Method for transforming large-included-angle contact channel pipe jacking machine equipment
Through the transformation of the pipe hoisting equipment, including adjusting the starting trolley, the lifting system and the crane beam track, the problem of long construction cycle and high risk in the construction of traditional contact channel under large angles is solved, and low cost is achieved. High-efficiency construction, suitable for contact channels with various angles.
Patent Information
- Application Number
- CN202411077732.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-12
AI Technical Summary
The construction of traditional freezing and mechanical methods of contact channels is difficult to achieve effective excavation under large angle conditions, resulting in a long construction period and high risk, which cannot meet the needs of rapid development of the subway.
By renovating the pipe hoisting equipment, including adjusting the starting trolley, pushing system, support system and crane beam track, adding wedge blocks and steel sleeves, using CAD simulation and total station measurement, ensuring that the equipment is at a large angle It can be dug safely and effectively.
It realizes low-cost and high-efficiency construction under large angle conditions, breaks through the limitation that conventional pipe hoisting machines can only be used for small-angle contact channels, and improves construction applicability and efficiency.
Smart Images

Figure CN118933830A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground communication channel construction, and in particular to a method for modifying pipe jacking machine equipment for a large-angle communication channel. Background Art
[0002] With the rapid development of urban subway construction, the construction conditions of communication channels are becoming more and more harsh. Affected by the surrounding environment, the original short-distance communication channels have to develop into long-distance communication channels.
[0003] The traditional freezing method is difficult to guarantee the freezing effect during the construction of long-distance connecting channels, the excavation risk is high, and the construction period is long, which seriously affects the rapid development of the subway. Therefore, it is necessary to gradually transform the connecting channel construction from the freezing method to the mechanical method. However, the mechanical method connecting channel cannot meet the normal excavation construction when the vertical angle between the tunnel axis and the connecting channel axis exceeds 3°.
[0004] Therefore, it is necessary to modify the relevant components of the pipe jacking machine so that it can adapt to the construction of large-angle connecting channels. Summary of the invention
[0005] Based on the above description, the present invention provides a method for modifying a large-angle connecting channel pipe jacking machine, aiming to solve the problems raised in the background technology.
[0006] The technical solution of the present invention to solve the above technical problems is as follows: a method for modifying a large-angle communication channel pipe jacking machine, comprising the following construction steps:
[0007] S1: Simulation of the starting and receiving lines of the communication channel: According to the actual assembly positions of the starting and receiving segments of the communication channel, simulate the positions of the starting tunnel gate and the receiving tunnel gate, connect the lines at the centers of the tunnel gates, and ensure the safety gap between the equipment cutter head and the tunnel gates. The pipe jacking machine and the starting trolley are offset by about 4.8° for excavation;
[0008] S2: Adjust the starting trolley: The starting trolley adopts a stepped design, and the section of the starting trolley is designed with equal strength. The starting position of the equipment adopts a sunken design, which is welded with steel plates. The positions on both sides and the starting position adopt a staggered design, and there are multiple ribs connected at the connection to play an auxiliary reinforcement role;
[0009] S3: Change the jacking system: The jacking system includes a cylinder bracket, a sliding track beam, a jacking cylinder and a hydraulic system. The sliding track beam is installed on the column of the starting trolley. The direction of the track beam is parallel to the axial position of the starting trolley. The cylinder bracket slides on the sliding track beam. The sliding track is changed to adapt to large-angle offsets. At the same time, a wedge block is added to provide a reaction force for the jacking system through the wedge block, so that the cylinder adapts to the inclined jacking.
[0010] S4: Adjust the support system: According to the force calculation, adjust the structure of the support system to adapt it to the requirements of excavation;
[0011] S5: Change the starting sleeve: According to the three-dimensional simulation, the plate is cut to ensure the structural shape and strength. According to the simulation results, the starting sleeve is cut and adjusted to ensure that the starting sleeve is tightly fitted to the main tunnel for easy welding connection.
[0012] S6: Change the crane beam track: Divide the crane beam of trolley No. 1 into three parts, namely crane beam No. 1, crane beam No. 2 and crane beam No. 3. The angle between crane beam No. 2 and crane beam No. 1 and crane beam No. 3 is 2.4°. At the same time, add some chains.
[0013] Based on the above technical solution, the present application can also be improved as follows.
[0014] Furthermore, in step S1, 10 points are measured at the starting end and the receiving end respectively using a total station, the centers of the tunnel gates at the starting end and the receiving end are fitted on the CAD, the center points of the tunnel gates at the starting end and the receiving end are connected, and the excavation control axis during the excavation of the pipe jacking machine is accurately simulated.
[0015] Furthermore, in step S2, the pipe jacking machine starts obliquely at the starting position, and the structure connecting the rib plate and the auxiliary structure that interferes with the main machine is cut off. At the same time, the structure of the trailer is changed to ensure the rigidity of the entire trolley after the rib plate is cut off.
[0016] Furthermore, in step S3, the wedge block is designed as a block structure, divided into two left and right blocks, and the wedge blocks on both sides adopt a staggered design to facilitate the position adjustment of the cylinder bracket.
[0017] Furthermore, there is a stroke difference between the oil cylinders on both sides of the two wedge blocks, and the zero position of the oil cylinder needs to be set in the control program to reduce the misalignment phenomenon during jacking.
[0018] Furthermore, after the crane beam track is changed in step S6, part of the deflection can be completed when the segment is transported to the location, and the remaining deflection needs to be completed with manual assistance to reduce the difficulty of assembling the segment.
[0019] Furthermore, steel sleeves are used for the launch and reception of jacking pipes, polyurethane expansion waterstops and EPDM rubber sealing pads are used for joint waterproofing, and single-component polyurethane sealant is used for sealing of caulking materials.
[0020] Compared with the prior art, the technical solution of this application has the following beneficial technical effects:
[0021] 1. According to the measured starting and receiving portal positions of the communication channel, the present invention simulates the actual positions of the shield tunnel axis and the communication channel tunnel axis on CAD, thereby determining the vertical angle deviation of the two axes, so as to simulate and discuss whether the equipment modification of the pipe jacking machine is feasible and to derive the overall modification method.
[0022] 2. The present invention solves the problem of adjusting the jacking angle during the jacking process by directly cutting and changing the length of the oil cylinder by adding a wedge-shaped block at the backrest position of the jacking oil cylinder, thereby accelerating the renovation progress and saving renovation costs.
[0023] 3. Compared with conventional pipe jacking machines, the present invention has strong applicability. According to the above-mentioned transformation method, a pipe jacking machine suitable for various angles can be transformed at low cost and high efficiency, which has good promotion significance. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a flow chart of equipment transformation of the present invention;
[0025] Figure 2 It is a schematic diagram of the relationship between the pipe jacking machine and the starting tunnel portal in the present invention;
[0026] Figure 3 It is a schematic diagram of the relationship between the pipe jacking machine and the receiving tunnel door in the present invention;
[0027] Figure 4 It is a schematic diagram of the structure of the starting trolley in the present invention;
[0028] Figure 5 This is a schematic diagram of the present invention in which the rib plate of the starting trolley is cut off and the starting trolley frame is tilted;
[0029] Figure 6 It is a schematic diagram of the structure of the track beam in the present invention;
[0030] Figure 7 This is a schematic diagram of the position of the oil cylinder support hole in the present invention;
[0031] Figure 8 It is a schematic diagram of the starting position of the oil cylinder support in the present invention;
[0032] Fig. 9 It is a schematic diagram of the positional relationship between the support system and the jacking system in the present invention;
[0033] Fig.10 It is a schematic diagram of the relationship between the starting sleeve and the tunnel door in the present invention;
[0034] Fig.11 It is a schematic diagram of the crane beam track change in the present invention.
[0035] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0036] 1. Starting portal segment; 2. Column; 3. No. 1 trolley; 4. Pipe jacking machine; 5. Receiving portal segment; 6. Starting trolley; 7. Pushing cylinder; 8. Cylinder bracket; 9. Track beam; 10. Backrest of pushing cylinder; 11. Wedge block; 12. Starting sleeve; 13. No. 1 crane beam; 14. No. 2 crane beam; 15. No. 3 crane beam; 16. Communication channel segment; 17. Starting portal. DETAILED DESCRIPTION
[0037] In order to facilitate understanding of the present application, the present application will be described more fully below with reference to the relevant drawings. Embodiments of the present application are provided in the drawings. However, the present application can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present application more thorough and comprehensive.
[0038] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein in the specification of this application are only for the purpose of describing specific embodiments and are not intended to limit this application.
[0039] The example is a pipe jacking machine communication channel equipment renovation project in a certain section of Zhengzhou Metro Line 12 project. The net length of the communication channel structure in this section is 15.28m, the buried depth is 21.2m, and the vertical angle deviation between the designed main tunnel axis and the communication channel axis is 4.8°. The communication channel adopts mechanical pipe jacking construction. Conventional pipe jacking machines are only suitable for communication channel construction with a vertical angle deviation of less than 3°. Therefore, the pipe jacking machine equipment needs to be modified.
[0040] The connecting channel tunnel is lined with concrete segments and steel segments. The thickness of the ordinary segment lining is 250mm, the outer diameter is 3260mm, and the ring width is 900mm. The lining length is adjusted by processing the steel adjustment ring segment. Steel sleeves are used for the launch and reception of the jacking pipe. Polyurethane expansion water stop strips and EPDM rubber sealing pads are used for joint waterproofing, and the caulking material is sealed with a single-component polyurethane sealant.
[0041] The present invention provides a method for constructing a large angle communication channel pipe jacking machine, referring to Figure 1 , including the following construction steps:
[0042] Step 1: Reference Figure 2 and Figure 3, Simulation of the starting and receiving lines of the communication channel: According to the actual assembly positions of the starting tunnel portal segment 1 and the receiving tunnel portal segment 5 of the communication channel, simulate the positions of the starting tunnel portal 17 and the receiving tunnel portal, connect the lines of the centers of the tunnel portals, and ensure the safety gap between the equipment cutter head and the tunnel portals. The jacking machine 4 needs to be excavated at an offset of about 4.8° from the starting trolley 6. Theoretically, the minimum gap between the cutter head and the starting tunnel portal 17 is 32mm, and the minimum gap with the receiving tunnel portal is about 118mm, which meets the starting and receiving requirements.
[0043] Among them, the starting and receiving line simulation of the communication channel directly uses a total station to measure 10 points at the starting and receiving ends respectively, fits the centers of the starting and receiving tunnel gates on the CAD, connects the center points of the starting and receiving tunnel gates, and accurately simulates the excavation control axis of the jacking machine 4 during the excavation process.
[0044] Step 2: Reference Figure 4 and Figure 5 , adjust the starting trolley 6: the starting trolley 6 adopts a stepped design, and the section of the starting trolley 6 is designed with equal strength. The starting position of the pipe jacking machine 4 adopts a sunken design and is welded with steel plates. The positions on both sides and the starting position adopt a staggered design. There are multiple ribs at the connection to play an auxiliary strengthening role. Figure 4 The bottom structure of the starting trolley 6 is shown in FIG.
[0045] The pipe jacking machine 4 starts obliquely at the starting position, and the connecting ribs, auxiliary structures, etc. will interfere with the pipe jacking machine 4. The ribs need to be cut off, which increases the risk of structural deformation. Therefore, the structure of the trailer needs to be changed to ensure the rigidity of the entire starting trolley 6 after the ribs are cut off.
[0046] Step 3: Reference Figures 6 to 8 , Change the jacking system: The jacking system includes components such as the cylinder bracket 8, the track beam 9, the jacking cylinder 7, and the hydraulic system. The sliding track beam 9 is installed on the column 2 of the starting trolley 6, and the direction of the sliding track beam 9 is parallel to the axial position of the starting trolley 6; the cylinder bracket 8 slides on the track beam 9, and its adjustment angle is limited, and the theoretical value is within 3°; the jacking cylinder 7 is suitable for excavation within 3°. When the angle increases, the cylinder will interfere with the main machine of the equipment when the equipment is transported into the tunnel.
[0047] In order to adapt to the changes in the segment route, the support of the jacking cylinder 7 needs to be modified, and the sliding structure needs to be changed to adapt to large angle offsets; at the same time, a wedge-shaped backrest is added to make the jacking cylinder 7 suitable for inclined jacking.
[0048] Step 4: Reference Fig. 9, Adjust the support system: The support system is designed to fit closely with the main tunnel segment, and the support system boots are designed to be parallel to the main tunnel. When the connecting channel and the main tunnel form a certain angle, the support system boots cannot provide reaction force to the jacking cylinder 7, so the support system needs to be adjusted. The support system needs to add a wedge-shaped structure to provide reaction force for the jacking system, and at the same time, the influence of the lateral force of the cylinder on the main tunnel segment needs to be considered. Fig. 9 Behind the middle push cylinder 7 is a push cylinder backrest 10 .
[0049] According to the force calculation, the structure of the support system is adjusted to meet the requirements of excavation. In order to avoid replacing the oil cylinder, the wedge block 11 is designed as a block structure, divided into two left and right blocks. The wedge blocks 11 on both sides are designed with staggered platforms to facilitate the position adjustment of the oil cylinder bracket 8. It should be noted that there is a stroke difference between the oil cylinders on both sides, and the zero position of the oil cylinder needs to be set in the control program to avoid misalignment during jacking.
[0050] Step 5: Reference Fig.10 , Change the starting sleeve 12: When the offset angle is 5°, the starting sleeve 12 and the tunnel door are arranged at an angle, and the stroke difference between the left and right sides is relatively large. During the simulation, the maximum stroke difference between the left and right sides is 35cm. The starting sleeve 12 needs to be changed accordingly. While ensuring the sealing of the tunnel door, the fitting of the starting sleeve 12 and the tunnel door is also a difficult problem. It is necessary to simulate in three dimensions and cut the plate to ensure the structural shape and strength. According to the simulation results, the starting sleeve 12 is cut and adjusted to ensure that the starting sleeve 12 is tightly fitted with the main tunnel for easy welding connection.
[0051] Step 6: Reference Fig.11 , Change the crane beam track: The original crane beam is perpendicular to the axis of the communication channel, offset by 4.8°. At the start, the angle between the communication channel segment 16 and the crane beam is also 4.8°, so it is necessary to deflect the communication channel segment 16. At 4.8°, a single-side offset of 27.5cm is required, which is difficult for the crane beam to complete, so the track beam 9 needs to be changed accordingly.
[0052] The crane beam of the No. 1 trolley 3 is divided into three parts, namely, the No. 1 crane beam 13, the No. 2 crane beam 14 and the No. 3 crane beam 15, wherein the angle between the No. 2 crane beam 14 and the No. 1 crane beam 13 and the No. 3 crane beam 15 is 2.4°, and some chains need to be added. After the change, when the segment is transported to the location, part of the deflection can be completed, and the remaining deflection needs to be completed with manual assistance, which can reduce the difficulty of segment assembly.
[0053] The equipment modification construction method in the present invention can be well applied to the construction of the communication channel of the project. Compared with the conventional pipe jacking machine 4, the present invention has strong applicability. According to the above modification method, the pipe jacking machine 4 suitable for various angles can be modified at low cost and high efficiency. The modification method of the present application is simple to operate and has a short construction period, breaking through the limitation that the pipe jacking machine 4 can only be constructed in small-angle communication channels.
[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for modifying a pipe jacking machine with a large angle communication channel, characterized in that: The construction steps include: S1: Simulation of the starting and receiving lines of the communication channel: According to the actual assembly positions of the starting and receiving segments of the communication channel, simulate the positions of the starting tunnel gate and the receiving tunnel gate, connect the lines at the centers of the tunnel gates, and ensure the safety gap between the equipment cutter head and the tunnel gates. The pipe jacking machine and the starting trolley are offset by about 4.8° for excavation; S2: Adjust the starting trolley: The starting trolley adopts a stepped design, and the section of the starting trolley is designed with equal strength. The starting position of the equipment adopts a sunken design, which is welded with steel plates. The positions on both sides and the starting position adopt a staggered design, and there are multiple ribs connected at the connection to play an auxiliary reinforcement role; S3: Change the jacking system: The jacking system includes a cylinder bracket, a sliding track beam, a jacking cylinder and a hydraulic system. The sliding track beam is installed on the column of the starting trolley. The direction of the track beam is parallel to the axial position of the starting trolley. The cylinder bracket slides on the sliding track beam. The sliding track is changed to adapt to large-angle offsets. At the same time, a wedge block is added to provide a reaction force for the jacking system through the wedge block, so that the cylinder adapts to the inclined jacking. S4: Adjust the support system: According to the force calculation, adjust the structure of the support system to adapt it to the requirements of excavation; S5: Change the starting sleeve: According to the three-dimensional simulation, the plate is cut to ensure the structural shape and strength. According to the simulation results, the starting sleeve is cut and adjusted to ensure that the starting sleeve is tightly attached to the main tunnel for easy welding connection; S6: Change the crane beam track: Divide the crane beam of trolley No. 1 into three parts, namely crane beam No. 1, crane beam No. 2 and crane beam No.
3. The angle between crane beam No. 2 and crane beam No. 1 and crane beam No. 3 is 2.4°. At the same time, add some chains.
2. A method for modifying a large angle communication channel pipe jacking machine according to claim 1, characterized in that: In step S1, 10 points are measured at the starting end and the receiving end respectively using a total station, and the centers of the tunnel gates at the starting end and the receiving end are fitted on the CAD. The center points of the tunnel gates at the starting end and the receiving end are connected to accurately simulate the excavation control axis during the excavation of the pipe jacking machine.
3. The method for modifying a large-angle connecting channel pipe jacking machine according to claim 1, characterized in that: In step S2, the pipe jacking machine starts obliquely at the starting position, and the structures connecting the ribs and the auxiliary structures that interfere with the main machine are cut off. At the same time, the structure of the trailer is changed to ensure the rigidity of the entire trolley after the ribs are cut off.
4. The method for modifying a large angle communication channel pipe jacking machine according to claim 1, characterized in that: In step S3, the wedge block is designed as a block structure, divided into two blocks on the left and right. The wedge blocks on both sides adopt a staggered design to facilitate the position adjustment of the cylinder bracket.
5. A method for modifying a large angle communication channel pipe jacking machine according to claim 4, characterized in that: There is a stroke difference between the oil cylinders on both sides of the two wedge blocks. It is necessary to set the zero position of the oil cylinder in the control program to reduce the misalignment during jacking.
6. The method for modifying a large angle communication channel pipe jacking machine according to claim 1, characterized in that: After the crane beam track is changed in step S6, part of the deflection can be completed when the segment is transported to the location, and the remaining deflection requires manual assistance to reduce the difficulty of assembling the segment.
7. The method for modifying a large angle communication channel pipe jacking machine according to claim 1, characterized in that: Steel sleeves are used for the launch and reception of jacking pipes, polyurethane expansion waterstops and EPDM rubber sealing pads are used for joint waterproofing, and one-component polyurethane sealant is used for sealing the caulking material.