Production method of prebaked anode for high-current-density aluminum and feeding equipment
By using mixed powder of calcined petroleum coke and graphite powder and specific feeding equipment design in the production of pre-baked anode for aluminum, the problem of unstable quality in the prior art is solved, and the production of high-density and low-resistivity anode materials is achieved. , improves the overall performance of the product.
Patent Information
- Application Number
- CN202410973403.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2044-07-19
AI Technical Summary
The existing production process of pre-baked anodes for aluminum leads to unstable quality, and there are large fluctuations in the specific resistance, density and strength indicators of finished products, resulting in high scrap rate.
After calcined petroleum coke is obtained by medium crushing screening and grinding of ball mill, coarse, medium and fine coke and powder are added, graphite powder is added to form a mixed powder, and then roasted after dry material ingredients, kneading and forming, combined with specific feeding equipment Design, including control components, displacement components and shunt components, ensures even addition of graphite powder and efficient dispersion of materials.
It significantly improves the density and resistivity of the aluminum electrolytic prebaked anode, improves the appearance and physical and chemical performance indicators of the material, meets the first-class product requirements of the industry standards, and reduces the scrap rate.
Smart Images

Figure CN118894725A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of carbon technology, in particular to a production method and feeding equipment for a prebaked anode for high current density aluminum. Background Art
[0002] At present, the industrial production of aluminum has always adopted the electrolytic method, that is, the electrochemical reaction in the electrolytic cell is used to produce aluminum. The prebaked anode is the core component of the prebaked electrolytic cell. It mainly plays a conductive role in the cell and is continuously consumed during the aluminum electrolysis process. The prebaked anode is generally made through the following processes: calcination process-forming process-baking process. Among them, the forming process is an important process, and its process level will directly affect the quality of the prebaked anode. The forming process consists of crushing, screening, grinding, batching, kneading, vibration forming and dust collection systems. The materials entering the forming process are screened after crushing, and part of the screened materials enter the batching bin of different material grades according to the size of the particles. The other part enters the grinding system, and the ground powder with relatively stable process characteristics enters the powder bin; however, the quality of the prebaked anode for aluminum produced by the existing production process is unstable, and the performance of the prebaked anode for aluminum produced does not meet the standards. Its specific resistance, density and strength indicators have large fluctuations, resulting in a high scrap rate. Summary of the invention
[0003] The object of the present invention is to provide a production method and feeding equipment for a prebaked anode for high current density aluminum, which can solve the problems raised by the above-mentioned background technology in view of the shortcomings of the prior art.
[0004] The technical solution of the present invention is achieved in this way:
[0005] The present invention provides a method for producing a prebaked anode for high current density aluminum, wherein calcined petroleum coke is subjected to medium crushing and screening and then ground by a ball mill to obtain four types of materials, namely, coarse coke, medium coke, fine coke and powder;
[0006] After the residual anode and waste cooked blocks are screened through medium crushing, two types of materials, coarse residual and fine residual, are obtained; the process includes the following steps:
[0007] When the calcined coke and dust collected powder are added to the ball mill for grinding, graphite powder is added to form a mixed powder;
[0008] The calcined coke with a particle size of 6-8mm in the coarse coke batching bin, the calcined coke with a particle size of 3-6mm in the medium coke batching bin, the calcined coke with a particle size of 0.5-3mm in the fine coke batching bin, the mixed powder with a particle size of less than 200 mesh in the mixed powder batching bin, the coarse residue with a particle size of 6-12mm in the coarse residue batching bin, and the fine residue with a particle size of 3-6mm in the fine residue batching bin are dry-batched according to the process requirements;
[0009] After the dry ingredients are batched, the materials are weighed by the batching scale and sent to the collecting screw equipment, and then transported to the preheating screw by the bucket elevator for preheating and then enter the kneading machine;
[0010] After the liquid asphalt is measured, it is pumped into the kneading machine by the asphalt pump to be mixed with the dry material into a paste;
[0011] The paste is sent to a molding machine after being strongly cooled to obtain a molded carbon block, and the molded carbon block is cooled with cooling water;
[0012] The cooled shaped carbon blocks are sent to a roasting furnace for heating until the asphalt in them is converted into coke, so that the entire carbon block forms a firm and uniform whole.
[0013] A prebaked anode feeding device for high current density aluminum includes multiple bins and gas supply equipment. Conveying pipelines connected to the gas supply equipment are installed on the multiple bins. A valve body is provided at the connection between the conveying pipeline and the gas supply equipment. A control component for controlling the material discharge rate is provided between the bin and the conveying pipeline. The conveying pipeline is partially embedded in the chamber of a ball mill, and a diversion component for diverting materials is provided on the free end of the conveying pipeline.
[0014] In some technical schemes of the present invention, the control component includes a baffle installed in the bin body, a plurality of discharge ports are opened around the baffle, a rotating shaft is provided on the baffle, a mounting plate is sleeved on the rotating shaft, a plurality of shielding plates for shielding the discharge ports are sleeved on the outer circumferential wall of the mounting plate, a limit spring abutting against the mounting plate is sleeved on the rotating shaft, and a displacement component for controlling the rotation of the shielding plate is provided on the rotating shaft.
[0015] In some technical schemes of the present invention, the displacement assembly includes a displacement plate mounted on a rotating shaft, a plurality of fan blades are arranged around the side of the displacement plate facing away from the shielding plate, and the plurality of fan blades are all obliquely arranged on the shielding plate; a plurality of first ratchet teeth are arranged around the side wall opposite to the shielding plate, and a plurality of second ratchet teeth engaging with the first ratchet teeth are arranged on the side wall opposite to the displacement plate.
[0016] In some technical solutions of the present invention, a mounting column is passed through the baffle plate, a spiral blade embedded in the bin body is provided on the mounting column, the outer edge of the spiral blade abuts against the inner wall of the bin body, and the mounting column is connected to the mounting plate.
[0017] In some technical schemes of the present invention, the diversion component includes a plurality of first discharge pipes arranged around the outer wall of the conveying pipe, a flexible pipe is provided on the free end of the first discharge pipe, a second discharge pipe is provided on the free end of the flexible pipe, a displacement rod is passed through the conveying pipe, a plurality of push rods respectively connected to the second discharge pipes are hinged on the extended end of the displacement rod, and a push plate is provided at the end of the displacement rod placed in the conveying pipe.
[0018] In some technical solutions of the present invention, a turbine is rotatably provided on the push plate, and an oscillation component for preventing material from piling up in the conveying pipeline is provided on the surface of the conveying pipeline, and the oscillation component is drivingly connected to the turbine.
[0019] In some technical solutions of the present invention, a conical spring is sleeved on the push rod.
[0020] In some technical schemes of the present invention, the oscillation component includes a spiral guide groove opened on the outer wall of the conveying pipe, a winding drum is sleeved on the outer surface of the conveying pipe, a traction rope is wound on the winding drum, a plurality of sliders are passed through the traction rope, the sliders are slidably set in the spiral guide groove, and a reset spring is provided between any two adjacent sliders, a plurality of first magnetic poles are arranged around the turbine, and a plurality of second magnetic poles magnetically attracted to the first magnetic poles are provided on the winding drum.
[0021] In some technical solutions of the present invention, a plurality of mounting grooves are provided on the groove bottom of the spiral guide groove, and an arched metal spring is slidably provided in the mounting groove.
[0022] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:
[0023] Effectively improve the density of prebaked anode for aluminum electrolysis. The average apparent density of prebaked anode is:
[0024] 1.564g / cm3, the average true density is 2.067g / cm3,
[0025] Due to the addition of graphite powder, its specific resistance, density and strength indicators are better than those of calcined coke, so that the prepared anode material has greatly improved both appearance and physical and chemical performance indicators. The average resistivity is 54.63μΩ·m, which is lower than the industry standard of the first-grade resistivity of less than 57.00μΩ·m, improving the quality of aluminum electrolysis prebaked anode;
[0026] The control component allows a certain amount of graphite powder in the bin to enter the conveying pipeline from the corresponding bin at a certain discharge speed according to the air intake into the conveying pipeline, so that the operator can control the graphite powder addition rate.
[0027] The displacement component rotates on the rotating shaft under the blowing of high-pressure airflow, thereby driving the mounting plate to make circular motion on the rotating shaft. At this time, the discharge port on the baffle is periodically opened, and the material is discharged smoothly from the discharge port. The high-speed rotating mounting plate and the shielding plate are in the process of making circular motion relative to the baffle. The shear force formed by the relative motion of the two is used to crush the material to prevent the material from being in a clumping state. Then the material is transported to the chamber of the ball mill along the conveying pipeline driven by the high-pressure airflow.
[0028] The first discharge pipe obliquely arranged on the conveying pipeline can guide the materials conveyed by the high-pressure airflow to be ejected separately, move in a certain direction and then impact each other, thereby improving the dispersion of the materials, thereby reducing the grinding burden of the ball mill and improving the grinding efficiency and grinding quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0030] Figure 1 It is a schematic diagram of the process flow of the present invention;
[0031] Figure 2 It is a schematic diagram of the installation structure of the middle feeding equipment of the present invention;
[0032] Figure 3 It is a partial cross-sectional combined schematic diagram of the bin body and the conveying pipeline of the present invention;
[0033] Figure 4 This is a schematic diagram of the installation structure of the control component in the present invention;
[0034] Figure 5 It is a schematic diagram of the installation structure of the oscillating component in the present invention;
[0035] Figure 6 It is a schematic diagram of the installation structure of the diversion component in the present invention;
[0036] Figure 7 It is a schematic diagram of the installation structure of the first magnetic pole and the second magnetic pole in the invention;
[0037] Figure 8 It is a schematic diagram of the partial cross-sectional structure of the conveying pipeline in the present invention.
[0038] Icons: 1. Air supply equipment; 2. Bin body; 3. Valve body; 4. Conveying pipeline; 5. Ball mill; 6. Spiral blade; 7. Mounting column; 8. Fan blade; 9. Baffle; 10. Shielding plate; 11. Mounting plate; 12. Displacement plate; 13. Second ratchet; 14. First ratchet; 15. Rotating shaft; 16. Return spring; 17. Slider; 18. Winding reel; 19. Traction rope; 20. Metal spring; 21. Spiral guide groove; 22. Mounting seat; 23. Turbine; 24. Push plate; 25. Displacement rod; 26. First discharge pipe; 27. Flexible pipe; 28. Second discharge pipe; 29. Push rod; 30. First magnetic pole; 31. Second magnetic pole; 32. Push rod; 33. Displacement spring; 34. Limit spring. DETAILED DESCRIPTION
[0039] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0040] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] Example 1
[0042] Please refer to Figure 1-Figure 8 shown.
[0043] The present invention provides a method for producing a prebaked anode for high current density aluminum. Figure 1 , Figure 2 As shown, the calcined petroleum coke is subjected to medium crushing and screening and then ground by a ball mill to obtain four types of materials: coarse coke, medium coke, fine coke and powder.
[0044] After the residual anode and waste cooked blocks are screened through medium crushing, two types of materials, coarse residual and fine residual, are obtained; the process includes the following steps:
[0045] When the calcined coke and dust collected powder are added to the ball mill for grinding, graphite powder is added to form a mixed powder;
[0046] The calcined coke with a particle size of 6-8mm in the coarse coke batching bin, the calcined coke with a particle size of 3-6mm in the medium coke batching bin, the calcined coke with a particle size of 0.5-3mm in the fine coke batching bin, the mixed powder with a particle size of less than 200 mesh in the mixed powder batching bin, the coarse residue with a particle size of 6-12mm in the coarse residue batching bin, and the fine residue with a particle size of 3-6mm in the fine residue batching bin are dry-batched according to the process requirements;
[0047] After the dry ingredients are batched, the materials are weighed by the batching scale and sent to the collecting screw equipment, and then transported to the preheating screw by the bucket elevator for preheating and then enter the kneading machine;
[0048] After the liquid asphalt is measured, it is pumped into the kneading machine by the asphalt pump to be mixed with the dry material into a paste;
[0049] The paste is sent to a molding machine after being strongly cooled to obtain a molded carbon block, and the molded carbon block is cooled with cooling water;
[0050] The cooled shaped carbon blocks are sent to a roasting furnace for heating until the asphalt in them is converted into coke, so that the entire carbon block forms a firm and uniform whole.
[0051] The material formula for prebaked anode production is formulated as follows: among the dry materials, the total amount of coarse coke, medium coke, fine coke and powder accounts for about 68.31% of the total weight of the dry materials, the total amount of coarse residue and fine residue accounts for about 14.41% of the total weight of the dry materials, graphite powder accounts for 1.69% of the total weight of the dry materials, powder accounts for 0.34% of the total weight of the dry materials, and asphalt accounts for 15.25% of the total weight of the dry materials.
[0052] In this way, when the ball mill system is started to prepare powder, the ball mill capacity is set to 30t / h, and the graphite powder added to the ball mill can be calculated through the ingredient table. The graphite powder is added at 33.4kg / min to prepare a mixed powder with a certain ratio and enter the powder bin for storage; the dry material with a particle size of 6-12mm accounts for 20±2% of the total weight of the dry material, the dry material with a particle size of 3-6mm accounts for 16±2% of the total weight of the dry material, the dry material with a particle size of 0.5-3mm accounts for 22±2% of the total weight of the dry material, the dry material with a particle size of 0.075-0.5mm accounts for 22±2% of the total weight of the dry material, and the powder below -200 mesh accounts for 20±2% of the total weight of the dry material. The heating rate of the roasting is controlled according to a 32h cycle, and the final roasting temperature is 1170℃. The asphalt is modified asphalt.
[0053] The use of graphite powder increases the carbon content of the anode shaft, because the graphitized fixed carbon can reach up to 99%. The fixed carbon content of calcined coke is 80-87%. Sulfur content: graphite powder is generally between 0.03-0.06%, generally 0.05% is more; calcined petroleum coke is generally around 0.5%. Compared with calcined coke, it has a higher degree of graphitization, lower resistance, and relatively less ash.
[0054] The production of prebaked anodes for high current density aluminum also includes crushers, screeners, electromagnetic iron removers, electromagnetic vibrating feeders, collecting screws, ball mills, bucket elevators, preheating screws, kneading machines, powerful coolers, vibration molding machines, roasting furnaces, various conveyors, etc., all of which can use existing technology equipment for equipment for transporting materials other than graphite powder and equipment for generating anodes.
[0055] A prebaked anode feeding device for high current density aluminum includes multiple bin bodies 2 and a gas supply device 1. A delivery pipeline 4 connected to the gas supply device 1 is installed on each of the multiple bin bodies 2. A valve body 3 is provided at the connection between the delivery pipeline 4 and the gas supply device 1. A control component for controlling the material discharge rate is provided between the bin body 2 and the delivery pipeline 4; a part of the delivery pipeline 4 is embedded in the bin of a ball mill 5, and a diversion component for diverting materials is provided on the free end of the delivery pipeline 4. The feeding equipment provided in the present technical solution is mainly used to continuously and quantitatively add a corresponding amount of graphite powder into the ball mill 5 when producing mixed powder for prebaked anode of high current density aluminum, so as to avoid that the graphite powder in the produced mixed powder does not reach the content, resulting in the quality of the subsequently produced anode not meeting the use requirements; in order to solve the above problems, the inventor has designed a transmission device for graphite powder transmission based on the principle of pneumatic conveying; the air supply device 1 provided is a commonly used air supply device for pneumatic conveying in the prior art, and the number of bins 2 provided is at least two, which are used to store graphite powder respectively, and the two bins 2 respectively convey the graphite powder to the bins of the ball mill 5 through two conveying pipes 4, so as to ensure that the graphite powder is not The toner powder does not interfere with each other during the transportation process; a valve body 3 is provided at the connection point between the transportation pipeline 4 and the air supply device 1, and the valve body 3 is a solenoid valve, which can control the air intake of the air supply device 1 entering the transportation pipeline 4 through the PLC controller, and then control the transportation rate of the graphite powder; the control component allows the graphite powder in the bin 2 to enter the transportation pipeline 4 from the corresponding bin 2 at a certain discharge speed according to the air intake into the transportation pipeline 4, so that the operator can control the addition rate of the graphite powder; the diversion component provided on the free end of the transportation pipeline 4 can disperse the material and spray it into the bin of the ball mill 5, thereby reducing the grinding burden of the ball mill 5, and improving the grinding efficiency and grinding quality.
[0056] In some technical schemes of the present invention, the specific structure of the control component includes a baffle 9 installed in the bin body 2 and adapted to the cross-section of the output port of the bin body 2. The cross-section of the baffle 9 is preferably circular. A plurality of rectangular or circular discharge ports are arranged around the baffle 9. A rotating shaft 15 is connected to the mounting hole on the bottom of the baffle 9 by threading or welding. A mounting plate 11 is sleeved on the rotating shaft 15 through a shaft sleeve. A plurality of shielding plates 10 for shielding the discharge ports are arranged around the outer circumferential wall of the mounting plate 11. The shielding plates 10 and the baffle 9 are made of materials with a small friction coefficient to avoid the large friction generated when the two are in contact and affect the normal operation of the device. A limit spring 34 is sleeved on the rotating shaft 15 to abut against the mounting plate 11. The limit spring 34 applies a certain force to the mounting plate 11. A thrust in the vertical direction makes it contact with the baffle plate 9, which plays a role of dynamic sealing. A displacement component for controlling the rotation of the shielding plate 10 is provided on the rotating shaft 15; and the power source of the displacement component is the high-pressure airflow entering the conveying pipe 4; when the displacement component rotates on the rotating shaft 15 under the blowing of the high-pressure airflow, it drives the mounting plate 11 to make a circular motion on the rotating shaft 15. At this time, the discharge port located on the baffle plate 9 is periodically opened, and the material is discharged smoothly from the discharge port. In the process of the high-speed rotating mounting plate 11 and the shielding plate 10 making a circular motion relative to the baffle plate 9, the shear force formed by the relative motion of the two is used to crush the material to prevent the material from being in a clumping state. Then the material is transported to the chamber of the ball mill 5 along the conveying pipe 4 driven by the high-pressure airflow.
[0057] Preferably, the middle portion of the limit spring 34 is fixed on the rotating shaft 15, and both ends of the limit spring 34 can be freely compressed.
[0058] In some technical schemes of the present invention, the specific structure of the displacement assembly includes a displacement plate 12 mounted on a rotating shaft 15 through a shaft sleeve, the displacement plate 12 can move along the axis of the rotating shaft 15, a plurality of blades 8 are arranged around the side of the displacement plate 12 away from the shielding plate 10, and the plurality of blades 8 are all arranged obliquely on the shielding plate 10. When the high-pressure airflow enters the connection between the silo 2 and the conveying pipe 4, the airflow can apply a lifting force in the vertical direction to the displacement plate 12, and at the same time apply a rotational force to the mounting plate 11 having the plurality of blades 8, so that the mounting plate 11 will make a circular motion on the rotating shaft 15; and a plurality of A first ratchet 14 and a plurality of second ratchet teeth 13 meshing with the first ratchet teeth 14 are arranged on the side walls opposite to the mounting plate 11 and the displacement plate 12; the displacement plate 12 is pushed by the high-pressure airflow to move on the rotating shaft 15 in the direction close to the mounting plate 11; after moving for a certain distance, the first ratchet 14 and the second ratchet teeth 13 mesh with each other, and the mounting plate 11 and the displacement plate 12 become a whole at this moment, ensuring that the mounting plate 11 and the displacement plate 12 mesh and drive the displacement plate 12 to perform synchronous circular motion; thereby, the discharge port on the baffle plate 9 is periodically opened, and the material is smoothly discharged from the discharge port, and the material is transported to the chamber of the ball mill 5 along the conveying pipe 4 driven by the high-pressure airflow.
[0059] In some technical schemes of the present invention, a cylindrical mounting column 7 is passed through the baffle 9, and a spiral blade 6 is provided on the mounting column 7 and embedded in the silo body 2. The outer edge of the spiral blade 6 abuts against the inner wall of the silo body 2, so that the spiral blade 6 can stir the material accumulated in the silo body 2 and discharge it from the discharge port, thereby avoiding gaps in the material during transmission, causing discontinuity in the output material, and avoiding affecting the quality of material mixing. The mounting column 7 is fixedly connected to the mounting plate 11 by welding.
[0060] In some technical schemes of the present invention, the specific structure of the diversion component includes a plurality of first discharge pipes 26 arranged around the end of the free end of the conveying pipe 4, and the plurality of first discharge pipes 26 are arranged obliquely at the end of the conveying pipe 4, and the angle between the two is an acute angle; in this way, the second row of pipes can move relative to the first discharge pipes 26, so that the second pipe has a larger movement space in the space, thereby spraying the material in a scattered manner into the chamber of the ball mill 5, and the first discharge pipes 26 obliquely arranged on the conveying pipe 4 can guide the materials transported by the high-pressure airflow to be ejected separately and then move in a certain direction and then impact each other, thereby improving the dispersion of the materials, thereby reducing the grinding burden of the ball mill 5; and improving the grinding efficiency and grinding quality.
[0061] The free end of the conveying pipe is closed, and a flexible tube 27 is provided on the free end of the first discharge pipe 26, and a second discharge pipe 28 is provided on the free end of the flexible tube 27. A displacement rod 25 is passed through the conveying pipe 4, and a plurality of push rods 29 respectively connected to the second discharge pipe 28 are hinged on the extended end of the displacement rod 25. A push plate 24 is provided at the end of the displacement rod 25 placed in the conveying pipe 4; this structure can use high-pressure gas to drive the material to impact on the push plate 24, and push the displacement rod 25 to gradually move out of the conveying pipe 4. The displacement rod 25 will force the angle of the push rod 29 to gradually increase, thereby expanding the second discharge pipe 28 connected to the push rod 29 outward, so that the material is sprayed in a scattered state in the chamber of the ball mill 5.
[0062] In some technical solutions of the present invention, an oscillating component is provided on the outer surface of the conveying pipe 4 to prevent the material from accumulating in the conveying pipe 4. The oscillating component knocks the outer wall of the conveying pipe 4, so that part of the powder attached to the inner wall of the conveying pipe 4 is separated from the contact with the conveying pipe 4, and the inner wall of the conveying pipe 4 is cleaned.
[0063] In some technical solutions of the present invention, a conical spring is sleeved on the push rod 29. When the high-pressure gas drives the material to impact on the push plate 24 and pushes the displacement rod 25 to gradually move out of the conveying pipe 4, the push plate 24 will squeeze the conical spring, and the conical springs will contract with each other. Because the force of the airflow blowing to the push plate 24 is unbalanced, the conical spring will be compressed in an undirectional manner, which can shear and crush the powder passing through it, prevent the powder from clumping and adhering to the inner wall of the conveying pipe 4, and can also use the elastic potential energy generated by it to impact on the inner wall of the conveying pipe 4, so as to clean the inner wall of the conveying pipe 4.
[0064] In some technical schemes of the present invention, the oscillation component includes a spiral guide groove 21 opened on the outer wall of the conveying pipe 4, a turbine 23 is rotatably provided on the push plate 24, a winding drum 18 is sleeved on the outer surface of the conveying pipe 4, a traction rope 19 is wound on the winding drum 18, and a plurality of sliders 17 are passed through the traction rope 19. The sliders 17 are all slidably set in the spiral guide groove 21, and a reset spring 16 is provided between any two adjacent sliders 17, a plurality of first magnetic poles 30 are surrounded by the turbine 23, and a plurality of second magnetic poles 31 that magnetically repel the first magnetic poles 30 are provided on the winding drum 18.
[0065] Preferably, the first magnetic pole 30 is arranged in the inclined blade in the turbine 23, and the second magnetic pole 31 is also arranged in a corresponding inclined manner in the winding drum 18. The turbine 23 and the winding drum 18 are both made of plastic. When the high-pressure gas drives the material to impact on the push plate 24 and blows the turbine 23 to rotate in the conveying pipeline 4, the first magnetic pole 30 will exert a reaction force on the second magnetic pole 31, forcing the winding drum 18 to perform a rotational motion opposite to the turbine 23. At this time, the winding drum 18 will pull the traction rope 19 gradually back into the winding drum, and force the slider 17 slidably arranged on the traction rope 19 to slide in the spiral guide groove 21. At this time, The slider 17 will squeeze the return spring 16; when the elastic force applied by the return spring 16 to the slider 17 is greater than the reaction force applied by the first magnetic pole 30 to the second magnetic pole 31, the return spring 16 will push the slider 17 to gradually retreat to the initial position, and the traction rope 19 will gradually retreat from the winding drum 18 under the traction of the slider 17; in this way, the slider 17 is in frictional contact with the bottom of the spiral guide groove 21 in the spiral guide groove 21 to generate vibration, that is, the outer wall of the conveying pipe 4 is knocked, so that part of the powder attached to the inner wall of the conveying pipe 4 is separated from the contact with the conveying pipe 4, and the inner wall of the conveying pipe 4 is cleaned;
[0066] When the elastic force applied by the return spring 16 to the slider 17 is less than the reaction force applied by the first magnetic pole 30 to the second magnetic pole 31; at this time, the winding drum 18 will continue to rotate, continue to pull the traction rope 19 to gradually rewind in the winding drum and force the slider 17 slidably set on the traction rope 19 to slide in the spiral guide groove 21. At this time, the slider 17 will squeeze the return spring 16, and repeat the above steps to periodically rub and vibrate the conveying pipe 4 to prevent materials from adhering to the inner wall of the conveying pipe 4, avoid frequent cleaning and maintenance in the later stage, increase the service life of the equipment, extend the maintenance period, and save costs.
[0067] Preferably, a mounting seat 22 with a circular cross-section is also installed on the conveying pipeline 4, and a conical winding drum 18 is rotatably set on the mounting seat 22. A plurality of through holes are obliquely opened in the mounting seat 22, and the second magnetic pole 31 is slidably set in the through hole, and a push rod 32 connected to the second magnetic pole 31 is slidably provided in the through hole, and an inclined surface is opened on the free end of the push rod 32, and a displacement spring 33 is sleeved on the push rod 32 to limit the movement of the push rod 32. When the high-pressure gas drives the material to impact on the push plate 24 and blows the turbine 23 to rotate in the conveying pipeline 4, the first magnetic pole 30 will exert a reaction force on the second magnetic pole 31. At this time, the second magnetic pole 31 will push the push rod 32 to gradually extend out of the through hole and exert an oblique thrust on the winding drum 18, thereby forcing the winding drum 18 to make a circular motion relative to the conveying pipeline 4, and the traction rope 19 is gradually wound back in the winding drum 18 and forces the slider 17 slidably set on the traction rope 19 to slide in the spiral guide groove 21.
[0068] In addition, spirally distributed convex teeth are provided on the disk surface of the winding disk 18, and the convex teeth can increase the friction between the winding disk 18 and the traction rope 19, thereby ensuring the traction effect.
[0069] In some technical solutions of the present invention, a plurality of mounting grooves are provided on the bottom of the spiral guide groove 21, and an arched metal spring 20 is slidably provided in the mounting groove. When the slider 17 squeezes the metal spring 20, the metal spring 20 is squeezed by the slider 17 and gradually moves toward the bottom of the mounting groove; when the slider 17 does not squeeze the metal spring 20, the metal spring 20 releases its stored elastic potential energy, and it vibrates up and down in the mounting groove, gradually hitting the bottom of the spiral guide groove 21, thereby improving the ability of the slider 17 to generate amplitude on the bottom of the spiral guide groove 21, and improving the cleaning effect of the structure on the material attached to the inner wall of the conveying pipe 4.
[0070] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for producing a prebaked anode for high current density aluminum, wherein calcined petroleum coke is subjected to medium crushing and screening and then ground by a ball mill to obtain four kinds of materials: coarse coke, medium coke, fine coke and powder; After the residual anode and waste cooked blocks are screened through medium crushing, two types of materials, coarse residual and fine residual, are obtained; the characteristics are: The following steps are involved: When the calcined coke and dust collected powder are added to the ball mill for grinding, graphite powder is added to form a mixed powder; The calcined coke with a particle size of 6-8mm in the coarse coke batching bin, the calcined coke with a particle size of 3-6mm in the medium coke batching bin, the calcined coke with a particle size of 0.5-3mm in the fine coke batching bin, the mixed powder with a particle size of less than 200 mesh in the mixed powder batching bin, the coarse residue with a particle size of 6-12mm in the coarse residue batching bin, and the fine residue with a particle size of 3-6mm in the fine residue batching bin are dry-batched according to the process requirements; After the dry ingredients are batched, the materials are weighed by the batching scale and sent to the collecting screw equipment, and then transported to the preheating screw by the bucket elevator for preheating and then enter the kneading machine; After the liquid asphalt is measured, it is pumped into the kneading machine by the asphalt pump to be mixed with the dry material into a paste; The paste is sent to a molding machine after being strongly cooled to obtain a molded carbon block, and the molded carbon block is cooled with cooling water; The cooled shaped carbon blocks are sent to a roasting furnace for heating until the asphalt in them is converted into coke, so that the entire carbon block forms a firm and uniform whole.
2. A prebaked anode charging device for high current density aluminum, characterized in that: It includes a feeding device used in the production method according to claim 1, wherein the feeding device includes a plurality of bins and an air supply device, each of the plurality of bins is equipped with a conveying pipe connected to the air supply device, a valve body is provided at the connection between the conveying pipe and the air supply device, and a control component for controlling the material discharge rate is provided between the bin and the conveying pipe; a part of the conveying pipe is embedded in the chamber of the ball mill, and a diversion component for diverting the material is provided on the free end of the conveying pipe.
3. A high current density aluminum prebaked anode charging device according to claim 2, characterized in that: The control component includes a baffle installed in the bin body, a plurality of discharge ports are opened around the baffle, a rotating shaft is provided on the baffle, a mounting plate is sleeved on the rotating shaft, a plurality of shielding plates for shielding the discharge ports are sleeved on the outer circumferential wall of the mounting plate, a limit spring abutting against the mounting plate is sleeved on the rotating shaft, and a displacement component for controlling the rotation of the shielding plate is provided on the rotating shaft.
4. A high current density aluminum prebaked anode charging device according to claim 3, characterized in that: The displacement assembly includes a displacement plate sleeved on a rotating shaft, a plurality of fan blades are arranged around a side of the displacement plate facing away from the shielding plate, and the plurality of fan blades are all obliquely arranged on the shielding plate; a plurality of first ratchet teeth are arranged around a side wall of the displacement plate opposite to the shielding plate, and a plurality of second ratchet teeth engaging with the first ratchet teeth are arranged on a side wall of the shielding plate opposite to the displacement plate.
5. The high current density aluminum prebaked anode charging device according to claim 3, characterized in that: The baffle plate is provided with a mounting column, the mounting column is provided with a spiral blade embedded in the bin body, the outer edge of the spiral blade abuts against the inner wall of the bin body, and the mounting column is connected to the mounting plate.
6. The high current density aluminum prebaked anode charging device according to claim 2, characterized in that: The diversion component includes a plurality of first discharge pipes arranged around the outer wall of the conveying pipe, a flexible pipe is provided on the free end of each of the first discharge pipes, a second discharge pipe is provided on the free end of each of the flexible pipes, a displacement rod is passed through the conveying pipe, a plurality of push rods respectively connected to the second discharge pipes are hinged on the extended end of the displacement rod, and a push plate is provided at the end of the displacement rod placed in the conveying pipe.
7. A high current density aluminum prebaked anode charging device according to claim 6, characterized in that: The outer surface of the conveying pipeline is provided with an oscillating component for preventing materials from piling up in the conveying pipeline.
8. The high current density aluminum prebaked anode charging device according to claim 6, characterized in that: The push rod is sleeved with a conical spring.
9. The high current density aluminum prebaked anode charging device according to claim 7, characterized in that: The oscillation component includes a spiral guide groove opened on the outer wall of the conveying pipe, a turbine is rotatably provided on the push plate, a winding disk is sleeved on the outer surface of the conveying pipe, a traction rope is wound on the winding disk, and a plurality of sliders are passed through the traction rope, and the sliders are slidably set in the spiral guide groove, and a reset spring is provided between any two adjacent sliders, a plurality of first magnetic poles are surrounded by the turbine, and a plurality of second magnetic poles are provided on the winding disk that are magnetically attracted to the first magnetic poles.
10. The high current density aluminum prebaked anode charging device according to claim 9, characterized in that: A plurality of mounting grooves are provided on the groove bottom of the spiral guide groove, and an arched metal spring sheet is slidably provided in the mounting groove.
Citation Information
Patent Citations
Method for preparing prebaked anode by using aluminum electrolysis waste carbon cathode
CN105441979A
Fire coal crushing and conveying device high in automation degree
CN109865548A
Feeding control method of vertical grinding machine and vertical grinding machine
CN115518764A
Discharging flow controllable device
CN219399984U
device for the continuous pneumatic conveying of material
FR1465957A