Bridge deck concrete curing device for highway engineering bridge construction
By designing a bridge deck concrete maintenance device for highway engineering bridge construction with liftable maintenance vehicles and multi-function modules, the problem of difficulty in achieving multiple maintenance functions in the existing technology is solved, and the multifunctionality and efficiency of bridge deck maintenance is achieved.
Patent Information
- Application Number
- CN202411351374.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-26
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing concrete pavement maintenance device is difficult to achieve wet coating during bridge deck maintenance, secondary spraying maintenance of coating, secondary heating maintenance of coating, rapid recovery of coating, and automatic extrusion and removal of recycling coating. Liquid and heat dry.
A concrete maintenance device for bridge construction bridge deck construction on highway engineering was designed, including a liftable maintenance vehicle, an adjustable angle maintenance frame, a coated roller driven by a motor, an inner guide roller and an outer pressure roller, an expansion frame, a scissor telescopic Components, nozzle modules, heating and liquid supply components and extrusion dehydration modules realize wet coating, secondary spraying and maintenance of coating, secondary heating and maintenance of coating, rapid recovery and thermal drying of coating.
It realizes the versatility of bridge deck maintenance, improves the functionality and efficiency of the device, and can synchronize the wet coating, secondary spraying maintenance of coating, secondary heating maintenance of coating, and rapid recovery of coating. and heat drying extends the service life of the curing film.
Smart Images

Figure CN118910988A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of concrete curing, and more specifically to a bridge deck concrete curing device for highway engineering bridge construction. Background Art
[0002] After the concrete pavement is paved or the soft anti-skid structure is completed, maintenance is required.
[0003] In the prior art, a patent document with publication number CN114934428B discloses a concrete pavement maintenance device, including a frame, a covering material laying mechanism and a spraying mechanism, wherein the frame includes a side frame 1, a side frame 2, a frame respectively arranged at the bottom ends of the two side frames, and a telescopic frame that is telescopic in the horizontal direction, the side frame 1 and the side frame 2 are arranged opposite to each other and are respectively connected to the two ends of the telescopic frame; the covering material laying mechanism includes two prismatic insertion rods and a covering coil, the two insertion rods are respectively rotatably connected to the two side frames, the geometric axes and the rotation axes of the two insertion rods are coincident and parallel to the telescopic direction of the telescopic frame, and a reel is arranged at one end of the covering coil, so that the above device is convenient for covering The roll material is laid on the road surface or rolled up in an orderly manner, and water or curing agent can be sprayed during the laying of the covering material, which can greatly reduce the workload required for workers to lay the covering material, facilitate the recycling and reuse of the covering roll material, and help to increase the service life of the covering roll material. The equipment occupies a small area and is convenient for transportation and storage. However, the above-mentioned maintenance device is not convenient for simultaneously realizing wet coating, secondary spraying maintenance of the coating, secondary heating maintenance of the coating, rapid recovery of the coating, automatic extrusion dehydration and thermal drying of the recovered coating during bridge deck maintenance. Based on this, the present invention provides a bridge deck concrete maintenance device for highway engineering bridge construction to solve the technical problems raised in the above-mentioned background technology. Summary of the invention
[0004] In order to overcome the shortcomings of the prior art, the present invention provides a bridge deck concrete maintenance device for highway engineering bridge construction. When the present invention is working, it can simultaneously realize wet coating, secondary spraying maintenance of the coating, secondary heating maintenance of the coating, rapid recovery of the coating, automatic extrusion dehydration and thermal drying of the recovered coating during bridge deck maintenance. By realizing the above functions, the functionality of the device is effectively improved.
[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a bridge deck concrete maintenance device for highway engineering bridge construction, comprising a maintenance vehicle, a lift frame that can be raised or lowered is installed on the maintenance vehicle, a maintenance frame with an adjustable angle is installed on the lift frame, a coating roller driven by a motor is rotatably connected between the inner surfaces of the lift frame, an inner guide roller and an outer pressure roller are rotatably connected between the inner surfaces of the maintenance frame, an expansion frame is provided above the maintenance frame, a scissor-type telescopic component is installed between the maintenance frame and the expansion frame, a group of regularly distributed and spaced-adjustable nozzle modules are installed on the scissor-type telescopic component, a heating and liquid supply component is installed on the maintenance vehicle, a group of the nozzle modules are all connected to the heating and liquid supply component, two upper guide rollers are rotatably connected between the inner surfaces of the expansion frame, an extrusion deliquidation module is installed on the expansion frame and at a position corresponding to the upper side of an upper guide roller, and a bridge deck cleaning module is installed at the front of the maintenance frame.
[0006] As a preferred technical solution of the present invention, a group of casters are installed on the bottom surface of the maintenance vehicle, a single-chip microcomputer is installed on the end face of the maintenance vehicle, a vertically arranged screw lifting module is installed on the maintenance vehicle, the screw lifting module is transmission-connected to the lifting frame, the lifting frame is hinged to the maintenance frame, and two symmetrically arranged angle adjustment push rods are hinged between the lifting frame and the maintenance frame.
[0007] As a preferred technical solution of the present invention, a curing film is wound on the laminating roller, and the inner guide roller, the outer pressure roller and the two upper guide rollers are all in contact with the curing film.
[0008] As a preferred technical solution of the present invention, the bridge deck cleaning module includes a negative pressure vacuum cleaner fixed to the side of the maintenance frame and two negative pressure suction shafts rotatably connected to the inner surface of the maintenance frame, the outer pressure roller is transmission-connected with a chain belt, the two negative pressure suction shafts are transmission-connected with the chain belt, the two negative pressure suction shafts are fixedly installed with spiral brush pieces, a negative pressure flow channel is fixedly opened at the axial position of the negative pressure suction shaft, the suction end of the negative pressure vacuum cleaner is connected with a negative pressure connecting pipe, the two negative pressure flow channels are rotationally connected with the negative pressure connecting pipe, and a group of negative pressure strip holes distributed in a circular array and connected to the negative pressure flow channel are opened on the negative pressure suction shaft.
[0009] As a preferred technical solution of the present invention, the spiral directions of the two spiral brush pieces are opposite, and the spiral brush pieces include a spiral skeleton, the spiral skeleton is made of metal, and the outer edge of the spiral skeleton is evenly distributed with bristles, and the bristles are made of rubber.
[0010] As a preferred technical solution of the present invention, the extrusion dehydration module includes an extrusion roller rotatably connected to the inner surface of the expansion frame, the extrusion roller is arranged above the upper guide roller, a pressurized flow channel is fixedly opened inside the extrusion roller, an extrusion ring bag is installed on the extrusion roller, a plurality of groups of pressure-transmitting holes are opened on the extrusion roller, the inner cavity of the extrusion ring bag is connected with the pressurized flow channel through the pressure-transmitting holes, an extrusion seam for extruding the curing film is fixedly arranged between the extrusion ring bag and the upper guide roller, an air pump is installed on the curing vehicle, the port of the air pump is rotatably connected with the pressurized flow channel through a connecting pressure pipe, and an air pressure probe electrically connected to the single-chip computer is installed on the connecting pressure pipe.
[0011] As a preferred technical solution of the present invention, the heating and liquid supply components include a flexible connecting pipe and a liquid storage tank and a hot air blower installed on a maintenance vehicle. A pump body is provided at the bottom of the liquid storage tank. The air outlet port of the pump body and the air outlet port of the hot air blower are both connected to the flexible connecting pipe. A one-way liquid outlet valve is fixedly provided at the connection point between the pump body and the flexible connecting pipe, and a one-way air outlet valve is fixedly provided at the connection point between the hot air blower and the flexible connecting pipe. Each of the nozzle modules is connected to the flexible connecting pipe.
[0012] As a preferred technical solution of the present invention, the scissor-type telescopic component includes a linear transmission module installed on the maintenance frame and a group of "X"-shaped frames distributed in a linear array and hinged in pairs in sequence, and the hinges of the two "X"-shaped frames are each provided with two symmetrically arranged positioning sleeves, and a certain hinge seat is installed on the maintenance vehicle and the expansion frame, and a movable hinge seat is slidably connected to the maintenance vehicle and the expansion frame, and the fixed hinge seat and the movable hinge seat are both hinged to the "X"-shaped frame at adjacent positions, and the linear transmission module is transmission-connected to the movable hinge seat on the maintenance frame.
[0013] As a preferred technical solution of the present invention, the nozzle module includes two symmetrically arranged nozzle bodies and two positioning rods which are interconnected by a three-way pipe. The two positioning rods are rotatably connected to the positioning sleeves at corresponding positions. A guide groove is provided on the back of the two nozzle bodies. Guide blocks slidably connected to the guide groove are fixedly installed at both ends of each positioning rod. A group of regularly distributed nozzles are installed on the nozzle body, and the axis of the nozzle is perpendicular to the axis of the inner guide roller.
[0014] Compared with the prior art, the present invention has the following beneficial effects: 1. When the present invention is working, it can simultaneously realize wet coating during bridge deck maintenance, secondary spraying maintenance of the coating, secondary heating maintenance of the coating, rapid recovery of the coating, automatic extrusion dehydration and thermal drying of the recovered coating. By realizing the above functions, the functionality of the device is effectively improved.
[0015] 2. In the present invention, when the maintenance device performs film coating maintenance operations on concrete pavement, the angle adjustment push rod is set so that the maintenance frame is set vertically. When the maintenance frame is set vertically, the scissor-type telescopic component is fully retracted, so that the distance between the expansion frame and the maintenance frame is maintained to a minimum. During the coating operation, the curing film is wound on the coating roller, and the curing film passes through the inner guide roller, the upper guide roller and the outer pressure roller in sequence, and then the curing film is laid on the concrete bridge deck. After the curing film is laid, when wet coating is required, the pump body discharges liquid, and then the spray liquid is evenly sprayed on the curing film. By spraying the spray liquid, wet coating of the bridge deck is achieved.
[0016] 3. In the present invention, when the concrete pavement is coated and the coated body needs to be sprayed with water for the second time, first, the coating roller fully reels the unused curing film so that the nozzle body leaks out. After the nozzle body is exposed, the output setting of the adjusting arm push rod is adjusted so that the curing frame is unfolded at a set angle. After the curing frame is unfolded, the telescopic range of the scissor-type telescopic component is adjusted by setting the linear transmission module according to the spraying efficiency and spraying intensity requirements of the concrete pavement. By adjusting the telescopic range of the scissor-type telescopic component, the distance between the two nozzle modules and the spray coverage area and spray curing intensity of the concrete pavement per unit time of the device are adjusted.
[0017] 4. In the present invention, when the concrete pavement is coated and the coating body needs to be heated and insulated, first, the coating roller fully rolls up the unused curing film so that the nozzle body leaks out. After the nozzle body is exposed, the output setting of the adjusting arm push rod is adjusted so that the curing frame is unfolded at a set angle. After the curing frame is unfolded, according to the heating and insulation requirements of the concrete pavement, the telescopic range of the scissor-type telescopic component is adjusted by setting the linear transmission module. By adjusting the telescopic range of the scissor-type telescopic component, the distance between the two nozzle modules and the hot air outlet coverage area and heat coverage intensity of the concrete pavement per unit time of the device are adjusted.
[0018] 5. In the present invention, when the device is in the film coating mode, the gas inside the extrusion ring bag is fully emptied, so that the extrusion ring bag loses the extrusion and dehydration effect on the curing film. When it is necessary to realize the recovery operation of the curing film laid on the concrete, the curing film to be recovered on the concrete first passes through the extrusion ring bag and the upper guide roller, and the front end of the curing film to be recovered is fixed on the film coating roller. When the film is recovered, the film coating roller reels the curing film to be recovered at a set speed, and the interior of the extrusion ring bag is fully aired, thereby realizing the forced extrusion and dehydration when the curing film is recovered. Liquid, and when the curing film is recovered, the hot air blower discharges hot air at high pressure, and then simultaneously realizes the extrusion deliquescence and thermal drying when the curing film is recovered. Through thermal drying, it is beneficial to the subsequent storage of the curing film. When the curing film is recovered, the curing frame is vertically arranged. When the curing frame is vertically arranged, the scissor-type telescopic component is fully expanded, and the distance between the expansion frame and the curing frame and the distance between the two nozzle modules are adjusted to the maximum. By maintaining the above state, the curing film can fully receive the hot air effect of the nozzle body, and then the curing film can be fully thermally dried.
[0019] 6. During the coating operation of the present invention, the negative pressure vacuum cleaner works synchronously, and the two spiral brushes rotate at a set speed, thereby pre-cleaning the debris on the concrete bridge deck. Through pre-cleaning, the influence of the bridge deck dirt on the coverage of the maintenance film is reduced, and then the coating flatness and coating fit of the maintenance film on the concrete pavement are improved, so as to improve the coating maintenance effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is a structural schematic diagram of a bridge deck concrete maintenance device for highway engineering bridge construction according to the present invention; Figure 2 For the present invention Figure 1 A schematic diagram of the local enlarged structure at point A in the middle; Figure 3 For the present invention Figure 1 A schematic diagram of the local enlarged structure at B in the middle; Figure 4 It is a structural schematic diagram of the joint pressure pipe and the liquid storage tank of the present invention; Figure 5 For the present invention Figure 4 A schematic diagram of the local enlarged structure at C in the middle; Figure 6 For the present invention Figure 4 A schematic diagram of the local enlarged structure at D in the middle; Figure 7 It is a schematic diagram of the cross-sectional structure of the extruded ring capsule of the present invention; Figure 8 It is a schematic structural diagram of the nozzle body and the positioning rod of the present invention.
[0021] In the figure: 1. maintenance vehicle; 2. lifting frame; 3. maintenance frame; 4. motor; 5. coating roller; 6. inner guide roller; 7. outer pressure roller; 8. expansion frame; 9. upper guide roller; 10. caster; 11. single chip microcomputer; 12. screw lifting module; 13. angle adjustment push rod; 14. maintenance film; 15. negative pressure vacuum cleaner; 16. negative pressure suction shaft; 17. spiral brush piece; 18. negative pressure connecting pipe; 19. negative pressure strip hole; 20. extrusion roller; 21. extrusion ring bag; 22. pressure hole; 23. air pump; 24. connecting pressure pipe; 25. air pressure probe; 26. flexible connecting pipe; 27. liquid storage tank; 28. hot air blower; 29. pump body; 30. linear transmission module; 31. "X" frame; 32. positioning sleeve; 33. three-way pipe; 34. nozzle body; 35. positioning rod; 36. guide block. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] like Figures 1 to 8 As shown, the present invention provides a bridge deck concrete maintenance device for highway engineering bridge construction, comprising a maintenance vehicle 1, a group of casters 10 are installed on the bottom surface of the maintenance vehicle 1, and a single-chip computer 11 is installed on the end surface of the maintenance vehicle 1; A lift frame 2 that can be raised and lowered is installed on the maintenance vehicle 1; A vertically arranged screw lifting module 12 is installed on the maintenance vehicle 1, and the screw lifting module 12 is transmission-connected to the lifting frame 2; An angle-adjustable curing frame 3 is installed on the lifting frame 2; The lifting frame 2 is hinged to the curing frame 3, and two symmetrically arranged angle adjustment push rods 13 are hinged between the lifting frame 2 and the curing frame 3; By setting the screw lifting module 12, the layout height of the curing frame 3 can be quickly adjusted, and by setting the two angle adjustment push rods 13, the layout angle and curing mode of the curing frame 3 can be quickly adjusted; When the maintenance device is performing a film-covering maintenance operation on a concrete pavement, the angle adjustment push rod 13 is set so that the maintenance frame 3 is set vertically. When the maintenance frame 3 is set vertically, the scissor-type telescopic component is fully retracted, so that the distance between the expansion frame 8 and the maintenance frame 3 is maintained at a minimum. During the film coating operation, the curing film 14 is wound on the film coating roller 5, and the curing film 14 passes through the inner guide roller 6, the upper guide roller 9 and the outer pressure roller 7 in sequence, and then the curing film 14 is laid on the concrete bridge deck; After the curing film 14 is laid, when wet coating is required, the pump body 29 discharges liquid, and then sprays the spray liquid evenly on the curing film 14, thereby achieving wet coating of the bridge deck through spraying of the spray liquid; When the concrete pavement is coated and the coating body needs to be sprayed with water for the second time, first, the coating roller 5 fully retracts the unused curing film 14, so that the nozzle body 34 leaks out. After the nozzle body 34 is exposed, the curing frame 3 is unfolded at a set angle by adjusting the output setting of the adjusting arm push rod. After the curing frame 3 is unfolded, the telescopic range of the scissor-type telescopic component is adjusted by setting the linear transmission module 30 according to the spraying efficiency and spraying intensity requirements of the concrete pavement. By adjusting the telescopic range of the scissor-type telescopic component, the spacing between the two nozzle modules and the spraying coverage area and spraying curing intensity of the concrete pavement per unit time of the device are adjusted; When the concrete pavement is covered with film and the heating and heat preservation of the covered body is required, first, the film-covering roller 5 fully retracts the unused curing film 14, so that the nozzle body 34 leaks out. After the nozzle body 34 is exposed, the curing frame 3 is unfolded at a set angle by adjusting the output setting of the adjusting arm push rod. After the curing frame 3 is unfolded, the telescopic range of the scissor-type telescopic component is adjusted by setting the linear transmission module 30 according to the heating and heat preservation requirements of the concrete pavement. By adjusting the telescopic range of the scissor-type telescopic component, the distance between the two nozzle modules and the hot air outlet coverage area and heat coverage intensity of the concrete pavement per unit time of the device are adjusted; A coating roller 5 driven by a motor 4 is rotatably connected between the inner surfaces of the lifting frame 2, an inner guide roller 6 and an outer pressure roller 7 are rotatably connected between the inner surfaces of the curing frame 3, an expansion frame 8 is provided above the curing frame 3, two upper guide rollers 9 are rotatably connected between the inner surfaces of the expansion frame 8, and an extrusion dehydration module is installed on the expansion frame 8 and at a position corresponding to the upper side of an upper guide roller 9; The film coating roller 5 is wound with a curing film 14, and the inner guide roller 6, the outer pressure roller 7 and the two upper guide rollers 9 are all in contact with the curing film 14; The extrusion dehydration module includes an extrusion roller 20 rotatably connected to the inner surface of the expansion frame 8, the extrusion roller 20 is arranged above the upper guide roller 9, a pressurized flow channel is fixedly opened inside the extrusion roller 20, an extrusion ring capsule 21 is installed on the extrusion roller 20, a plurality of groups of through-pressure holes 22 are opened on the extrusion roller 20, the inner cavity of the extrusion ring capsule 21 is connected to the pressurized flow channel through the through-pressure holes 22, an extrusion seam for extruding the curing film 14 is fixedly arranged between the extrusion ring capsule 21 and the upper guide roller 9, an air pump 23 is installed on the curing vehicle 1, a port of the air pump 23 is rotatably connected to the pressurized flow channel through a connecting pressure pipe 24, and an air pressure probe 25 electrically connected to the single-chip computer 11 is installed on the connecting pressure pipe 24; When the device is in the film coating mode, the gas inside the extrusion ring capsule 21 is fully emptied, so that the extrusion ring capsule 21 loses the extrusion and dehydration effect on the curing film 14; When it is necessary to realize the recovery operation of the curing film 14 laid on the concrete, the curing film 14 to be recovered on the concrete first passes through the extrusion ring bag 21 and the upper guide roller 9, and the front end of the curing film 14 to be recovered is fixed on the film coating roller 5. When the film is recovered, the film coating roller 5 reels the curing film 14 to be recovered at a set speed, and the interior of the extrusion ring bag 21 is fully aired, and then the forced extrusion and liquid removal of the curing film 14 is realized when the curing film 14 is recovered; When the curing film 14 is recycled, the hot air blower 28 blows out hot air at high pressure, and then simultaneously realizes the extrusion dehydration and thermal drying of the curing film 14 during recycling, and the thermal drying is beneficial to the subsequent storage of the curing film 14; When the curing film 14 is recovered, the curing frame 3 is vertically arranged. When the curing frame 3 is vertically arranged, the scissor-type telescopic component is fully extended, and the distance between the extension frame 8 and the curing frame 3 and the distance between the two nozzle modules are adjusted to the maximum. By maintaining the above state, the curing film 14 can fully receive the hot air effect of the nozzle body 34, and then the curing film 14 can be fully thermally dried; A scissor-type telescopic component is installed between the maintenance frame 3 and the expansion frame 8, and a group of regularly distributed and adjustable-pitch nozzle modules are installed on the scissor-type telescopic component. A heating and liquid supply component is installed on the maintenance vehicle 1, and a group of nozzle modules are connected to the heating and liquid supply components. A bridge deck cleaning module is installed at the front of the maintenance frame 3.
[0024] The bridge deck cleaning module includes a negative pressure vacuum cleaner 15 fixed to the side of the maintenance frame 3 and two negative pressure suction shafts 16 rotatably connected to the inner surface of the maintenance frame 3. A chain belt is transmission-connected to the outer pressure roller 7. The two negative pressure suction shafts 16 are both transmission-connected to the chain belt. Spiral brush pieces 17 are fixedly installed on the two negative pressure suction shafts 16. A negative pressure flow channel is fixedly opened at the axial position of the negative pressure suction shaft 16. The suction end of the negative pressure vacuum cleaner 15 is connected to a negative pressure connecting pipe 18. The two negative pressure flow channels are both rotationally connected to the negative pressure connecting pipe 18. A group of negative pressure strip holes 19 distributed in a circular array and connected to the negative pressure flow channel are opened on the negative pressure suction shaft 16.
[0025] The spiral directions of the two spiral brush pieces 17 are opposite. The spiral brush piece 17 comprises a spiral skeleton made of metal. The outer edge of the spiral skeleton is evenly distributed with bristles made of rubber.
[0026] During the film coating operation, the negative pressure vacuum cleaner 15 works synchronously, and the two spiral brush pieces 17 rotate at a set speed, thereby pre-cleaning the debris on the concrete bridge deck. Through pre-cleaning, the influence of the bridge deck dirt on the coverage of the curing film 14 is reduced, and then the film coating flatness and film coating fit of the curing film 14 on the concrete road surface are improved, so as to improve the film coating curing effect; The heating and liquid supply components include a flexible connecting pipe 26, a liquid storage tank 27 and a hot air blower 28 installed on the maintenance vehicle 1. A pump body 29 is provided at the bottom of the liquid storage tank 27. The air outlet port of the pump body 29 and the air outlet port of the hot air blower 28 are both connected to the flexible connecting pipe 26. A one-way liquid outlet valve is fixedly provided at the connection point between the pump body 29 and the flexible connecting pipe 26. A one-way air outlet valve is fixedly provided at the connection point between the hot air blower 28 and the flexible connecting pipe 26. Each nozzle module is connected to the flexible connecting pipe 26.
[0027] By setting the one-way liquid outlet valve, the pump body 29 can only discharge liquid in one direction; By setting the one-way air outlet valve, the hot air blower 28 can only blow air in one direction, and effectively prevent the spray liquid and curing liquid from entering the hot air blower 28 when the pump body 29 is working; The scissor-type telescopic component includes a linear transmission module 30 installed on the maintenance frame 3 and a group of "X"-shaped frames 31 distributed in a linear array and hinged in pairs in sequence. The hinges of the two "X"-shaped frames 31 are each provided with two symmetrically arranged positioning sleeves 32. A certain hinge seat is installed on the maintenance vehicle 1 and the expansion frame 8. A movable hinge seat is slidably connected to the maintenance vehicle 1 and the expansion frame 8. The fixed hinge seat and the movable hinge seat are both hinged to the "X"-shaped frame 31 at adjacent positions. The linear transmission module 30 is in transmission connection with the movable hinge seat on the maintenance frame 3. The nozzle module includes two symmetrically arranged nozzle bodies 34 and two positioning rods 35 which are interconnected through a three-way pipe 33. The two positioning rods 35 are rotatably connected to the positioning sleeves 32 at corresponding positions. A guide groove is provided on the back of the two nozzle bodies 34. Both ends of each positioning rod 35 are fixedly installed with a guide block 36 which is slidably connected to the guide groove. A group of regularly distributed nozzles are installed on the nozzle body 34, and the axis of the nozzle is perpendicular to the axis of the inner guide roller 6.
[0028] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A bridge deck concrete maintenance device for highway engineering bridge construction, comprising a maintenance vehicle (1), characterized in that: The maintenance vehicle (1) is provided with a lifting frame (2) that can be raised and lowered, and an angle-adjustable maintenance frame (3) is provided on the lifting frame (2). A coating roller (5) driven by a motor (4) is rotatably connected between the inner surfaces of the lifting frame (2), and an inner guide roller (6) and an outer pressure roller (7) are rotatably connected between the inner surfaces of the maintenance frame (3). An expansion frame (8) is provided above the maintenance frame (3), and a scissor-type telescopic component is installed between the maintenance frame (3) and the expansion frame (8). A group of regularly distributed and spaced-adjustable nozzle modules are installed on the scissor-type telescopic component. The maintenance vehicle (1) is provided with a heating and liquid supply component, and a group of the nozzle modules are all connected to the heating and liquid supply component. Two upper guide rollers (9) are rotatably connected between the inner surfaces of the expansion frame (8), and an extrusion dehydration module is installed on the expansion frame (8) and at a position corresponding to the upper side of an upper guide roller (9). A bridge deck cleaning module is installed at the front of the maintenance frame (3).
2. A bridge deck concrete maintenance device for highway engineering bridge construction according to claim 1, characterized in that: A group of casters (10) are installed on the bottom surface of the maintenance vehicle (1), a single chip computer (11) is installed on the end surface of the maintenance vehicle (1), and a vertically arranged screw lifting module (12) is installed on the maintenance vehicle (1), the screw lifting module (12) is transmission-connected to the lifting frame (2), the lifting frame (2) is hinged to the maintenance frame (3), and two symmetrically arranged angle adjustment push rods (13) are hinged between the lifting frame (2) and the maintenance frame (3).
3. A bridge deck concrete maintenance device for highway engineering bridge construction according to claim 1, characterized in that: A curing film (14) is wound on the laminating roller (5), and the inner guide roller (6), the outer pressure roller (7) and the two upper guide rollers (9) are all in contact with the curing film (14).
4. A bridge deck concrete maintenance device for highway engineering bridge construction according to claim 1, characterized in that: The bridge deck cleaning module comprises a negative pressure vacuum cleaner (15) fixed to the side of the maintenance frame (3) and two negative pressure suction shafts (16) rotatably connected to the inner surface of the maintenance frame (3); a chain belt is connected to the outer pressure roller (7); the two negative pressure suction shafts (16) are connected to the chain belt in a transmission manner; spiral brush pieces (17) are fixedly installed on the two negative pressure suction shafts (16); a negative pressure flow channel is fixedly opened at the axial position of the negative pressure suction shaft (16); the suction end of the negative pressure vacuum cleaner (15) is connected to a negative pressure connecting pipe (18); the two negative pressure flow channels are rotatably connected to the negative pressure connecting pipe (18); and a group of negative pressure strip holes (19) distributed in a circular array and connected to the negative pressure flow channel are opened on the negative pressure suction shaft (16).
5. A bridge deck concrete maintenance device for highway engineering bridge construction according to claim 4, characterized in that: The spiral directions of the two spiral brush pieces (17) are opposite, and the spiral brush pieces (17) comprise a spiral skeleton, the spiral skeleton is made of metal, and the outer edge of the spiral skeleton is evenly distributed with bristles, and the bristles are made of rubber.
6. A bridge deck concrete maintenance device for highway engineering bridge construction according to claim 1, characterized in that: The extrusion dehydration module comprises an extrusion roller (20) rotatably connected to the inner surface of the expansion frame (8), the extrusion roller (20) being arranged above the upper guide roller (9), a pressurizing flow channel being fixedly opened inside the extrusion roller (20), an extrusion ring capsule (21) being installed on the extrusion roller (20), a plurality of groups of pressure-transmitting holes (22) being opened on the extrusion roller (20), an inner cavity of the extrusion ring capsule (21) being connected to the pressurizing flow channel through the pressure-transmitting holes (22), an extrusion seam for extruding the curing film (14) being fixedly arranged between the extrusion ring capsule (21) and the upper guide roller (9), an air pump (23) being installed on the curing vehicle (1), a port of the air pump (23) being rotatably connected to the pressurizing flow channel through a pressure-connecting pipe (24), and an air pressure probe (25) being electrically connected to the single-chip computer (11) being installed on the pressure-connecting pipe (24).
7. A bridge deck concrete maintenance device for highway engineering bridge construction according to claim 6, characterized in that: The heat supply and liquid supply component comprises a flexible connecting pipe (26), a liquid storage tank (27) and a hot air blower (28) installed on the maintenance vehicle (1); a pump body (29) is provided at the bottom of the liquid storage tank (27); an air outlet port of the pump body (29) and an air outlet port of the hot air blower (28) are both in communication with the flexible connecting pipe (26); a one-way liquid outlet valve is fixedly provided at the connection point between the pump body (29) and the flexible connecting pipe (26); a one-way air outlet valve is fixedly provided at the connection point between the hot air blower (28) and the flexible connecting pipe (26); and each of the nozzle modules is in communication with the flexible connecting pipe (26).
8. A bridge deck concrete maintenance device for highway engineering bridge construction according to claim 7, characterized in that: The scissor-type telescopic component comprises a linear transmission module (30) mounted on the maintenance frame (3) and a group of "X"-shaped frames (31) distributed in a linear array and hinged in pairs, two symmetrically arranged positioning sleeves (32) are provided at the hinges of the two "X"-shaped frames (31), a certain hinge seat is installed on the maintenance vehicle (1) and the expansion frame (8), a movable hinge seat is slidably connected to the maintenance vehicle (1) and the expansion frame (8), the fixed hinge seat and the movable hinge seat are hinged to the "X"-shaped frames (31) at adjacent positions, and the linear transmission module (30) is transmission-connected to the movable hinge seat on the maintenance frame (3).
9. A bridge deck concrete maintenance device for highway engineering bridge construction according to claim 8, characterized in that: The nozzle module comprises two nozzle bodies (34) and two positioning rods (35) which are symmetrically arranged and interconnected via a three-way pipe (33). The two positioning rods (35) are rotatably connected to the positioning sleeves (32) at corresponding positions. A guide groove is provided on the back of the two nozzle bodies (34). A guide block (36) which is slidably connected to the guide groove is fixedly mounted at both ends of each positioning rod (35). A group of regularly distributed nozzles are mounted on the nozzle body (34), and the axes of the nozzles are perpendicular to the axis of the inner guide roller (6).
