Method for measuring material accumulation morphology in material yard based on laser scanning

Through the combination of laser scanning technology and multi-mesh three-dimensional monitoring module, the problem of low measurement accuracy of material accumulation morphology in the material field is solved, and efficient management of material field space and resource optimization are achieved.

CN118857107BActive Publication Date: 2024-12-03DALIAN CHINA CREATIVE TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411331297.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-12-03
Estimated Expiration
2044-09-24

AI Technical Summary

Technical Problem

In the prior art, the measurement accuracy of material accumulation morphology in the material field is limited, resulting in low efficiency in material field space management and serious waste of resources.

Method used

Using laser scanning-based material accumulation morphology measurement method, the material processing and transportation assembly line is connected, the material processing process is split, the redundant working nodes are cancelled, single-piece flow segments are set, the nodes are closely marked and rearranged, and the material yard is in the A multi-purpose three-dimensional monitoring module is arranged to collect and register material accumulation point cloud data to obtain accurate material accumulation patterns.

Benefits of technology

It realizes accurate measurement and real-time monitoring of material accumulation forms in the material yard, optimizes material transport and storage space utilization, and improves material yard management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118857107B_ABST
    Figure CN118857107B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field related to material morphology measurement, specifically including a material accumulation morphology measurement method in a material yard based on laser scanning, including: connecting a material assembly line in a target material yard to obtain M nodes; determining a processing flow, splitting N processes and marking V operation types, eliminating redundancy, setting up single-piece flow segments, rearranging processes, vertically laying out nodes, deploying monitoring modules to collect point cloud data, combining nodes and data, and registering modules to obtain material accumulation morphology measurement results. The technical problems of limited measurement accuracy of material accumulation morphology in a material yard and low efficiency of material yard space management are solved, and the accurate acquisition of material accumulation morphology is achieved. In combination with node optimization and layout adjustment of the material processing flow, the utilization rate of material transfer and storage space is optimized, and the multi-eye three-dimensional monitoring module is registered with material node data, so that the real-time monitoring of material accumulation morphology is more accurate, and the technical effect of effectively improving the efficiency of material yard management is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field related to material form measurement, and in particular to a method for measuring the piled form of materials in a material yard based on laser scanning. Background Art

[0002] With the rapid development of industrial automation and intelligent manufacturing technology, the efficiency optimization of material processing, transportation and storage has become an important link in various manufacturing and logistics systems. Most companies still rely on two-dimensional image monitoring to estimate the state of material accumulation in material yard management. However, due to the lack of comprehensive perception of material height, shape and distribution, they can only rely on empirical functions for estimation and adjustment, resulting in low space utilization of material yards and serious waste of resources.

[0003] In summary, the prior art has technical problems such as limited measurement accuracy of material stacking morphology in a material yard and low efficiency of material yard space management. Summary of the invention

[0004] The present application provides a material pile morphology measurement method in a material yard based on laser scanning, aiming to solve the technical problems in the prior art of limited measurement accuracy of material pile morphology in a material yard and low efficiency of material yard space management.

[0005] In view of the above problems, the technical solution to implement this application is:

[0006] The present application provides a material pile morphology measurement method based on laser scanning in a material yard, wherein the method comprises: in a target material yard space, connecting a material processing and transfer assembly line, obtaining M material transfer and accumulation nodes, wherein the material transfer and accumulation nodes include a raw material accumulation node, a semi-finished product accumulation node, and a finished product accumulation node;

[0007] According to the material processing and transfer assembly line, determine the material processing flow, split it into N material processing procedures, and loosely mark the nodes of the N material processing procedures, wherein the loosely marked nodes include V different operation types;

[0008] Based on the N material processing procedures, in the V different operation types corresponding to the node loose markings, redundant operation nodes are cancelled and multiple single-piece flow segments are set;

[0009] In the material processing flow, the V different types of operations are closely marked by nodes after the redundant operation nodes are removed through the multiple single-piece flow segments, and the closely marked nodes are used to rearrange the N material processing procedures;

[0010] After the N material processing procedures are rearranged, the M material transfer and accumulation nodes are connected in a vertical layout, and a multi-eye three-dimensional monitoring module is deployed to collect material accumulation point cloud data;

[0011] Based on each material transfer and accumulation node in the material accumulation point cloud data and in combination with the M material transfer and accumulation nodes connected in a vertical layout, the multi-eye three-dimensional monitoring module is aligned to obtain the material accumulation morphology measurement result of the target material yard space.

[0012] In summary, one or more technical solutions provided in this application solve the technical problems of limited measurement accuracy of material accumulation morphology in the material yard and low efficiency of material yard space management, realize the accurate acquisition of material accumulation morphology, combine node optimization and layout adjustment of material processing flow, optimize material transfer and storage space utilization, align multi-eye three-dimensional monitoring modules with material node data, and make real-time monitoring of material accumulation morphology more accurate, effectively improving the technical effect of material yard management efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 A schematic flow chart of a method for measuring the material accumulation morphology of a material field based on laser scanning is provided for this application;

[0014] Figure 2 A schematic flow chart of obtaining a second layout optimization space in a method for measuring the material accumulation morphology of a material yard based on laser scanning is provided for this application. DETAILED DESCRIPTION

[0015] Example

[0016] The present application is described in detail below with reference to the accompanying drawings. Figure 1 As shown, the present application provides a method for measuring the material accumulation morphology of a material field based on laser scanning, wherein the method comprises:

[0017] S1: In the target material yard space, connect the material processing and transfer assembly line to obtain M material transfer accumulation nodes, which include raw material accumulation nodes, semi-finished product accumulation nodes, and finished product accumulation nodes; S2: According to the material processing and transfer assembly line, determine the material processing flow, split it into N material processing procedures, and loosely mark the nodes of the N material processing procedures, and the loose node marking includes V different operation types.

[0018] Specifically, the target material yard space refers to a specific area or site for storing and processing materials; the material processing and transfer line is an equipment system that transports materials from one processing node to another to ensure the fluidity of the materials and the continuity of processing; the material transfer accumulation node refers to the different positions of the materials in the transfer or processing process, which is specifically divided into raw material accumulation nodes, semi-finished product accumulation nodes and finished product accumulation nodes, which respectively indicate the positions of the materials at the beginning, middle and end of the processing; the material processing flow refers to all steps of the material in the entire processing process, from the preparation of raw materials to the completion of finished products; the N material processing procedures represent several specific operation steps decomposed in the material processing flow; the node loose marking is to identify the different operations of each processing procedure to ensure that different tasks are clearly classified during the processing process, and the V different job types are different classifications of operations.

[0019] Execution steps: In the target material yard space, establish a material processing and transfer assembly line. The assembly line can connect different processing nodes through conveyor belts, transmission equipment, etc. These nodes are divided into raw material accumulation nodes (the starting point for raw materials to enter the assembly line), semi-finished product accumulation nodes (intermediate nodes after the material has undergone preliminary processing) and finished product accumulation nodes (storage points after processing). According to the type of material and production goals, design and determine the entire processing flow, including multiple different steps. For example, in the flour production process, corresponding operations include mixing, grinding, heating, etc. Then, split these operation steps into N material processing procedures, and each procedure can be regarded as an independent task unit.

[0020] For each processing step, node loose marking means that each step is classified and identified according to its characteristics. The operation type can be classified according to different standards. For example, for automated operations (such as packaging machines), node loose marking is used to ensure that different types of operations can operate independently and with flexibility. Through the above method, the entire material handling process can be systematized and standardized, and each node and operation step can be clearly classified and identified, making the entire production process more efficient and easy to manage.

[0021] S3: Based on the N material processing procedures, in the V different job types corresponding to the node loose markings, the redundant job nodes are cancelled and a plurality of single-piece flow segments are set; S4: In the material processing flow, the V different job types after the redundant job nodes are cancelled are tightly marked with nodes through the multiple single-piece flow segments, and the node tight marking is used to rearrange the N material processing procedures.

[0022] Specifically, N material processing procedures refer to several independent steps or tasks decomposed from the entire processing flow, and each step represents a specific material processing operation; node loose marking is a process of identifying and classifying each material processing step to distinguish steps of different job types. V different job types represent that these operations are divided into different categories, which may be based on operation methods, machine automation levels or job purposes, etc.; redundant operation nodes refer to operation steps that are no longer needed or repeated in the material processing flow. Canceling these nodes is to simplify the process and reduce unnecessary waste of resources; single-piece flow fragments refer to connecting the material processing steps in series in a one-by-one operation manner, so that each step or task runs independently to form a linear workflow; after eliminating redundant nodes, the remaining processing steps are more compactly marked with nodes to make the material processing process more efficient and continuous; process reordering refers to the reordering and optimization of the processing procedures. After node tight marking, the order of the steps is rearranged to achieve the optimal processing flow.

[0023] Execution steps: In the entire material processing flow, based on the V types of operations loosely marked by the nodes, analyze the necessity of each step. If some steps have repeated or similar operations during the processing, these nodes are considered redundant and need to be cancelled. For example, in some processes, two adjacent steps may both undergo quality inspections, but in fact only one inspection is required. Such redundant nodes can be removed; after canceling the redundant operation nodes, the remaining processes are divided into multiple single-piece flow segments. Single-piece flow segments mean that each material only flows independently at each node, rather than batch processing, making the process more linear and efficient. For example, in automobile manufacturing, the car bodies were previously assembled in batches and then painted in batches. However, after changing to single-piece flow segments, materials are no longer transferred in batches, but pass through each processing link one by one. The car body can go directly to the painting link after assembly is completed, without waiting for the rest of the car bodies to be assembled. This can shorten waiting time and improve production flexibility.

[0024] After the redundant nodes are removed, the remaining V different types of operations are then closely marked, which means more strictly defining the operation sequence, time and resource allocation of each step so that each operation can be seamlessly connected. For example, accurate calculations are made on the time of each process to ensure that the waiting time between each step is minimized and resource utilization is maximized. Based on the node close marking, the order of N material processing processes is rearranged, which means moving some steps forward or backward, or even disrupting the original fixed order, so as to form a more efficient process. The purpose of rearrangement is to reduce processing time, improve efficiency and reduce the waiting time of materials between each step. In the above steps, by removing redundant nodes, setting single-piece flow segments and node close marking, the entire material processing process can be simplified, resource waste can be reduced, and the efficiency and accuracy of each step can be improved. Then, by rearranging the entire process, the production line can be optimized and the overall production efficiency can be improved.

[0025] S5: After the N material processing procedures are rearranged, the M material transfer and accumulation nodes are connected in a vertical layout, and a multi-eye three-dimensional monitoring module is deployed to collect material accumulation point cloud data; S6: Based on each material transfer and accumulation node in the material accumulation point cloud data, combined with the M material transfer and accumulation nodes connected in a vertical layout, the multi-eye three-dimensional monitoring module is aligned to obtain the material accumulation morphology measurement result of the target material yard space.

[0026] Specifically, the rearrangement of N material processing procedures refers to the reordering and optimization of N processing procedures that have been completed before to form a more efficient workflow; M material transfer and accumulation nodes refer to multiple key points related to material processing and transfer in the material yard, including accumulation points of materials in different states, such as raw materials, semi-finished products, and finished products; vertical layout connection refers to the vertical connection of various material transfer and accumulation nodes according to the spatial layout. Vertical layout means arranging the nodes in the vertical direction in space to facilitate the flow and accumulation of materials between different processes; the multi-eye three-dimensional monitoring module is composed of multiple three-dimensional cameras or laser radars, which capture image data from different angles to form a complete three-dimensional point cloud. Point cloud data refers to a collection of multiple three-dimensional coordinate points collected by laser scanning and other means, which reflects the distribution and shape of materials in space; registration refers to the alignment and calibration of point cloud data from multiple different angles collected by the multi-eye three-dimensional monitoring module to ensure that the point cloud data can accurately describe the material accumulation shape of the target material yard space.

[0027] Execution steps: Optimize and rearrange N material processing procedures to improve efficiency and simplify the process. These optimized procedures redefine the material processing order, making the material flow more smoothly during the processing. For example, in the food processing industry, the originally cumbersome steps of cleaning, cutting, baking, etc. may be optimized, and the order of cleaning and cutting steps may be rearranged to ensure that the materials are processed in the shortest time; when the materials flow between the various processing procedures, they are usually piled up and stored at a certain node, that is, the material transfer accumulation node. The material transfer accumulation node includes raw material accumulation, semi-finished product accumulation and finished product accumulation. In order to optimize the connection of these nodes, these nodes are laid out and connected in the vertical direction, that is, by rationally planning the material accumulation nodes in different states in the vertical direction, the storage and transportation of materials at different stages are made more efficient. For example, in a multi-layer material yard, the raw material accumulation node can be located on the first floor, the semi-finished product accumulation node can be located on the second floor, and the finished product accumulation node can be on the third floor, so that the material is transferred by means of a conveyor belt in the vertical direction.

[0028] In order to obtain detailed information of each material accumulation node, multiple cameras need to be deployed. Multiple cameras are deployed in different positions of the material yard to ensure that the morphological information of the material accumulation can be collected from different angles. The morphological information of the material accumulation is presented in the form of point cloud data through the multi-eye 3D monitoring module. The material accumulation point cloud data records the accumulation height, volume and other information of the material in space; then, the multi-eye 3D monitoring module starts to collect the 3D morphological data of the material accumulation and generates point cloud data. The material accumulation point cloud data reflects the material shape, accumulation height and spatial distribution of each accumulation node in the material yard, and can intuitively see whether the material accumulation is too high or whether it needs to be adjusted.

[0029] Since the data collected by each multi-eye 3D monitoring module comes from different angles, it is necessary to align these data, that is, to align these point cloud data from different perspectives through algorithms to ensure that a complete 3D model can be formed. Usually, it is necessary to combine the relative positions and parameters of each monitoring module, such as the focal length of the camera, the acquisition frequency, the main point coordinates, etc.; after completing the alignment, a complete 3D model of the material accumulation in the material yard is generated, that is, the material accumulation morphology measurement result, which can be used to analyze the overall layout of the material accumulation in the material yard, evaluate whether it needs to be optimized, whether there is a risk of exceeding the safe accumulation height, etc. In the above steps, by connecting the vertical layout of M material transfer accumulation nodes and using the multi-eye 3D monitoring module to collect point cloud data, the 3D morphology measurement results of the material accumulation in the material yard are formed, which not only optimizes the material transfer process, but also provides data support for the management of the material yard, improving safety and efficiency.

[0030] Furthermore, based on the N material processing procedures, in the V different operation types corresponding to the node loose markings, redundant operation nodes are cancelled and multiple single-piece flow segments are set. The method of the present application includes:

[0031] Based on the N material processing procedures, the target material yard space is partitioned according to the horizontal layout, and is divided into multiple loose partitions; according to the multiple loose partitions of the target material yard space, node loose marks are set, and material transportation analysis is performed in accordance with the material processing and transfer assembly line, and a material transportation relationship map is added; based on the material transportation relationship map, in the V different operation types corresponding to the node loose marks, redundant operation nodes are cancelled and multiple single-piece flow segments are set.

[0032] Specifically, N material processing procedures refer to multiple processing steps related to material handling in the material yard, such as material handling, sorting, stacking, etc., and each procedure is a link in the complete processing flow; loose marking of nodes indicates preliminary classification and marking of each processing procedure, and loose marking indicates that these nodes have not been optimized at this time, and there may be redundancy or duplication between operations; V different types of operations: V types of operations refer to different categories of work, such as loading, unloading, processing, etc., and each type of operation corresponds to different tasks and processing methods; single-piece flow segments refer to sections where materials are processed in single pieces (or small batches) after redundant nodes are eliminated, ensuring that materials flow between different processes in the most optimized manner; horizontal layout zoning refers to the horizontal division of the material yard space according to function or operation type, and each partition is responsible for different material operation links; the material transportation relationship map is used to represent the transportation relationship of materials between different processes, marking the material flow path and its dependency between each node.

[0033] Execution steps: Divide the spatial layout of the target material yard into multiple horizontal areas. Each area is responsible for different material processing procedures in order to optimize space utilization and material flow efficiency. The purpose of horizontal layout zoning is to allow the materials in the material yard to complete as many processing operations as possible on the same level and reduce unnecessary handling and lifting operations; preliminarily mark the various material processing procedures in the material yard and assign a loose mark to each node. The node loose mark can be a preliminary classification based on the operation type, such as marking the material handling node as a handling node and the material stacking node as a stacking node. The node loose mark is preliminary and has not been optimized. There is a certain probability of overlap or redundancy between operations.

[0034] According to the loose marking of nodes, material transportation analysis is carried out to determine the material flow routes between nodes. Through analysis, a material transportation relationship map is drawn. The material transportation relationship map is used to indicate the transportation relationship and path between each node and its related nodes. Each line in the material transportation relationship map represents the transfer of materials between different nodes, which helps to discover potential redundancy in the transportation path. After analyzing the material transportation relationship map, it is found that some nodes may be redundant, which means that some operation steps are repeated or unnecessary. By optimizing the process, these redundant nodes are cancelled and the material flow path is replanned. The cancellation of redundant nodes can reduce the waste of resources and improve the efficiency of material flow.

[0035] After the redundant nodes are cancelled, the single-piece flow segments are reset, which means that materials can be transferred to the next process in single pieces or small batches, without having to wait until a large amount of materials are accumulated before processing, so that the material flow is smoother, waiting time and inventory backlog are reduced, and overall efficiency is further improved. Through the above steps, the material processing flow in the target material yard will be more streamlined and efficient. After the redundant operation nodes are cancelled, materials can flow smoothly between multiple partitions without backlogs caused by unnecessary steps and waiting time. In addition, by analyzing and optimizing the material transportation path, the layout of the entire material yard and the material flow will become more reasonable, thereby improving operating efficiency.

[0036] Furthermore, based on the material transport relationship graph, in the V different operation types corresponding to the node loose marks, redundant operation nodes are cancelled and multiple single-piece flow segments are set. The method of the present application includes:

[0037] Based on the material processing and transportation assembly line, V types of operations are determined, wherein each type of operation corresponds to at least one key operation node; based on the key operation nodes, the subsets of V operation nodes bound to the V types of operations are analyzed to determine the auxiliary operation node combination of the key operation nodes; the subsets of V operation nodes bound to the V types of operations and the auxiliary operation node combination of the key operation nodes are compared to determine redundant operation nodes.

[0038] Specifically, the key operation node is the most important node in the processing flow and is the core node that must be passed to complete a certain type of operation; the remaining operation nodes that are associated with the key operation node are secondary nodes that assist the key operation node in completing tasks, and complete related tasks together with the key operation node, playing a role in supporting and accelerating the key node tasks; redundant operation nodes are repeated or unnecessary operation nodes in the process, and the existence of redundant operation nodes usually leads to waste of resources or time delays.

[0039] Execution steps: Different operation types need to be determined according to the material processing and transfer lines. V types of operations may include handling, stacking, processing, etc. For example, in a logistics distribution center, the operation types may be sorting, transportation and loading. In each operation type, there are one or more key operation nodes, which are the steps necessary to complete this type of operation; conduct in-depth analysis of each operation type to find the subset of operation nodes corresponding to its key nodes, which means that all possible associated nodes under each operation type are determined and divided into key nodes and auxiliary nodes; then, based on the analyzed key operation nodes, further determine the combination of auxiliary operation nodes associated with them. Auxiliary nodes are essential parts to support key operation nodes to complete tasks. For example, the auxiliary operation nodes of loading nodes may include transportation equipment, personnel configuration and loading tools, etc. The key operation nodes and their auxiliary nodes are combined into a complete work unit.

[0040] After identifying the node subsets and auxiliary node combinations of each job type, the V job node subsets bound to the V job types and the auxiliary job node combinations of the key job nodes are compared to find the redundant nodes therein. By comparing, it is determined that the existence of some nodes is unnecessary or duplicated with other nodes, and redundant job nodes are obtained; redundant job nodes in the process are identified and cancelled. After the redundant job nodes are cancelled, the process will become more concise and efficient. Then, according to the optimized process, multiple single-piece flow segments are set to ensure that materials can flow in single pieces or small batches, reduce waiting time, and improve overall efficiency. Through the above steps, redundant job nodes are cancelled, so that the material processing process is simplified and optimized.

[0041] Furthermore, the present application method comprises:

[0042] Based on the material transportation relationship map, a material transportation time consumption mark is introduced; based on the material transportation time consumption mark, in the case of continuous operation, the material transportation waiting time is calculated; based on the material transportation waiting time, combined with the auxiliary operation node combination of the key operation node, the layout of multiple loose partitions of the target material yard space is optimized to form the multiple single-piece flow segments.

[0043] Specifically, the material transportation time mark is used to mark the transportation time of each material between different nodes, including the time it takes for the material to move from one node to another and the waiting time; the transportation waiting time refers to the time the material spends waiting at a certain node before the next action starts, which is caused by the mismatch between the previous and subsequent processes, insufficient equipment resources or other bottleneck links; loose partitioning refers to the division of various areas for material processing and transportation in the material yard space. Loose partitions can be different operating areas, such as stacking areas, processing areas, shipping areas, etc. These areas may not be tight enough during the initial layout, resulting in waste of resources and efficiency.

[0044] Execution steps: Based on each node in the material transportation relationship map, the material transportation time is marked, which means that in each material transportation process, the material transportation time of each node is recorded in detail, including the time for the material to move to the next node and the waiting time for the material between nodes. These time consumption data will be used to evaluate the efficiency of each link; after recording the material transportation time consumption data, the waiting time of the material at each node is calculated based on these data. The transportation waiting time reflects the possible backlog or stagnation of materials at certain nodes. In the case of continuous operation, the waiting time may increase due to the slow processing speed or insufficient equipment of a certain node, which becomes a bottleneck in the process.

[0045] Based on the calculated waiting time, combined with the combination of key operation nodes and auxiliary nodes, the layout of the target material yard space is optimized. The combination of key operation nodes and auxiliary nodes is the core factor that determines the efficiency of the entire process. Taking into account the waiting time data, the layout of these nodes is readjusted so that materials can flow from one node to another with the least waiting time; after optimizing the layout, materials can flow more efficiently. According to these optimization results, multiple single-piece flow segments are set to ensure that materials flow in the process in single pieces or small batches to avoid large-scale backlogs or stagnation. This flow method helps to reduce the waiting time of the overall process and ensure that each node can quickly enter the next step after processing the material. Through the above steps, the optimization of the layout and the formation of single-piece flow segments greatly reduce the stagnation time of materials between nodes, ensure the continuous flow of materials, and improve production and transportation efficiency.

[0046] Furthermore, according to the waiting time for material transportation, combined with the auxiliary operation node combination of the key operation node, the layout of multiple loose partitions of the target material yard space is optimized to form the multiple single-piece flow segments. The method of this application includes:

[0047] Through the combination of auxiliary operation nodes of the key operation nodes, from the perspective of action integration, the layout of multiple loose partitions of the target material yard space is optimized to obtain a first layout optimization space; through the combination of auxiliary operation nodes of the key operation nodes, from the perspective of transportation integration, the layout of multiple loose partitions of the target material yard space is optimized to obtain a second layout optimization space; according to the waiting time of the material transportation, the timeliness analysis is performed by comparing the first layout optimization space and the second layout optimization space to obtain a layout optimization space, wherein the multiple single-piece flow segments are delineated in the layout optimization space.

[0048] Specifically, action integration refers to the overall planning and integration of all operations in a certain work process to ensure that all actions can run efficiently and in coordination. The goal of action integration is to reduce unnecessary operation steps, optimize the operation sequence, and achieve a smooth material handling process; handling integration refers to optimizing the transportation and handling process of materials between different nodes, and reducing the time wasted in the material handling process by reasonably configuring handling tools, shortening the handling distance, and optimizing the handling path; the first layout optimization space is based on the optimization result of the target material yard space by action integration. By coordinating the operations of key nodes and auxiliary nodes, the connection between each loose partition is optimized, so that materials can be handled and moved more efficiently; the second layout optimization space is based on The optimization results of the target material yard space based on the integrated handling mainly focus on reducing the time and distance of material handling, optimizing the handling paths between loose partitions, and improving handling efficiency; timeliness analysis is an analysis of time factors in the material transportation process, which mainly evaluates the waiting time and transportation time of materials at different nodes, with the aim of optimizing the process and improving efficiency; the layout optimization space is to determine the optimal material flow layout plan through a comprehensive timeliness analysis of the first layout optimization space and the second layout optimization space, and define multiple single-piece flow segments to ensure that materials can flow efficiently in the shortest time; a single-piece flow segment refers to the continuous flow of materials in the form of single pieces or small batches. In this embodiment of the present application, a single-piece flow segment is a material flow form in the layout optimization space.

[0049] Execution steps: By analyzing the key operation nodes and their auxiliary operation node combinations, the target material yard space is optimized from the perspective of action integration. The goal of action integration is to ensure that the operations on each node can be seamlessly connected and reduce unnecessary steps. To achieve this, it is necessary to determine the operation sequence between the nodes and adjust the process to ensure efficient flow between different nodes; after the actions are integrated, the target material yard space is further optimized from the perspective of transportation integration through the combination of key operation nodes and auxiliary operation nodes. The goal of transportation integration is to shorten the transportation distance and time of materials between different nodes, and to ensure that materials can quickly reach the required location by optimizing the transportation routes between loose partitions and reducing empty transportation and repeated transportation.

[0050] After completing the layout optimization after action integration and handling integration, it is necessary to conduct a timeliness analysis by comparing these two layout optimization spaces. The core of the timeliness analysis is to evaluate the waiting time and handling time at each node. By comparing the first layout optimization space (based on the optimization results of action integration) with the second layout optimization space (based on the optimization results of handling integration), the layout scheme with the highest efficiency and the smoothest material flow is selected; after conducting a timeliness analysis on the layout optimization space, the optimal material flow layout is obtained; in the layout optimization space, multiple single-piece flow segments are delineated to ensure that materials can flow in single pieces or small batches to avoid bottlenecks and backlogs. The formation of single-piece flow segments is a key part of the entire optimization, which makes the material flow smoother, reduces waiting and handling time, and achieves a dual improvement in layout optimization and production efficiency.

[0051] Furthermore, if Figure 2 As shown, through the combination of auxiliary operation nodes of the key operation nodes, from the perspective of handling integration, the layout of multiple loose partitions of the target material yard space is optimized to obtain a second layout optimization space. The method of this application includes:

[0052] Based on the material transportation relationship map, the vehicle empty transportation information is collected, and the vehicle empty transportation information includes idle time information and idle path information; through the idle time information in the vehicle empty transportation information, the idle time length of multiple loose partitions of the target material yard space is marked, and a first transportation integrated optimization vector is set; through the idle path information in the vehicle empty transportation information, the empty rate of multiple loose partitions of the target material yard space is marked, and a second transportation integrated optimization vector is set; through the auxiliary operation node combination of the key operation node, the first transportation integrated optimization vector and the second transportation integrated optimization vector are used to optimize the layout of multiple loose partitions of the target material yard space to obtain the second layout optimization space.

[0053] Specifically, the vehicle empty transport information includes empty time information and empty path information. The empty time information refers to the empty time when the vehicle is not carrying materials when transporting materials, that is, the waiting or empty time when the vehicle is in the process of transporting materials; the empty path information refers to the path or travel information of the vehicle without carrying materials in the process of transporting materials, including the empty route of the vehicle from one place to another; the first handling integrated optimization vector is an optimization vector formed based on the empty time information, which is used to identify and optimize the empty time of the target material yard space. The first handling integrated optimization vector mainly focuses on reducing the time when the vehicle is in the empty state, thereby improving the overall handling efficiency; the second handling integrated optimization vector is an optimization vector formed based on the empty path information, which is used to identify and optimize the empty rate of the target material yard space. The second handling integrated optimization vector focuses on reducing the frequency and length of the empty path, thereby optimizing the material handling path and improving the handling efficiency; the second layout optimization space is the target material yard space optimized based on the first handling integrated optimization vector and the second handling integrated optimization vector. In the second layout optimization space, the material handling process is more efficient, the empty time and the empty path are reduced, and the overall material flow efficiency is improved.

[0054] Execution steps: Extract relevant data from the material transportation relationship map, especially the empty load information of vehicles (such as forklifts, transport vehicles, etc.). The collected empty load information of vehicles includes empty load time information and empty load path information. The empty load information of vehicles can be monitored and recorded in real time through the GPS and sensor system installed on the vehicle; analyze the collected empty load time information, identify the empty load time of each loose partition in the target material yard space, and use linear programming to set the first handling integrated optimization vector according to the empty load time data. The first handling integrated optimization vector is used to optimize the empty load time and reduce the empty load time of the vehicle.

[0055] Use linear programming to set the first transport integrated optimization vector. Specifically, the goal is to optimize the transport efficiency by reducing the idle time of the carrier. Set an objective function to represent the sum of the idle time of each carrier in the entire material yard, and minimize the objective function as the ultimate goal. The objective function can be expressed as , where i represents each carrier in the material yard, and n is the total number of carriers. is the idle time information corresponding to vehicle i; configure constraints, that is, the idle time and operation interval of the vehicle must meet the time requirements of the assembly line or production plan. For example, the time interval for completing a task cannot be too long and must be synchronized with the production rhythm of materials in the material yard; use a linear programming algorithm (such as the simplex method and the interior point method) to solve and obtain the first handling integrated optimization vector, that is, the optimal idle time allocation of the vehicle in each partition.

[0056] Analyze the empty path information, identify the empty rate of each loose partition in the target material yard space, and set the second handling integrated optimization vector based on the empty rate of each loose partition using the shortest path algorithm in graph theory. The second handling integrated optimization vector is used to optimize the empty path and reduce the frequency and length of the empty path. Combine the first handling integrated optimization vector and the second handling integrated optimization vector and apply them to the layout optimization of the target material yard space. Consider the combination of key operation nodes and auxiliary operation nodes in the layout, and re-plan the layout of each loose partition to ensure optimal material flow and handling efficiency.

[0057] The shortest path algorithm in graph theory is used to set the second handling integrated optimization vector. Specifically, a suitable graph theory algorithm is selected to calculate the shortest path. Classic algorithms include the Dijkstra algorithm or the Floyd-Warshall algorithm. Furthermore, starting from a key partition (starting point), it is regarded as the source node; the shortest path from the source node to each other partition (destination node) is calculated, and the path is optimized according to the weight value (empty rate); the node sequence of the shortest path is recorded and the path length is minimized; according to the results calculated by the shortest path algorithm, the optimal empty path between each partition is determined, and the corresponding optimization vector is set. The second handling integrated optimization vector can be expressed as the shortest path sequence between each partition and the weight value after path optimization, which is used to guide actual handling operations, reduce the frequency and total length of the empty path of the carrier, and improve transportation efficiency.

[0058] Furthermore, the application method includes:

[0059] Based on the material transportation relationship map, material handling information is collected, and the material handling information includes material placement status and handling action requirements; based on the material placement status and handling action requirements in the material handling information, a third handling integrated optimization vector and a fourth handling integrated optimization vector are set, and through the auxiliary operation node combination of the key operation node, the third handling integrated optimization vector and the fourth handling integrated optimization vector are used to perform layout optimization on multiple loose partitions of the target material yard space to obtain a first layout optimization space.

[0060] Specifically, the material handling information includes material placement status and handling action requirements. The material placement status refers to the position, storage conditions and arrangement of materials in the target material yard space, including the stacking height, location density, classified storage, etc. of the materials; the handling action requirements refer to the specific operating requirements required when handling materials, including the frequency and method of handling (such as handling, loading and unloading, stacking), required equipment (such as forklifts, conveyor belts), etc.; the third handling integrated optimization vector is an optimization vector generated based on the material placement status data, which is used to identify and optimize the material placement configuration in the target material yard space to improve the efficiency of material handling; the fourth handling integrated optimization vector is an optimization vector generated based on the handling action requirement data, which is used to optimize the operation process and action requirements in the material handling process, thereby improving the handling efficiency; the first layout optimization space is the target material yard space optimized based on the third and fourth handling integrated optimization vectors. In the first layout optimization space, the material placement and handling requirements are optimized, which improves the overall efficiency and smoothness of operation.

[0061] Execution steps: Similar to the second layout optimization space, material handling information is extracted from the material transport relationship map, including material placement status and handling action requirements. The material placement status can be obtained by investigating and recording the actual layout of the materials in the material yard, and the handling action requirements can be obtained by analyzing the handling records and equipment requirements; Analyze the material placement status data, identify the optimization potential of the material in the target material yard space, and set the third handling integrated optimization vector to optimize the layout configuration of the material, for example, reduce the stacking height of the material or adjust the storage position to improve the access efficiency; Analyze the handling action requirement data, identify the efficiency bottleneck in the handling operation, and set the fourth handling integrated optimization vector to optimize the handling operation process, for example, replace the handling method with a gravity rack, differentiate the original handling requirements, and further optimize the handling path and equipment use to improve the operation efficiency; Combine the third handling integrated optimization vector (material placement status optimization) and the fourth handling integrated optimization vector (handling action requirement optimization) to perform comprehensive layout optimization on multiple loose partitions of the target material yard space. In the above steps, by optimizing the placement configuration of the material and the handling operation process, the first layout optimization space is formed to improve the overall material handling efficiency and operation fluency.

[0062] Furthermore, the multi-eye three-dimensional monitoring module is registered to obtain the material accumulation morphology measurement result of the target material field space. The method of the present application includes:

[0063] According to the N material processing steps, timestamp marking is performed to determine the time reference information; the internal and external parameters of the equipment of the multi-camera three-dimensional monitoring module are obtained, and the internal and external parameters of the equipment include acquisition frequency, focal length, principal point coordinates, distortion coefficient and relative position relationship; through the time reference information, the internal and external parameters of the equipment of the multi-camera three-dimensional monitoring module are configured for timing synchronization.

[0064] Specifically, the timestamp is assigned a time stamp to each frame of image or scan data during the data acquisition process to ensure the time synchronization of the data; the internal and external parameters of the device include acquisition frequency, focal length, principal point coordinates, distortion coefficient and relative position relationship, among which the acquisition frequency refers to the frequency of data acquisition by the device in unit time; the focal length is the focal length of the lens, which is used to determine the clarity and field of view of the image; the principal point coordinates refer to the principal point position on the image sensor, usually the intersection of the optical axis of the lens; the distortion coefficient is used to correct the parameters of image distortion, such as barrel distortion or pincushion distortion; the relative position relationship is the relative position and direction relationship between devices, which is used for the alignment of multi-device data.

[0065] Execution steps: According to the N material processing procedures, assign a timestamp to each material processing procedure and data collection process to determine the time reference information, which is helpful to maintain the consistency and synchronization of data in subsequent data processing and registration; collect all equipment parameters of the multi-eye 3D monitoring module, including acquisition frequency, focal length, principal point coordinates, distortion coefficient and relative position relationship, for subsequent data registration and correction; use the time reference information to synchronize the internal and external parameters of all multi-eye 3D monitoring modules to ensure that the image data of different devices are consistent in time during the data collection process, so that they can be accurately aligned in subsequent processing; based on the timestamp mark, internal and external parameters of the equipment and synchronization configuration, align the collected material accumulation point cloud data, align the point cloud data of different devices, and generate a complete material accumulation morphology measurement result. Through the above steps, it is ensured that the data obtained from the multi-eye 3D monitoring module can accurately reflect the material accumulation situation in the target material yard space.

[0066] In summary, the beneficial effects of the embodiments of the present application are:

[0067] 1. By configuring the equipment parameters and time reference information of the multi-view 3D monitoring module in time sequence synchronization, the point cloud data of material accumulation can be accurately obtained to ensure the real-time nature of the monitoring data and realize high-precision synchronous measurement and analysis of the material accumulation form in the material yard.

[0068] 2. By canceling redundant operation nodes, setting up single-piece flow segments and rearranging material processing procedures, the material processing and transportation processes are made more efficient and ineffective operations are reduced.

[0069] 3. Based on the vertical layout of material transfer nodes and optimized space division, the material transfer efficiency and space utilization of the material yard are improved, and the reasonable planning and optimal resource allocation of the material yard are realized.

[0070] 4. As the time stamp is used according to N material processing procedures, the time reference information is determined; the internal and external parameters of the multi-camera 3D monitoring module are obtained, including the acquisition frequency, focal length, principal point coordinates, distortion coefficient and relative position relationship; the internal and external parameters of the multi-camera 3D monitoring module are configured with time synchronization through the time reference information. Through the above steps, it is ensured that the data obtained from the multi-camera 3D monitoring module can accurately reflect the material accumulation in the target material yard space.

[0071] In summary, any step can be stored as a computer instruction or program in an unlimited computer memory, and can be called and recognized by an unlimited computer processor, and no unnecessary restrictions are made here.

[0072] Furthermore, the above-mentioned technical scheme only reflects the preferred technical scheme of the technical scheme of the embodiment of the present application. Some changes that may be made to some parts thereof by technicians in this technical field all reflect the novel principles of the embodiment of the present application. Obviously, technicians in this field can make various changes and modifications to the present application without departing from the scope of the present application.

Claims

1. A method for measuring the material accumulation morphology of a material field based on laser scanning, characterized in that: The method comprises: In the target material yard space, the material processing and transfer lines are connected to obtain M material transfer and accumulation nodes, wherein the material transfer and accumulation nodes include raw material accumulation nodes, semi-finished product accumulation nodes, and finished product accumulation nodes; According to the material processing and transfer assembly line, determine the material processing flow, split it into N material processing procedures, and loosely mark the nodes of the N material processing procedures, wherein the loosely marked nodes include V different operation types; Based on the N material processing procedures, in the V different operation types corresponding to the node loose markings, redundant operation nodes are cancelled and multiple single-piece flow segments are set; In the material processing flow, the V different types of operations are closely marked by nodes after the redundant operation nodes are removed through the multiple single-piece flow segments, and the closely marked nodes are used to rearrange the N material processing procedures; After the N material processing procedures are rearranged, the M material transfer and accumulation nodes are connected in a vertical layout, and a multi-eye three-dimensional monitoring module is deployed to collect material accumulation point cloud data; Based on each material transfer and accumulation node in the material accumulation point cloud data and in combination with the M material transfer and accumulation nodes connected in a vertical layout, the multi-eye three-dimensional monitoring module is aligned to obtain the material accumulation morphology measurement result of the target material yard space.

2. The method for measuring material accumulation morphology in a material field based on laser scanning according to claim 1, characterized in that: Based on the N material processing procedures, in the V different operation types corresponding to the node loose markings, redundant operation nodes are cancelled and multiple single-piece flow segments are set, the method comprising: Based on the N material processing procedures, the target material yard space is divided into a plurality of loose partitions according to the horizontal layout; According to the multiple loose partitions of the target material yard space, node loose marks are set, and material transportation analysis is performed in accordance with the material processing and transfer assembly line, and a material transportation relationship map is added; Based on the material transportation relationship map, in the V different operation types corresponding to the node loose marks, redundant operation nodes are cancelled and multiple single-piece flow segments are set.

3. The method for measuring material accumulation morphology in a material field based on laser scanning according to claim 2, characterized in that: Based on the material transport relationship graph, in V different operation types corresponding to the node loose marks, redundant operation nodes are cancelled and multiple single-piece flow segments are set, the method comprising: Based on the material processing and transfer assembly line, V types of operations are determined, wherein each type of operation corresponds to at least one key operation node; According to the key operation node, a subset of V operation nodes bound to the V types of operations is analyzed to determine a combination of auxiliary operation nodes of the key operation node; The V subsets of job nodes bound to the V job types and the auxiliary job node combinations of the key job nodes are compared to determine redundant job nodes.

4. The method for measuring material accumulation morphology in a material field based on laser scanning according to claim 3, characterized in that: The method comprises: Based on the material transportation relationship map, a material transportation time consumption mark is introduced; According to the material transportation time consumption mark, in the case of continuous operation, the material transportation waiting time is calculated; According to the waiting time for material transportation and in combination with the auxiliary operation node combination of the key operation node, the layout of multiple loose partitions of the target material yard space is optimized to form the multiple single-piece flow segments.

5. The method for measuring material accumulation morphology in a material field based on laser scanning according to claim 4, characterized in that: According to the material transportation waiting time, combined with the auxiliary operation node combination of the key operation node, multiple loose partitions of the target material yard space are optimized for layout to form multiple single-piece flow segments, the method includes: By combining the auxiliary operation nodes of the key operation nodes, from the perspective of action integration, the layout of multiple loose partitions of the target material yard space is optimized to obtain a first layout optimization space; By combining the auxiliary operation nodes of the key operation nodes, from the perspective of handling integration, multiple loose partitions of the target material yard space are optimized for layout, so as to obtain a second layout optimization space; According to the waiting time for material transportation, a timeliness analysis is performed by comparing the first layout optimization space and the second layout optimization space to obtain a layout optimization space, wherein the multiple single-piece flow segments are defined in the layout optimization space.

6. The method for measuring material accumulation morphology in a material field based on laser scanning according to claim 5, characterized in that: By combining the auxiliary operation nodes of the key operation nodes, from the perspective of handling integration, multiple loose partitions of the target material yard space are optimized for layout to obtain a second layout optimization space, the method comprising: Based on the material transport relationship map, collecting vehicle empty transport information, the vehicle empty transport information includes empty time information and empty path information; Using the idle time information in the carrier air transport information, multiple loose partitions of the target material yard space are marked with idle time lengths, and a first transport integrated optimization vector is set; Using the empty path information in the empty transport information of the carrier, multiple loose partitions of the target material yard space are marked with empty rates, and a second transport integrated optimization vector is set; By combining the auxiliary operation nodes of the key operation nodes, the first transport integrated optimization vector and the second transport integrated optimization vector are used to perform layout optimization on multiple loose partitions of the target material yard space to obtain the second layout optimization space.

7. The method for measuring material accumulation morphology in a material field based on laser scanning according to claim 6, characterized in that: Based on the material transport relationship map, collecting material handling information, the material handling information includes material placement status and handling action requirements; Based on the material placement status and handling action requirements in the material handling information, a third handling integrated optimization vector and a fourth handling integrated optimization vector are set, and through the auxiliary operation node combination of the key operation node, the third handling integrated optimization vector and the fourth handling integrated optimization vector are used to perform layout optimization on multiple loose partitions of the target material yard space to obtain a first layout optimization space.

8. The method for measuring the material accumulation morphology of a material field based on laser scanning according to claim 7, characterized in that: The multi-eye three-dimensional monitoring module is registered to obtain the material accumulation morphology measurement result of the target material yard space, and the method includes: According to the N material processing steps, timestamp marking is performed to determine time reference information; Obtaining the internal and external parameters of the multi-camera 3D monitoring module, wherein the internal and external parameters of the device include acquisition frequency, focal length, principal point coordinates, distortion coefficient, and relative position relationship; The time reference information is used to perform timing synchronization configuration on the internal and external parameters of the equipment of the multi-view three-dimensional monitoring module.

Citation Information

Patent Citations

  • Stock ground material volume measurement method and system

    CN111968172A

  • Computer-implementated method for identifying mechanical properties by coupled correlation of images and mechanical modelling

    CN112055871A

  • Comprehensive muck pile form evaluation method and system, electronic equipment and storage medium

    CN114295046A

  • Information processing apparatus, information processing method, and storage medium

    US20160379370A1

  • Image capturing simulation in a coordinate measuring apparatus

    WO2015106829A1