A capacity planning method and system for an integrated energy system of an oxygen-enriched combustion power plant

By introducing oxygen-rich combustion capture technology and oxygen storage tank equipment, combined with electric-to-gas and seasonal gas storage technology, the problem of low carbon capture capacity of traditional thermal power plants has been solved, and efficient carbon emission reduction and energy scheduling have been achieved, reducing the number of energy scheduling in the reduction of carbon emissions and energy scheduling. Operating costs and area occupied.

CN118917556BActive Publication Date: 2024-12-06HOHAI UNIV
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411405287.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-12-06
Estimated Expiration
2044-10-10

AI Technical Summary

Technical Problem

The existing post-combustion carbon capture technology has low carbon capture capacity, high investment cost for transformation, large area in traditional thermal power plants, and is not conducive to the low-carbon transformation of the system.

Method used

Introduce oxygen-rich combustion capture technology, combines oxygen storage tanks, air-divided oxygen production equipment and carbon capture equipment, and converts the captured carbon dioxide into methane into natural gas network through electric gas conversion technology, and adopts seasonal gas storage and P2G technology to establish The gas grid and power grid coupled operation model is constructed to build a two-stage distributed robust planning model to optimize capacity planning.

Benefits of technology

It significantly reduces carbon emissions, reduces system operating costs, improves energy supply capacity and utilization efficiency, overcomes the bottleneck of low-carbon capture rate of traditional methods, and realizes the low-carbon transformation of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917556B_ABST
    Figure CN118917556B_ABST
Patent Text Reader

Abstract

The present invention discloses a capacity planning method and system for an integrated energy system including an oxygen-enriched combustion power plant. The method introduces an oxygen storage tank, an air separation oxygen production device and a carbon capture device into the integrated energy system to establish an oxygen-enriched combustion power plant model and an actual carbon emission model; considers the seasonal gas consumption difference of users to establish a seasonal gas storage model; based on the actual carbon emission model and the seasonal gas storage model, a gas grid and power grid coupling operation model is established, and the Weymouth equation is introduced to establish a gas grid and power grid flow model; based on the gas grid and power grid flow model, an integrated energy system planning target is established; considers the fluctuation of photovoltaic, wind turbine output and load power, and constructs a wind, light and load uncertainty set; constructs a two-stage distributed robust planning model according to the integrated energy system planning target and the wind, light and load uncertainty set; solves the optimal planning strategy of the two-stage distributed robust planning model based on a data-driven distributed robust optimization method, and determines a capacity planning method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power systems and integrated energy, and in particular to a capacity planning method and system for an integrated energy system of an oxygen-enriched combustion power plant. Background Art

[0002] The energy industry leads the industry in carbon emissions, accounting for 80% of the world's total carbon emissions. Traditional thermal power plants (CTPPs) are the main source of carbon emissions in the energy industry. According to a report released by the International Energy Agency, future work will achieve carbon reduction targets by transforming existing energy facilities.

[0003] At present, there have been a lot of studies on introducing post-combustion carbon capture technology into CTPP within the integrated energy system IES, converting CTPP into a carbon capture power plant CCPP. In addition, by transforming CTPP, the traditional situation of independent operation of the power grid and gas grid has been broken, and the pressure of gas supply has been alleviated. The carbon produced by IES can be converted into methane through power-to-gas P2G equipment and injected into the natural gas network. However, existing studies mostly consider post-combustion carbon capture technology. By introducing carbon capture equipment into IES containing thermal power units, carbon dioxide emitted by thermal power units can be absorbed, thereby reducing the actual carbon emissions of CTPP. Post-combustion carbon capture technology has the disadvantages of low carbon capture capacity, high transformation investment cost, and large occupied area. The use of this technology to transform IES is not conducive to the low-carbon transformation of the system. Summary of the invention

[0004] The present invention aims to provide a capacity planning method for an integrated energy system of an oxygen-enriched combustion power plant, which introduces oxygen-enriched combustion capture (OCC) technology into IES planning and considers the coupled operation of short-term gas storage, seasonal gas storage and P2G technology in IES planning; another object of the present invention is to provide a capacity planning system for an integrated energy system of an oxygen-enriched combustion power plant.

[0005] Technical solution: The capacity planning method of the comprehensive energy system of the oxygen-enriched combustion power plant described in the present invention comprises the following steps:

[0006] Introduce oxygen storage tanks, air separation oxygen production equipment and carbon capture equipment into the integrated energy system IES to establish an oxygen-enriched combustion power plant model;

[0007] Considering the capture of carbon dioxide by oxyfuel combustion power plants, a realistic carbon emission model is established;

[0008] Considering the seasonal differences in gas consumption among users, a seasonal gas storage model is established;

[0009] Considering the oxygen-enriched combustion capture technology, the captured carbon dioxide is converted into methane through the power-to-gas (P2G) equipment and injected into the natural gas network. Based on the actual carbon emission model and seasonal gas storage model, a gas grid and power grid coupling operation model is established;

[0010] Based on the coupled operation model of gas grid and power grid, the Weymouth equation is introduced to describe the flow of natural gas in the pipeline, and the power flow model of gas grid and power grid is established;

[0011] In order to reduce the long-term operating costs of IES and reduce the carbon emissions of the system, IES planning targets are established based on the gas grid and power grid flow models;

[0012] Considering the fluctuations of photovoltaic, wind turbine output and load power, a set of wind, solar and load uncertainties is constructed;

[0013] According to the IES planning objectives and the uncertainty set of wind, solar and load, a two-stage distributed robust planning model is constructed;

[0014] Based on the data-driven distributionally robust optimization method, the optimal planning strategy of the two-stage distributionally robust programming model is solved and the capacity planning method is determined.

[0015] Further, the oxygen-enriched combustion power plant model is as follows:

[0016] ;

[0017] ;

[0018] ;

[0019] ;

[0020] ;

[0021] in, for t The first i The output power of a thermal power generating unit G, for t Moment i The net output power of an oxyfuel combustion power plant OCCP is for t Moment i The power consumption of a carbon capture device CC, for t Moment i The power consumption of an air separation oxygen production equipment AS, is the power consumption coefficient of the oxygen-rich combustion power plant OCCP, is the carbon capture level of OCCP in oxyfuel combustion power plants, is the carbon emission intensity of thermal power generating unit G, is the power consumption coefficient of the air separation oxygen production equipment AS, for t Moment iThe oxygen production of an air separation oxygen production equipment AS, and They are respectively i The minimum and maximum power of a thermal power generating unit G, is the minimum operating coefficient of the air separation oxygen production equipment AS, For the i The maximum planned capacity of an air separation oxygen generator AS;

[0022] At time t i Oxygen storage capacity of an oxygen tank OST for

[0023] ;

[0024] ;

[0025] ;

[0026] ;

[0027] ;

[0028] in, and They are t Moment i The amount of oxygen released and absorbed by each oxygen storage tank OST, and Respectively i The maximum amount of oxygen released and absorbed by an oxygen storage tank OST, and Respectively i The minimum and maximum oxygen storage capacity of an oxygen tank OST, and for t Moment i An oxygen tank OST operating status mark, is the oxygen tank OST self-damage rate, and They are the efficiency of absorbing and releasing gas of the oxygen storage tank OST, respectively.

[0029] Furthermore, the actual carbon emission model is as follows:

[0030] t Moment i Carbon emissions from thermal power generation unit G for

[0031] ;

[0032] t Moment i Actual carbon emissions from oxyfuel combustion power plants for

[0033] ;

[0034] in, It is the maximum carbon capture rate of OCCP of oxygen-rich combustion power plant.

[0035] Furthermore, the seasonal gas storage model is as follows:

[0036] ;

[0037] ;

[0038] ;

[0039] ;

[0040] ;

[0041] ;

[0042] in, and are the amount of natural gas released and absorbed by the seasonal gas storage equipment SGS at time t, and are binary variables, representing the operating status of the seasonal gas storage equipment SGS, is the total number of discrete scenarios, and are the maximum amount of natural gas released and absorbed by the seasonal gas storage equipment SGS, At time 0 s Gas storage capacity of seasonal gas storage equipment SGS in each scenario, The maximum planned capacity of the seasonal gas storage facility SGS, is the self-damage rate of seasonal gas storage equipment SGS, is the gas storage capacity of the seasonal gas storage equipment SGS at time t, and are the efficiency of absorbing and releasing natural gas in seasonal gas storage equipment SGS, is the gas storage capacity of the seasonal gas storage equipment in the first scenario at time 0, For 24 hours Gas storage capacity of seasonal gas storage equipment SGS in each scenario.

[0043] Furthermore, the coupled operation model of the gas grid and the power grid is as follows:

[0044] ;

[0045] ;

[0046] in, for t The first i Methane produced by each P2G device, is the conversion efficiency of P2G equipment, for t Moment i The efficiency of each P2G device is the electrical power, is the calorific value of methane, and Respectively i The minimum and maximum values ​​of the input power of each P2G device, It is a binary variable, representing whether the P2G device is built.

[0047] Furthermore, the gas grid and power grid flow models are established as follows:

[0048] The Weymouth equation is used to describe the flow of natural gas in the pipeline. The flow equation is expressed as follows:

[0049] ;

[0050] in, for t The natural gas flow rate of pipeline AB at the moment, is the Weymouth coefficient of pipe AB, is the direction parameter, representing the flow direction of natural gas in pipeline AB, for t The pressure of the gas input node A at the moment, for t The pressure of gas output node B at the moment;

[0051] The DC power flow model is used to estimate the steady-state operation characteristics of the power system, as follows:

[0052] ;

[0053] ;

[0054] ;

[0055] in, For the line l Power flow, For Line l Reactance, and They are t The phase angles corresponding to nodes M and N at the moment, For Line l Maximum power flow.

[0056] Furthermore, the IES planning objectives include the first phase investment objectives and the second phase operation objectives, as follows:

[0057] ;

[0058] ;

[0059] ;

[0060] ;

[0061] ;

[0062] ;

[0063] ;

[0064] in, The overall planning cost for daily IES, is the daily investment cost, is the system operation and maintenance cost, U is the uncertainty set of wind, solar and load, is the discount rate, L is the equipment life, D is the total number of days in a year, The maximum planned capacity of the gas storage facility GS, The maximum planned capacity of the oxygen storage tank OST, The maximum planned capacity of the air separation oxygen generator AS. The maximum planned capacity of the P2G power-to-gas plant, is the daily operating cost of gas source GS, is the daily operating cost of the generator GEN, is the daily CC capture cost, For carbon penalty fees, is the cost of interacting with the grid, Maintenance costs for all equipment, For the b Equipment maintenance factor, For the b The output power of each device, for t The gas source output power at all times, and are respectively the operating cost coefficients of gas source GS and generator GEN, is the carbon price per ton;

[0065] Among them, the uncertainty set U of wind, solar and load is

[0066] ;

[0067] In the formula, for t The output of the photovoltaic unit PV at any moment, for t The output of wind turbine WT at the moment, for t The gas load at node n at time, for t The electrical load of node m at time.

[0068] Furthermore, the two-stage distributed robust programming model is

[0069] ;

[0070] in, x is the variable of the first stage investment target, X for x A collection of variables, is the matrix coefficient of the first stage investment target, is the probability of the sth scene appearing, is the variable of the second stage operation target, Y is a set of variables, are the wind turbine, PV power and load in the sth discrete scenario after scenario clustering screening, and K is the matrix coefficient of the second-stage operation target.

[0071] Furthermore, the column and constraint generation algorithm is used to divide the two-stage robust programming model into a main problem and sub-problems for iterative solution. The main problem is to solve the optimal planning strategy under the known scenario probability distribution:

[0072] ;

[0073] in, is the introduced intermediate variable, is the current iteration number, For iteration u The probability of the s scene appearing after the second time, For iteration u The variables of the second-stage operation objectives in the post-s scenario; ;

[0074] The sub-problems are specifically expressed as follows:

[0075] ;

[0076] ;

[0077] in, is the operating cost in the sth scenario, is the weighted operating cost of all scenarios, Solve the main problem to find the optimal solution for the variables of the first-stage investment target;

[0078] Use the CPLEX solver to determine whether the difference in planning costs between the main problem and the subproblem is less than the threshold set by the system. ; If yes, output the IES optimal planning solution; otherwise, continue to iterate and solve.

[0079] The capacity planning system of the comprehensive energy system of the oxygen-enriched combustion power plant of the present invention comprises:

[0080] Data acquisition module, used to collect photovoltaic and wind turbine output data and electricity and gas load data of the comprehensive energy system of the oxygen-enriched combustion power plant;

[0081] Model building module, used to build oxygen-rich combustion power plant model, actual carbon emission model, seasonal gas storage model, gas grid and power grid coupled operation model, gas grid and power grid flow model;

[0082] The planning target module is used to determine the planning target of the integrated energy system with the equipment investment cost and system operation cost as the optimization target;

[0083] The capacity optimization model is used to obtain the IES optimal equipment capacity configuration and capacity planning method based on the optimization objective function and preset constraints.

[0084] Beneficial effects: Compared with the prior art, the present invention has the following significant advantages: 1. The present invention introduces OCC technology into IES planning, and introduces air separation oxygen production equipment and oxygen storage tank equipment into IES planning containing thermal power units, expanding the oxygen source, while overcoming the bottleneck of low carbon capture rate of traditional planning methods, thereby significantly reducing IES carbon emissions and reducing system operating costs; 2. The present invention combines P2G and seasonal gas storage technology in an energy scheduling strategy to improve the system's energy supply capacity, based on the characteristics of seasonal energy consumption differences among users, such as low gas consumption in summer, high gas consumption in winter, and low electricity consumption in spring and autumn. 1. Electricity consumption is high in summer and winter, and the surplus electricity in spring and autumn is converted by P2G equipment and stored in seasonal gas storage equipment. The surplus gas in summer is directly stored in seasonal gas storage equipment, thereby improving energy utilization efficiency and alleviating gas supply pressure; 3. The present invention takes equipment investment cost and system operation cost as optimization goals, and constructs a two-stage distributed robust planning model according to the wind, solar and load uncertainty set; based on the data-driven distributed robust optimization method, solves the optimal planning strategy of the two-stage distributed robust planning model, determines the capacity planning method, and efficiently and quickly solves the IES planning problem with large-scale variables. BRIEF DESCRIPTION OF THE DRAWINGS

[0085] Figure 1 Flow chart of the method of the present invention. DETAILED DESCRIPTION

[0086] The following is combined with Figure 1 The present invention is further described.

[0087] The capacity planning method of the comprehensive energy system of the oxygen-enriched combustion power plant of the present invention comprises the following steps:

[0088] Step 1: Introduce oxygen storage tanks, air separation oxygen production equipment and carbon capture equipment into the integrated energy system IES, and establish an oxygen-enriched combustion unit model. Under normal operation of the oxygen-enriched combustion power plant, the terminal power load consumes the most electricity, followed by air separation oxygen production and carbon capture equipment. The amount of oxygen required for the oxygen-enriched combustion process is proportional to the amount of fuel. During peak electricity consumption, reduce the power consumption of air separation oxygen production and carbon capture equipment to maintain power balance. At this time, if the air separation oxygen production equipment cannot produce sufficient oxygen, the missing oxygen is obtained from the oxygen storage tank. In addition, during the low-peak period of electricity, the thermal power generator generates excess electricity for oxygen production and storage in the oxygen storage tank. The oxygen-enriched combustion power plant model is as follows:

[0089] ;

[0090] ;

[0091] ;

[0092] ;

[0093] ;

[0094] in, for t The first i The output power of a thermal power generating unit G, for t Moment i The net output power of an oxyfuel combustion power plant OCCP is for t Moment i The power consumption of a carbon capture device CC, for t Moment i The power consumption of an air separation oxygen production equipment AS, is the power consumption coefficient of the oxygen-rich combustion power plant OCCP, is the carbon capture level of OCCP in oxyfuel combustion power plants, is the carbon emission intensity of thermal power generating unit G, is the power consumption coefficient of the air separation oxygen production equipment AS, for t Moment i The oxygen production of an air separation oxygen production equipment AS, and They are respectively i The minimum and maximum power of a thermal power generating unit G, is the minimum operating coefficient of the air separation oxygen production equipment AS, For the i The maximum planned capacity of an air separation oxygen production equipment AS.

[0095] In addition, the oxygen storage tank realizes the storage of oxygen across time and space. i Oxygen storage capacity of an oxygen tank OST for

[0096] ;

[0097] ;

[0098] ;

[0099] ;

[0100] ;

[0101] in, and They are t Momenti The amount of oxygen released and absorbed by each oxygen storage tank OST, and Respectively i The maximum amount of oxygen released and absorbed by an oxygen storage tank OST, and Respectively i The minimum and maximum oxygen storage capacity of an oxygen tank OST, and for t Moment i An oxygen tank OST operating status mark, is the oxygen tank OST self-damage rate, and They are the efficiency of absorbing and releasing gas of the oxygen storage tank OST, respectively.

[0102] Step 2: Establish an actual carbon emission model. After completing the modeling in step 1, considering that the oxygen-enriched combustion power plant will capture carbon dioxide, establish a carbon emission model for thermal power units and an IES actual carbon emission model, as follows:

[0103] t Moment i Carbon emissions from thermal power generation unit G for

[0104] ;

[0105] t Moment i Actual carbon emissions from oxyfuel combustion power plants for

[0106] ;

[0107] in, It is the maximum carbon capture rate of OCCP of oxygen-rich combustion power plant.

[0108] Step 3: Consider the seasonal differences in gas consumption among users and establish a seasonal gas storage model. Considering the seasonal differences in natural gas demand among users, with less gas consumption in summer and more gas consumption in winter, seasonal gas storage equipment is used to release and absorb natural gas on different typical days. Here, it is assumed that there is only one filling and discharging state for seasonal gas storage on different typical days, and the operating restrictions of seasonal gas storage equipment are as follows:

[0109] ;

[0110] ;

[0111] ;

[0112] ;

[0113] ;

[0114] ;

[0115] in, and are the amount of natural gas released and absorbed by the seasonal gas storage equipment SGS at time t, and are binary variables, representing the operating status of the seasonal gas storage equipment SGS, is the total number of discrete scenarios, and are the maximum amount of natural gas released and absorbed by the seasonal gas storage equipment SGS, At time 0 s Gas storage capacity of seasonal gas storage equipment SGS in each scenario, The maximum planned capacity of the seasonal gas storage facility SGS, is the self-damage rate of seasonal gas storage equipment SGS, is the gas storage capacity of the seasonal gas storage equipment SGS at time t, and are the efficiency of absorbing and releasing natural gas in seasonal gas storage equipment SGS, is the gas storage capacity of the seasonal gas storage equipment in the first scenario at time 0, For 24 hours Gas storage capacity of seasonal gas storage equipment SGS in each scenario.

[0116] Step 4: Establish a gas grid and power grid coupling operation model. Considering that the carbon dioxide captured by the oxygen-enriched combustion capture (OCC) technology is used as the raw material for the P2G technology to produce methane, the power grid is coupled with the gas grid to reduce the gas supply pressure. The gas grid and power grid coupling operation model is as follows:

[0117] ;

[0118] ;

[0119] in, for t The first i Methane produced by each P2G device, is the conversion efficiency of P2G equipment, for t Moment i The efficiency of each P2G device is the electrical power, is the calorific value of methane, and Respectively i The minimum and maximum values ​​of the input power of each P2G device, It is a binary variable, representing whether the P2G device is built.

[0120] Step 5: Establish the gas grid and power grid flow model. Based on step 4, the Weymouth equation is used to describe the natural gas flow in the pipeline, where the flow depends only on the pressure at both ends of the pipeline and moves from the node with higher pressure to the node with lower pressure. Take pipeline AB as an example, where A represents the input node and B represents the output node, and its flow equation is expressed as follows:

[0121] ;

[0122] in, for t The natural gas flow rate of pipeline AB at the moment, is the Weymouth coefficient of pipe AB, is the direction parameter, representing the flow direction of natural gas in pipeline AB, for t The pressure of the gas input node A at the moment, for t The pressure of gas output node B at the moment.

[0123] The DC power flow model is used to estimate the steady-state operation characteristics of the power system, as follows:

[0124] ;

[0125] ;

[0126] ;

[0127] in, For the line l Power flow, For Line l Reactance, and They are t The phase angles corresponding to nodes M and N at the moment, For Line l Maximum power flow.

[0128] Step 6: Establish IES planning objectives. In order to reduce the long-term operating costs of IES and reduce system carbon emissions, a two-stage planning objective function is constructed. The first stage is the investment stage, which plans the capacity and quantity of seasonal gas storage, short-term gas storage, oxygen storage tanks, air separation oxygen production and P2G equipment. The second stage is the operation stage, which simulates the long-term operation of IES under the first stage investment plan, with the goal of minimizing the operation and maintenance costs. The corresponding mathematical model is as follows:

[0129] ;

[0130] ;

[0131] ;

[0132] ;

[0133] ;

[0134] ;

[0135] ;

[0136] in, The overall planning cost for daily IES, is the daily investment cost, is the system operation and maintenance cost, U is the uncertainty set of wind, solar and load, is the discount rate, L is the equipment life, D is the total number of days in a year, The maximum planned capacity of the gas storage facility GS, The maximum planned capacity of the oxygen storage tank OST, The maximum planned capacity of the air separation oxygen generator AS. The maximum planned capacity of the P2G power-to-gas plant, is the daily operating cost of gas source GS, is the daily operating cost of the generator GEN, is the daily CC capture cost, For carbon penalty fees, is the cost of interacting with the grid, Maintenance costs for all equipment, For the b Equipment maintenance factor, For the b The output power of each device, for t The gas source output power at all times, and are respectively the operating cost coefficients of gas source GS and generator GEN, is the price of carbon per ton.

[0137] Step 7: Construct the uncertainty set of wind, solar and load. The solution obtained by the deterministic optimization model is often too "risky", and the impact of uncertainty needs to be taken into account in the model. It is necessary to consider the fluctuation range of photovoltaic, wind turbine output and load power, and the uncertainty set of wind, solar and load U for

[0138] ;

[0139] In the formula, for t The output of the photovoltaic unit PV at any moment, for t The output of wind turbine WT at the moment, for t The gas load at node n at time, for t The electrical load of node m at time.

[0140] Step 8: Construct a two-stage distributed robust programming model. According to steps 1-7, a two-stage distributed robust programming model is constructed in matrix form.

[0141] The two-stage distributed robust programming model is

[0142] ;

[0143] in, x is the variable of the first stage investment target, X for x A collection of variables, is the matrix coefficient of the first stage investment target, is the probability of the sth scene appearing, is the variable of the second stage operation target, Y is a set of variables, are the wind turbine, PV power and load in the sth discrete scenario after scenario clustering screening, and K is the matrix coefficient of the second-stage operation target.

[0144] Step 9: Solve the two-stage optimal planning strategy based on the data-driven distributional robust optimization method. The column and constraint generation algorithm is used to divide the two-stage distributional robust planning model in step 8 into the main problem and sub-problems for iterative solution. The main problem is to solve the optimal planning strategy under the known scenario probability distribution, as shown below:

[0145] The main problem is to solve the optimal planning strategy under the known scenario probability distribution:

[0146] ;

[0147] in, is the introduced intermediate variable, is the current iteration number, For iteration u The probability of the s scene appearing after the second time, For iteration u The variables of the second-stage operation objectives in the post-s scenario; .

[0148] Due to the independence between the probability values ​​of the discrete scenarios and the variables in the second stage, there is no need to transform the minimization problem into a maximization problem through the duality theorem. The subproblem is solved in two steps, as shown below:

[0149] ;

[0150] ;

[0151] in, is the operating cost in the sth scenario, is the weighted operating cost of all scenarios, Solve the main problem to find the optimal solution for the variables of the first-stage investment target;

[0152] Use the CPLEX solver to determine whether the difference in planning costs between the main problem and the subproblem is less than the threshold set by the system. ; If yes, output the IES optimal planning solution; otherwise, continue to iterate and solve.

[0153] The capacity planning system of the comprehensive energy system of the oxygen-enriched combustion power plant of the present invention comprises:

[0154] Data acquisition module, used to collect photovoltaic and wind turbine output data and electricity and gas load data of the comprehensive energy system of the oxygen-enriched combustion power plant;

[0155] Model building module, used to build oxygen-rich combustion power plant model, actual carbon emission model, seasonal gas storage model, gas grid and power grid coupled operation model, gas grid and power grid flow model;

[0156] The planning target module is used to determine the planning target of the integrated energy system with the equipment investment cost and system operation cost as the optimization target;

[0157] The capacity optimization model is used to obtain the IES optimal equipment capacity configuration and capacity planning method based on the optimization objective function and preset constraints.

Claims

1. A capacity planning method for an integrated energy system including an oxyfuel combustion power plant, It is characterized in that The following steps are involved: Introduce oxygen storage tanks, air separation oxygen production equipment and carbon capture equipment into the integrated energy system IES to establish an oxygen-enriched combustion power plant model; Considering the capture of carbon dioxide by oxyfuel combustion power plants, a realistic carbon emission model is established; Considering the seasonal differences in gas consumption among users, a seasonal gas storage model is established; Considering the oxygen-enriched combustion capture technology, the captured carbon dioxide is converted into methane through the power-to-gas (P2G) equipment and injected into the natural gas network. Based on the actual carbon emission model and seasonal gas storage model, a gas grid and power grid coupling operation model is established; Based on the coupled operation model of gas grid and power grid, the Weymouth equation is introduced to describe the flow of natural gas in the pipeline, and the power flow model of gas grid and power grid is established; In order to reduce the long-term operating costs of IES and reduce the carbon emissions of the system, IES planning targets are established based on the gas grid and power grid flow models; Considering the fluctuations of photovoltaic, wind turbine output and load power, a set of wind, solar and load uncertainties is constructed; According to the IES planning objectives and the uncertainty set of wind, solar and load, a two-stage distributed robust planning model is constructed; Based on the data-driven distributed robust optimization method, the optimal planning strategy of the two-stage distributed robust programming model is solved and the capacity planning method is determined; Among them, the oxygen-enriched combustion power plant model is as follows: ; ; ; ; ; in, for t The first i The output power of a thermal power generating unit G, for t Moment i The net output power of an oxyfuel combustion power plant OCCP is for t Moment i The power consumption of a carbon capture device CC, for t Moment i The power consumption of an air separation oxygen production equipment AS, is the power consumption coefficient of the oxygen-rich combustion power plant OCCP, is the carbon capture level of OCCP in oxyfuel combustion power plants, is the carbon emission intensity of thermal power generating unit G, is the power consumption coefficient of the air separation oxygen production equipment AS, for t Moment i The oxygen production of an air separation oxygen production equipment AS, and They are respectively i The minimum and maximum power of a thermal power generating unit G, is the minimum operating coefficient of the air separation oxygen production equipment AS, For the i The maximum planned capacity of an air separation oxygen generator AS; At time t i Oxygen storage capacity of an oxygen tank OST for ; ; ; ; ; in, and They are t Moment i The amount of oxygen released and absorbed by each oxygen storage tank OST, and Respectively i The maximum amount of oxygen released and absorbed by an oxygen storage tank OST, and Respectively i The minimum and maximum oxygen storage capacity of an oxygen storage tank OST, and for t Moment i An oxygen tank OST operating status mark, is the oxygen tank OST self-damage rate, and are the efficiency of absorbing and releasing gas of the oxygen storage tank OST respectively; The actual carbon emission model is as follows: t Moment i Carbon emissions from thermal power generating unit G for ; t Moment i Actual carbon emissions from oxyfuel combustion power plants for ; in, is the maximum carbon capture rate of OCCP of oxy-fuel combustion power plant; Seasonal gas storage model, as follows: ; ; ; ; ; ; in, and are the amount of natural gas released and absorbed by the seasonal gas storage equipment SGS at time t, and are binary variables, representing the operating status of the seasonal gas storage equipment SGS, is the total number of discrete scenarios, and are the maximum amount of natural gas released and absorbed by the seasonal gas storage equipment SGS, At time 0 s Gas storage capacity of seasonal gas storage equipment SGS in each scenario, The maximum planned capacity of the seasonal gas storage facility SGS, is the self-damage rate of seasonal gas storage equipment SGS, is the gas storage capacity of the seasonal gas storage equipment SGS at time t, and are the efficiency of absorbing and releasing natural gas in seasonal gas storage equipment SGS, is the gas storage capacity of the seasonal gas storage equipment in the first scenario at time 0, For 24 hours Gas storage capacity of seasonal gas storage equipment SGS in each scenario; The coupled operation model of the gas grid and the power grid is as follows: ; ; in, for t The first i Methane produced by each P2G device, is the conversion efficiency of P2G equipment, for t Moment i The efficiency of each P2G device is the electrical power, is the calorific value of methane, and Respectively i The minimum and maximum values ​​of the input power of each P2G device, is a binary variable, representing whether the P2G device is built; The gas grid and power grid flow models are established as follows: The Weymouth equation is used to describe the flow of natural gas in the pipeline. The flow equation is expressed as follows: ; in, for t The natural gas flow rate of pipeline AB at the moment, is the Weymouth coefficient of pipe AB, is the direction parameter, representing the flow direction of natural gas in pipeline AB, for t The pressure of the gas input node A at the moment, for t The pressure of gas output node B at the moment; The DC power flow model is used to estimate the steady-state operation characteristics of the power system, as follows: ; ; ; in, For Line l Power flow, For Line l Reactance, and They are t The phase angle corresponding to nodes M and N at the moment, For Line l Maximum power flow; IES planning objectives include the first phase investment objectives and the second phase operation objectives, as follows: ; ; ; ; ; ; ; in, The overall planning cost for daily IES, is the daily investment cost, is the system operation and maintenance cost, U is the uncertainty set of wind, solar and load, is the discount rate, L is the equipment life, D is the total number of days in a year, The maximum planned capacity of the gas storage facility GS, The maximum planned capacity of the oxygen storage tank OST, The maximum planned capacity of the air separation oxygen generator AS. The maximum planned capacity of the P2G power-to-gas plant, is the daily operating cost of gas source GS, is the daily operating cost of the generator GEN, is the daily CC capture cost, For carbon penalty fees, is the cost of interacting with the grid, Maintenance costs for all equipment, For the b Equipment maintenance factor, For the b The output power of each device, for t The gas source output gas power at all times, and are respectively the operating cost coefficients of gas source GS and generator GEN, is the carbon price per ton; Among them, the uncertainty set U of wind, solar and load is ; In the formula, for t The output of the photovoltaic unit PV at the moment, for t The output of wind turbine WT at the moment, for t The gas load at node n at time instant, for t The electrical load of node m at time instant; The two-stage distributed robust programming model is ; in, x is the variable of the first stage investment target, X for x A collection of variables, is the matrix coefficient of the first stage investment target, is the probability of the sth scene appearing, is the variable of the second stage operation target, Y is a set of variables, are the wind turbine, PV power and load in the sth discrete scenario after scenario clustering screening, and K is the matrix coefficient of the second-stage operation target; The column and constraint generation algorithm is used to divide the two-stage distributed robust programming model into a main problem and sub-problems for iterative solution. The main problem is to solve the optimal planning strategy under the known scenario probability distribution: ; in, is the introduced intermediate variable, is the current iteration number, For iteration u The probability of the s scene appearing after the second time, For iteration u variables of the second-stage operational objectives in the post-s scenario; ; The sub-problems are specifically expressed as follows: ; ; in, is the operating cost in the sth scenario, is the weighted operating cost of all scenarios, Solve the main problem to find the optimal solution for the variables of the first-stage investment target; Use the CPLEX solver to determine whether the difference in planning costs between the main problem and the subproblem is less than the threshold set by the system. ; If yes, output the IES optimal planning solution; otherwise, continue to iterate and solve.

2. A capacity planning system based on the capacity planning method of the integrated energy system containing oxyfuel combustion power plant according to claim 1, It is characterized in that include Data acquisition module, used to collect photovoltaic and wind turbine output data and electricity and gas load data of the comprehensive energy system of the oxygen-enriched combustion power plant; Model building module, used to build oxygen-rich combustion power plant model, actual carbon emission model, seasonal gas storage model, gas grid and power grid coupled operation model, gas grid and power grid flow model; The planning target module is used to determine the planning target of the integrated energy system with the equipment investment cost and system operation cost as the optimization target; The capacity optimization model is used to obtain the IES optimal equipment capacity configuration and capacity planning method based on the optimization objective function and preset constraints.

Citation Information

Patent Citations

  • Medium and long term energy optimization method for electricity-heat-gas multi-energy flow system considering large gas storage

    CN112928750A

  • Electro-thermal-gas multi-energy coupling system seasonal optimization control method considering entropy weight method carbon quota and cross-seasonal gas storage

    CN118037487A

  • Coal-fired power plant capacity optimization method, system, equipment and medium

    CN118153867A

  • Energy base scheduling method based on distributed robust optimization method and terminal

    CN118569561A

  • Fossil fuel thermodynamic system and carbon dioxide emission reduction method and device thereof

    WO2022268002A1