] 2. A slope deep pre-splitting drilling construction device and a drill cuttings processing method described in the present invention, through the rotation of the cleaning push plate, the fourth gear rotates around the outer wall of the drill rod and engages with the fan gear, the coil spring is deformed, and controls the second bevel gear to drive the threaded rod to rotate, thereby driving the pushing plate to retract. When the fourth gear is released from the meshing state with the fan gear, the coil spring will release its elastic potential energy, driving the first bevel gear to rotate and reset, and at the same time driving the second bevel gear and the threaded rod to rotate, so that the pushing plate will push the rock cuttings accumulated on one side of the cleaning push plate toward the opening direction of the receiving tube, further improving the efficiency of pushing the rock cuttings inside the protective cover into the receiving tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The present invention will be further described below in conjunction with the accompanying drawings.

[0027] Figure 1 It is a stereogram in the present invention;

[0028] Figure 2 It is a structural schematic diagram of the cleaning push plate in the present invention;

[0029] Figure 3 The present invention Figure 2 A in the enlarged view;

[0030] Figure 4 The present invention Figure 2 The enlarged view of point B in the figure;

[0031] Figure 5 is a schematic structural diagram of the first motor in the present invention;

[0032] Figure 6 The present invention Figure 5 The enlarged view of point C in the figure;

[0033] Figure 7 It is a flow chart of the method in the present invention.

[0034] In the figure: 1. drilling rig body; 2. drill rod; 3. protective cover; 4. receiving tube; 5. water tank; 6. first motor; 7. auger; 8. discharge port; 9. threaded rod; 10. cleaning push plate; 11. transmission gear ring; 12. vent; 13. first gear; 14. second motor; 15. second gear; 16. transmission rod; 17. moving ring; 18. first connecting pipe; 19. second connecting pipe; 20. third connecting pipe; 21. transmission cylinder; 22. threaded ring; 23. third gear; 24. reciprocating threaded rod; 25. piston; 26. dust collecting hole; 27. sector gear; 28. fourth gear; 29. ​​coil spring; 30. first bevel gear; 31. second bevel gear; 32. push plate. DETAILED DESCRIPTION

[0035] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.

[0036] Embodiment 1: Figures 1 to 4 As shown, a slope deep pre-splitting drilling construction device according to an embodiment of the present invention comprises a drilling machine body 1, a drill rod 2 and a protective cover 3;

[0037] It also includes a cleaning push plate 10, which is rotatably mounted inside the protective cover 3 and is used to push the rock cuttings inside the protective cover 3;

[0038] One end of the cleaning push plate 10 is in contact with the outer wall of the drill pipe 2 , and the other end is in contact with the inner wall of the protective cover 3 , so when the cleaning push plate 10 rotates inside the protective cover 3 , the rock cuttings inside the protective cover 3 can be pushed.

[0039] A receiving tube 4, the receiving tube 4 is connected to the protective cover 3, and a discharge port 8 is provided at the bottom end of the receiving tube 4;

[0040] One end of the receiving tube 4 extends to the interior of the protective cover 3, and its inner cavity is connected to the protective cover 3, and an opening of the receiving tube 4 is arranged inside the protective cover 3. Therefore, when the cleaning push plate 10 rotates around the outer wall of the drill rod 2, the rock chips accumulated inside the protective cover 3 can be pushed until the rock chips are pushed to the opening of the receiving tube 4. At this time, the rock chips can enter the interior of the receiving tube 4 through the opening of the receiving tube 4. As the rock chips entering the receiving tube 4 gradually increase, they can finally be discharged through the discharge port 8 opened at the bottom of the receiving tube 4, which effectively solves the problem that the rock chips accumulate in the protective cover 3, which will increase the resistance of the drill rod 2 to drilling, and cause the protective cover 3 to deform or rupture.

[0041] A conveying assembly is arranged inside the receiving tube 4 and is used to convey the rock cuttings entering the receiving tube 4 to the discharge port 8 for discharge;

[0042] The provided conveying assembly can further convey the rock chips pushed into the receiving tube 4 by the cleaned push plate 10, and the rock chips do not need to be accumulated inside the receiving tube 4. The rock chips can be discharged from the discharge port 8 through volume change, and the rock chips can be quickly and effectively conducted from the entrance of the receiving tube 4 to the discharge port 8 for discharge.

[0043] A clumping assembly is provided on the receiving tube 4 and is used to condense the dust entering the receiving tube 4;

[0044] The rock chips pushed by the cleaning push plate 10 will fly in the protective cover 3. At the same time, the rock chips that enter the receiving tube 4 and are transported by the conveying assembly will also fly. Therefore, even if the rock chips are discharged through the discharge port 8, the discharged rock chips will still fly. The rock chips are mixed in the air and are not easy to settle. At this time, the rock chips mixed in the air will affect the air quality.

[0045] By setting up the agglomeration components, the flying of rock chips can be reduced as much as possible, thereby ensuring the air quality of the working environment.

[0046] The dust collecting component provided can effectively absorb the dust inside the protective cover 3, and can instantly absorb the flying rock chips when the cleaning push plate 10 pushes the rock chips inside the protective cover 3, thereby reducing the rock chips entering the receiving tube 4 and minimizing the flying of rock chips when the rock chips are discharged from the discharge port 8.

[0047] The conveying assembly includes a first motor 6 and an auger 7. The first motor 6 is fixedly installed on one side of the receiving tube 4. The auger 7 is rotatably installed inside the receiving tube 4. One end of the auger 7 is fixedly connected to the output shaft of the first motor 6.

[0048] The first motor 6 can drive the auger 7 to rotate, and the rock cuttings entering the receiving tube 4 can be pushed by the rotation of the auger 7, and the rock cuttings can be transported to the direction of the discharge port 8 for discharge.

[0049] The agglomeration assembly includes a transfer cylinder 21, a piston 25, a third connecting pipe 20, a water tank 5 and a second connecting pipe 19. The piston 25 is slidably mounted inside the transfer cylinder 21. One end of the second connecting pipe 19 and the third connecting pipe 20 are both connected to the transfer cylinder 21. The other end of the third connecting pipe 20 is connected to the water tank 5. The other end of the second connecting pipe 19 extends to the inside of the receiving pipe 4.

[0050] Both the second connecting pipe 19 and the third connecting pipe 20 are provided with a one-way valve.

[0051] The one-way valve disposed on the second connecting pipe 19 can block the flow from the receiving pipe 4 toward the transfer cylinder 21 , and the one-way valve on the third connecting pipe 20 can block the flow from the transfer cylinder 21 toward the water tank 5 .

[0052] Therefore, when the piston 25 slides upward inside the transfer cylinder 21, the water in the water tank 5 can be pumped into the interior of the transfer cylinder 21 through the third connecting pipe 20. Then, the piston 25 is controlled to slide downward inside the transfer cylinder 21, so that the water entering the transfer cylinder 21 can be transported to the interior of the receiving tube 4 through the second connecting pipe 19. By transporting water to the receiving tube 4 through the second connecting pipe 19, the rock chips being transported inside the receiving tube 4 can be sprayed. Through the characteristics of water adsorption, the transported rock chips can be condensed and clumped, which can effectively reduce the flying of rock chips. At this time, when the transported rock chips are discharged, the flying of rock chips can be reduced, thereby ensuring the air quality.

[0053] The dust collecting assembly includes a first connecting tube 18, a conductive gear ring 11 arranged in a cavity, a dust collecting hole 26 and an air vent 12. One end of the first connecting tube 18 extends to the interior of the transfer cylinder 21. The conductive gear ring 11 is rotatably installed inside the protective cover 3. The cleaning push plate 10 is fixedly installed at the bottom end of the conductive gear ring 11. The cleaning push plate 10 is connected to the inner cavity of the conductive gear ring 11 through the air vent 12. The other end of the first connecting tube 18 is connected to the interior of the conductive gear ring 11. The dust collecting hole 26 is opened on the side wall of the cleaning push plate 10. A one-way valve is arranged on the first connecting tube 18.

[0054] The one-way valve arranged on the first connecting pipe 18 can block the flow of the transfer cylinder 21 toward the conduction gear ring 11. Therefore, when the piston 25 slides upward inside the transfer cylinder 21, the interior of the conduction gear ring 11 can be negatively pressurized through the first connecting pipe 18, and the interior of the cleaning push plate 10 connected thereto is also negatively pressurized. At this time, the dust inside the protective cover 3 is collected through the dust collecting holes 26 opened on the cleaning push plate 10 and transported to the interior of the transfer cylinder 21. At the same time, the third connecting pipe 20 will also suck the clean water in the water tank 5 into the interior of the transfer cylinder 21 and mix it with the sucked rock chips. The mixture is then sent into the interior of the receiving tube 4 to agglomerate and condense the rock chips inside the receiving tube 4.

[0055] A moving ring 17 is rotatably mounted on the top of the conductive gear ring 11 . One end of the first connecting pipe 18 penetrates the moving ring 17 and is connected to the inner cavity of the conductive gear ring 11 .

[0056] One end of the first connecting pipe 18 passes through the moving ring 17 , so that the normal use of the first connecting pipe 18 is not affected when the conductive gear ring 11 rotates.

[0057] A second motor 14 is fixedly mounted on the top of the protective cover 3 , a transmission rod 16 is fixedly mounted on the output shaft of the second motor 14 , a first gear 13 is fixedly mounted on the transmission rod 16 , and the first gear 13 is meshed with the transmission gear ring 11 .

[0058] The second motor 14 can drive the transmission rod 16 to rotate, so that the first gear 13 drives the transmission ring 11 to rotate. When the transmission ring 11 rotates, it can drive the cleaning push plate 10 to rotate inside the protective cover 3 to push the cuttings.

[0059] A threaded ring 22 is rotatably installed inside the protective cover 3, and a reciprocating threaded rod 24 is threadedly connected inside the threaded ring 22. One end of the reciprocating threaded rod 24 is fixedly connected to the piston 25. A third gear 23 is fixedly installed on the outer wall of the threaded ring 22, and a second gear 15 is fixedly installed on the transmission rod 16. The second gear 15 is meshed with the third gear 23.

[0060] When the second motor 14 is started, the transmission rod 16 can not only drive the first gear 13 to rotate, but also drive the second gear 15 to rotate, and then the third gear 23 drives the threaded ring 22 to rotate, so that the reciprocating threaded rod 24 can slide back and forth up and down inside the threaded ring 22, and then drive the piston 25 to slide up and down on the inner wall of the transfer cylinder 21, so as to collect the dust inside the protective cover 3 and transport it to the inside of the transfer cylinder 21. At the same time, the third connecting pipe 20 will also suck the clean water in the water tank 5 into the inside of the transfer cylinder 21, and mix it with the sucked rock chips, and then send the mixture into the inside of the receiving tube 4 to agglomerate and condense the rock chips inside the receiving tube 4.

[0061] Embodiment 2: Figures 5 and 6 As shown in Comparative Example 1, another embodiment of the present invention is:

[0062] A first bevel gear 30 is elastically mounted inside the cleaning push plate 10 through a coil spring 29, a second bevel gear 31 is rotatably mounted inside the cleaning push plate 10, a threaded rod 9 is fixedly mounted on the second bevel gear 31, and a push plate 32 is threadedly connected to the threaded rod 9.

[0063] A fourth gear 28 is fixedly mounted on the top of the first bevel gear 30 , a sector gear 27 is fixedly mounted on the outer wall of the drill rod 2 , and the fourth gear 28 is meshed with the sector gear 27 .

[0064] When the transmission gear ring 11 drives the cleaning push plate 10 to rotate, the fourth gear 28 provided on the cleaning push plate 10 will synchronously rotate around the outer wall of the drill rod 2 until the fourth gear 28 is meshed with the fan gear 27 provided on the drill rod 2, and the coil spring 29 will be deformed to store elastic potential energy. At this time, the fourth gear 28 will rotate, and at the same time drive the first bevel gear 30 to rotate, and drive the second bevel gear 31 to rotate, so that the threaded rod 9 rotates, and drives the push plate 32 to move. Through the fan gear 27 provided, the rock cuttings can be pushed to the receiving end on the cleaning push plate 10. When the fourth gear 28 is in mesh with the sector gear 27 again, the fourth gear 28 is just released from the meshing state with the sector gear 27. At this time, the elastic potential energy is released by the coil spring 29, which can drive the first bevel gear 30 to rotate and reset, and at the same time drive the second bevel gear 31 and the threaded rod 9 to rotate, so that the debris pushing plate 32 pushes the rock debris accumulated on one side of the cleaning push plate 10 toward the opening direction of the receiving tube 4. When the fourth gear 28 is meshed with the sector gear 27 again, it can drive the fourth gear 28 to rotate again, and the debris pushing plate 32 is retracted through the cooperation of the first bevel gear 30 and the second bevel gear 31.

[0065] like Figure 7 As shown, a method for processing drill cuttings, which adopts the above-mentioned deep pre-splitting drilling construction device for slopes, comprises the following steps:

[0066] S1: First, the drilling rig body 1 is moved to the desired construction location, and the drilling rod 2 is controlled to perform drilling construction on the ground surface;

[0067] S2: Secondly, by starting the second motor 14, under the cooperation of the first gear 13 and the transmission gear ring 11, the cleaning push plate 10 is driven to rotate inside the protective cover 3, and the accumulated dust is pushed into the inside of the receiving tube 4 and discharged;

[0068] S3: Finally, through the cooperation of the second gear 15 and the third gear 23, the piston 25 is controlled to slide up and down inside the transfer tube 21. At this time, the rock chips in the protective cover 3 and the clean water in the water tank 5 can be sucked into the inside of the transfer tube 21, and then transported to the inside of the receiving tube 4 through the second connecting pipe 19, so that the rock chips are condensed and discharged. After that, blasting construction can be carried out as needed

[0069] Working principle: The second motor 14 can drive the transmission rod 16 to rotate, and then the first gear 13 drives the transmission gear ring 11 to rotate. When the transmission gear ring 11 rotates, it can drive the cleaning push plate 10 to rotate inside the protective cover 3 to push the rock chips. At this time, the transmission rod 16 can not only drive the first gear 13 to rotate, but also drive the second gear 15 to rotate, and then the third gear 23 drives the threaded ring 22 to rotate, so that the reciprocating threaded rod 24 slides up and down inside the threaded ring 22, and then the piston 25 can be driven to slide up and down on the inner wall of the transmission cylinder 21, so as to push the rock chips. The dust inside the protective cover 3 is collected and transported to the inside of the transfer tube 21. At the same time, the third connecting pipe 20 will also suck the clean water in the water tank 5 into the inside of the transfer tube 21 and mix it with the sucked rock chips. The mixture is then sent to the inside of the receiving tube 4 and the rock chips inside the receiving tube 4 are agglomerated. Finally, the first motor 6 is set to drive the auger 7 to rotate. The rotation of the auger 7 can push the rock chips entering the receiving tube 4, and the rock chips can be transported to the direction of the discharge port 8 for discharge. At this time, the discharged rock chips will be condensed into clumps and discharged, reducing the problem of flying rock chips affecting air quality.

[0070] By rotating the cleaning push plate 10, the fourth gear 28 rotates around the outer wall of the drill rod 2 until the fourth gear 28 is meshed with the fan gear 27 provided on the drill rod 2. The coil spring 29 is deformed to store elastic potential energy. The fourth gear 28 drives the first bevel gear 30 to rotate, and controls the second bevel gear 31 to drive the threaded rod 9 to rotate, and drives the push plate 32 to move. By the fan gear 27 provided, when the cleaning push plate 10 pushes the cuttings to the opening of the receiving tube 4, the fourth gear 28 is just released from the meshing state with the fan gear 27. The first bevel gear 30 is rotated and reset, and the second bevel gear 31 and the threaded rod 9 are driven to rotate, so that the debris pushing plate 32 pushes the rock debris accumulated on one side of the cleaning push plate 10 toward the opening direction of the receiving tube 4. When the fourth gear 28 is meshed with the sector gear 27 again, the fourth gear 28 can be driven to rotate again. The first bevel gear 30 and the second bevel gear 31 cooperate to retract the debris pushing plate 32, which can further improve the efficiency of pushing the rock debris inside the protective cover 3 into the receiving tube 4.

[0071] The above-mentioned front, back, left, right, top and bottom are all based on the figures in the specification. Figure 1 As a benchmark, according to the person's observation perspective, the side of the device facing the observer is defined as the front, the left side of the observer is defined as the left, and so on.

[0072] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the scope of protection of the present invention.

[0073] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A slope deep pre-splitting drilling construction device, comprising a drilling machine body (1), a drill rod (2) and a protective cover (3); Features: It also includes a cleaning push plate (10), wherein the cleaning push plate (10) is rotatably mounted inside the protective cover (3) and is used to push the rock cuttings inside the protective cover (3); A receiving tube (4), the receiving tube (4) being in communication with the protective cover (3), and a discharge port (8) being provided at the bottom end of the receiving tube (4); A conveying assembly, arranged inside the receiving tube (4), and used to convey the rock cuttings entering the receiving tube (4) to the discharge port (8) for discharge; A clumping assembly, arranged on the receiving tube (4), and used for condensing dust entering the receiving tube (4); A dust collecting assembly, comprising a first connecting pipe (18), a conductive toothed ring (11) provided in a cavity, a dust collecting hole (26) and a vent hole (12), wherein the conductive toothed ring (11) is rotatably mounted inside the protective cover (3), the cleaning push plate (10) is fixedly mounted on the bottom end of the conductive toothed ring (11), the cleaning push plate (10) is connected to the inner cavity of the conductive toothed ring (11) through the vent hole (12), and the dust collecting hole (26) is opened on the side wall of the cleaning push plate (10); The conveying assembly comprises a first motor (6) and an auger (7), wherein the first motor (6) is fixedly mounted on one side of the receiving tube (4), the auger (7) is rotatably mounted inside the receiving tube (4), and one end of the auger (7) is fixedly connected to the output shaft of the first motor (6); The agglomeration assembly comprises a transfer cylinder (21), a piston (25), a third connecting tube (20), a water tank (5) and a second connecting tube (19); the piston (25) is slidably mounted inside the transfer cylinder (21); one end of the second connecting tube (19) and the third connecting tube (20) are both connected to the transfer cylinder (21); the other end of the third connecting tube (20) is connected to the water tank (5); and the other end of the second connecting tube (19) extends to the inside of the receiving tube (4); The first connecting tube (18), the second connecting tube (19) and the third connecting tube (20) are all provided with a one-way valve; one end of the first connecting tube (18) extends to the interior of the transmission cylinder (21), and the other end of the first connecting tube (18) is in communication with the interior of the transmission gear ring (11); A moving ring (17) is rotatably mounted on the top end of the conductive toothed ring (11), and one end of the first connecting tube (18) passes through the moving ring (17) and is connected to the inner cavity of the conductive toothed ring (11).

2. A slope deep pre-splitting drilling construction device according to claim 1, characterized in that: A second motor (14) is fixedly mounted on the top of the protective cover (3); a transmission rod (16) is fixedly mounted on the output shaft of the second motor (14); a first gear (13) is fixedly mounted on the transmission rod (16); and the first gear (13) is meshed with a transmission gear ring (11).

3. A slope deep pre-splitting drilling construction device according to claim 2, characterized in that: A threaded ring (22) is rotatably mounted inside the protective cover (3), a reciprocating threaded rod (24) is threadedly connected inside the threaded ring (22), one end of the reciprocating threaded rod (24) is fixedly connected to a piston (25), a third gear (23) is fixedly mounted on the outer wall of the threaded ring (22), a second gear (15) is fixedly mounted on the transmission rod (16), and the second gear (15) is meshed with the third gear (23).

4. A slope deep pre-splitting drilling construction device according to claim 3, characterized in that: A first bevel gear (30) is elastically mounted inside the cleaning push plate (10) via a coil spring (29), a second bevel gear (31) is rotatably mounted inside the cleaning push plate (10), a threaded rod (9) is fixedly mounted on the second bevel gear (31), and a debris pushing plate (32) is threadedly connected to the threaded rod (9).

5. A slope deep pre-splitting drilling construction device according to claim 4, characterized in that: A fourth gear (28) is fixedly mounted on the top end of the first bevel gear (30), a sector gear (27) is fixedly mounted on the outer wall of the drill rod (2), and the fourth gear (28) is meshed with the sector gear (27).

6. A method for processing drill cuttings, the method using the slope deep pre-splitting drilling construction device as claimed in claim 5, characterized in that: The following steps are involved: S1: moving the drilling rig body (1) to a desired construction location, and performing drilling construction on the ground surface by controlling the drill rod (2); S2: starting the second motor (14), and driving the cleaning push plate (10) to rotate inside the protective cover (3) under the cooperation of the first gear (13) and the transmission gear ring (11), so as to push the accumulated dust into the receiving tube (4) and discharge it; S3: By means of the cooperation between the second gear (15) and the third gear (23), the piston (25) is controlled to slide reciprocatingly up and down inside the transfer cylinder (21), so that the rock cuttings in the protective cover (3) and the clean water in the water tank (5) are sucked into the interior of the transfer cylinder (21), and transported to the interior of the receiving tube (4) through the second connecting pipe (19), so that the rock cuttings are condensed and discharged.

Citation Information

Patent Citations

  • Waste gas combustion device with soot treatment function

    CN112413612A

  • High-altitude roofbolter

    CN113338795A

  • Drilling platform for highway bridge construction

    CN116255084A

  • Rock drilling device with dust fall function

    CN207829804U

  • Drilling machine dust removal equipment for mine

    CN215276435U