Gas supply apparatus, gas supply control method, and substrate processing apparatus

By using a circulation line and an injector combined with a flow control module in the semiconductor manufacturing process, the flow error problem caused by the internal pressure of the gas supply line is solved, and the precise control of the gas supply is achieved, and the stability and accuracy of the process are improved.

CN118899240APending Publication Date: 2024-11-05SYSTEM ENGINEERING MEGA SOLUTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410196459.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2023-05-02
Filing Date
2024-02-22
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In semiconductor manufacturing processes, the internal pressure in the gas supply line causes rapid errors in the gas supply flow, affecting process performance.

Method used

By setting up a circulation line and an injector in the gas supply line, the gas from the circulation line is sucked in and injected into the gas supply line using the pressure of the gas supply source, combined with the flow control module and valve, the flow rate and pressure of the gas are accurately controlled to prevent Generation of errors.

Benefits of technology

Accurate control of gas supply is achieved, flow errors caused by internal pressure of the gas supply line are prevented, and process accuracy and stability are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899240A_ABST
    Figure CN118899240A_ABST
Patent Text Reader

Abstract

The invention provides a gas supply apparatus, a gas supply control method, and a substrate processing apparatus capable of accurately supplying gas. The gas supply apparatus for supplying a gas to a chamber in which a process is performed on a substrate according to the present invention comprises: a gas supply line connected to the chamber from a gas supply source and providing a flow path of the gas; a circulation line branching at a branching point of the gas supply line and connected to the upstream side of the branching point; an ejector having an internal space for sucking in the gas supplied from the circulation line by using the pressure of the gas flowing in from a gas supply source, and ejecting the gas in the internal space toward the gas supply line; and a flow control module for adjusting the flow of the gas supplied to the chamber by controlling the pressure of the gas in the gas supply line. Whether the gas supply line and the circulation line are opened or not can be controlled based on the internal pressure of the gas supply line and the control pressure of the flow control module.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a gas supply device for supplying gas to a chamber for performing a process on a substrate, a gas supply control method performed by the gas supply device, and a substrate processing device including the gas supply device. Background Art

[0002] The semiconductor manufacturing process is a process for manufacturing semiconductor elements on a substrate (e.g., a wafer), and includes, for example, exposure, vapor deposition, etching, ion implantation, cleaning, etc. In order to perform each manufacturing process, semiconductor manufacturing equipment for performing each process is set up in a clean room of a semiconductor manufacturing plant, and the process is performed on the substrate put into the semiconductor manufacturing equipment.

[0003] Various gases are used in semiconductor manufacturing processes for processing substrates. Depending on the process, the gas can be used for various purposes. For example, in a plasma etching process, a process gas for reacting with a specific substance of the substrate can be supplied to a plasma processing chamber. The process gas used in the etching process can be diverse, and the flow rate of the supplied process gas can be different from each other according to each type or time.

[0004] In the process of changing the gas supply amount, the gas supply flow rate may produce a rapid error (hunting; deviation) due to the pressure of the residual gas in the gas supply line. This error may affect the process performance. Summary of the invention

[0005] The present invention provides a gas supply device capable of accurately supplying gas, a gas supply control method and a substrate processing device.

[0006] The gas supply device for supplying gas to a chamber for processing a substrate according to the present invention comprises: a gas supply line connected to the chamber from a gas supply source and providing a flow path for the gas; a circulation line branched at a branch point of the gas supply line and connected to the upstream side of the branch point; an ejector having an internal space for sucking gas provided from the circulation line by using the pressure of the gas flowing in from the gas supply source and ejecting the gas in the internal space to the gas supply line; and a flow control module for adjusting the flow of the gas supplied to the chamber by controlling the pressure of the gas in the gas supply line. It may be that the opening between the gas supply line and the circulation line is controlled based on the internal pressure of the gas supply line and the control pressure of the flow control module.

[0007] According to an embodiment of the present invention, the injector may include: a main body, forming the internal space; an inflow nozzle, formed to flow in the gas provided from the gas supply source; a suction nozzle, formed to suck in the gas provided from the circulation line; and a diffuser nozzle, injecting the gas in the internal space toward the gas supply line.

[0008] According to an embodiment of the present invention, the gas supply device may further include: a first supply valve, arranged between the injector and the flow control module; a second supply valve, arranged between the flow control module and the chamber; a first circulation valve, arranged in a position adjacent to the flow control module in the circulation line; a second circulation valve, arranged in a position adjacent to the injector in the circulation line; a first pressure gauge, arranged in a first section between the first supply valve and the flow control module in the gas supply line; and a circulation line pressure gauge, arranged in the circulation line between the first circulation valve and the second circulation valve.

[0009] According to an embodiment of the present invention, the flow control module may include: a control valve, which is arranged at a position adjacent to the first supply valve and controls the opening ratio of the gas supply line; an orifice, which is arranged at a position adjacent to the second supply valve; a second pressure gauge, which is arranged in a second section between the control valve and the orifice in the gas supply line; a third pressure gauge, which is arranged in a third section between the orifice and the second supply valve; and a controller, which controls the control valve so that the pressure in the second section in the gas supply line is maintained at a set control pressure.

[0010] According to an embodiment of the present invention, the second supply valve may be set to repeatedly open and close in constant time units by a pulse signal, and during the time when the second supply valve is open, the gas is supplied to the chamber at a supply flow rate determined by the control valve.

[0011] According to an embodiment of the present invention, it may be that, in a first timing when the second supply valve is open, the control valve is controlled so that a first control pressure corresponding to the first gas supply flow rate is maintained in the second interval, and in a second timing when the second supply valve is closed, if the pressure of the gas remaining in the second interval is greater than a second control pressure corresponding to the second gas supply flow rate to be supplied in a third timing, the first circulation valve is controlled to be open during a set time period.

[0012] According to an embodiment of the present invention, if the difference between the pressure of the gas remaining in the second section and the pressure of the gas remaining in the circulation line is greater than a reference value, the second circulation valve may be controlled to be opened at a third timing when the second supply valve is opened.

[0013] According to an embodiment of the present invention, the gas supply device may further include: a discharge line branched between the first circulation valve and the second circulation valve in the circulation line and connected to a discharge end; and a discharge valve disposed on the discharge line.

[0014] According to an embodiment of the present invention, during the cut-off time when the second supply valve is closed, the opening or closing of the discharge valve may be controlled based on the internal pressure of the gas supply line, the internal pressure of the circulation line and the control pressure for supplying gas after the cut-off time.

[0015] According to an embodiment of the present invention, it may be that, in a first timing when the second supply valve is open, the control valve is controlled so that a first control pressure corresponding to a first gas supply flow rate is maintained in the second interval; in a second timing when the second supply valve is closed, if the pressure of the gas remaining in the second interval is greater than a second control pressure corresponding to a second gas supply flow rate to be supplied in a third timing, the second circulation valve is controlled to be open during a set time period; in a third timing when the second supply valve is open, the control valve is controlled so that the second control pressure is maintained in the second interval; in a fourth timing when the second supply valve is closed, if the pressure in the first interval is greater than a first reference value, the pressure of the circulation line is greater than a second reference value, and the pressure in the second interval is greater than a third control pressure corresponding to a third gas supply flow rate to be supplied in a fifth timing, the discharge valve is controlled to be open.

[0016] According to the present invention, a gas supply control method performed by a gas supply device for supplying gas to a chamber performing processing on a substrate includes: a step of determining a control pressure of the flow control module based on the supply flow rate of the gas; and a step of supplying the gas to the chamber at a supply flow rate corresponding to the control pressure.

[0017] The substrate processing device according to the present invention comprises: a chamber for performing a process on a substrate; a gas supply device for supplying gas to the chamber; and a control device for controlling the operation of the gas supply device.

[0018] According to the present invention, it is possible to prevent an error due to the internal pressure of the gas supply line and to accurately control the gas supply flow rate by configuring a gas circulation line branched from the gas supply line and connected to the ejector. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 The structure of a substrate processing apparatus including the gas supply apparatus according to the present invention is schematically shown.

[0020] Figure 2A gas supply device according to a comparative example of the present invention is shown.

[0021] Figure 3 A case where an error occurs in the gas supply process according to a comparative example of the present invention is shown.

[0022] Figure 4 A gas supply device according to an embodiment of the present invention is shown.

[0023] Figure 5 The configuration of a flow control device according to an embodiment of the present invention is shown.

[0024] Figure 6 The structure of an injector according to an embodiment of the present invention is shown.

[0025] Figure 7 is a timing chart for gas flow control performed by the gas supply device according to the embodiment of the present invention.

[0026] Figure 8 is a timing chart for gas flow rate control performed by the gas supply device applicable to the exhaust line according to the embodiment of the present invention.

[0027] Fig. 9 is a flowchart illustrating a gas supply control method according to an embodiment of the present invention.

[0028] (Explanation of Reference Numerals)

[0029] 1: Substrate processing equipment

[0030] 10: Chamber

[0031] 20: Gas supply device

[0032] 30: Discharge end

[0033] 40: Gas supply source

[0034] 50: Control device

[0035] 22: Supply Line

[0036] SGR: Circulation Line

[0037] 100: Flow control module

[0038] 200: Injector

[0039] DMP: Discharge Line DETAILED DESCRIPTION

[0040] Hereinafter, embodiments of the present invention will be described in detail with reference to the attached drawings so that a person having ordinary knowledge in the technical field to which the present invention belongs can easily implement the present invention. The present invention can be implemented in many different ways, but is not limited to the embodiments described here.

[0041] In order to clearly explain the present invention, parts not related to the description are omitted, and the same or similar components are denoted by the same reference numerals throughout the specification.

[0042] In addition, in various embodiments, components having the same structure will be described using the same reference numerals only in representative embodiments, and only structures different from the representative embodiments will be described in other embodiments.

[0043] Throughout the specification, when a certain part is expressed as being "connected (or coupled)" to another part, it includes not only the case of being "directly connected (or coupled)" but also the case of being "indirectly connected (or coupled)" via other parts. In addition, when a certain part is expressed as "including" a certain constituent element, unless otherwise stated, it means that other constituent elements are not excluded but may be included.

[0044] As long as they are not defined differently, all terms used herein, including technical or scientific terms, may have the same meaning as those generally understood by a person having ordinary knowledge in the technical field to which the present invention belongs. Terms such as terms defined in commonly used dictionaries should be interpreted as having the same meaning as in the context of the relevant technology, and should not be interpreted in an idealized or overly formal meaning as long as they are not explicitly defined in this application. .

[0045] Hereinafter, a gas supply device, a gas supply control method, and a substrate processing device according to an embodiment of the present invention are described. The gas supply device, the gas supply control method, and the substrate processing device according to the embodiment of the present invention variably adjust the flow rate of the gas to prevent rapid flow rate changes (errors) generated during the supply process. The intended flow rate of gas can be constantly supplied by preventing errors in the gas supply process, thereby improving the accuracy of the process.

[0046] Figure 1 The structure of a substrate processing apparatus 1 including a gas supply device 20 according to the present invention is schematically shown. The substrate processing apparatus 1 performs a process on a substrate (e.g., a wafer, glass). The substrate processing apparatus 1 can perform a process (e.g., etching, evaporation) on a substrate input through an interface portion, and discharge the substrate to the outside for the next process.

[0047] The substrate processing apparatus 1 includes a chamber 10 for performing a process on a substrate, a gas supply device 20 for supplying gas to the chamber 10 , and a control device 50 for controlling the operation of the gas supply device 20 .

[0048] The chamber 10 provides a space for performing a process on a substrate. A chuck for placing the substrate, a nozzle (or shower head) for supplying gas to the inner space of the chamber 10, and an electrode for generating plasma in the inner space of the chamber 10 may be provided inside the chamber 10. A gas supply device 20 may supply gas to the inner space of the chamber 10.

[0049] The gas supply device 20 may be connected to a gas supply pipe provided in the chamber 10. A plurality of gas supply devices 20 may be provided. Each gas supply device 20 may supply a specific gas to the chamber 10. Each gas supply device 20 may supply a gas at a set flow rate.

[0050] The control device 50 can control the operation of each component of the gas supply device 20. The control device 50 can store the recipe data received from the superior control system or the recipe data input in advance. The control device 50 can control the gas supply device 20 so that the process is performed according to the stored recipe data. In addition, the control device 50 may include other components of the substrate processing device 1 to control the overall operation of the substrate processing device 1. The control device 50 may include a memory, a processor, a communication module, and an input / output interface. The gas supply control method described below can be executed by the control device 50. The processor of the control device 50 can generate a control signal for gas supply and transmit the corresponding control signal to the gas supply device 20.

[0051] Figure 2 A gas supply device 20 according to a comparative example of the present invention is shown. Figure 3 A case where an error occurs in the gas supply process according to a comparative example of the present invention is shown.

[0052] refer to Figure 2 The gas supply device 20 includes a gas supply line 22 connected to a gas supply source 40, a flow control module 100 for controlling the flow rate of gas in the gas supply line 22, a first supply valve VL1 and a second supply valve VL2 respectively provided on the upstream side and the downstream side of the flow control module 100, and a first pressure gauge PS1 for measuring the pressure of gas between the first supply valve VL1 and the flow control module 100. The flow control module 100 includes a control valve CVL and an orifice ORF for adjusting the supply pressure of gas, and a second pressure gauge PS2 and a third pressure gauge PS3 respectively provided across the orifice ORF. The first pressure gauge PS1 measures the pressure P of the gas flowing into the flow control module 100 in the first section 22A of the gas supply line 22. 1The second pressure gauge PS2 measures the pressure P on the upstream side of the orifice ORF (the second section 22B of the gas supply line 22). 2 The third pressure gauge PS3 measures the pressure P at the downstream side of the orifice ORF (the third section 22C of the gas supply line 22). 3 The gas whose flow rate is controlled by the flow control module 100 is supplied to the chamber 10 through the fourth section 22D of the gas supply line 22 .

[0053] The flow control module 100 is a pressure-based fluid control device. The flow control module 100 is under critical expansion conditions, that is, the pressure P on the upstream side of the orifice ORF 2 is the pressure on the downstream side P 3 More than twice (i.e., P 2 ≥2P 3 ) under the condition of adjusting the pressure P 2 A device to control the flow rate of gas. Under critical expansion conditions, the speed of gas passing through the orifice ORF always remains at the speed of sound, so the flow rate can only be related to the pressure P on the upstream side. 2 Therefore, the flow control module 100 can use the control valve CVL and the second pressure gauge PS2 to adjust the upstream side pressure P of the orifice ORF. 2 , thereby controlling the flow of gas.

[0054] In the process of controlling the flow rate using pressure, a rapid error may occur in the supply flow rate of the gas due to the pressure of the gas remaining in the gas supply line 22. Figure 3 When the gas is first supplied, a constant level of supply pressure P flows through the first supply valve VL1 in the first section 22A. 1 Gas. The pressure P controlled by the control valve CVL 2 The gas of the second interval 22B flows, and the gas of the flow rate set by the orifice ORF flows through the third interval 22C. Here, when the pressure P of the third interval 22C is 3 is the pressure P in the second zone 22B 2 When the pressure P of the second interval 22B is less than half of 2 The gas flow rate in the third interval 22C is determined in proportion.

[0055] During the first gas supply period, the gas may flow in the second interval 22B at a first pressure (e.g., 30 Torr). The flow rate of the gas in the third interval 22C at this time may be supplied at a first flow rate (150 cc / min). Thereafter, during the second gas supply period, the gas is supplied at a second flow rate (e.g., 100 cc / min). At this time, the gas is controlled to be a second pressure (e.g., 20 Torr) in the second interval 22B. At this time, in the first gas supply period, a gas of a first pressure greater than the second pressure may remain in the second interval 22B. If the second supply valve VL2 is opened while the gas of the first pressure remains in the second interval 22B, a gas of a flow rate greatly exceeding the set flow rate may be instantly supplied to the chamber 10. That is, when supplying the gas, an error due to the hysteresis of the previous recipe may occur.

[0056] Embodiments of the present invention provide a gas supply apparatus, a gas supply control method, and a substrate processing apparatus capable of preventing an error caused by hysteresis of a previous recipe.

[0057] Figure 4 The gas supply device 20 according to an embodiment of the present invention is shown. The gas supply device 20 according to the present invention includes a gas supply line 22 connected to the chamber 10 from the gas supply source 40 and providing a flow path of gas, a circulation line SGR branched at a branch point SP of the gas supply line 22 and connected to the upstream side of the branch point SP, an injector 200 having an internal space IS for sucking gas supplied from the circulation line SGR by using the pressure of gas flowing in from the gas supply source 40 and injecting the gas in the internal space IS toward the gas supply line 22, and a flow control module 100 for adjusting the flow rate of the gas supplied to the chamber 10 by controlling the pressure of the gas in the gas supply line 22. In addition, the gas supply device 20 includes a first supply valve VL1 arranged between the injector 200 and the flow control module 100, a second supply valve VL2 arranged between the flow control module 100 and the chamber 10, a first circulation valve SGR-VL1 arranged at a position adjacent to the flow control module 100 in the circulation line SGR, a second circulation valve SGR-VL2 arranged at a position adjacent to the injector 200 in the circulation line SGR, a first pressure gauge PS1 arranged in the first section 22A between the first supply valve VL1 and the flow control module 100 in the gas supply line 22, and a circulation line pressure gauge SGR-PS arranged between the first circulation valve SGR-VL1 and the second circulation valve SGR-VL2 in the circulation line SGR.

[0058] refer to Figure 5The flow control module 100 includes a control valve CVL which is arranged at a position adjacent to the first supply valve VL1 and controls the opening ratio of the gas supply line 22, an orifice ORF which is arranged at a position adjacent to the second supply valve VL2, a second pressure gauge PS2 which is arranged in the second section 22B between the control valve CVL and the orifice ORF in the gas supply line 22, a third pressure gauge PS3 which is arranged in the third section 22C between the orifice ORF and the second supply valve VL2, and a controller 120 which controls the control valve so that the pressure in the second section 22B in the gas supply line 22 is maintained at a set control pressure.

[0059] The first pressure gauge PS1 may measure the gas pressure of the first section 22A between the first supply valve VL1 and the control valve CVL, the second pressure gauge PS2 may measure the gas pressure of the second section 22B between the control valve CVL and the orifice ORF, and the third pressure gauge PS3 may measure the gas pressure of the third section 22C between the orifice ORF and the second supply valve VL2. The circulation line pressure gauge SGR-PS may measure the pressure between the first circulation line valve SGR-VL1 and the second circulation line valve SGR-VL2.

[0060] The gas supply device 20 may include a discharge line DMP that branches at a position between the first circulation line valve SGR-VL1 and the second circulation line valve SGR-VL2 in the circulation line SGR and is connected to the discharge end 30, and a discharge valve DMP-VL provided on the discharge line DMP. The discharge line DMP is configured to discharge the gas remaining in the second section 22B of the gas supply line 22 to the outside. The discharge valve DMP-VL may control whether the discharge line DMP is open or not. A pump for sucking gas may be provided in the discharge end 30, and if the discharge valve DMP-VL is opened, the gas is discharged through the discharge end 30 due to the vacuum pressure.

[0061] According to an embodiment of the present invention, the opening between the gas supply line 22 and the circulation line SGR may be controlled based on the internal pressure of the gas supply line 22 and the control pressure of the flow control module 100 .

[0062] refer to Figure 5The flow control module 100 includes a control valve CVL disposed at a position adjacent to the first supply valve VL1 and regulating the open area of ​​the path of gas flow in the gas supply line 22, an orifice ORF disposed at a position adjacent to the second supply valve VL2, a second pressure gauge PS2 disposed in the second section 22B between the control valve CVL and the orifice ORF in the gas supply line 22, and a third pressure gauge PS3 disposed in the third section 22C between the orifice ORF and the second supply valve VL2. A controller 120 electrically connected to the control valve CVL, the second pressure gauge PS2, and the third pressure gauge PS3 is included. The controller 120 can be connected to the control device 50. According to an embodiment of the present invention, a circulation line SGR can be connected to the second section 22B of the gas supply line 22, and the gas in the second section 22B is discharged or flows into the ejector 200 through the circulation line SGR.

[0063] The controller 120 receives formula information related to the supply flow rate of the gas from the control device 50. The controller 120 calculates the gas control pressure in the second interval 22B from the formula information. In addition, the controller 120 receives the measured values ​​of the second pressure gauge PS2 and the third pressure gauge PS3. The controller 120 can compare the pressure measurement value and the control pressure to control the opening amount of the control valve CVL. The controller 120 can calculate the opening degree of the control valve CVL to generate a control signal of the control valve CVL, and transmit the control signal to the control valve CVL. The control valve CVL can operate according to the received control signal.

[0064] The control valve CVL may be a piezoelectric control valve. A device for controlling the degree of opening of the gas supply line 22 may be formed inside the control valve CVL, and the opening area of ​​the gas supply line 22 is adjusted by driving the device according to a control signal received from the controller 120 .

[0065] Figure 6 The structure of the ejector 200 according to the embodiment of the present invention is shown. The ejector 200 is a device for transferring fluid using the Venturi effect. The Venturi effect refers to the effect that the velocity of the fluid increases and the pressure decreases when the fluid passes through a narrow channel. Figure 6 The ejector 200 includes a body 210 forming an internal space IS, an inflow nozzle 220 for guiding a high-pressure fluid FL1 to the internal space IS of the body 210, a suction nozzle 230 for guiding a low-pressure fluid FL2 to the internal space IS of the body 210, and a diffuser nozzle 240 for discharging a fluid FL3 from the body 210. In the ejector 200, the high-pressure fluid FL1 flows in through the inflow nozzle 220, and the low-pressure fluid FL2 is sucked into the internal space IS of the body 210 by the pressure held by the high-pressure fluid FL1. The fluid FL3 in the internal space IS of the body 210 is discharged to the outside through the diffuser nozzle 240.

[0066] The ejector 200 includes a main body 210 forming an internal space IS, an inflow nozzle 220 formed to flow in gas provided from a gas supply source 40, a suction nozzle 230 formed to suck in gas provided from a circulation line SGR, and a diffuser nozzle 240 that ejects the gas in the internal space IS toward the gas supply line 22. According to an embodiment of the present invention, the inflow nozzle 220 is connected to the gas supply source 40 through a supply end side valve VL0, the suction nozzle 230 is connected to the circulation line SGR, and the diffuser nozzle 240 is connected to the gas supply line 22. The gas supplied to the circulation line SGR in the flow control module 100 can be sucked into the ejector 200 again and supplied to the gas supply line 22 again.

[0067] According to an embodiment of the present invention, during the first gas supply period, the gas remaining in the second interval 22B can be discharged through the circulation line SGR. Through the circulation line SGR, the gas remaining in the second interval 22B flows into the ejector 200, so that the gas can be reused. The gas remaining in the second interval 22B can be discharged through the circulation line SGR, thereby preventing an error due to the residual pressure.

[0068] Figure 7 2 is a timing chart for gas flow control performed by the gas supply device 20 according to an embodiment of the present invention. The gas flow control according to the present invention can be performed by controlling the operation of each valve through the command of the control device 50.

[0069] According to the present invention, the second supply valve VL2 can be set to repeatedly open and close in units of a constant time (e.g., 1 second) according to the pulse signal, and during the time when the second supply valve VL2 is open, the gas is supplied to the chamber 10 at a supply flow rate determined by the control valve CVL. Figure 7 , gas is supplied in a pulsed manner, and the flow rate of gas supplied in each pulse cycle is different.

[0070] It is set that no gas is supplied in the initial timing T0, a first flow rate (e.g., 150 cc / min) of gas is supplied to the chamber 10 in the first timing T1, the gas supply is cut off in the second timing T2, a second flow rate (e.g., 100 cc / min) of gas is supplied to the chamber 10 in the third timing T3, and the gas supply is cut off in the fourth timing T4.

[0071] refer to Figure 7, the supply and cut-off of gas is determined by controlling the opening and closing of the supply end valve VL0 and the second supply valve VL2 in the state of opening the first supply valve VL1. In addition, the supply and cut-off of gas can be controlled by opening and closing the first supply valve VL1 and the second supply valve VL2 together. Alternatively, the supply and cut-off of gas can be controlled by opening and closing the first supply valve VL1 alone.

[0072] In the first timing T1 when the second supply valve VL2 is open, the control valve CVL is controlled so that the first control pressure (e.g., 30 Torr) corresponding to the first gas supply flow rate (e.g., 150 cc / min) is maintained in the second interval 22B. In the first timing T1, the second supply valve VL2 is opened for the supply of gas, and the first control pressure (e.g., 30 Torr) corresponding to the first flow rate (e.g., 150 cc / min) is maintained in the second interval 22B by the control of the control valve CVL. At this time, the gas of the first supply flow rate (e.g., 150 cc / min) is supplied to the chamber 10.

[0073] At the second timing T2 when the second supply valve VL2 is closed, if the pressure P of the gas remaining in the second zone 22B is 2 If the pressure P20 is greater than the second control pressure (e.g., 20 Torr) corresponding to the second gas supply flow rate (e.g., 100 cc / min) to be supplied in the third timing T3, the first circulation valve SGR-VL1 is controlled to be open during the set time (e.g., 0.5 seconds). The supply of gas is cut off by the second supply valve VL2 in the third timing T3. At this time, the pressure (30 Torr) remaining in the second interval 22B is greater than the second control pressure (e.g., 20 Torr) for the next gas supply. In this case, the pressure P20 remaining in the upstream side of the orifice ORF can be reduced by opening the first circulation valve SGR-VL1. 2 That is, if the pressure of the gas remaining in the second interval 22B is greater than the control pressure for the next gas supply, the first circulation valve SGR-VL1 can be set to open. By opening the first circulation valve SGR-VL1, a part of the gas remaining in the second interval 22B is discharged to the circulation line SGR, and a gas with a small pressure (e.g., 15 Torr) remains in the second interval 22B and the circulation line SGR.

[0074] If the pressure P of the gas remaining in the second zone 22B is 2 and the pressure P of the gas remaining in the circulation line SGR SGR If the difference is greater than a reference value (e.g., 10 Torr), the second circulation valve SGR-VL2 is controlled to be open at the third timing T3 when the second supply valve VL2 is open. The pressure P of the gas remaining in the second zone 22B is 2Set to be greater than or equal to the pressure P of the gas remaining in the circulation line SGR SGR At the third timing T3, the gas is supplied to the chamber 10 again through the second supply valve VL2, and the second control pressure (e.g., 20 Torr) corresponding to the second flow rate (e.g., 100 cc / min) is maintained in the second interval 22B through the control valve CVL. At this time, the gas remaining in the circulation line SGR can be sucked into the ejector 200 by opening the second circulation valve SGR-VL2. The gas of the second supply flow rate (e.g., 100 cc / min) is supplied to the chamber 10.

[0075] The opening of the second circulation valve SGR-VL2 is determined by the pressure P in the second zone 22B. 2 and the pressure P of the circulation line SGR SGR Preferably, the pressure P in the second interval 22B is 2 Maintain a pressure greater than the circulation line SGR pressure P SGR Therefore, when the gas flows into the circulation line SGR through the opening of the first circulation line SGR-VL1, the second circulation valve SGR-VL2 can be opened to maintain the difference above the constant reference value. That is, if the pressure P of the second interval 22B is 2 and the pressure P of the circulation line SGR SGR If the difference is less than the reference value, the second circulation valve SGR-VL2 can be set to open. The gas remaining in the circulation line SGR can be supplied to the gas supply line 22 again through the ejector 200 and the gas pressure of the circulation line SGR is kept very low (close to 0).

[0076] Thereafter, at the fourth timing T4, the gas supply may be cut off by the second supply valve VL2, and if necessary, the first circulation valve SGR-VL1 may be opened to remove the residual pressure in the second interval 22B. At this time, at the next timing, the second circulation valve SGR-VL2 may be opened to reduce the pressure P in the second interval 22B. 2 and the pressure P of the circulation line SGR SGR The difference is greater than the baseline value.

[0077] Figure 8 2 is a timing chart for gas flow control performed by the gas supply device 20 applicable to the discharge line DMP according to an embodiment of the present invention. Figure 7 Compare, Figure 8 The process of exhausting the gas remaining in the second zone 22B through the exhaust line DMP is also included.

[0078] During the cut-off time when the second supply valve VL2 is closed, the internal pressure (P 1 , P 2 , P3 ), the internal pressure P of the circulation line SGR SGR And the control pressure for gas supply after the cut-off time controls whether the discharge valve DMP-VL is open or not.

[0079] The operation from the initial timing T0 to the third timing T3 is Figure 7 The control method described in the third timing T3 is the same as that described in the second timing T4. In the second interval 22B, the gas of the second control pressure (e.g., 20 Torr) remains, and in the second timing T2, the gas flowing into the circulation line SGR remains. The internal pressure (P 1 , P 2 , P 3 ), the internal pressure P of the circulation line SGR SGR And the control pressure for gas supply after the cut-off time controls whether the discharge valve DMP-VL is open or not.

[0080] In the first timing T1 when the second supply valve VL2 is open, the control valve CVL is controlled so that the first control pressure (e.g., 30 Torr) corresponding to the first gas supply flow rate (e.g., 150 cc / min) is maintained in the second interval 22B. At this time, the gas of the first supply flow rate (e.g., 150 cc / min) is supplied to the chamber 10.

[0081] At the second timing T2 when the second supply valve VL2 is closed, if the pressure P of the gas remaining in the second zone 22B is 2 If the pressure is greater than the second control pressure (eg, 20 Torr) corresponding to the second gas supply flow rate (eg, 100 cc / min) to be supplied in the third timing T3, the second circulation valve SGR-VL2 is controlled to be open for a set time (eg, 0.5 seconds).

[0082] At the third timing T3 when the second supply valve VL2 is open, the control valve CVL is controlled so that the second control pressure (eg, 20 Torr) is maintained in the second section 22B. At this time, the gas is supplied to the chamber 10 at a second supply flow rate (eg, 100 cc / min).

[0083] In the fourth timing T4 when the second supply valve VL2 is closed, if (i) the pressure P in the first zone 22A is 1 greater than a first reference value (e.g., 100 Torr), (ii) the pressure P of the circulation line SGR SGR greater than the second reference value (e.g., 10 Torr), (iii) the pressure P in the second interval 22B 2If the pressure is greater than the third control pressure (e.g., 10 Torr) corresponding to the third gas supply flow rate (e.g., 50 cc / min) to be supplied in the fifth timing T5, the discharge valve DMP-VL is controlled to be opened. The gas remaining in the second section 22B of the gas supply line and the circulation line SGR can be discharged to the discharge port 30 through the discharge line DMP.

[0084] At the fifth timing T5 when the second supply valve VL2 is open, the control valve CVL is controlled so that the third control pressure (eg, 10 Torr) is maintained in the second section 22B. At this time, the gas is supplied to the chamber 10 at a third supply flow rate (eg, 50 cc / min).

[0085] On the contrary, if (i) the pressure P in the first zone 22A is 1 is less than the first reference value (e.g., 100 Torr), or (ii) the pressure P of the circulation line SGR is SGR is less than a reference value (e.g., 10 Torr), or (iii) the pressure P of the gas remaining in the second zone 22B is 2 If the pressure is lower than the control pressure (e.g. 10 Torr) for the next gas supply, the discharge valve DMP-VL can be controlled to be closed.

[0086] When the pressure P on the upstream side of the orifice ORF (i.e., the second interval 22B) 2 When the pressure of the gas in the circulation line SGR is greater than the reference value while the pressure is greater than the control pressure for the next gas supply, it is difficult to introduce gas to the circulation line SGR. In this case, the gas can be discharged in advance through the discharge line DMP to prevent the error of the gas flow rate.

[0087] Fig. 9 1 is a flow chart showing a gas supply control method performed by the gas supply device 20 according to an embodiment of the present invention. The gas supply control method includes a step of determining a control pressure of the flow control module 100 based on a supply flow rate of the gas (S910), and a step of supplying the gas to the chamber 10 at a supply flow rate corresponding to the control pressure (S920).

[0088] The second supply valve VL2 is set to repeatedly open and close in units of a constant time (e.g., 1 second) according to the pulse signal. During the time when the second supply valve VL2 is open, the gas is supplied to the chamber 10 at a supply flow rate determined by the control valve CVL. For example, in step S910, the second supply valve VL2 is closed and the supply of gas is cut off. In step S920, the second supply valve VL2 is opened and the gas is supplied to the chamber 10 at a set flow rate. Steps S910 and S920 may be repeatedly performed. In step S910, the second supply valve VL2 is closed and the supply of gas is cut off. In step S920, the second supply valve VL2 is opened and the gas is supplied to the chamber 10 at a set flow rate. Figure 7 as well as Figure 8The work of step S910 is performed in the initial timing T0, the second timing T2, and the fourth timing T4, and the work of step S920 is performed in the first timing T1, the third timing T3, and the fifth timing T5.

[0089] In the initial timing T0, the second supply valve VL2 may be closed and the gas is not supplied to the chamber 10. At this time, as in step S910, a first control pressure (eg, 30 Torr) corresponding to a first supply flow rate (eg, 150 cc / min) of the gas to be supplied in the first timing T1 is determined.

[0090] In the first timing T1 when the second supply valve VL2 is open, the control valve is controlled so that the first control pressure (e.g., 30 Torr) corresponding to the first gas supply flow rate (e.g., 150 cc / min) is maintained in the second interval 22B. At this time, as in step S920, the process of supplying the gas to the chamber 10 at the supply flow rate (e.g., 150 cc / min) corresponding to the first control pressure (e.g., 30 Torr) is performed.

[0091] In the second timing T2 when the second supply valve VL2 is closed, if the pressure of the gas remaining in the second interval 22B is greater than the second control pressure (e.g., 20 Torr) corresponding to the second gas supply flow rate (e.g., 100 cc / min) to be supplied in the third timing T3, the second circulation valve SGR-VL2 is controlled to be opened for a set time (e.g., 0.5 seconds). At this time, as in step S910, a process of determining the second control pressure (e.g., 20 Torr) corresponding to the second supply flow rate (e.g., 100 cc / min) of the gas to be supplied in the third timing T3 is performed.

[0092] In the third timing T3 when the second supply valve VL2 is open, as in step S920, the process of supplying gas to the chamber 10 at a supply flow rate (e.g., 100 cc / min) corresponding to the second control pressure (e.g., 20 Torr) is performed. 2 and the remaining gas P in the circulation line SGR SGR If the pressure difference is greater than the reference value (e.g., 10 Torr), the second circulation valve SGR-VL2 is controlled to be open. In the third timing T3, the gas is supplied to the chamber 10 again through the second supply valve VL2, and the second control pressure (e.g., 20 Torr) corresponding to the second flow rate (e.g., 100 cc / min) is maintained in the second interval 22B through the control valve CVL. At this time, the gas remaining in the circulation line SGR can be sucked into the ejector 200 by opening the second circulation valve SGR-VL2. The gas of the second supply flow rate (e.g., 100 cc / min) is supplied to the chamber 10.

[0093] In the fourth timing T4 when the second supply valve VL2 is closed, at this time, as in step S910, a process of determining a third control pressure (e.g., 10 Torr) corresponding to a third supply flow rate (e.g., 50 cc / min) of the gas to be supplied in the fifth timing T5 is performed. In the fourth timing T4 when the second supply valve VL2 is closed, if (i) the pressure P of the first section 22A is 1 greater than the first reference value (e.g., 100 Torr), (ii) the pressure P of the circulation line SGR SGR greater than the second reference value (e.g., 10 Torr), (iii) the pressure P in the second section 22B 2 When the pressure is greater than the third control pressure (e.g., 10 Torr) corresponding to the third gas supply flow rate (e.g., 50 cc / min) to be supplied in the fifth timing T5, the discharge valve DMP-VL is controlled to be opened. The gas remaining in the second section 22B of the gas supply line and the circulation line SGR can be discharged to the discharge port 30 through the discharge line DMP.

[0094] In the fifth timing T5 when the second supply valve VL2 is open, the control valve CVL is controlled so that the third control pressure (e.g., 10 Torr) is maintained in the second interval 22B. As in step S920, a process of supplying gas to the chamber 10 at a supply flow rate (e.g., 50 cc / min) corresponding to the third control pressure (e.g., 10 Torr) is performed.

[0095] The gas supply control method described above can be controlled by the control device 50 of the substrate processing apparatus 1 .

[0096] According to the present invention, the control device 50 transmits information related to the supply flow rate of the gas to the controller 120 of the flow control module 100. The controller 120 determines the control pressure of the flow control module 100 based on the supply flow rate of the gas. The controller 120 controls the control valve CVL so that the control pressure is maintained in the second interval 22B during the period when the gas is supplied to the chamber 10. The control device 50 may determine the control pressure of the gas remaining in the second interval 22B based on the pressure P of the gas remaining in the second interval 22B. 2 The control pressure of the flow control module 100 controls the opening of the first circulation valve SGR-VL. The control device 50 can control the gas supply device 20 to perform the operation as shown in FIG. Figure 7 or Figure 8 Such a gas supply control process will be described.

[0097] This embodiment and the drawings attached to this specification only clearly indicate a part of the technical concept included in the present invention. Obviously, within the scope of the technical concept included in the specification and drawings of the present invention, the modified examples and specific embodiments that can be easily inferred by those skilled in the art are all included in the scope of rights of the present invention.

[0098] Therefore, it should be understood that the concept of the present invention should not be limited to the illustrated embodiments, but rather should be within the scope of the appended claims. All equivalent or equivalent variations to the scope of the claims should fall within the scope of the present invention.

Claims

1. A gas supply device for supplying gas to a chamber for performing processing on a substrate, in, The gas supply device comprises: a gas supply line connected from a gas supply source to the chamber and providing a flow path for the gas; a circulation line branched at a branch point of the gas supply line and connected to an upstream side of the branch point; An ejector having an internal space for sucking the gas supplied from the circulation line by utilizing the pressure of the gas flowing in from the gas supply source, and ejecting the gas in the internal space toward the gas supply line; and a flow control module for adjusting the flow rate of the gas supplied to the chamber by controlling the pressure of the gas in the gas supply line, The opening between the gas supply line and the circulation line is controlled based on the internal pressure of the gas supply line and the control pressure of the flow control module.

2. The gas supply device according to claim 1, in, The injector comprises: A main body, forming the internal space; an inflow nozzle formed to flow in a gas supplied from the gas supply source; a suction nozzle formed to suck the gas provided from the circulation line; and The diffuser nozzle sprays the gas in the inner space toward the gas supply line.

3. The gas supply device according to claim 1, in, The gas supply device also includes: A first supply valve, disposed between the injector and the flow control module; a second supply valve, disposed between the flow control module and the chamber; A first circulation valve, arranged in the circulation line at a position adjacent to the flow control module; a second circulation valve disposed in the circulation line adjacent to the ejector; a first pressure gauge provided in a first section between the first supply valve and the flow control module in the gas supply line; and A circulation line pressure gauge is provided in the circulation line between the first circulation valve and the second circulation valve.

4. The gas supply device according to claim 3, in, The flow control module comprises: a control valve disposed adjacent to the first supply valve and controlling an opening ratio of the gas supply line; an orifice disposed adjacent to the second supply valve; a second pressure gauge disposed in the gas supply line in a second interval between the control valve and the orifice; a third pressure gauge disposed in a third interval between the orifice and the second supply valve; and A controller controls the control valve so that the pressure of the second section in the gas supply line is maintained at a set control pressure.

5. The gas supply device according to claim 4, in, The second supply valve is set to repeatedly open and close in a constant time unit by a pulse signal, During the time when the second supply valve is open, the gas is supplied to the chamber at a supply flow rate determined by the control valve.

6. The gas supply device according to claim 4, in, At a first timing when the second supply valve is opened, the control valve is controlled so that a first control pressure corresponding to a first gas supply flow rate is maintained in the second section, If, at the second timing when the second supply valve is closed, the pressure of the gas remaining in the second interval is greater than a second control pressure corresponding to the second gas supply flow rate to be supplied at a third timing, the first circulation valve is controlled to be open for a set time period.

7. The gas supply device according to claim 5, in, If the difference between the pressure of the gas remaining in the second section and the pressure of the gas remaining in the circulation line is equal to or larger than a reference value, the second circulation valve is controlled to be opened at a third timing at which the second supply valve is opened.

8. The gas supply device according to claim 4, in, The gas supply device further includes: a discharge line branched between the first circulation valve and the second circulation valve in the circulation line and connected to a discharge end; and A discharge valve is disposed on the discharge line.

9. The gas supply device according to claim 8, in, During the cutoff time when the second supply valve is closed, the opening of the discharge valve is controlled based on the internal pressure of the gas supply line, the internal pressure of the circulation line, and the control pressure for supplying gas after the cutoff time.

10. The gas supply device according to claim 9, in, At a first timing when the second supply valve is opened, the control valve is controlled so that a first control pressure corresponding to a first gas supply flow rate is maintained in the second section, At the second timing when the second supply valve is closed, if the pressure of the gas remaining in the second interval is greater than the second control pressure corresponding to the second gas supply flow rate to be supplied at the third timing, the second circulation valve is controlled to be open for a set time period. At a third timing when the second supply valve is opened, the control valve is controlled so that the second control pressure is maintained in the second interval, At the fourth timing when the second supply valve is closed, if the pressure in the first interval is greater than the first reference value, the pressure in the circulation line is greater than the second reference value, and the pressure in the second interval is greater than the third control pressure corresponding to the third gas supply flow rate to be supplied at the fifth timing, the discharge valve is controlled to be open.

11. A gas supply control method, performed by a gas supply device, in, The gas supply device comprises: A gas supply line connected from a gas supply source to the chamber and providing a flow path for the gas; a circulation line branched at a branch point of the gas supply line and connected to an upstream side of the branch point; An ejector having an internal space for sucking the gas supplied from the circulation line by utilizing the pressure of the gas flowing in from the gas supply source, and ejecting the gas in the internal space toward the gas supply line; and a flow control module for adjusting the flow rate of the gas supplied to the chamber by controlling the pressure of the gas in the gas supply line, The gas supply control method comprises: A step of determining a control pressure of the flow control module based on the supply flow of the gas; and supplying the gas to the chamber at a supply flow rate corresponding to the control pressure, The opening between the gas supply line and the circulation line is controlled based on the internal pressure of the gas supply line and the control pressure of the flow control module.

12. The gas supply control method according to claim 11, in, The gas supply device also includes: A first supply valve, disposed between the injector and the flow control module; a second supply valve, disposed between the flow control module and the chamber; a first circulation valve, disposed in a circulation line connecting the injector and the flow control module at a position adjacent to the flow control module; a second circulation valve disposed in the circulation line adjacent to the ejector; a first pressure gauge provided in a first section between the first supply valve and the flow control module in the gas supply line; and A circulation line pressure gauge is provided in the circulation line between the first circulation valve and the second circulation valve.

13. The gas supply control method according to claim 12, in, The flow control module comprises: a control valve disposed adjacent to the first supply valve and controlling an opening ratio of the gas supply line; an orifice disposed adjacent to the second supply valve; a second pressure gauge disposed in the gas supply line in a second interval between the control valve and the orifice; a third pressure gauge disposed in a third interval between the orifice and the second supply valve; and A controller controls the control valve so that the pressure of the second section in the gas supply line is maintained at a set control pressure.

14. The gas supply control method according to claim 13, in, The second supply valve is set to repeatedly open and close in a constant time unit by a pulse signal, During the time when the second supply valve is open, the gas is supplied to the chamber at a supply flow rate determined by the control valve.

15. The gas supply control method according to claim 13, in, At a first timing when the second supply valve is opened, the control valve is controlled so that a first control pressure corresponding to a first gas supply flow rate is maintained in the second section, If, at the second timing when the second supply valve is closed, the pressure of the gas remaining in the second interval is greater than a second control pressure corresponding to the second gas supply flow rate to be supplied at a third timing, the second circulation valve is controlled to be open for a set time period.

16. The gas supply control method according to claim 15, in, If the difference between the pressure of the gas remaining in the second section and the pressure of the gas remaining in the circulation line is equal to or larger than a reference value, the second circulation valve is controlled to be opened at a third timing at which the second supply valve is opened.

17. The gas supply control method according to claim 13, in, The gas supply device also includes: a discharge line branched between the first circulation valve and the second circulation valve in the circulation line and connected to a discharge end; and A discharge valve is disposed on the discharge line.

18. The gas supply control method according to claim 17, in, During the cutoff time when the second supply valve is closed, the opening of the discharge valve is controlled based on the internal pressure of the gas supply line, the internal pressure of the circulation line, and the control pressure for supplying gas after the cutoff time.

19. The gas supply control method according to claim 18, in, At a first timing when the second supply valve is opened, the control valve is controlled so that a first control pressure corresponding to a first gas supply flow rate is maintained in the second section, At the second timing when the second supply valve is closed, if the pressure of the gas remaining in the second interval is greater than the second control pressure corresponding to the second gas supply flow rate to be supplied at the third timing, the second circulation valve is controlled to be open for a set time period. At a third timing when the second supply valve is opened, the control valve is controlled so that the second control pressure is maintained in the second interval, At the fourth timing when the second supply valve is closed, if the pressure in the first interval is greater than the first reference value, the pressure in the circulation line is greater than the second reference value, and the pressure in the second interval is greater than the third control pressure corresponding to the third gas supply flow rate to be supplied at the fifth timing, the discharge valve is controlled to be open.

20. A substrate processing device, in, include: a chamber for performing a process on a substrate; a gas supply device for supplying gas to the chamber; as well as a control device for controlling the operation of the gas supply device, The gas supply device comprises: a gas supply line connected from a gas supply source to the chamber and providing a flow path for the gas; a circulation line branched at a branch point of the gas supply line and connected to an upstream side of the branch point; An ejector having an internal space for sucking the gas supplied from the circulation line by utilizing the pressure of the gas flowing in from the gas supply source, and ejecting the gas in the internal space toward the gas supply line; a flow control module for adjusting the flow of the gas supplied to the chamber by controlling the pressure of the gas in the gas supply line; A first supply valve, disposed between the injector and the flow control module; a second supply valve, disposed between the flow control module and the chamber; a first circulation valve, disposed in a circulation line connecting the injector and the flow control module at a position adjacent to the flow control module; a second circulation valve disposed in the circulation line adjacent to the ejector; a discharge line branched between the first circulation valve and the second circulation valve in the circulation line and connected to a discharge end; A discharge valve, disposed on the discharge line; a first pressure gauge disposed in the gas supply line in a first section between the first supply valve and the flow control module; a circulation line pressure gauge, arranged in the circulation line between the first circulation valve and the second circulation valve, The flow control module comprises: a control valve disposed adjacent to the first supply valve and controlling an opening ratio of the gas supply line; an orifice disposed adjacent to the second supply valve; a second pressure gauge disposed in the gas supply line in a second interval between the control valve and the orifice; a third pressure gauge disposed in a third interval between the orifice and the second supply valve; and a controller that controls the control valve so that the pressure of the second section in the gas supply line is maintained at a set control pressure, The control device transmits information related to the supply flow rate of the gas to the controller of the flow control module, The controller determines a control pressure of the flow control module based on a supply flow rate of the gas, and controls the control valve so that the control pressure is maintained in the second interval during the period when the gas is supplied to the chamber. The control device controls whether the first circulation valve is opened or not based on the pressure of the gas remaining in the second section and the control pressure of the flow control module.