Separating and pressure maintaining device for segmented uniform cracking blasting of composite roof and construction method
By using a composite roof segmented uniform cracking blasting isolation and pressure-holding device and construction method, the problem of pre-cracking of composite roof in traditional blasting methods was solved, and the independent wedging of explosive gas and crack penetration of each blasting zone were achieved, thus optimizing the blasting effect.
Patent Information
- Application Number
- CN202411338486.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-09-25
AI Technical Summary
Traditional blasting methods are difficult to controllably pre-splitting composite roof structures, resulting in the crack development range gradually decreasing from the bottom of the hole to the opening after blasting. It is also difficult for the cuts of adjacent pre-splitting holes to be connected, thus failing to guarantee the ideal roof cutting effect.
A composite top plate segmented uniform fracture blasting isolation and pressure holding device is adopted, including a tube body, an expansion sleeve and a sealing component. By opening annular grooves and material passage holes in the circumferential sidewall of the tube body, the expansion sleeve expands and fills the cut holes under the action of the expansion agent. Combined with the initiation network of electronic digital detonators, the blasting effect is optimized.
It enables independent explosive gas wedging processes in each blasting zone, reduces the amount of explosives used, optimizes the blasting effect, ensures the continuity of cracks after blasting, and achieves the ideal roof-cutting effect.
Smart Images

Figure CN118913042A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining, and in particular to a composite roof segmented homogeneous splitting blasting isolation and pressure maintaining device and a construction method. Background Art
[0002] Pre-splitting blasting and roof cutting is a key method of roof weakening technology. The current research on roof weakening mainly focuses on the surrounding rock control mechanism and technology that assumes that a good roof cutting effect has been achieved, but the assumed good roof cutting effect is difficult to control in actual engineering applications. Therefore, optimizing the roof cutting and pressure relief technology, especially the pre-splitting blasting technology for composite roof structures, is of great significance to improving the roof weakening effect and mine safety.
[0003] The composite roof is composed of multiple layers of rocks with different lithology. The sensitivity of each rock layer to blasting is significantly different, and the fracture state of each rock layer under blasting shows different rules according to the lithology of the blasting layer. In traditional blasting methods, since the matching problem of explosives and lithology is not considered, large-volume, small-spacing pre-splitting blasting parameters are usually used. However, this method is difficult to controllably pre-splitting the composite roof structure, which easily leads to the gradual decrease of the fracture development range from the bottom of the hole to the hole mouth after blasting, that is, an inverted cone (refer to Figure 1 ), and the cuts of adjacent pre-splitting holes are difficult to penetrate, forming a rock sill near the hole mouth (refer to Figure 2 ), so the ideal topping effect cannot be guaranteed.
[0004] In view of the technical phenomena mentioned above, the inventors believe that the blasting effect is caused by the combined effects of the explosion shock wave and the wedging of the explosion gas, wherein the explosion shock wave is an instantaneous effect, and the rock mass is destroyed and forms a crushing circle under the action of tensile stress and shear stress, and the explosion gas then wedges into the cracks, causing further damage to the rock mass. During the blasting process, the original cracks in the rock mass can be regarded as a buffer layer, which can guide the explosion gas and weaken the explosion shock wave due to its porous nature. The macroscopic manifestation is that the sensitivity of soft rock and hard rock to blasting is significantly different. To this end, the inventors proposed a composite roof segmented splitting blasting isolation and pressure maintaining device, and combined it with a blasting construction method to optimize the top cutting effect. Summary of the invention
[0005] The purpose of the present invention is to provide a composite roof segmented homogeneous splitting blasting isolation and pressure maintaining device and a construction method to solve the problem that pre-splitting slit holes are difficult to penetrate and the roof cutting effect is poor.
[0006] The present invention provides a composite roof segmented homogeneous blasting isolation and pressure-maintaining device, which adopts the following technical solution: A composite roof segmented homogeneous blasting isolation and pressure-maintaining device, comprising: A tube body, wherein a cavity is arranged inside the tube body, an annular groove is provided on the circumferential side wall of the tube body, and the annular groove is provided in multiple groups, and the multiple groups of annular grooves are distributed at equal intervals along the length direction of the tube body, and the tube wall of the tube body located in the annular groove is provided with multiple groups of material passing holes communicating with the cavity; An expansion sleeve member, sleeved on the circumferential groove wall of the annular groove; The blocking member is arranged in the cavity and is used to block the two ends of the tube body in the length direction.
[0007] Preferably, the expansion sleeve is made of rubber and comprises a main cylinder body and an expansion cylinder body. The main cylinder body is sleeved on the circumferential groove wall of the annular groove. The cylinder diameter of the expansion cylinder body is gradually reduced, and the shrinking end of the expansion cylinder body is connected to the circumferential side wall of the main cylinder body.
[0008] Preferably, the blocking member comprises a connecting rod and a blocking sheet group, two groups of the blocking sheet groups are provided, and the two groups of the blocking sheet groups are respectively arranged at both ends of the connecting rod in the length direction, and the cavity wall is provided with a limiting structure for fixing the blocking sheet group.
[0009] Preferably, the blocking piece group includes a spacer and a steel sheet, and the spacer and the steel sheet are sequentially mounted on the end of a connecting rod, and a limiting piece for fixing the blocking piece group is provided at the end of the connecting rod.
[0010] Preferably, the limiting structure is a limiting ring body, and two groups of the limiting structures are provided, and the side of the spacer facing away from the steel sheet abuts against the limiting structure.
[0011] Preferably, the limiting ring body is provided with a wire threading groove.
[0012] Preferably, both ends of the connecting rod in the length direction are respectively provided with mounting grooves, and the spacer and the steel sheet are sleeved on the circumferential groove wall of the mounting groove; The limiting member is a nut, and a circumferential groove wall of the installation groove is provided with a thread matching the nut.
[0013] Preferably, the cavity walls at both ends in the length direction of the cavity are also provided with wire tie rings respectively, and the wire tie rings are located on the side of the spacer away from the steel sheet.
[0014] The present invention also provides a construction method of the composite roof segmented homogeneous blasting isolation and pressure-maintaining device, comprising the following steps: S1. Drill and coring the tunnel roof to be pre-splitting blasted. The coring length is greater than 3 times the mining height. Take several rock samples and test them to obtain the rock mass quality classification; S2, analyzing the position of the key layer of the roof according to the rock sample taken in step S1, designing and constructing the slit holes, drilling and peering at the slit holes, analyzing the lithology structure and fracture development characteristics of each layer, dividing the pre-blasting area and the non-blasting area, and dividing the pre-blasting area into a soft rock blasting area, a medium hard rock blasting area, a hard rock blasting area and their corresponding lengths; S3, determining the charge amount of the soft rock blasting area, the medium hard rock blasting area and the hard rock blasting area in step S2, and filling the explosives into multiple groups of energy-focusing tubes; S4, connecting the energy-gathering tube and the composite roof segmented homogeneous blasting isolation and pressure-maintaining device in step S3 in sequence end to end, and leading out the wires; S5, repeating steps S3 and S4 to complete the charging of the slit holes, and filling the electronic digital detonator at one end of the pre-blasting area close to the non-blasting area, and leading out the wire of the electronic digital detonator; S6, plugging the cut holes and connecting in parallel the electronic digital detonator detonation network; S7. Wait for 20-30 minutes, evacuate underground workers to a safe location, and detonate to complete the blasting and top cutting operation.
[0015] Preferably, the installation of the composite roof segmented homogeneous blasting isolation and pressure-maintaining device in step S4 comprises the following steps: S1. Sleeve the expansion sleeve on the annular groove of the tube body, lead the lead wire in from the top end of the tube body, and lead it out from the bottom end of the tube body; S2. Install the plugging plate group located at the bottom end of the pipe body, place the septum and the steel plate in the installation groove of the connecting rod in sequence, install the nut to fix the plugging plate group, and make the side of the septum away from the steel plate abut against the limiting ring at the bottom end of the pipe body; S3. Prepare a retarder and inject it into the cavity from the top of the pipe body. Stop filling after the retarder is filled to the limiting ring at the top of the pipe body. Install the spacer and steel sheet at the top of the pipe body in sequence, and install the nut to obtain a composite roof segmented uniform blasting isolation and pressure maintaining device.
[0016] In summary, the present invention includes the following beneficial technical effects: 1. A composite roof segmented homogeneous blasting isolation and pressure-maintaining device of the present invention comprises a pipe body, an expansion sleeve and a sealing member, wherein an annular groove is provided on the circumferential side wall of the pipe body, a feeding hole is provided on the wall of the annular groove, and the expansion sleeve is sleeved on the wall of the annular groove, wherein a cavity pre-loaded with a retarder is provided inside the pipe body, and the sealing member plays a role of sealing both ends of the pipe body in the length direction, thereby avoiding the phenomenon of the retarder flowing out from both ends of the pipe body in the length direction, and the retarder flows from the feeding hole to the gap between the expansion sleeve and the annular groove, and the sleeve expands under the action of the expansion agent, thereby causing the retarder to fill the cut hole, compact the rock mass, and achieve the isolation effect.
[0017] 2. The composite roof segmented homogeneous blasting isolation and pressure-maintaining device and blasting construction method of the present invention weaken the energy absorption effect of the soft rock blasting zone on the explosion shock wave, reduce the phenomenon of the explosion gas from the hard rock blasting zone escaping to the soft rock blasting zone, and enable each blasting zone to have an independent post-blasting explosion gas wedging process, fully utilize the sensitivity difference of different rock types to the blasting effect, reduce the amount of explosives used, and optimize the blasting effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a picture of the blasting effect under the traditional charging method; Figure 2 This is a diagram of the blasting effect under the uniform bulk charge method; Figure 3 It is a structural schematic diagram of a composite roof segmented homogeneous blasting isolation and pressure-maintaining device provided by an embodiment of the present invention; Figure 4 It is a schematic diagram for showing the structure of the plugging member in a disassembled state; Figure 5 This is a schematic diagram of the structure of the pipe body without the expansion sleeve installed; Figure 6 is a schematic diagram of the cross-sectional structure of the expansion sleeve; Figure 7 is a schematic structural diagram of a site arrangement in an embodiment of the present invention; Figure 8 is a schematic structural diagram of the blasting zone arrangement in an embodiment of the present invention; Fig. 9 It is a schematic diagram of the blasting effect structure in an embodiment of the present invention.
[0019] Explanation of the reference numerals: 1. Tube body; 11. Cavity; 111. Limiting structure; 112. Threading groove; 113. Wire tie ring; 12. Ring groove; 121. Feed hole; 2. Expansion sleeve; 21. Main cylinder; 22. Expanding cylinder; 3. Sealing member; 31. Connecting rod; 311. Mounting groove; 32. Sealing piece group; 321. Spacer; 322. Steel sheet; 4. Limiting member; 5. Pre-blasting zone; 51. Hard rock blasting zone; 52. Medium hard rock blasting zone; 6. Non-blasting zone; 7. Digital electronic detonator. DETAILED DESCRIPTION
[0020] The following is combined with Figure 1-9 The present invention is described in further detail.
[0021] The present invention provides a composite roof segmented homogeneous blasting isolation and pressure maintaining device, referring to Figure 3 and Figure 4 , comprising a tube body 1, an expansion sleeve 2 and a plugging member 3; wherein the tube body 1 is provided with a cavity 11 running through both ends of its length direction, and the cavity 11 is used to fill the retarder; Figure 5The circumferential side wall of the pipe body 1 has multiple groups of annular grooves 12 equidistantly distributed along the length direction of the pipe body 1. The annular grooves 12 are used to install the expansion sleeve 2, and the groove wall of the annular groove 12 has multiple groups of feeding holes 121 connected with the cavity 11. The expansion agent flows to the gap between the expansion sleeve 2 and the annular groove 12 through the feeding holes 121. The sleeve expands under the action of the expansion agent, so that the retarding agent fills the cut hole, compacts the rock mass, and achieves the isolation effect; the plugging member 3 is arranged in the cavity 11 to block the two ends of the pipe body 1 in the length direction to prevent the expansion agent from flowing out from the two ends of the pipe body 1 in the length direction.
[0022] Reference Figure 3 and Figure 6 The expansion sleeve 2 in this embodiment is made of rubber, so it has the characteristic of being deformable. The expansion sleeve 2 includes a main cylinder 21 and an expansion cylinder 22. The main cylinder 21 is sleeved on the circumferential groove wall of the annular groove 12. The cylinder diameter of the expansion cylinder 22 is gradually reduced, and the shrinking end of the expansion cylinder 22 is fixedly connected to the circumferential side wall of the main cylinder 21. The expansion sleeve 2 expands under the extrusion of the retarder, and the expansion end of the expansion cylinder 22 abuts against the wall of the slit hole, thereby achieving a positioning effect on the pipe body 1.
[0023] Reference Figure 4 The blocking member 3 includes a connecting rod 31 and a blocking sheet group 32. The connecting rod 31 in this embodiment is made of steel. Two groups of blocking sheet groups 32 are provided, and the two groups of blocking sheet groups 32 are respectively installed at the two ends of the connecting rod 31 in the length direction; the blocking sheet group 32 includes a spacer 321 and a steel sheet 322. The two ends of the connecting rod 31 in the length direction are respectively provided with mounting grooves 311. The spacer 321 and the steel sheet 322 are sequentially sleeved on the circumferential groove wall of the mounting groove 311, and the two ends of the connecting rod 31 in the length direction are respectively provided with limiting members 4 for fixing the blocking sheet group 32, and the cavity wall of the cavity 11 is provided with a limiting structure 111 for fixing the blocking member 3.
[0024] Reference Figure 4 The limiting member 4 in this embodiment is a nut, and the circumferential groove wall of the mounting groove 311 is provided with a thread matching the nut. The nut is threadedly connected to the mounting groove 311 to fix the spacer 321 and the steel sheet 322; the limiting structure 111 in this embodiment is a limiting ring body, and the limiting ring body is fixedly connected to the cavity walls at both ends of the length direction of the cavity 11, and the side of the spacer 321 facing away from the steel sheet 322 abuts against the limiting ring body, thereby completing the fixing work of the blocking member 3.
[0025] Reference Figure 4The limiting ring body is provided with a threading groove 112, and the spacer 321 in this embodiment is made of rubber material. The lead wire can be passed from the edge of the spacer 321 into the threading groove 112 to reduce the squeezing of the lead wire; the cavity walls at both ends in the length direction of the cavity 11 are also fixedly connected with a wire tie ring 113 for the lead wire to pass through, and the wire tie ring 113 is located on the side of the spacer 321 away from the steel sheet 322, and the wire tie ring 113 plays a role in organizing the lead wire.
[0026] The present invention also provides a method for installing a composite roof segmented homogeneous blasting isolation and pressure-maintaining device, referring to Figure 1-Figure 8 , including the following steps: S1. The mining height is 4m. The tunnel roof to be pre-splitting blasted is drilled and cored. The coring length is greater than 3 times the mining height. In this embodiment, the coring length is 15m. Several rock samples of mudstone, coarse sandstone, sandy mudstone, coarse sandstone, and fine sandstone are obtained and tested. The wave impedance, elastic modulus, and compressive strength of the rock samples are measured to classify the rock mass quality. S2, according to the rock sample taken in step S1, the key layer position of the roof is analyzed, and the slit holes are designed and constructed. The slit position is 800mm from the side of the working face to the side of the roadway, the slit angle is 15°, the hole depth is 15.0m, and the hole spacing is 1.5m. The direct top mudstone is considered to have no ability to resist the explosion, and it is easy to be punched and cause the roof to fall locally. Therefore, it is divided into a non-blasting area 6 with a length of 4.0m and a pre-blasting area 5 with a length of 11.0m; S3, drill and peer into the cut hole, analyze the lithological structure and crack development characteristics of each layer, and divide the pre-blasting area 5 into a soft rock blasting area, a medium hard rock blasting area 52, and a hard rock blasting area 51 and their corresponding lengths. In this embodiment, 3.42m from the bottom of the hole is fine sandstone, which is hard and has undeveloped stratification, and is divided into a hard rock blasting area 51, and the length of this hard rock blasting area 51 is 3.2m; 2.15m from the outside of the fine sandstone is coarse sandstone, which is hard and has developed stratification, and is divided into a hard rock blasting area 51, and the length of this hard rock blasting area 51 is 1.7m; 2.74m from the outside of the coarse sandstone is sandy mudstone, which is relatively hard and has developed stratification, and is divided into a medium hard rock blasting area 52, and the length of this hard rock blasting area 51 is 2.3m; 2.21m from the outside of the sandy mudstone is limestone, which is hard and has developed stratification, and is divided into a hard rock blasting area 51, and the length of this hard rock blasting area 51 is 2m; S4, according to the blasting areas and lengths divided by S3, determine the charge amount of each blasting area. The charge density of line 51 in the hard rock blasting area is 600g / m, the required charge amount is 4.08kg, and 4.1kg is taken; the charge density of line 52 in the medium hard rock blasting area is 300g / m, the required charge amount is 690g, and 0.7kg is taken; S5, from the bottom of the hole, charge the explosive and the digital electronic detonator 7 in the energy-gathering tube according to the charge amount determined in S4, the energy-gathering direction of the energy-gathering tube should be toward the advancing direction of the working face, and the energy-gathering hole direction of the digital electronic detonator 7 should always be toward the bottom of the hole to control the detonation direction. After the explosive is filled, the energy-gathering hole is tied with iron wire to form a limiter to fix the position of the explosive; S6. After the explosives are loaded, the composite roof segmented homogeneous blasting isolation and pressure-maintaining device is installed, the expansion sleeve 2 is sleeved on the annular groove 12 of the pipe body 1, the lead is introduced from the top of the pipe body 1 and led out from the bottom of the pipe body 1, the plugging plate group 32 located at the bottom of the pipe body 1 is installed, the spacer 321 and the steel sheet 322 are placed in the installation groove 311 of the connecting rod 31 in sequence, and the nut is installed to fix the plugging plate group 32, and the side of the spacer 321 away from the steel sheet 322 is abutted against the limiting ring body at the bottom of the pipe body 1, and the retarder is prepared and injected into the cavity 11 from the top of the pipe body 1. The retarder is filled to the limiting ring body at the top of the pipe body 1 and the filling is stopped. The spacer 321 and the steel sheet 322 located at the top of the pipe body 1 are installed in sequence, and the nut is installed to obtain the composite roof segmented homogeneous blasting isolation and pressure-maintaining device; S7, the energy-gathering tube in step S5 and the composite roof segmented homogeneous blasting isolation and pressure-maintaining device in step S6 are connected end to end in sequence, and the wires are led out, and steps S5 and S6 are repeated to complete the charging work of the slit holes, and an electronic digital detonator is filled in one end of the pre-blasting area 5 close to the non-blasting area 6, and the wires of the electronic digital detonator are led out; S8, plugging the cut hole and connecting in parallel the electronic digital detonator detonation network; S9. Wait for 20-30 minutes, evacuate underground workers to a safe location, and detonate to complete the blasting and top cutting operation.
[0027] Reference Fig. 9 By adopting the composite roof segmented homogeneous blasting isolation and pressure-maintaining device and the matching charging blasting method of the present invention, the cracks of the composite roof after blasting are in a through-state, which has an ideal roof cutting effect.
[0028] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A composite roof segmented homogeneous blasting isolation and pressure-maintaining device, characterized in that: include, A tube body (1), wherein a cavity (11) is arranged inside the tube body (1), an annular groove (12) is provided on a circumferential side wall of the tube body (1), a plurality of groups of the annular grooves (12) are provided, the plurality of groups of the annular grooves (12) are distributed at equal intervals along the length direction of the tube body (1), and a plurality of groups of material passing holes (121) communicating with the cavity (11) are provided on the tube wall of the tube body (1) located at the annular groove (12); An expansion sleeve member (2) sleeved on a circumferential groove wall of the annular groove (12); The blocking member (3) is arranged in the cavity (11), and the blocking member (3) is used to block the two ends of the tube body (1) in the length direction.
2. A composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to claim 1, characterized in that: The expansion sleeve member (2) is made of rubber material and comprises a main cylinder body (21) and an expansion cylinder body (22). The main cylinder body (21) is sleeved on the circumferential groove wall of the annular groove (12). The cylinder diameter of the expansion cylinder body (22) is in a gradually decreasing state. The shrinking end of the expansion cylinder body (22) is connected to the circumferential side wall of the main cylinder body (21).
3. The composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to claim 1, characterized in that: The blocking member (3) comprises a connecting rod (31) and a blocking sheet group (32), wherein two groups of the blocking sheet groups (32) are provided, and the two groups of the blocking sheet groups (32) are respectively provided at two ends of the connecting rod (31) in a length direction, and the cavity wall of the cavity (11) is provided with a limiting structure (111) for fixing the blocking sheet group (32).
4. A composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to claim 3, characterized in that: The blocking piece group (32) comprises a spacer (321) and a steel sheet (322), wherein the spacer (321) and the steel sheet (322) are sequentially mounted on the end of a connecting rod (31), and a stopper (4) for fixing the blocking piece group (32) is provided on the end of the connecting rod (31).
5. A composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to claim 4, characterized in that: The limiting structure (111) is a limiting ring body, and two groups of the limiting structure (111) are provided. The side of the spacer (321) facing away from the steel sheet (322) abuts against the limiting structure (111).
6. A composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to claim 4, characterized in that: The limiting ring body is provided with a wire threading groove (112).
7. A composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to claim 4, characterized in that: Both ends of the connecting rod (31) in the length direction are respectively provided with mounting grooves (311), and the spacer (321) and the steel sheet (322) are sleeved on the circumferential groove wall of the mounting groove (311); The limiting member (4) is a nut, and a thread matching the nut is formed on the circumferential groove wall of the installation groove (311).
8. The composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to claim 4, characterized in that: The cavity walls at both ends of the cavity (11) in the length direction are also provided with wire tie rings (113) respectively, and the wire tie rings (113) are located on the side of the spacer (321) facing away from the steel sheet (322).
9. A construction method of the composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1. Drill and coring the tunnel roof to be pre-splitting blasted. The coring length is greater than 3 times the mining height. Take several rock samples and test them to obtain the rock mass quality classification; S2, analyzing the position of the key layer of the roof according to the rock sample taken in step S1, designing and constructing the slit holes, drilling and peering at the slit holes, analyzing the lithology structure and fracture development characteristics of each layer, dividing the pre-blasting area (5) and the non-blasting area (6), and dividing the pre-blasting area (5) into a soft rock blasting area, a medium hard rock blasting area (52), and a hard rock blasting area (51) and their corresponding lengths; S3, determining the charge amount of the soft rock blasting area, the medium hard rock blasting area (52) and the hard rock blasting area (51) in step S2, and filling the explosives into the multiple groups of energy-focusing tubes; S4, connecting the energy-gathering tube and the composite roof segmented homogeneous blasting isolation and pressure-maintaining device in step S3 in sequence end to end, and leading out the wires; S5, repeating steps S3 and S4 to complete the charging of the cut holes, and filling an electronic digital detonator at one end of the pre-blasting area (5) close to the non-blasting area (6), and leading out the wire of the electronic digital detonator; S6, plugging the cut holes and connecting in parallel the electronic digital detonator detonation network; S7. Wait for 20-30 minutes, evacuate underground workers to a safe location, and detonate to complete the blasting and top cutting operation.
10. The construction method of a composite roof segmented homogeneous blasting isolation and pressure-maintaining device according to claim 9, characterized in that: The installation of the composite roof segmented homogeneous blasting isolation and pressure-maintaining device in step S4 includes the following steps: S1. Sleeve the expansion sleeve (2) on the annular groove (12) of the tube body (1), introduce the lead wire from the top end of the tube body (1), and lead it out from the bottom end of the tube body (1); S2, installing the blocking piece group (32) located at the bottom end of the tube body (1), placing the spacer (321) and the steel sheet (322) in the installation groove (311) of the connecting rod (31) in sequence, installing a nut to fix the blocking piece group (32), and making the side of the spacer (321) facing away from the steel sheet (322) abut against the limiting ring body located at the bottom end of the tube body (1); S3, prepare a retarder, and inject the retarder into the cavity (11) from the top of the pipe body (1), stop filling after the retarder is filled to the limit ring at the top of the pipe body (1), install the spacer (321) and the steel sheet (322) at the top of the pipe body (1) in sequence, and install the nut to obtain a composite roof segmented homogeneous blasting isolation and pressure maintaining device.
Citation Information
Patent Citations
High-efficiency bench blasting method for interbedded rock mass
CN106679522A
Advanced roof cutting pressure relief and surrounding rock control method for hard roof of gob-side roadway
CN113417638A
Lithology distribution-based blast hole charging structure design method
CN113515793A
Self-expanding filling body for blasthole blocking and preparation and construction method of self-expanding filling body
CN115235309A
Blasting hole sealing device
CN117029604A