Optimization dispatching method and device for airport integrated energy system
Patent Information
- Application Number
- CN202411393839.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-10-08
Smart Images

Figure CN118898381B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of scheduling optimization, and in particular to a method and device for optimizing scheduling of a comprehensive energy system of an airport. Background Art
[0002] As an energy-intensive infrastructure, the energy consumption of airports accounts for a high proportion of global primary energy consumption. Large airports require a large amount of energy supply to meet the energy supply needs of air conditioning, lighting, boarding gates and other equipment. At the same time, airports are one of the sources of increasing carbon dioxide emissions. Therefore, energy allocation for the Airport Integrated Energy System (AIES) is an effective means to achieve green and low-carbon development. Research on AIES optimization scheduling has become a hot topic in this field.
[0003] In the new energy system, incorporating renewable energy has become an effective solution for energy conservation and emission reduction in airports. However, as a renewable energy source, the volatility and intermittency of photovoltaic power generation will pose challenges to the safe and stable operation of the airport's comprehensive energy system. Therefore, it is necessary to improve the system's ability to absorb renewable energy in order to alleviate the impact of renewable energy output fluctuations on the stability of system operation.
[0004] In the context of huge energy consumption in airports, achieving flexible load management is of great significance to improving the energy efficiency of airport energy systems. In the integrated energy system of airports, cooling load is an elastic load with a large inertia constant coefficient, which is manifested as the cooling system response is delayed after the load change, thereby buffering the direct impact of external temperature changes on the indoor cooling environment. Reshaping the load curve through reasonable adjustment schemes can reduce the energy consumption of airports. In fact, cooling load accounts for a large proportion of the energy system of airports. In the hot southern regions, the summer cooling load demand accounts for as much as 80-85% of the total cooling load, and there is huge potential for efficiency optimization. At the same time, airports need stable and safe energy supply, and maintaining indoor ambient temperature to ensure passenger comfort is also an important part of energy application and management in airports. At present, there are few studies on optimizing the scheduling of load-storage integrated energy systems in hot and humid climates, considering the characteristics of energy systems, to improve the level of renewable energy consumption in airports and ensure the comfort experience of passengers, and there is a lack of in-depth exploration of the flexible scheduling of cooling loads. Summary of the invention
[0005] The purpose of this application is to propose a method and device for optimizing the scheduling of the airport integrated energy system in response to the above-mentioned technical problems.
[0006] In a first aspect, the present invention provides a method for optimizing the scheduling of an airport integrated energy system, comprising the following steps:
[0007] Establish an integrated energy system architecture for the airport that includes an ice storage system. The operating modes of the ice storage system include ice storage charging mode and ice melting energy release mode.
[0008] The cooling load at the load end of the airport integrated energy system architecture is analyzed to obtain the cooling load elasticity characteristics;
[0009] According to the elasticity characteristics of cooling load, the power balance constraint of the cooling system of the airport integrated energy system architecture is converted from an equality constraint to an interval constraint.
[0010] A day-ahead optimal scheduling model for the airport integrated energy system of the current scheduling period is constructed by considering the elastic characteristics of cooling load and the coordination of ice storage system. The model is solved under the condition of satisfying constraints and taking the minimum operation cost and the minimum environmental cost as the optimization objectives to obtain the day-ahead optimal scheduling plan for the next scheduling period. The constraints include the abandoned light power constraint, the ice storage system operation constraint, the cooling system power balance constraint, the power supply system power balance constraint, the heating system power balance constraint and the gas supply system power balance constraint.
[0011] As a preferred option, the airport integrated energy system architecture includes a photovoltaic output model, a demand response model on the electric load side, a combined heat and power unit output model, and a mathematical model of the ice storage system in two operating modes;
[0012] The expression of the photovoltaic output model is as follows:
[0013] P PV (t) = S (t) A η;
[0014]
[0015] Where f(S) is the probability density function of the Beta distribution, Γ(·) is the gamma function used to calculate the standardized coefficients of the Beta distribution, S and S max is the actual irradiation intensity and the maximum irradiation intensity, S(t) is the actual irradiation intensity in period t, α and β are the shape parameters of Beta distribution, μ and σ are the expectation and variance of Beta distribution, P PV (t) is the output power of the photovoltaic cell in time period t, A is the photovoltaic array area, η is the photoelectric conversion efficiency, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle;
[0016] The demand response model on the electric load side is described by the price elasticity matrix. The expression of the element in the i-th row and j-th column in the price elasticity matrix W(i,j) is as follows:
[0017]
[0018] Among them, ei,j It represents the elasticity coefficient of the load in period i to the electricity price in period j, i = 0, 1, 2, ..., T, j = 0, 1, 2, ..., T, ΔL E (i) is the change in electric load after demand response, L E (i=0) and Pr(j=0) are the initial electric load and initial electricity price, respectively, and ΔPr(j) is the change in electricity price after demand response;
[0019] The actual electric load after demand response L E The expression of (t) is as follows:
[0020]
[0021] The expression of the combined cooling, heating and power unit output model is as follows:
[0022]
[0023] Among them, P c (t), P e (t) and P h (t) are the cooling output power, electric output power and thermal output power of the combined cooling, heating and power unit in period t, respectively, P ng (t) is the natural gas input power during period t, η c , η e and η h They are the cooling efficiency, electrical efficiency and thermal efficiency of the combined cooling, heating and power unit respectively;
[0024] The mathematical model of the ice storage system in two operating modes is shown as follows:
[0025]
[0026] in, The energy stored in the ice storage system before switching between the ice storage charging mode and the ice melting energy release mode. represents the energy stored in the ice storage system during the period t = 0, represents the energy stored in the ice storage system during the period t = T, is the energy stored in the ice storage system after the conversion between ice storage charging mode and ice melting energy release mode, δ ice is the loss limit of the ice storage system, and are charging power and discharging power respectively, η ice,c and η ice,d are the ice storage efficiency coefficient and ice melting efficiency coefficient, P ice,c (t) and P ice,d (t) are the ice storage charging power and ice melting discharging power of the ice storage system in period t, u iceTo limit the variables that the ice storage charging mode and ice melting energy release mode cannot occur at the same time, u ice The value can only be 0 or 1. and are the upper limit of charging power and the upper limit of discharging power of the ice storage system, and are the lower and upper limits of the energy stored in the ice storage system, respectively. c , b c 、e c 、f c 、a d , b d 、e d and f d is the regression coefficient, Q ice,c (t) and Q ice,d (t) are the capacity of the ice storage system to carry the cooling load in the ice storage charging mode and the capacity of the ice storage system to carry the cooling load in the ice melting energy release mode during the period t, and the expression is as follows:
[0027] Q ice,c =LPM·ΔT isw,c ·c pw 60 minutes;
[0028] Q ice,d =LPM·ΔT isw,d ·c pw 60 minutes;
[0029] Among them, c pw is the specific heat of chilled water, LPM is the ice storage water flow rate, and the temperature change of ice storage water during ice storage is ΔT isw,c The change of ice storage water temperature ΔT during ice melting isw,d The expression is as follows:
[0030] ΔT isw,c =T iswr,c -T isws,c ;
[0031] ΔT isw,d =T iswr,d -T isws,d ;
[0032] Among them, T iswr,c and T isws,c are the return water temperature and supply water temperature of ice storage water in ice storage charging mode respectively; T iswr,d and T isws,d They are the return water temperature and supply water temperature of ice storage water in ice melting and energy release mode respectively.
[0033] As a preferred embodiment, the cooling load elasticity characteristic is expressed as the relationship between the average prediction index of indoor temperature comfort and the air temperature around the human body, which is expressed by the following formula:
[0034]
[0035] Among them, PMV is the average prediction index of indoor temperature comfort, MR is the human metabolic rate, which is set at 80W / m 2 ;I cl is the thermal resistance of clothing, take 0.078(m 2 .℃) / W;t s The average temperature of human skin in a comfortable state is approximately 33.5℃; t a is the temperature of the air surrounding the human body.
[0036] As a preferred method, the power balance constraint of the cooling system of the airport integrated energy system architecture is converted from an equality constraint to an interval constraint according to the elasticity characteristics of the cooling load, specifically including:
[0037] The equality constraint of the cooling system power balance constraint is expressed as:
[0038] P c (t)+C EC (t)+P ice,d (t)-P ice,c (t) = L C (t);
[0039] Among them, P c (t) is the cooling output power of the combined cooling, heating and power unit in period t, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle, P ice,c (t) and P ice,d (t) is the ice storage charging power and ice melting discharging power of the ice storage system in period t, C EC (t) is the output power of the electric refrigerator during period t, L C (t) is the cooling load of the airport integrated energy system architecture during period t;
[0040] The output power C of the electric refrigerator in the ice storage system during period t EC (t) and the output power C of the absorption refrigerator AC The expression of (t) is as follows:
[0041]
[0042] Among them, P EC (t) is the input power of the electric refrigerator during period t; P WHB (t) is the output power of the waste heat boiler in the combined cooling, heating and power unit during period t; COPEC and COP AC are the coefficient of performance of the electric refrigerator and the coefficient of performance of the absorption refrigerator respectively;
[0043] After considering the elasticity of cooling load, the power balance constraint of cooling system is transformed from equality constraint to interval constraint, and the expression is as follows:
[0044]
[0045] Among them, L C (t) min and L C (t) max are the lower and upper limits of the cooling load of the airport integrated energy system architecture under the premise of meeting the comfort level, k down and k up is the cooling load elasticity coefficient;
[0046] Cooling load elasticity coefficient k down and k up The expression is as follows:
[0047]
[0048] Where T is the standard cooling environment air temperature, which is 26℃; t amin and t amax They are t and t respectively calculated by analyzing the elastic characteristics of cooling load and combining the actual typical day environment in summer. a The minimum and maximum boundary values.
[0049] As a preferred embodiment, the parameters in the optimization objective of the day-ahead optimization scheduling model of the airport integrated energy system include the minimum operating cost and the minimum environmental cost. The expression of the minimum operating cost minf1(t) is as follows:
[0050]
[0051] Among them, C grid (t) is the purchase and sales cost of time period t, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle, C loss (t) is the penalty cost of abandoning light in period t, C m (t) is the operation and maintenance cost of period t, C sell (t) is the electricity sales revenue in period t, and its expressions are as follows:
[0052]
[0053] Among them, T is the total number of time periods in a scheduling cycle, C e and C gare electricity price and natural gas price respectively; P in (t) is the power input power of the airport integrated energy system architecture during period t; P ng (t) is the natural gas input power of the airport integrated energy system architecture during period t; r = 1, 2, ..., n, n is the total number of devices in the airport integrated energy system architecture; k r is the unit maintenance cost of the rth equipment; P r (t) is the output power of the rth device in time period t; P out (t) is the active power sold by the airport integrated energy system architecture to the main power grid during period t; g p (t) is the penalty coefficient for abandoned light segment; A PV (t) is the abandoned optical power of the airport integrated energy system architecture during period t; is the abandoned light rate of the airport integrated energy system architecture in period t;
[0054] The expression of the minimum environmental cost minf2(t) is as follows:
[0055]
[0056] Among them, μ e is the average carbon dioxide emission coefficient of each equipment unit, P grid (t) is the power of the interaction between the airport integrated energy system architecture and the main power grid during the period t;
[0057] The expression of the abandoned optical power constraint is as follows:
[0058]
[0059] Among them, P PV (t) is the output power of the photovoltaic cell during period t, is the minimum photovoltaic output power acceptable to the airport integrated energy system architecture during period t, is the maximum allowable abandoned light ratio;
[0060] The expressions of the ice storage system operation constraints are as follows:
[0061]
[0062] Among them, S ice (t) is the cold energy stored in the ice storage system during period t, S ice (t-1) is the cold energy stored in the ice storage system during the period t-1; γ Q is the self-loss coefficient, η ice,c and η ice,d are the ice storage efficiency coefficient and ice melting efficiency coefficient, Q ice,c (t) and Qice,d (t) are the capacity of the ice storage system to carry the cooling load in the ice storage charging mode and the capacity of the ice storage system to carry the cooling load in the ice melting discharging mode during period t;
[0063] The power balance constraint expression of the power supply system is as follows:
[0064] P in (t)+P e (t)+P PV (t)+DR(t)=L E (t)+P EC (t)+P Loss (t);
[0065] P grid (t)η t =P in (t);
[0066] Among them, P in (t) is the power input power of the airport integrated energy system architecture during period t, P e (t) is the power output of the combined cooling, heating and power unit in period t, P PV (t) is the output power of the photovoltaic panel in period t, DR(t) is the change in electric load after demand response, L E (t) is the electrical load of the airport integrated energy system architecture during period t, P EC (t) is the input power of the electric refrigerator during period t, P Loss (t) is the power loss of the airport integrated energy system architecture during period t, η t is the transformer efficiency, P grid (t) is the power of the interaction between the airport integrated energy system architecture and the main power grid during the period t;
[0067] The expression of the power balance constraint of the gas supply system is as follows:
[0068] P ng (t) = G GT (t)+G GB (t);
[0069] Among them, P ng (t) is the natural gas input power of the airport integrated energy system architecture at time t, G GT (t) and G GB (t) are the gas consumption of the gas turbine and the gas boiler in the combined cooling, heating and power unit in period t;
[0070] The expression of the power balance constraint of the heating system is as follows:
[0071] P h(t) = L H (t);
[0072] Among them, P h (t) is the thermal output power of the combined cooling, heating and power unit in period t, L H (t) is the heat load of the airport integrated energy system architecture during period t.
[0073] As a preferred method, the NSGA-Ⅱ algorithm is used to solve the day-ahead optimization scheduling model of the airport integrated energy system. During the genetic evolution process, the NSGA-Ⅱ algorithm takes the initial feasible solution of the population size as the starting point for solution. By drawing the Pareto front under operating cost and environmental cost, the congestion of the Pareto front is calculated. Based on the congestion of the Pareto front, when the weight of operating cost and environmental cost is 1:1, the compromise optimal solution is selected. The compromise optimal solution is the value of the optimization target corresponding to the output of each equipment in the airport integrated energy system architecture in the next scheduling cycle.
[0074] In a second aspect, the present invention provides a day-ahead optimization and scheduling device for an integrated energy system of an airport, comprising:
[0075] An architecture building module is configured to establish an airport integrated energy system architecture including an ice storage system, wherein the operation modes of the ice storage system include an ice storage charging mode and an ice melting discharging mode;
[0076] An analysis module is configured to analyze the cooling load at the load end of the airport integrated energy system architecture to obtain the cooling load elasticity characteristics;
[0077] A constraint conversion module is configured to convert a power balance constraint of a cooling system of an airport integrated energy system architecture from an equality constraint to an interval constraint according to the cooling load elasticity characteristic;
[0078] The solving module is configured to construct a day-ahead optimal scheduling model for the airport comprehensive energy system of the current scheduling period that takes into account the elastic characteristics of the cooling load and the coordination of the ice storage system, and solve the model with the lowest operating cost and the lowest environmental cost as the optimization goals under the constraints, and obtain the day-ahead optimal scheduling plan for the next scheduling period. The constraints include the abandoned light power constraint, the ice storage system operation constraint, the cooling system power balance constraint, the power supply system power balance constraint, the heating system power balance constraint and the gas supply system power balance constraint.
[0079] In a third aspect, the present invention provides an electronic device comprising one or more processors; a storage device for storing one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation manner in the first aspect.
[0080] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the method described in any implementation manner in the first aspect.
[0081] In a fifth aspect, the present invention provides a computer program product, comprising a computer program, which, when executed by a processor, implements the method described in any implementation manner in the first aspect.
[0082] Compared with the prior art, the present invention has the following beneficial effects:
[0083] (1) The method for optimizing the scheduling of the airport integrated energy system proposed in the present invention combines the energy consumption and geographical location characteristics of the airport, breaks through the single mode of using the ice storage system as a load-end device, and incorporates it into the airport integrated energy system architecture as a load-storage collaborative module. Combined with the rapid switching process of the ice storage system's working mode and the elastic characteristics of the cooling load, a comprehensive energy system architecture suitable for large international airports in the southern region is constructed.
[0084] (2) The proposed method for optimizing the day-ahead scheduling of the airport integrated energy system takes into account the high proportion and elasticity of the cooling load, introduces the PMV index to solve the limitation that the passenger comfort experience range is difficult to quantify, improves the flexibility of scheduling while meeting the reliability of the airport energy supply and the passenger comfort experience, and establishes an optimized scheduling model for the day-ahead scheduling of the airport integrated energy system. Compared with conventional scheduling, the proposed day-ahead scheduling model for the airport integrated energy system reduces the system operating cost and carbon dioxide emissions by 16.8% and 19.0%.
[0085] (3) The day-ahead optimization scheduling method for the airport integrated energy system proposed in this invention is faced with high proportion of renewable energy access and strict passenger comfort requirements. Through comparison and verification of different scenarios, the day-ahead optimization scheduling scheme considering the elastic characteristics of cooling load can basically achieve full photovoltaic absorption under the premise of meeting the system energy supply requirements, reasonably respond to cooling demand, and ensure that the indoor cooling temperature is in the passenger comfort temperature range. The results show that incorporating the ice storage system as a load-storage integrated module into the airport integrated energy system architecture is an effective way to smooth the impact of renewable energy on the airport integrated energy system and ensure passenger experience. BRIEF DESCRIPTION OF THE DRAWINGS
[0086] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0087] Figure 1 A flow chart of a method for optimizing the scheduling of an airport integrated energy system according to an embodiment of the present application;
[0088] Figure 2 A schematic diagram of an airport integrated energy system architecture of an airport integrated energy system day-ahead optimization scheduling method according to an embodiment of the present application;
[0089] Figure 3 The heat load prediction curve, the electricity load prediction curve, the cooling load prediction curve and the outdoor temperature change curve on a typical day in summer in the airport integrated energy system of the airport integrated energy system day-ahead optimization scheduling method of the embodiment of the present application;
[0090] Figure 4 The photovoltaic power generation output prediction curve and real-time electricity price change trend in the airport integrated energy system of the airport integrated energy system of the present application embodiment of the day-ahead optimization scheduling method;
[0091] Figure 5 The result of limiting the PMV value by time after considering the elasticity characteristics of the cooling load in the day-ahead optimization scheduling method of the airport integrated energy system of the embodiment of the present application;
[0092] Figure 6 The Pareto frontier curve obtained by the day-ahead optimization scheduling method for the airport integrated energy system according to the embodiment of the present application;
[0093] Figure 7 The cooling load balancing result of the day-ahead optimization scheduling method for the airport integrated energy system of the embodiment of the present application;
[0094] Figure 8 The photovoltaic power output grid-connected power change curve in scenarios 1, 2 and 3 of this application;
[0095] Fig. 9 The working mode and output power change curve of the ice storage system in scenarios 1, 2 and 3 of this application;
[0096] Fig.10 The indoor cooling temperature change curves in scenarios 1, 4 and 5 of this application;
[0097] Fig.11 The PMV value and indoor cooling temperature change curve in scenario 1 of this application;
[0098] Fig.12 The initial cooling load curve in scenario 1 of the present application and the cooling load curve after considering the cooling load elasticity characteristics;
[0099] Fig.13 A schematic diagram of a day-ahead optimization and scheduling device for an airport integrated energy system according to an embodiment of the present application;
[0100] Fig.14 A schematic diagram of the hardware structure of an electronic device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0101] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0102] Figure 1 The embodiment of the present application provides a method for optimizing the scheduling of the airport integrated energy system, including the following steps:
[0103] S1. Establish an integrated energy system architecture for the airport including an ice storage system. The operation modes of the ice storage system include an ice storage charging mode and an ice melting energy release mode.
[0104] In a specific embodiment, the airport integrated energy system architecture includes a photovoltaic output model, a demand response model on the electrical load side, a combined cooling, heating and power unit output model, and a mathematical model of the ice storage system in two operating modes;
[0105] The expression of the photovoltaic output model is as follows:
[0106] P PV (t) = S (t) A η;
[0107]
[0108] Where f(S) is the probability density function of the Beta distribution, Γ(·) is the gamma function used to calculate the standardized coefficients of the Beta distribution, S and S max is the actual irradiation intensity and the maximum irradiation intensity, S(t) is the actual irradiation intensity in period t, α and β are the shape parameters of Beta distribution, μ and σ are the expectation and variance of Beta distribution, P PV (t) is the output power of the photovoltaic cell in time period t, A is the photovoltaic array area, η is the photoelectric conversion efficiency, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle;
[0109] The demand response model on the electric load side is described by the price elasticity matrix. The expression of the element in the i-th row and j-th column in the price elasticity matrix W(i,j) is as follows:
[0110]
[0111] Among them, e i,j It represents the elasticity coefficient of the load in period i to the electricity price in period j, i = 0, 1, 2, ..., T, j = 0, 1, 2, ..., T, ΔL E (i) is the change in electric load after demand response, L E (i=0) and Pr(j=0) are the initial electric load and initial electricity price, respectively, and ΔPr(j) is the change in electricity price after demand response;
[0112] The actual electric load after demand response L E The expression of (t) is as follows:
[0113]
[0114] The expression of the combined cooling, heating and power unit output model is as follows:
[0115]
[0116] Among them, P c (t), P e (t) and P h (t) are the cooling output power, electric output power and thermal output power of the combined cooling, heating and power unit in period t, respectively, P ng (t) is the natural gas input power during period t, η c , η e and η h They are the cooling efficiency, electrical efficiency and thermal efficiency of the combined cooling, heating and power unit respectively;
[0117] The mathematical model of the ice storage system in two operating modes is shown as follows:
[0118]
[0119] in, The energy stored in the ice storage system before switching between the ice storage charging mode and the ice melting energy release mode. represents the energy stored in the ice storage system during the period t = 0, represents the energy stored in the ice storage system during the period t = T, is the energy stored in the ice storage system after the conversion between ice storage charging mode and ice melting energy release mode, δ ice is the loss limit of the ice storage system, and are charging power and discharging power respectively, η ice,c and η ice,d are the ice storage efficiency coefficient and ice melting efficiency coefficient, P ice,c (t) and P ice,d(t) are the ice storage charging power and ice melting discharging power of the ice storage system in period t, u ice To limit the variables that the ice storage charging mode and ice melting energy release mode cannot occur at the same time, u ice The value can only be 0 or 1. and are the upper limit of charging power and the upper limit of discharging power of the ice storage system, and are the lower and upper limits of the energy stored in the ice storage system, respectively. c 、b c 、e c 、f c 、a d 、b d 、e d and f d is the regression coefficient, Q ice,c (t) and Q ice,d (t) are the capacity of the ice storage system to carry the cooling load in the ice storage charging mode and the capacity of the ice storage system to carry the cooling load in the ice melting energy release mode during the period t, and the expression is as follows:
[0120] Q ice,c =LPM·ΔT isw,c ·c pw 60 minutes;
[0121] Q ice,d =LPM·ΔT isw,d ·c pw 60 minutes;
[0122] Among them, c pw is the specific heat of chilled water, LPM is the ice storage water flow rate, and the temperature change of ice storage water during ice storage is ΔT isw,c The change of ice storage water temperature ΔT during ice melting isw,d The expression is as follows:
[0123] ΔT isw,c =T iswr,c -T isws,c ;
[0124] ΔT isw,d =T iswr,d -T isws,d ;
[0125] Among them, T iswr,c and T isws,c are the return water temperature and supply water temperature of ice storage water in ice storage charging mode respectively; T iswr,d and T isws,d They are the return water temperature and supply water temperature of ice storage water in ice melting and energy release mode respectively.
[0126] Specifically, the working characteristics of the ice storage system are first analyzed. According to the working characteristics of the ice storage system (ISS), which can quickly switch between two working modes, namely, ice storage and energy storage during the low electricity price and load period and ice melting and energy release during the peak electricity price and load period, the system is incorporated into the airport comprehensive energy system architecture. In the airport comprehensive energy system architecture, the source end includes the main power grid, the main gas grid, photovoltaic, and the combined heat and power generation units, the storage end includes the ice storage system, and the load end includes the airport power load, heat load, and cold load. The power load side includes demand response, and the cold load end is divided into rigid cold load and elastic cold load. Subsequently, the elasticity and proportion characteristics of the cooling load in the airport comprehensive energy system architecture are analyzed, and the power balance constraint of the cooling system in the airport comprehensive energy system architecture is converted from an equality constraint to an interval constraint. Finally, taking the operating cost and environmental cost of the airport comprehensive energy system architecture as the optimization target, combined with the inequality constraint of the cooling system, the airport comprehensive energy system is optimized for the day-ahead scheduling, and the output of each device in the airport comprehensive energy system architecture in the future scheduling cycle is determined.
[0127] The airport integrated energy system architecture includes the interconnection, conversion, storage, and allocation of energy, interacts with the main power grid at a certain price, and meets the load demand of the airport. Therefore, the airport integrated energy system architecture includes photovoltaic output model, demand response model, combined heat and power unit output model, and ice storage system model. The operation mode of the ice storage system is divided into ice storage charging mode and ice melting release mode, so the ice storage system model is a mathematical model of the ice storage system in two operation modes.
[0128] S2, analyze the cooling load at the load end of the airport integrated energy system architecture and obtain the cooling load elasticity characteristics.
[0129] In a specific embodiment, the cooling load elasticity characteristic is expressed as the relationship between the average prediction index of indoor temperature comfort and the air temperature around the human body, which is expressed by the following formula:
[0130]
[0131] Among them, PMV is the average prediction index of indoor temperature comfort, MR is the human metabolic rate, which is set at 80W / m 2 ;I cl is the thermal resistance of clothing, take 0.078(m 2 .℃) / W;t s The average temperature of human skin in a comfortable state is approximately 33.5℃; t a is the temperature of the air surrounding the human body.
[0132] Specifically, a detailed analysis is conducted on the cooling load at the load end of the airport comprehensive energy system architecture. The cooling load at the load end of the airport comprehensive energy system architecture includes rigid cooling load and elastic cooling load. Rigid cooling load is mostly the cooling energy required by key equipment such as the airport navigation system; elastic cooling load is mostly cooling load with a large inertia constant coefficient. Since the cooling load accounts for a high proportion of the overall cooling load, the cooling load is mainly considered in the analysis.
[0133] The cooling system adjusts the dynamic balance of energy storage and release by controlling the mass flow of the medium. During the cooling process, the temperature change of the cooling medium usually lags behind that of the cooling medium, so that the indoor temperature can still be maintained at a comfortable level for a period of time when the cooling is stopped.
[0134] Passengers' perception of temperature is also flexible, and the cooling temperature will not affect passengers' cooling experience when it changes within a certain range. Therefore, the cooling system composed of ice storage devices and airport cooling buildings has a certain energy storage capacity, so that the airport integrated energy system architecture that incorporates the ice storage system can achieve load-storage coordinated scheduling, and improve the operating economy of the entire airport integrated energy system architecture by utilizing the cooling load elasticity (CSLE) characteristics.
[0135] The Predicted Mean Vote (PMV) indicator for evaluating indoor temperature comfort is introduced to quantify the comfort of passengers in the airport integrated energy system architecture. PMV is proposed based on the ASHRAE thermal perception scale to predict the average response of a large number of people. Since this indicator is affected by many factors, the effects of air velocity and humidity are often ignored in engineering. Passengers are active during the day and have relatively high requirements for comfort, while their activity frequency is reduced at night, and the comfort requirements can be appropriately relaxed. Based on this, the limit value of PMV is limited by time, such as Figure 5 shown.
[0136] S3, according to the elasticity characteristics of cooling load, the power balance constraint of the cooling system of the airport integrated energy system architecture is converted from an equality constraint to an interval constraint.
[0137] In a specific embodiment, according to the cooling load elasticity characteristics, the cooling system power balance constraint of the airport integrated energy system architecture is converted from an equality constraint to an interval constraint, specifically including:
[0138] The equality constraint of the cooling system power balance constraint is expressed as:
[0139] P c (t)+C EC (t)+P ice,d (t)-P ice,c (t) = L C (t);
[0140] Among them, P c (t) is the cooling output power of the combined cooling, heating and power unit in period t, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle, P ice,c (t) and P ice,d (t) is the ice storage charging power and ice melting discharging power of the ice storage system in period t, C EC (t) is the output power of the electric refrigerator during period t, L C (t) is the cooling load of the airport integrated energy system architecture during period t;
[0141] The output power C of the electric refrigerator in the ice storage system during period t EC (t) and the output power C of the absorption refrigerator AC The expression of (t) is as follows:
[0142]
[0143] Among them, P EC (t) is the input power of the electric refrigerator during period t; P WHB (t) is the output power of the waste heat boiler in the combined cooling, heating and power unit during period t; COP EC and COP AC are the coefficient of performance of the electric refrigerator and the coefficient of performance of the absorption refrigerator respectively;
[0144] After considering the elasticity of cooling load, the power balance constraint of cooling system is transformed from equality constraint to interval constraint, and the expression is as follows:
[0145]
[0146] Among them, L C (t) min and L C (t) max are the lower and upper limits of the cooling load of the airport integrated energy system architecture under the premise of meeting the comfort level, k down and k up is the cooling load elasticity coefficient;
[0147] Cooling load elasticity coefficient k down and k up The expression is as follows:
[0148]
[0149] Where T is the standard cooling environment air temperature, which is 26℃; t amin and t amax They are t and t respectively calculated by analyzing the elastic characteristics of cooling load and combining the actual typical day environment in summer. aThe minimum and maximum boundary values.
[0150] Specifically, after considering the elasticity of cooling load, the cooling demand of the airport integrated energy system architecture can be met if the cooling capacity is kept within a certain range. The cooling capacity of the airport integrated energy system architecture is changed from a fixed value to an interval value. Therefore, the power balance constraint of the cooling system is converted based on the elasticity of cooling load. Figure 5 The average predictor of indoor temperature comfort, PMV, and t a The relationship is combined with the actual typical summer day ambient temperature to calculate t a The minimum and maximum boundary values of k down and k up , further determine the lower limit of the cooling load L of the airport integrated energy system architecture under the premise of meeting the comfort level C (t) min and upper limit L C (t) max .
[0151] S4, construct a day-ahead optimal scheduling model for the airport comprehensive energy system of the current scheduling period that considers the elastic characteristics of the cooling load and the coordination of the ice storage system, and solve it under the constraints with the lowest operating cost and the lowest environmental cost as the optimization goals to obtain the day-ahead optimal scheduling plan for the next scheduling period. The constraints include the abandoned light power constraint, the ice storage system operation constraint, the cooling system power balance constraint, the power supply system power balance constraint, the heating system power balance constraint and the gas supply system power balance constraint.
[0152] In a specific embodiment, the parameters in the optimization objective of the day-ahead optimization scheduling model of the airport integrated energy system include the minimum operating cost and the minimum environmental cost. The expression of the minimum operating cost minf1(t) is as follows:
[0153]
[0154] Among them, C grid (t) is the purchase and sales cost of time period t, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle, C loss (t) is the penalty cost of abandoning light in period t, C m (t) is the operation and maintenance cost of period t, C sell (t) is the electricity sales revenue in period t, and its expressions are as follows:
[0155]
[0156] Among them, T is the total number of time periods in a scheduling cycle, C e and C gare electricity price and natural gas price respectively; P in (t) is the power input power of the airport integrated energy system architecture during period t; P ng (t) is the natural gas input power of the airport integrated energy system architecture during period t; r = 1, 2, ..., n, n is the total number of devices in the airport integrated energy system architecture; k r is the unit maintenance cost of the rth equipment; P r (t) is the output power of the rth device in time period t; P out (t) is the active power sold by the airport integrated energy system architecture to the main power grid during period t; g p (t) is the penalty coefficient for abandoned light segment; A PV (t) is the abandoned optical power of the airport integrated energy system architecture during period t; is the abandoned light rate of the airport integrated energy system architecture in period t;
[0157] The expression of the minimum environmental cost minf2(t) is as follows:
[0158]
[0159] Among them, μ e is the average carbon dioxide emission coefficient of each equipment unit, P grid (t) is the power of the interaction between the airport integrated energy system architecture and the main power grid during the period t;
[0160] The expression of the abandoned optical power constraint is as follows:
[0161]
[0162] Among them, P PV (t) is the output power of the photovoltaic cell during period t, is the minimum photovoltaic output power acceptable to the airport integrated energy system architecture during period t, is the maximum allowable abandoned light ratio;
[0163] The expressions of the ice storage system operation constraints are as follows:
[0164]
[0165] Among them, S ice (t) is the cold energy stored in the ice storage system during period t, S ice (t-1) is the cold energy stored in the ice storage system during the period t-1; γ Q is the self-loss coefficient, η ice,c and η ice,d are the ice storage efficiency coefficient and ice melting efficiency coefficient, Q ice,c (t) and Qice,d (t) are the capacity of the ice storage system to carry the cooling load in the ice storage charging mode and the capacity of the ice storage system to carry the cooling load in the ice melting discharging mode during period t;
[0166] The power balance constraint expression of the power supply system is as follows:
[0167] P in (t)+P e (t)+P PV (t)+DR(t)=L E (t)+P EC (t)+P Loss (t);
[0168] P grid (t)η t =P in (t);
[0169] Among them, P in (t) is the power input power of the airport integrated energy system architecture during period t, P e (t) is the power output of the combined cooling, heating and power unit in period t, P PV (t) is the output power of the photovoltaic panel in period t, DR(t) is the change in electric load after demand response, L E (t) is the electrical load of the airport integrated energy system architecture during period t, P EC (t) is the input power of the electric refrigerator during period t, P Loss (t) is the power loss of the airport integrated energy system architecture during period t, η t is the transformer efficiency, P grid (t) is the power of the interaction between the airport integrated energy system architecture and the main power grid during the period t;
[0170] The expression of the power balance constraint of the gas supply system is as follows:
[0171] P ng (t) = G GT (t)+G GB (t);
[0172] Among them, P ng (t) is the natural gas input power of the airport integrated energy system architecture at time t, G GT (t) and G GB (t) are the gas consumption of the gas turbine and the gas boiler in the combined cooling, heating and power unit in period t;
[0173] The expression of the power balance constraint of the heating system is as follows:
[0174] P h(t) = L H (t);
[0175] Among them, P h (t) is the thermal output power of the combined cooling, heating and power unit in period t, L H (t) is the heat load of the airport integrated energy system architecture during period t.
[0176] In a specific embodiment, the NSGA-Ⅱ algorithm is used to solve the day-ahead optimization scheduling model of the airport integrated energy system. During the genetic evolution process, the NSGA-Ⅱ algorithm takes the initial feasible solution of the population size as the starting point for solving, and calculates the congestion of the Pareto frontier by drawing the Pareto frontier under the operating cost and environmental cost. Based on the congestion of the Pareto frontier, when the weights of the operating cost and the environmental cost are 1:1, a compromise optimal solution is selected. The compromise optimal solution is the value of the optimization target corresponding to the output of each device in the airport integrated energy system architecture in the next scheduling cycle.
[0177] Specifically, a day-ahead optimization scheduling model for the integrated energy system of the airport based on load-storage synergy is constructed. The model aims to minimize the operating cost and environmental cost while meeting the system operation constraints. The operating cost takes into account the purchase and sales cost, the penalty cost of abandoned solar power, the operation and maintenance cost, and the income from electricity sales. The environmental cost is measured by carbon dioxide emissions. The constraints include the abandoned solar power constraint, the ice storage system operation constraint, the cooling system power balance constraint, the power supply system power balance constraint, the heating system power balance constraint, and the gas supply system power balance constraint.
[0178] The present invention is described below by means of specific embodiments:
[0179] like Figure 2 The structure diagram of the airport integrated energy system architecture is shown in Table 1. The system load forecast curve and ambient temperature curve for a typical day in summer are shown in Table 2. Figure 3 As shown in Figure 2, cooling load accounts for 45.88% of the total energy demand. The real-time electricity price trend and typical daily photovoltaic output forecast curve are shown in Figure 2. Figure 4 The electricity sold to the main grid is at a constant price of 0.39CNY / kWh.
[0180] Table 1 System cost parameters:
[0181]
[0182] Table 2 Parameters of ice storage system:
[0183]
[0184] The NSGA-Ⅱ algorithm is used to solve the day-ahead optimization scheduling model of the Airport Integrated Energy System (AIES) proposed in the embodiment of this application. In the genetic evolution process, the NSGA-Ⅱ algorithm uses the initial feasible solution of the population size as the starting point for solving, and selects the optimal compromise solution by drawing the Pareto front. After iterative calculation, the Pareto solution set and the optimal compromise solution of the operating cost and environmental cost of the Airport Integrated Energy System are as follows: Figure 6 As shown. It can be seen that the two optimization objectives are contradictory. The reduction of carbon emissions will lead to a significant increase in operating costs. When carbon emissions are lower than 15700kg, the operating cost increases more for the same carbon emission reduction. Usually, the sparsity of solutions is measured by calculating the distance between the solution and the adjacent solution in the target space, that is, the congestion of the Pareto frontier. The larger the distance, the higher the congestion, indicating that the solution is sparser. Such solutions are preferred when selecting to maintain the diversity of the final solution. Therefore, based on the obtained Pareto frontier congestion, when the weight of operating cost and environmental cost is 1:1, the optimal compromise solution is selected to avoid serious deterioration of a single indicator. The Pareto solution set is the solution set in the decision variable space, that is, the set of all solutions; the Pareto frontier is the mapping of these solutions in the optimization target space, that is, the curve formed by the numerical value of the optimization target. The congestion of the Pareto front reflects the distribution density of solutions on the Pareto frontier. The weight between operating cost and environmental cost directly affects the distribution of the obtained solutions on the Pareto frontier. When the weight between operating costs and environmental costs changes, the shape of the Pareto front and the concentrated area of solutions will adjust accordingly. For example, if the operating cost has a larger weight, the solution obtained by NSGA-Ⅱ tends to concentrate the solution in the superior area of operating costs (i.e., the area with lower operating costs), resulting in increased congestion in the area, which in turn affects the diversity and balance of the Pareto front. According to the set optimization objectives and constraints, the optimal solution for the output of all equipment in the system during the entire scheduling cycle (i.e., 24 hours) is obtained. Under the output scenario, the corresponding value of the optimization target is the optimal compromise solution. The compromise optimal solution in this embodiment is: the operating cost is 198730.4762CNY, and the carbon dioxide emissions are 196875.6463kg.
[0185] Under the day-ahead scheduling optimization scheme of the airport integrated energy system considering the cooling load elasticity (CSLE) characteristics, the total cost comparison of the system is shown in Table 3, and the system cooling network scheduling balance results are shown in Figure 7 As shown. Figure 7It can be seen that during the period of 3:00-5:00 when the system cooling load and electricity price are both at the low point, the ice storage system participates in the storage of cold energy with the maximum ice storage charging power; during the period of 11:00-13:00 when the system cooling load and electricity price are both at the peak point, the ice melting energy release power of the ice storage system is the largest to meet the cold energy demand of the load end. In summary, the day-ahead optimal scheduling considering the elastic characteristics of the cooling load can achieve a better power balance result.
[0186] Table 3 considers the optimization scheduling results of CSLE:
[0187]
[0188] In order to further analyze the effectiveness of the day-ahead optimization scheduling method for the airport integrated energy system proposed in the embodiment of the present application in smoothing the fluctuation of photovoltaic output, the photovoltaic output model proposed in the embodiment of the present application is used, and the predicted photovoltaic output of a typical day in summer is used as a benchmark. The photovoltaic output prediction values of different fluctuation degrees are obtained by selecting the standard deviation. The design embodiment is as follows:
[0189] Scenario 1: Basic scenario. Using typical summer day outdoor temperature data and PV output forecast data.
[0190] Scenario 2: Large fluctuation scenario. By enlarging the standard deviation to 2σ, significant fluctuations in photovoltaic power generation under rapidly changing weather conditions are simulated.
[0191] Scenario 3: Small fluctuation scenario. By reducing the standard deviation to 0.5σ, smaller fluctuations in PV power generation under stable weather conditions are simulated.
[0192] The total photovoltaic output, photovoltaic grid-connected power in each scenario, and the working mode and output of the ice storage system are as follows: Figure 8 and Fig. 9 As shown. Combined Figure 2 It can be seen that during the peak period of cooling load from 10:00 to 13:00 in the integrated energy system architecture of the airport, the ice storage system (ISS) is in the ice melting and energy release working mode to respond to the cooling load at the load end; during the cooling load trough periods from 3:00 to 8:00 and 17:00 to 18:00, the ice storage system is in the ice storage and energy charging working mode to reduce system costs, realize the regulation function of the load-storage integrated module, and effectively alleviate the operating pressure caused by the high cooling load.
[0193] After incorporating the ice storage system for coordination and scheduling, the daily photovoltaic absorption ratios of Example 1, Example 2, and Example 3 were 99.87%, 99.59%, and 99.73%, respectively, basically achieving full absorption of photovoltaic output. The above results show that due to the incorporation of the ice storage system, the airport integrated energy system architecture proposed in the embodiments of this application and the load-storage coordinated airport integrated energy system day-ahead optimization scheduling model considering the cooling load elasticity (CSLE) characteristics can effectively alleviate the impact of renewable energy output fluctuations on the system. When faced with new energy outputs with different degrees of fluctuation caused by uncontrollable factors such as external weather, the system can achieve maximum absorption.
[0194] In order to further verify the universality of the day-ahead optimization scheduling method for the airport integrated energy system proposed in the embodiment of the present application in the face of different environmental conditions, the typical outdoor temperature in summer in Example 1 is used as a benchmark, the temperature at 14:00 is selected as the highest temperature in 24 hours to represent the daily ambient temperature, and the design embodiment is as follows:
[0195] Scenario 4: High temperature scenario. The maximum daily temperature is selected as 37°C to simulate hot weather conditions.
[0196] Scenario 5: Low temperature scenario. The maximum daily temperature is selected as 27°C to simulate relatively cool weather conditions.
[0197] Indoor cooling temperature under each embodiment is as follows Fig.10 As shown, the indoor temperature comfort range is marked with orange dotted lines. In summer, the indoor temperature comfort range of the airport is 23.9-27.3°C. It can be seen that the indoor cooling temperature of the three embodiments under the corresponding environmental conditions is within the comfort range. Take embodiment 1 as an example for specific analysis.
[0198] The corresponding indoor temperature and PMV value change curves are as follows: Fig.11 and 12 As shown. It can be seen that the indoor temperature of the airport during the day is between 24.1℃ and 27.2℃, and the corresponding PMV value ranges from -0.11 to 0.92; after the 21st hour, the PMV value shows a fluctuation trend of first decreasing, then increasing, and then decreasing, with a range of -0.11 to -0.84, and the corresponding indoor temperature range is 24.1℃ to 25.8℃. The above results show that after considering the cooling load elasticity (CSLE) characteristics, a larger PMV value is selected to ensure a higher comfort level during the day when passengers are active; at night, although the indoor temperature has not changed significantly compared with the daytime, passengers are not sensitive to temperature at this time, so the PMV value is mostly negative. By adjusting the PMV value to moderately fluctuate under the premise of meeting the indoor cooling comfort, the cooling load curve can be reasonably optimized to improve the economic benefits of the airport energy system.
[0199] It can be seen that the day-ahead optimization scheduling method for the airport integrated energy system proposed in the present invention is feasible and effective. Through load-storage coordinated scheduling, the comfort experience of passengers can be guaranteed under the premise of ensuring the safe and stable energy supply of the airport integrated energy system. On the one hand, it can alleviate the high energy consumption pressure caused by the huge cooling load of large international airports in the southern region, and on the other hand, it can provide online space for photovoltaic output, which can basically realize the full consumption of photovoltaic power in the airport system.
[0200] Further references Fig.13 As an implementation of the methods shown in the above figures, the present application provides an embodiment of a day-ahead optimization scheduling device for an airport integrated energy system. Figure 1 Corresponding to the method embodiment shown, the device can be specifically applied to various electronic devices.
[0201] The embodiment of the present application provides a day-ahead optimization and scheduling device for an integrated energy system of an airport, comprising:
[0202] The architecture building module 1 is configured to establish an airport integrated energy system architecture including an ice storage system, wherein the operation modes of the ice storage system include an ice storage charging mode and an ice melting energy releasing mode;
[0203] The analysis module 2 is configured to analyze the cooling load at the load end of the airport integrated energy system architecture to obtain the cooling load elasticity characteristics;
[0204] The constraint conversion module 3 is configured to convert the power balance constraint of the cooling system of the airport integrated energy system architecture from an equality constraint to an interval constraint according to the cooling load elasticity characteristic;
[0205] Solving module 4 is configured to construct a day-ahead optimal scheduling model for the airport comprehensive energy system of the current scheduling period that takes into account the elastic characteristics of the cooling load and the coordination of the ice storage system, and solve the model with the lowest operating cost and the lowest environmental cost as the optimization goals under the constraints, and obtain the day-ahead optimal scheduling plan for the next scheduling period. The constraints include the constraints on the abandoned light power, the operation constraints of the ice storage system, the power balance constraints of the cooling system, the power balance constraints of the power supply system, the power balance constraints of the heating system, and the power balance constraints of the gas supply system.
[0206] Fig.14 Schematic diagram of the hardware structure of the electronic device provided by the embodiment of the present invention. Fig.14 As shown, the electronic device of this embodiment includes: a processor 1401 and a memory 1402; wherein the memory 1402 is used to store computer-executable instructions; the processor 1401 is used to execute the computer-executable instructions stored in the memory to implement the various steps performed by the electronic device in the above embodiment. For details, please refer to the relevant description in the above method embodiment.
[0207] Optionally, the memory 1402 may be independent or integrated with the processor 1401 .
[0208] When the memory 1402 is independently provided, the electronic device further includes a bus 1403 for connecting the memory 1402 and the processor 1401 .
[0209] The embodiment of the present invention further provides a computer storage medium, in which computer execution instructions are stored. When the processor 1401 executes the computer execution instructions, the above method is implemented.
[0210] The embodiment of the present invention further provides a computer program product, including a computer program. When the computer program is executed by the processor 1401, the above method is implemented.
[0211] In the embodiments provided by the present invention, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic, for example, the division of modules is only a logical function division, and there may be other division methods in actual implementation, such as multiple modules can be combined or integrated into another system, or some features can be ignored or not executed. Another point, the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or modules, which can be electrical, mechanical or other forms.
[0212] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to implement the solution of this embodiment.
[0213] In addition, each functional module in each embodiment of the present invention may be integrated into one processing unit, each module may exist physically separately, or two or more modules may be integrated into one unit. The unit formed by the above modules may be implemented in the form of hardware or in the form of hardware plus software functional units.
[0214] The above-mentioned integrated module implemented in the form of a software function module can be stored in a computer-readable storage medium. The above-mentioned software function module is stored in a storage medium, including a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) or a processor 1401 to perform some steps of the methods of various embodiments of the present application.
[0215] It should be understood that the processor 1401 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), etc. A general-purpose processor may be a microprocessor or the processor 1401 may be any conventional processor 1401, etc. The steps of the method disclosed in the invention may be directly embodied in the hardware processor 1401 for execution, or may be executed by a combination of hardware and software modules in the processor 1401.
[0216] The memory 1402 may include a high-speed RAM memory, and may also include a non-volatile storage NVM, such as at least one disk memory, and may also be a USB flash drive, a mobile hard disk, a read-only memory, a magnetic disk or an optical disk, etc.
[0217] The bus 1403 may be an Industry Standard Architecture (ISA), a Peripheral Component Interconnect (PCI) bus, or an Extended Industry Standard Architecture (EISA) bus, etc. The bus 1403 may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, the bus 1403 in the drawings of the present application is not limited to only one bus 1403 or one type of bus 1403.
[0218] The above storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk. The storage medium can be any available medium that can be accessed by a general or special purpose computer.
[0219] An exemplary storage medium is coupled to the processor 1401, so that the processor 1401 can read information from the storage medium and write information to the storage medium. Of course, the storage medium can also be a component of the processor 1401. The processor 1401 and the storage medium can be located in an application specific integrated circuit (Application Specific Integrated Circuits, referred to as ASIC). Of course, the processor 1401 and the storage medium can also exist as discrete components in an electronic device or a main control device.
[0220] Those skilled in the art can understand that all or part of the steps of implementing the above-mentioned method embodiments can be completed by hardware related to program instructions. The aforementioned program can be stored in a computer-readable storage medium. When the program is executed, the steps of the above-mentioned method embodiments are executed; and the aforementioned storage medium includes: ROM, RAM, disk or optical disk and other media that can store program codes.
[0221] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for optimizing the day-ahead scheduling of an integrated energy system of an airport, characterized in that: The following steps are involved: Establishing an integrated energy system architecture for an airport including an ice storage system, wherein the operation modes of the ice storage system include an ice storage charging mode and an ice melting energy release mode; Analyze the cooling load at the load end of the airport integrated energy system architecture to obtain the cooling load elasticity characteristics; According to the cooling load elasticity characteristics, the cooling system power balance constraint of the airport integrated energy system architecture is converted from an equality constraint to an interval constraint, and the airport integrated energy system architecture includes a photovoltaic output model, a demand response model on the electric load side, a combined cooling, heating and power unit output model, and a mathematical model of the ice storage system in two operating modes; The expression of the photovoltaic output model is as follows: P PV (t)=S(t)Aη; Where f(S) is the probability density function of the Beta distribution, Γ(·) is the gamma function used to calculate the standardized coefficients of the Beta distribution, S and S max is the actual irradiation intensity and the maximum irradiation intensity, S(t) is the actual irradiation intensity in period t, α and β are the shape parameters of Beta distribution, μ and σ are the expectation and variance of Beta distribution, P PV (t) is the output power of the photovoltaic cell in time period t, A is the photovoltaic array area, η is the photoelectric conversion efficiency, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle; The demand response model on the electric load side is described by the price elasticity matrix. The expression of the element in the i-th row and j-th column in the price elasticity matrix W(i,j) is as follows: Among them, e i,j It represents the elasticity coefficient of the load in period i to the electricity price in period j, i = 0, 1, 2, ..., T, j = 0, 1, 2, ..., T, ΔL E (i) is the change in electric load after demand response, L E (i=0) and Pr(j=0) are the initial electric load and initial electricity price, respectively, and ΔPr(j) is the change in electricity price after demand response; The actual electric load L after demand response in period t E The expression of (t) is as follows: The expression of the output model of the combined cooling, heating and power unit is as follows: Among them, P c (t), P e (t) and P h (t) are the cooling output power, electric output power and thermal output power of the combined cooling, heating and power unit in period t, respectively, P ng (t) is the natural gas input power during period t, η c , η e and η h They are the cooling efficiency, electrical efficiency and thermal efficiency of the combined cooling, heating and power unit respectively; The mathematical model of the ice storage system in two operating modes is shown as follows: in, The energy stored in the ice storage system before the conversion between the ice storage charging mode and the ice melting energy release mode. represents the energy stored in the ice storage system during the period t = 0, represents the energy stored in the ice storage system during the period t = T, is the energy stored in the ice storage system after the conversion between the ice storage charging mode and the ice melting energy release mode, δ ice is the loss limit of the ice storage system, and are charging power and discharging power respectively, η ice,c and η ice,d are the ice storage efficiency coefficient and ice melting efficiency coefficient, P ice,c (t) and P ice,d (t) are the ice storage charging power and ice melting discharging power of the ice storage system in period t, u ice To limit the variables that the ice storage charging mode and ice melting energy release mode cannot occur at the same time, u ice The value can only be 0 or 1. and are the upper limit of charging power and the upper limit of discharging power of the ice storage system, and are the lower and upper limits of the energy stored in the ice storage system, respectively. c 、b c 、e c 、f c 、a d 、b d 、e d and f d is the regression coefficient, Q ice,c (t) and Q ice,d (t) are the capacity of the ice storage system to carry the cooling load in the ice storage charging mode and the capacity of the ice storage system to carry the cooling load in the ice melting energy release mode during the period t, and the expression is as follows: Q ice,c (t)=LPM·ΔT isw,c ·c pw ·60; Q ice,d (t)=LPM·ΔT isw,d ·c pw ·60; Among them, c pw is the specific heat of chilled water, LPM is the ice storage water flow rate, and the temperature change of ice storage water during ice storage is ΔT isw,c The change of ice storage water temperature ΔT during ice melting isw,d The expression is as follows: ΔT isw,c =T iswr,c -T isws,c ; ΔT isw,d =T iswr,d -T isws,d ; Among them, T iswr,c and T isws,c are the return water temperature and supply water temperature of ice storage water in ice storage charging mode respectively; T iswr,d and T isws,d They are the return water temperature and supply water temperature of ice storage water in the ice melting energy release mode respectively; A day-ahead optimal scheduling model for the airport integrated energy system of the current scheduling period is constructed considering the elastic characteristics of the cooling load and the coordination of the ice storage system. Under the constraints, the model is solved with the lowest operating cost and the lowest environmental cost as the optimization objectives to obtain the day-ahead optimal scheduling plan for the next scheduling period. The constraints include the abandoned light power constraint, the ice storage system operation constraint, the cooling system power balance constraint, the power supply system power balance constraint, the heating system power balance constraint and the gas supply system power balance constraint.
2. The day-ahead optimization scheduling method for the airport integrated energy system according to claim 1 is characterized in that: The cooling load elasticity characteristic is expressed as the relationship between the average prediction index of indoor temperature comfort and the air temperature around the human body, which is expressed by the following formula: Among them, PMV is the average prediction index of indoor temperature comfort, MR is the human metabolic rate, which is set at 80W / m 2 ;I cl is the thermal resistance of clothing, take 0.078(m 2 .℃) / W;t s The average temperature of human skin in a comfortable state is approximately 33.5℃; t a is the temperature of the air surrounding the human body.
3. The day-ahead optimization scheduling method for the airport integrated energy system according to claim 2 is characterized in that: According to the cooling load elasticity characteristics, the cooling system power balance constraint of the airport integrated energy system architecture is converted from an equality constraint to an interval constraint, specifically including: The equality constraint of the cooling system power balance constraint is expressed as: P c (t)+C EC (t)+P ice,d (t)-P ice,c (t)=L C (t); Among them, P c (t) is the cooling output power of the combined cooling, heating and power unit in period t, t=0,1,2,…,T,P ice,c (t) and P ice,d (t) is the ice storage charging power and ice melting discharging power of the ice storage system in period t, C EC (t) is the output power of the electric refrigerator during period t, L C (t) is the cooling load of the airport integrated energy system architecture during period t; The output power C of the electric refrigerator in the ice storage system during period t EC (t) and the output power C of the absorption refrigerator AC The expression of (t) is as follows: Among them, P EC (t) is the input power of the electric refrigerator during period t; P WHB (t) is the output power of the waste heat boiler in the combined cooling, heating and power unit during period t; COP EC and COP AC are the coefficient of performance of the electric refrigerator and the coefficient of performance of the absorption refrigerator respectively; After considering the elasticity characteristics of cooling load, the power balance constraint of the cooling system is converted from an equality constraint to an interval constraint, and the expression is as follows: Among them, L C (t) min and L C (t) max are the lower and upper limits of the cooling load of the airport integrated energy system architecture under the premise of meeting the comfort level, k down and k up is the cooling load elasticity coefficient; The cooling load elasticity coefficient k down and k up The expression is as follows: Where T' is the standard cooling environment air temperature, which is 26℃; t amin and t amax are calculated by combining the cooling load elasticity characteristics with the actual typical summer day environment. a The minimum and maximum boundary values.
4. The method for optimizing the day-ahead scheduling of the airport integrated energy system according to claim 1, characterized in that: The parameters in the optimization objective of the day-ahead optimization scheduling model of the airport integrated energy system include the minimum operating cost and the minimum environmental cost. The expression of the minimum operating cost minf1(t) is as follows: Among them, C grid (t) is the purchase and sales cost of time period t, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle, C loss (t) is the penalty cost of abandoned light in period t, C m (t) is the operation and maintenance cost of period t, C sell (t) is the electricity sales revenue in period t, and its expressions are as follows: Among them, C e (t) and C g (t) are the electricity price and natural gas price in period t respectively; P in (t) is the power input power of the airport integrated energy system architecture during period t; P ng (t) is the natural gas input power of the airport integrated energy system architecture during period t; r = 1, 2, ..., n, n is the total number of devices in the airport integrated energy system architecture; k r is the unit maintenance cost of the rth equipment; P r (t) is the output power of the rth device in time period t; P out (t) is the active power sold by the airport integrated energy system architecture to the main power grid during period t; g p (t) is the penalty coefficient for abandoned light segment; A PV (t) is the abandoned optical power of the airport integrated energy system architecture during period t; is the abandoned light rate of the airport integrated energy system architecture in period t; The expression of the minimum environmental cost minf2(t) is as follows: Among them, μ e is the average carbon dioxide emission coefficient of each equipment unit, P grid (t) is the power of the interaction between the airport integrated energy system architecture and the main power grid during the period t; The expression of the abandoned optical power constraint is as follows: Among them, P PV (t) is the output power of the photovoltaic cell during period t, is the minimum photovoltaic output power acceptable to the airport integrated energy system architecture during period t, is the maximum allowable abandoned light ratio; The expression of the ice storage system operation constraint is as follows: Among them, S ice (t) is the cold energy stored in the ice storage system during period t, S ice (t-1) is the cold energy stored in the ice storage system during the period t-1; γ Q is the self-loss coefficient, η ice,c and η ice,d are the ice storage efficiency coefficient and ice melting efficiency coefficient, Q ice,c (t) and Q ice,d (t) are the capacity of the ice storage system to carry the cooling load in the ice storage charging mode and the capacity of the ice storage system to carry the cooling load in the ice melting discharging mode during period t; The power balance constraint expression of the power supply system is as follows: P in (t)+P e (t)+P PV (t)+DR(t)=L E (t)+P EC (t)+P Loss (t); P grid (t)η t =P in (t); Among them, P in (t) is the power input power of the airport integrated energy system architecture during period t, P e (t) is the power output of the combined cooling, heating and power unit in period t, P PV (t) is the output power of the photovoltaic cell in period t, DR(t) is the change in electric load after demand response, L E (t) is the actual electric load after the demand response in period t, P EC (t) is the input power of the electric refrigerator during period t, P Loss (t) is the power loss of the airport integrated energy system architecture during period t, η t is the transformer efficiency, P grid (t) is the power of the interaction between the airport integrated energy system architecture and the main power grid during the period t; The expression of the power balance constraint of the gas supply system is as follows: P ng (t)=G GT (t)+G GB (t); Among them, P ng (t) is the natural gas input power of the airport integrated energy system architecture at time t, G GT (t) and G GB (t) are the gas consumption of the gas turbine and the gas boiler in the combined cooling, heating and power unit in period t; The expression of the power balance constraint of the heating system is as follows: P h (t)=L H (t); Among them, P h (t) is the thermal output power of the combined cooling, heating and power unit in period t, L H (t) is the heat load of the airport integrated energy system architecture during period t.
5. The method for optimizing the day-ahead scheduling of the airport integrated energy system according to claim 1, characterized in that: The NSGA-Ⅱ algorithm is used to solve the day-ahead optimization scheduling model of the airport integrated energy system. During the genetic evolution process, the NSGA-Ⅱ algorithm takes the initial feasible solution of the population size as the starting point for solving, and calculates the congestion of the Pareto frontier by drawing the Pareto frontier under the operating cost and environmental cost. Based on the congestion of the Pareto frontier, when the weights of the operating cost and the environmental cost are 1:1, a compromise optimal solution is selected. The compromise optimal solution is the value of the optimization target corresponding to the output of each device in the airport integrated energy system architecture in the next scheduling cycle.
6. A day-ahead optimization and scheduling device for an integrated energy system of an airport, characterized in that: include: An architecture building module is configured to establish an airport integrated energy system architecture including an ice storage system, wherein the operation modes of the ice storage system include an ice storage charging mode and an ice melting energy releasing mode; An analysis module is configured to analyze the cooling load at the load end of the airport integrated energy system architecture to obtain the cooling load elasticity characteristics; a constraint conversion module configured to convert the cooling system power balance constraint of the airport integrated energy system architecture from an equality constraint to an interval constraint according to the cooling load elasticity characteristic, the airport integrated energy system architecture including a photovoltaic output model, a demand response model on the electric load side, a cooling, heating and power cogeneration unit output model and a mathematical model of the ice storage system in two operating modes; The expression of the photovoltaic output model is as follows: P PV (t)=S(t)Aη; Where f(S) is the probability density function of the Beta distribution, Γ(·) is the gamma function used to calculate the standardized coefficients of the Beta distribution, S and S max is the actual irradiation intensity and the maximum irradiation intensity, S(t) is the actual irradiation intensity in period t, α and β are the shape parameters of Beta distribution, μ and σ are the expectation and variance of Beta distribution, P PV (t) is the output power of the photovoltaic cell in time period t, A is the photovoltaic array area, η is the photoelectric conversion efficiency, t = 0, 1, 2, ..., T, T is the total number of time periods in a scheduling cycle; The demand response model on the electric load side is described by the price elasticity matrix. The expression of the element in the i-th row and j-th column in the price elasticity matrix W(i,j) is as follows: Among them, e i,j It represents the elasticity coefficient of the load in period i to the electricity price in period j, i = 0, 1, 2, ..., T, j = 0, 1, 2, ..., T, ΔL E (i) is the change in electric load after demand response, L E (i=0) and Pr(j=0) are the initial electric load and initial electricity price, respectively, and ΔPr(j) is the change in electricity price after demand response; The actual electric load L after demand response in period t E The expression of (t) is as follows: The expression of the output model of the combined cooling, heating and power unit is as follows: Among them, P c (t), P e (t) and P h (t) are the cooling output power, electric output power and thermal output power of the combined cooling, heating and power unit in period t, respectively, P ng (t) is the natural gas input power during period t, η c , η e and η h They are the cooling efficiency, electrical efficiency and thermal efficiency of the combined cooling, heating and power unit respectively; The mathematical model of the ice storage system in two operating modes is shown as follows: in, The energy stored in the ice storage system before the conversion between the ice storage charging mode and the ice melting energy release mode. represents the energy stored in the ice storage system during the period t = 0, represents the energy stored in the ice storage system during the period t = T, is the energy stored in the ice storage system after the conversion between the ice storage charging mode and the ice melting energy release mode, δ ice is the loss limit of the ice storage system, and are charging power and discharging power respectively, η ice,c and η ice,d are the ice storage efficiency coefficient and ice melting efficiency coefficient, P ice,c (t) and P ice,d (t) are the ice storage charging power and ice melting discharging power of the ice storage system in period t, u ice To limit the variables that the ice storage charging mode and ice melting energy release mode cannot occur at the same time, u ice The value can only be 0 or 1. and are the upper limit of charging power and the upper limit of discharging power of the ice storage system, and are the lower and upper limits of the energy stored in the ice storage system, respectively. c 、b c 、e c 、f c 、a d 、b d 、e d and f d is the regression coefficient, Q ice,c (t) and Q ice,d (t) are the capacity of the ice storage system to carry the cooling load in the ice storage charging mode and the capacity of the ice storage system to carry the cooling load in the ice melting energy release mode during the period t, and the expression is as follows: Q ice,c (t)=LPM·ΔT isw,c ·c pw ·60; Q ice,d (t)=LPM·ΔT isw,d ·c pw ·60; Among them, c pw is the specific heat of chilled water, LPM is the ice storage water flow rate, and the temperature change of ice storage water during ice storage is ΔT isw,c The change of ice storage water temperature ΔT during ice melting isw,d The expression is as follows: ΔT isw,c =T iswr,c -T isws,c ; ΔT isw,d =T iswr,d -T isws,d ; Among them, T iswr,c and T isws,c are the return water temperature and supply water temperature of ice storage water in ice storage charging mode respectively; T iswr,d and T isws,d They are the return water temperature and supply water temperature of ice storage water in the ice melting energy release mode respectively; The solving module is configured to construct a day-ahead optimal scheduling model for the airport comprehensive energy system of the current scheduling period that takes into account the elastic characteristics of the cooling load and the coordination of the ice storage system, and solve the model with the lowest operating cost and the lowest environmental cost as the optimization goals under the constraints to obtain the day-ahead optimal scheduling plan for the next scheduling period. The constraints include the constraints on abandoned light power, the constraints on the operation of the ice storage system, the power balance constraints on the cooling system, the power balance constraints on the power supply system, the power balance constraints on the heating system, and the power balance constraints on the gas supply system.
7. An electronic device comprising: one or more processors; a storage device for storing one or more programs, When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 5.
8. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.
9. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.