High-quality boron carbide refined production system and method
By using downpressure mode and iron removal powerful magnet blocks and hydraulic forming technology in boron carbide powder production system, the problems of excessive impurity content and complex loading in traditional cold pressing treatment are solved, and efficient improvement of boron carbide powder purity and blanks are achieved. The density is improved, improving the quality and production efficiency of finished products.
Patent Information
- Application Number
- CN202411086380.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-15
AI Technical Summary
During the cold pressing process of traditional boron carbide powder, there are problems such as excessive impurity content, complex loading and labor-intensive discharge, which affects the blank density and finished product quality.
High-quality boron carbide fine production system adopting down-pressure mode, including decompression conveyors and high-quality blank forming devices, and uses quantitative feeding equipment, iron removal and molding of boron carbide powder to simplify Feeding and discharge processes to improve production efficiency and finished product quality.
Through the magnetic adsorption and hydraulic forming technology of the iron-removing strong magnet block, the purity and blank density of boron carbide powder are improved, the charging process is simplified, and the production efficiency and quality of the finished product are improved.
Smart Images

Figure CN118954028A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of boron carbide production, and in particular to a high-quality boron carbide refined production system and method. Background Art
[0002] The production of high-quality boron carbide requires comprehensive control from the early logistics control to the subsequent sintering chemical control. Especially in the early physical control process, high-purity and high-fineness boron carbide powder is made into billets through the combination of molding equipment and processes. The fineness and purity of the boron carbide powder in the billet determine the level of subsequent product instructions.
[0003] The traditional preparation process directly receives the powder after production for cold pressing. There are some defects in the process that affect the quality of the finished product, mainly concentrated in: in terms of the purity of boron carbide subdivision, the powder obtained by ductile iron contains a small amount of iron impurities. If these impurities are not removed, the impurity content in the later blank will exceed the standard, affecting the quality of the finished product after subsequent calcination. In addition, when the boron carbide powder enters the cold pressing equipment for pressing, there is a defect of inconvenient feeding. In order to improve the quality of the blank, the traditional cold pressing blank needs to provide a large pressure, and it is necessary to implement the upper pressing operation. When the upper pressing operation is adopted, the feeding process needs to be controlled by auxiliary telescopic equipment, and the feeding equipment is removed during the downward movement of the upper pressing plate. There are also many complex and repetitive operations during the discharge. Because its loading process is complicated and difficult to control, the discharge is labor-intensive and time-consuming, resulting in a reduction in the overall work and operation efficiency. However, the change of the traditional cold pressing equipment has insufficient pressure, resulting in defects such as reduced density and irregular shaping of the blank.
[0004] In this regard, the present invention provides a high-quality boron carbide refined production system and method with simple structure, convenient operation, strong continuous production capacity, which helps to improve the density and treatment of the blank, realize the blanking after the purity of the finished powder is improved, adopts a downward pressing mode, is convenient for feeding and discharging, helps to improve the production efficiency and quality of the finished product, and has a simple and easy-to-operate method. The system and method have broad market prospects. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a high-quality boron carbide refined production system and method with a simple structure, convenient operation, and strong continuous production capacity, which is helpful to improve the density and treatment of the blank and realize the blanking after the purity of the finished powder is improved. The downward pressing mode is adopted to facilitate feeding and discharging, which is helpful to improve the production efficiency and quality of the finished product. The method is simple and easy to operate, and is used to overcome the defects in the prior art.
[0006] The technical solution of the present invention is achieved as follows: a high-quality boron carbide fine production system, including a dust removal conveyor and a conveyor belt installed on the dust removal conveyor, characterized in that: a quantitative feeding device is fixedly installed above the feed end of the conveyor belt, and a plurality of quantitative receiving boxes connected to the output end of the quantitative feeding device are fixedly installed on the conveyor belt. A raised support roller is installed on the upper part of the dust removal conveyor through a raised bracket, and the conveyor belt is arranged on the upper part of the raised support roller. Pressure wheels are arranged on the upper position of the conveyor belt edge on both sides of the raised support roller. A strong iron removal magnet block is arranged above the conveyor belt outside the raised support roller. A discharging gathering bucket is arranged at the output end of the dust removal conveyor, and a refined discharging control valve is installed at the bottom of the discharging gathering bucket, and a high-quality billet forming device is arranged below the refined discharging control valve.
[0007] Furthermore, the high-quality blank forming device includes a ground trough arranged below the refined discharge control valve, a hydraulic press is installed at the bottom of the ground trough, a mold support seat is fixedly installed above the hydraulic press, a boron carbide shaping mold is fixedly installed at the upper center position of the mold support seat, an opening is arranged at the top of the boron carbide shaping mold, the opening is connected with the discharge port of the refined discharge control valve, an upper pressure rod with an output direction facing upward is installed in the boron carbide shaping mold, the bottom of the upper pressure rod is connected with the output end of the hydraulic press, the top of the boron carbide shaping mold extends to the upper part of the ground trough, a supporting plate is fixedly installed on the outside of the boron carbide shaping mold extending to the upper part of the ground trough, locking vertical rods and rotating opening and closing cover support rods are symmetrically installed on both sides of the boron carbide shaping mold above the supporting plate, a rotating opening and closing cover body whose bottom surface matches the top opening of the boron carbide shaping mold is installed on the rotating opening and closing cover support rod, and an auxiliary limit adjustment block whose bottom surface matches the top surface of the rotating opening and closing cover body is installed on the locking vertical rod.
[0008] Furthermore, the quantitative feeding equipment is a discharging crane or a ground-mobile discharging equipment, the quantitative material receiving box is a rectangular box structure, a material mixing tank is provided on the top of the quantitative material receiving box, the top surface of the material mixing tank is connected with the discharging end of the quantitative feeding equipment, the bottom of the quantitative material receiving box is fixedly connected with the outer side surface of the conveyor belt, the length of the quantitative material receiving box is not greater than the width of the conveyor belt, a plurality of quantitative material receiving boxes are evenly distributed on the outer side surface of the conveyor belt, and the installation direction of the quantitative material receiving box is perpendicular to the traveling direction of the conveyor belt.
[0009] Furthermore, the bottom of the raised bracket is fixedly installed on the top surface of the impurity removal conveyor, a supporting rotating shaft is installed on the inner side of the raised bracket, a raised support roller is mounted on the supporting rotating shaft, the bottom surface of the raised support roller is located above the top surface of the impurity removal conveyor, and the length of the raised support roller matches the width of the conveyor belt.
[0010] Furthermore, the pressure wheel is installed on the inner side of the top of the impurity removal conveyor through a pressure wheel bracket, the bottom surface of the pressure wheel is in contact with the top surface of the conveyor belt, the pressure wheel is arranged on the top of the conveyor belt on both sides of the quantitative material receiving box, and a pressure wheel rotating shaft is arranged on the inner side of the pressure wheel bracket, and the center position of the pressure wheel is mounted on the pressure wheel rotating shaft.
[0011] Furthermore, the strong iron removal magnet block is a rectangular block structure, and the length and width of the strong iron removal magnet block are respectively matched with the length and width of the quantitative material receiving box. Magnet brackets are arranged on both sides of the strong iron removal magnet block, and the bottom of the magnet bracket is fixedly installed on the top of the impurity removal conveyor. The magnet bracket is a bracket that can be extended and retracted longitudinally, and the bottom of the strong iron removal magnet block corresponds longitudinally to the top of the raised support roller.
[0012] Furthermore, a mold limit support seat is installed in the ground groove below the supporting plate, and a reinforcing connecting rod is installed between the mold support seat and the mold limit support seat. The boron carbide molding mold has an opening at the top and a square, circular or special-shaped cavity structure in cross section. The top pressure head of the upper pressure rod matches the inner diameter of the boron carbide molding mold.
[0013] Furthermore, a first external thread layer is provided on the rotating opening and closing cover support rod above the supporting plate, and an upper adjusting nut and a lower adjusting nut are threadedly connected to the first external thread layer, and one side of the rotating opening and closing cover body is sleeved on the rotating opening and closing cover support rod between the upper adjusting nut and the lower adjusting nut.
[0014] Furthermore, a second external thread layer is provided on the locking upright above the supporting plate, and the auxiliary limit adjustment block is mounted on the second external thread layer by means of a threaded connection. A snap-fitting groove matching the outer diameter of the locking upright is provided on the rotating opening and closing cover body, the width of the rotating opening and closing cover body is not less than the outer diameter of the boron carbide molding mold, the outer diameter of the boron carbide molding mold is not greater than the spacing between the locking upright and the rotating opening and closing cover support rod, and the length of the rotating opening and closing cover body is not less than the spacing between the locking upright and the rotating opening and closing cover support rod.
[0015] A production method of the high-quality boron carbide fine production system as described above, the method comprising:
[0016] 1) At the initial running position of the conveyor belt, start the quantitative feeding device to evenly convey the boron carbide powder into the quantitative receiving box with the opening facing upward. As the conveyor belt continues to run, the quantitative receiving box containing the boron carbide powder moves toward the discharge direction of the impurity removal conveyor;
[0017] 2) When the quantitative material receiving box runs to the top of the raised support roller, the boron carbide powder evenly spread in the quantitative material receiving box is adsorbed by the strong iron removal magnet block installed on the top of the box, and the iron impurities doped in the boron carbide powder are adsorbed by the strong iron removal magnet block;
[0018] 3) After the boron carbide powder in the quantitative receiving box is subjected to iron removal treatment, high-quality boron carbide fine powder is obtained. With the continuous operation of the conveyor belt, the high-quality boron carbide fine powder moves toward the discharge direction of the impurity removal conveyor, and is turned over and discharged into the discharge gathering hopper at the discharge end of the impurity removal conveyor, and the discharge amount is accurately controlled by the fine discharge control valve;
[0019] 4) In the initial position, the rotary opening and closing cover is in the open state. When the fine material discharging control valve is opened, the high-quality boron carbide fine powder is correspondingly dropped into the inner cavity of the boron carbide molding die. At this time, the upper pressure rod is in a contracted state. When the high-quality boron carbide fine powder is loaded to a preset weight, the fine material discharging control valve is closed, and then the rotary opening and closing cover is rotated to the top of the boron carbide molding die to seal it, and the rotary opening and closing cover is closed and positioned using the auxiliary limit adjustment block;
[0020] 5) Turn on the hydraulic press to drive the upper pressure rod to output upward, and squeeze the high-quality boron carbide fine powder loaded into the inner cavity of the boron carbide molding die upward. Under the blocking effect of the bottom surface of the rotating opening and closing cover body, the high-quality boron carbide fine powder is gradually extruded into a preset blank in the boron carbide molding die;
[0021] 6) After the blank is formed, the rotary opening and closing cover is opened, and then the upper pressure rod is driven to continuously move upward to eject the formed blank from the inner cavity of the boron carbide shaping mold, and the formed blank is transferred to the sintering equipment by a suction cup or a grabbing tool for sintering.
[0022] The present invention has the following positive effects:
[0023] 1. The present invention utilizes the raised support rollers and the pressure wheel provided on the impurity removal conveyor to perform ridge forming operation on the conveyor belt, and drives the quantitative material receiving box fixedly installed on the outer surface of the conveyor belt to approach the position with the strong iron removal magnet block, and performs iron removal operation on the boron carbide powder containing iron impurities loaded in the quantitative material receiving box, and adopts the method of strong magnet adsorption to perform purity improvement operation on the boron carbide powder evenly spread in the quantitative material receiving box through the lower part of the strong iron removal magnet block. The overall structure is simple, the iron removal efficiency is high, the structural design is reasonable and ingenious, the iron removal efficiency is high, and it is helpful to improve the purity of the boron carbide powder particles before forming.
[0024] 2. The present invention utilizes a high-quality blank forming device to implement efficient blank forming operations. It adopts a top feeding operation, and utilizes a flexibly movable rotating opening and closing cover body to implement a rotating sealing opening operation on the top opening of the boron carbide molding die. During the pressure forming operation, an upward pressure-type pressure feeding operation is utilized, and the bottom surface of the rotating opening and closing cover body is cooperated to implement a coordinated upper receiving operation. An upper adjusting nut and a lower adjusting nut are used to perform upper and lower positioning of the rotating opening and closing cover body after the rotation operation. The use of an auxiliary limit adjustment block is used to provide a stable upper limit support for the upper pressure operation. The loading method is simple and efficient, the material loaded into the boron carbide molding die has a high purity, and the degree of refinement after the later blank molding is high, which helps to improve the quality of the later finished product. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the main structure of the present invention.
[0026] Figure 2 It is a side structural schematic diagram of the present invention.
[0027] Figure 3 It is a schematic diagram of the top structure of the present invention.
[0028] Figure 4 It is a schematic diagram of the partial internal structure of the present invention.
[0029] Figure 5 It is a partial top view of the structure of the present invention. DETAILED DESCRIPTION
[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] In the following description of the invention, it should be noted that the terms "upper", "lower", "left", "right", "inner", "outer", etc., indicating directions or positional relationships, are based on directions or positional relationships shown in the drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific direction or be constructed and operated in a specific direction. The term "connection" only indicates the connection between devices and has no special meaning.
[0032] Specific embodiment: Figure 1 , 2As shown in Figures 3, 4 and 5, a high-quality boron carbide fine production system comprises a dust-removing conveyor 1 and a conveyor belt 2 installed on the dust-removing conveyor 1, a quantitative feeding device is fixedly installed above the feed end of the conveyor belt 2, and a plurality of quantitative receiving boxes 3 connected to the output end of the quantitative feeding device are fixedly installed on the conveyor belt 2, a raised support roller 7 is installed on the upper part of the dust-removing conveyor 1 through a raised bracket 6, the conveyor belt 2 is arranged on the upper part of the raised support roller 7, pressure wheels 4 are arranged on the upper position of the edge of the conveyor belt 2 on both sides of the raised support roller 7, a strong iron removal magnet block 9 is arranged above the conveyor belt 2 outside the raised support roller 7, a discharging gathering bucket 10 is arranged at the output end of the dust-removing conveyor 1, a refined discharging control valve 11 is installed at the bottom of the discharging gathering bucket 10, and a high-quality billet forming device is arranged below the refined discharging control valve 11.
[0033] During operation, the impurity removal conveyor 1 is responsible for material transfer operations, on which a conveyor belt 2 is installed, and the position of the conveyor belt feed port corresponds to the quantitative feeding device. The quantitative feeding device conveys a quantitative amount of primary boron carbide powder to the receiving box 3 on the upper part of the conveyor belt each time. The quantitative receiving box 3 is responsible for the filling and transfer operations of the primary boron carbide powder, and its transfer method is to follow the operation of the conveyor belt to achieve transfer. The function of the raised support roller 7 is to bring the quantitative feeding box 3 close to the strong iron removal magnet block in the process of transportation by ridge formation and slope formation, so as to achieve the upper surface of the primary boron carbide powder evenly spread in the quantitative feeding box 3 and the bottom of the strong iron removal magnet block 9, ensuring that the adsorption range of the strong iron removal magnet block 9 can radiate the surface and inner layer of the primary boron carbide powder. Then the iron powder and iron impurity particles mixed in the primary boron carbide powder are adsorbed. These iron impurities and iron particles are generated in the process of producing ductile iron or carried in the raw materials. By means of ridge approach, the normally open opening structure at the top of the quantitative feeding box 3 is brought close to the strong iron removal magnet block 9 for adsorption, which can achieve efficient iron removal without affecting the transfer and transportation of boron carbide powder, which is convenient and efficient. The discharge gathering bucket 10 cooperates with the output end of the impurity removal conveyor to realize material acceptance, and the refined discharge control valve 11 cooperates with the bottom of the discharge gathering bucket 10 to realize accurate control of the material discharge. The material after iron removal is finally transported to the high-quality billet forming device for efficient and convenient billet forming operations.
[0034] The high-quality blank forming device comprises a ground trough 13 arranged below the refined discharge control valve 11, a hydraulic press 17 is installed at the bottom of the ground trough 13, a mold support seat 16 is fixedly installed above the hydraulic press 17, a boron carbide shaping mold 15 is fixedly installed at the upper center position of the mold support seat 16, an opening is arranged at the top of the boron carbide shaping mold 15, and the opening is connected to the discharge port of the refined discharge control valve 11, an upper pressure rod 26 with an output direction facing upward is installed in the boron carbide shaping mold 15, and the bottom of the upper pressure rod 26 is connected to the output end of the hydraulic press 17. The top of the boron carbide shaping mold 15 extends to the upper part of the ground trough 13, and a supporting plate 12 is fixedly installed on the outer side of the boron carbide shaping mold 15 extending to the upper part of the ground trough 13. Locking vertical rods 19 and rotating opening and closing cover support rods 20 are symmetrically installed on both sides of the boron carbide shaping mold 15 above the supporting plate 12. The rotating opening and closing cover support rod 20 is provided with a rotating opening and closing cover body 23 whose bottom surface matches the top opening of the boron carbide shaping mold 15, and the locking vertical rod 19 is provided with an auxiliary limit adjustment block 24 whose bottom matches the top surface of the rotating opening and closing cover body 23.
[0035] The high-quality blank forming device adopts an upper pressure operation mode of upper feeding and upper discharging. In order to ensure that the blank can be formed efficiently during its operation, a boron carbide shaping mold 15 is provided to cooperate with an upper pressure rod 26 set therein to realize the feeding and pressing forming operation. The hydraulic press 17 cooperates with the upper pressure rod 26 to realize the pressure feeding and pressure relief telescopic operation of the upper pressure rod. The upper feeding method is adopted, and the material output by the refined discharge control valve 11 is directly discharged to the upper part of the upper pressure rod 26 of the inner cavity of the boron carbide shaping mold 15. When the hydraulic press 17 is turned on, the boron carbide shaping mold 15 is fixed by being fixed and matched with the upper support plate 12. When the upper pressure plate 26 is output upward, the material in the boron carbide shaping mold 15 is squeezed upward. At the same time, the rotating opening and closing cover 23 is rotated and moved to the top of the opening of the top of the boron carbide shaping mold 15 by rotating, and the plugging is realized. As the upper pressure rod 26 continues to rise, the material is extruded and formed in the inner cavity of the boron carbide shaping mold 15 between the upper pressure rod 26 and the bottom of the rotating opening and closing cover 23. After the blank is formed, the rotating opening and closing cover 23 is opened, and the output operation of the upper pressure rod is continuously operated to push the blank out of the inner cavity of the boron carbide shaping mold 15, and the blank is transferred using a suction cup and a gripper.
[0036] The quantitative feeding equipment is a discharging crane or a ground-mobile discharging equipment. The quantitative receiving box 3 is a rectangular box structure. A material-leveling tank 25 is provided on the top of the quantitative receiving box 3. The top surface of the material-leveling tank 25 is connected to the discharging end of the quantitative feeding equipment. The bottom of the quantitative receiving box 3 is fixedly connected to the outer side of the conveyor belt 2. The length of the quantitative receiving box 3 is not greater than the width of the conveyor belt 2. Several quantitative receiving boxes 3 are evenly distributed on the outer side of the conveyor belt 2. The installation direction of the quantitative receiving box 3 is perpendicular to the travel direction of the conveyor belt 2. The material-leveling tank 25 is a square trough structure. It is provided on the top of the quantitative receiving box 3. It receives the material output by the quantitative feeding equipment in a uniformly paved manner. When the quantitative feeding equipment outputs the material, it moves at a uniform speed from one side of the material-leveling tank 25 to the other side. During the movement, the material is evenly output and spreads the material leveling tank 25. The width of the quantitative material receiving box 3 is smaller than the span of the conveyor belt 2, providing a reserved conveyor belt clamping and pressing space for the pressing wheel 4, ensuring that the two sides of the conveyor 2 set on the outer side of the raised support roller 7 are loose and cause shaking, avoiding the material in the quantitative material receiving box 3 from spilling.
[0037] The bottom of the raised bracket 6 is fixedly mounted on the top surface of the impurity removal conveyor 1, and a support rotating shaft is installed on the inner side of the raised bracket 6. The raised support roller 7 is mounted on the support rotating shaft. The bottom surface of the raised support roller 7 is located above the top surface of the impurity removal conveyor 1, and the length of the raised support roller 7 matches the width of the conveyor belt 2. The raised support roller 7 needs to match the width of the conveyor belt when it is installed, and should be higher than the top surface of the impurity removal conveyor, so that when the quantitative material receiving box passes through the upper part of the raised support roller 7 during operation, it can exceed the top surface of the impurity removal conveyor 1 and approach the bottom surface of the strong iron removal magnet block 9 to ensure efficient operation of the iron removal effect. At the same time, the smooth operation of the conveyor belt 2 is ensured. The pressure wheel 4 is installed on the inner side of the top of the impurity removal conveyor 1 through the pressure wheel bracket 5, and the bottom surface of the pressure wheel 4 is in contact with the top surface of the conveyor belt 2. The pressure wheel 4 is arranged on the top of the conveyor belt 2 on both sides of the quantitative material receiving box 3. The inner side of the pressure wheel bracket 5 is provided with a pressure wheel rotating shaft, and the center position of the pressure wheel 4 is mounted on the pressure wheel rotating shaft. The pressure wheel 4 is used in conjunction with the pressure wheel bracket 5 , and the pressure wheel 4 is installed in a manner of supporting on the top of the impurity removal conveyor 1 while extending inward, ensuring that its bottom is in contact with the top surface of the conveyor belt 2 and is limited.
[0038] The strong magnet block 9 for iron removal is a rectangular block structure. The length and width of the strong magnet block 9 for iron removal are matched with the length and width of the quantitative feeding box 3 respectively. Magnet brackets 8 are arranged on both sides of the strong magnet block 9 for iron removal. The bottom of the magnet bracket 8 is fixedly mounted on the top of the impurity removal conveyor 1. The magnet bracket 8 is a bracket that can be telescopic in the longitudinal direction. The bottom of the strong magnet block 9 for iron removal corresponds to the top of the raised support roller 7 in the longitudinal direction. The strong magnet block 9 for iron removal is matched with the shape of the top of the quantitative feeding box 3 to ensure that the bottom of the strong magnet block 9 for iron removal can fully cover the top surface of the quantitative feeding box 3. The magnet bracket 8 adopts a telescopic mechanism to support the strong magnet block 9 for iron removal. During the specific operation, the height of the strong magnet block 9 for iron removal can be adjusted according to the single loading amount of the quantitative feeding box 3 to adjust the corresponding magnetic force of the top of the quantitative feeding box 3.
[0039] A mold limit support seat 14 is installed in the ground groove 13 below the support plate 12, and a reinforcing connecting rod 18 is installed between the mold support seat 16 and the mold limit support seat 14. The boron carbide shaping mold 15 has an opening at the top and a square, circular or special-shaped cavity structure in cross section. The top pressure head of the upper pressure rod 26 matches the inner diameter of the boron carbide shaping mold 15. The mold support seat 16, the mold limit support seat 14 and the reinforcing connecting rod 18 implement the fixed support operation of the boron carbide shaping mold 15, and are used in conjunction with the support plate 12, which can not only provide a working condition support platform for the upper staff, but also can implement maintenance and overhaul operations deep into the lower part.
[0040] The rotating cover support rod 20 above the support plate 12 is provided with a first external thread layer, and the upper adjustment nut 21 and the lower adjustment nut 22 are threadedly connected on the first external thread layer, and one side of the rotating cover body 23 is sleeved on the rotating cover support rod 20 between the upper adjustment nut 21 and the lower adjustment nut 22. The locking vertical rod 19 above the support plate 12 is provided with a second external thread layer, and the auxiliary limit adjustment block 24 is sleeved on the second external thread layer by threaded connection. The rotating cover body 23 is provided with a clamping notch 28 that matches the outer diameter of the locking vertical rod 19. The width of the rotating cover body 23 is not less than the outer diameter of the boron carbide molding die 15, the outer diameter of the boron carbide molding die 15 is not greater than the distance between the locking vertical rod 19 and the rotating cover support rod 20, and the length of the rotating cover body 23 is not less than the distance between the locking vertical rod 19 and the rotating cover support rod 20.
[0041] In order to further improve the stability and reliability of the present invention during operation, the rotating opening and closing cover body 23 is adjusted up and down during use, and one side of the rotating opening and closing cover body 23 is clamped by the upper adjustment nut 21 and the lower adjustment nut 22, and the rotating opening and closing cover support rod 20 is used as the support center during rotation. During the rotating opening operation, in order to ensure that the bottom surface of the rotating opening and closing cover body 23 is completely matched with the top opening of the boron carbide molding mold 15 after the bottom is screwed closed, the upper adjustment nut 21 and the lower adjustment nut 22 can be adjusted around the first external thread layer to achieve a close fit between the bottom surface of the rotating opening and closing cover body 23 and the top opening of the boron carbide molding mold 15 after the rotating opening and closing cover body 23 is closed. At the same time, the auxiliary limit adjustment block 24 cooperates with the second external thread layer to limit and fix the other side of the rotating opening and closing cover body 23 after the height is adjusted, and the clamping notch 28 realizes the matching clamping of the other side of the rotating opening and closing cover body 23 with the locking vertical rod 19.
[0042] The specific production method of the high-quality boron carbide fine production system of the present invention is:
[0043] First, at the initial operation position of the conveyor belt 2, the quantitative feeding device is turned on to uniformly convey the primary boron carbide powder into the quantitative receiving box 3 with the opening facing upward, and the primary boron carbide powder is mixed and dropped into the mixing tank 25, and a uniform thickness filling layer is formed in the mixing tank 25. As the conveyor belt 2 continues to run, the quantitative receiving box 3 filled with the primary boron carbide powder moves toward the discharge direction of the impurity removal conveyor 1. The primary boron carbide powder contains iron powder and other iron impurities generated in the ductile iron stage. The quantitative receiving box 3 is used to perform a uniform thickness loading operation, and the material is quantitatively loaded with powder.
[0044] When the quantitative material receiving box 3 runs to the top of the raised support roller 7, the quantitative material receiving box 3 slowly bulges along with the rise of the support roller 7 and the operation of the conveyor belt 2, and the boron carbide powder evenly spread in the quantitative material receiving box 3 is under the magnetic adsorption action of the strong iron removal magnet block 9 installed on the upper part thereof. When the iron impurities doped in the boron carbide powder pass through the bottom of the strong iron removal magnet block 9 at the top opening of the quantitative material receiving box 3, the surface of the primary boron carbide material in the quantitative material receiving box 3 and the internal powder fall into the magnetic range of the strong iron removal magnet block 9, and the iron impurities are adsorbed by the strong iron removal magnet block 9.
[0045] After the primary boron carbide powder in the quantitative receiving box 3 is subjected to the iron removal treatment, high-quality boron carbide fine powder 27 is obtained. With the continuous operation of the conveyor belt 2, the high-quality boron carbide fine powder 27 moves toward the discharging direction of the impurity removal conveyor 1, and is turned over and discharged into the discharging gathering bucket 10 at the discharging end of the impurity removal conveyor 1, and the discharging amount is accurately controlled by the fine discharging control valve 11. At the initial position, the rotary opening and closing cover 23 is in an open state. When the fine discharging control valve 11 is opened, the high-quality boron carbide fine powder 27 falls into the inner cavity of the boron carbide molding mold 15. At this time, the upper pressure rod 26 is in a contracted state. When the high-quality boron carbide fine powder 27 is loaded to a preset weight, the fine discharging control valve 11 is closed, and then the rotary opening and closing cover 23 is rotated to the top of the boron carbide molding mold 15 to seal it, and the rotary opening and closing cover 23 is closed and positioned by the auxiliary limit adjustment block 24. During the closing and positioning process, after the rotating opening and closing cover body 23 is closed, when there is a gap between its bottom surface and the top surface of the boron carbide molding mold 15, the upper adjusting nut 21 and the lower adjusting nut 22 are adjusted around the first external thread layer. During the adjustment process, the rotating opening and closing cover body 23 gradually descends until the bottom surface of the rotating opening and closing cover body 23 is tightly fitted with the opening position of the top surface of the boron carbide molding mold 15. At this time, the auxiliary limit adjustment block 24 is adjusted to lock the position of the snap-in slot 28 on one side of the rotating opening and closing cover body 23.
[0046] The hydraulic press 17 is turned on, and the upper pressure rod 26 is driven to output upward, and the high-quality boron carbide fine powder 27 loaded into the inner cavity of the boron carbide molding die 15 is squeezed upward. Under the blocking effect of the bottom surface of the rotating opening and closing cover body 23, the high-quality boron carbide fine powder 27 is gradually extruded into a preset blank in the boron carbide molding die 15. After the blank is formed, the rotating opening and closing cover body 23 is opened, and then the upper pressure rod 26 is driven to continue to move upward to eject the formed blank from the inner cavity of the boron carbide molding die 15, and the formed blank is transferred to the sintering equipment for sintering using a suction cup or a grabbing tool.
[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A high-quality boron carbide fine production system, comprising a dust removal conveyor (1) and a conveyor belt (2) installed on the dust removal conveyor (1), characterized in that: A quantitative feeding device is fixedly installed above the feed end of the conveyor belt (2), and a plurality of quantitative receiving boxes (3) connected to the output end of the quantitative feeding device are fixedly installed on the conveyor belt (2). A raised support roller (7) is installed on the upper part of the impurity removal conveyor (1) through a raised bracket (6). The conveyor belt (2) is arranged on the upper part of the raised support roller (7). Pressure wheels (4) are arranged on the upper part of the edge of the conveyor belt (2) on both sides of the raised support roller (7). A strong iron removal magnet block (9) is arranged above the conveyor belt (2) outside the raised support roller (7). A discharge gathering bucket (10) is arranged at the output end of the impurity removal conveyor (1). A refined discharge control valve (11) is installed at the bottom of the discharge gathering bucket (10), and a high-quality blank forming device is arranged below the refined discharge control valve (11).
2. The high-quality boron carbide fine production system according to claim 1 is characterized in that: The high-quality blank forming device comprises a ground trough (13) arranged below the refined discharge control valve (11), a hydraulic press (17) is installed at the bottom of the ground trough (13), a mold support seat (16) is fixedly installed above the hydraulic press (17), a boron carbide shaping mold (15) is fixedly installed at the upper center position of the mold support seat (16), an opening is arranged at the top of the boron carbide shaping mold (15), and the opening is connected to the discharge port of the refined discharge control valve (11), and an upper pressure rod (26) with an output direction facing upward is installed inside the boron carbide shaping mold (15), and the bottom of the upper pressure rod (26) is connected to the output end of the hydraulic press (17). The top of the boron carbide shaping mold (15) extends to the upper part of the ground trough (13), a support plate (12) is fixedly installed on the outer side of the boron carbide shaping mold (15) extending to the upper part of the ground trough (13), and locking vertical rods (19) and rotating opening and closing cover support rods (20) are symmetrically installed on both sides of the boron carbide shaping mold (15) above the support plate (12), and the rotating opening and closing cover support rods (20) are mounted with a rotating opening and closing cover body (23) whose bottom surface matches the top opening of the boron carbide shaping mold (15), and the locking vertical rod (19) is mounted with an auxiliary limit adjustment block (24) whose bottom surface matches the top surface of the rotating opening and closing cover body (23).
3. The high-quality boron carbide fine production system according to claim 1 is characterized in that: The quantitative feeding device is a discharging crane or a ground-mobile discharging device. The quantitative material receiving box (3) is a rectangular box structure. A material-leveling tank (25) is provided on the top of the quantitative material receiving box (3). The top surface of the material-leveling tank (25) is connected to the discharging end of the quantitative feeding device. The bottom of the quantitative material receiving box (3) is fixedly connected to the outer side surface of the conveyor belt (2). The length of the quantitative material receiving box (3) is not greater than the width of the conveyor belt (2). A plurality of quantitative material receiving boxes (3) are evenly distributed on the outer side surface of the conveyor belt (2). The installation direction of the quantitative material receiving box (3) is perpendicular to the travel direction of the conveyor belt (2).
4. The high-quality boron carbide fine production system according to claim 1 is characterized in that: The bottom of the raised bracket (6) is fixedly mounted on the top surface of the impurity removal conveyor (1), a supporting rotating shaft is mounted on the inner side of the raised bracket (6), a raised support roller (7) is mounted on the supporting rotating shaft, the bottom surface of the raised support roller (7) is located above the top surface of the impurity removal conveyor (1), and the length of the raised support roller (7) matches the width of the conveyor belt (2).
5. The high-quality boron carbide fine production system according to claim 1 is characterized by: The pressing wheel (4) is installed on the inner side of the top of the impurity removal conveyor (1) through a pressing wheel bracket (5), the bottom surface of the pressing wheel (4) is in contact with the top surface of the conveyor belt (2), the pressing wheel (4) is arranged on the top of the conveyor belt (2) on both sides of the quantitative material receiving box (3), and a pressing wheel rotating shaft is arranged on the inner side of the pressing wheel bracket (5), and the center position of the pressing wheel (4) is mounted on the pressing wheel rotating shaft.
6. The high-quality boron carbide fine production system according to claim 1 is characterized by: The strong iron removal magnet block (9) is a rectangular block structure. The length and width of the strong iron removal magnet block (9) are respectively matched with the length and width of the quantitative material receiving box (3). Magnet brackets (8) are arranged on both sides of the strong iron removal magnet block (9). The bottom of the magnet bracket (8) is fixedly installed on the top of the impurity removal conveyor (1). The magnet bracket (8) is a bracket that can be extended and retracted longitudinally. The bottom of the strong iron removal magnet block (9) corresponds longitudinally to the top of the raised support roller (7).
7. The high-quality boron carbide fine production system according to claim 2, characterized in that: A mold limit support seat (14) is installed in the ground groove (13) below the supporting plate (12), and a reinforcing connecting rod (18) is installed between the mold support seat (16) and the mold limit support seat (14). The boron carbide molding mold (15) has an opening at the top and a square, circular or irregular cavity structure in cross section. The top pressure head of the upper pressure rod (26) matches the inner diameter of the boron carbide molding mold (15).
8. The high-quality boron carbide fine production system according to claim 2, characterized in that: A first external thread layer is provided on the rotating opening and closing cover support rod (20) above the supporting plate (12), and an upper adjusting nut (21) and a lower adjusting nut (22) are threadedly connected on the first external thread layer. One side of the rotating opening and closing cover body (23) is sleeved on the rotating opening and closing cover support rod (20) between the upper adjusting nut (21) and the lower adjusting nut (22).
9. The high-quality boron carbide fine production system according to claim 2, characterized in that: A second outer thread layer is provided on the locking upright (19) above the support plate (12); an auxiliary limit adjustment block (24) is sleeved on the second outer thread layer by means of a threaded connection; a snap-in notch (28) matching the outer diameter of the locking upright (19) is provided on the rotary opening and closing cover body (23); the width of the rotary opening and closing cover body (23) is not less than the outer diameter of the boron carbide molding die (15); the outer diameter of the boron carbide molding die (15) is not greater than the distance between the locking upright (19) and the rotary opening and closing cover support rod (20); and the length of the rotary opening and closing cover body (23) is not less than the distance between the locking upright (19) and the rotary opening and closing cover support rod (20).
10. A method for producing a high-quality boron carbide fine production system as claimed in claim 2, It is characterized in that The method is: 1) At the initial running position of the conveyor belt (2), the quantitative feeding device is turned on to uniformly convey the boron carbide powder into the quantitative receiving box (3) with the opening facing upward, and as the conveyor belt (2) continues to run, the quantitative receiving box (3) containing the boron carbide powder moves toward the discharge direction of the impurity removal conveyor (1); 2) When the quantitative material receiving box (3) moves to the top of the raised support roller (7), the boron carbide powder evenly spread in the quantitative material receiving box (3) is attracted by the strong iron removal magnet block (9) installed on the top thereof, and the iron impurities doped in the boron carbide powder are attracted by the strong iron removal magnet block (9); 3) After the boron carbide powder in the quantitative receiving box (3) is subjected to iron removal treatment, high-quality boron carbide fine powder (27) is obtained. As the conveyor belt (2) continues to operate, the high-quality boron carbide fine powder (27) moves toward the discharge direction of the impurity removal conveyor (1), and is turned over at the discharge end of the impurity removal conveyor (1) and discharged into the discharge gathering bucket (10), and the discharge amount is accurately controlled by the fine discharge control valve (11); 4) At the initial position, the rotary opening and closing cover (23) is in an open state. When the fine material discharging control valve (11) is opened, the high-quality boron carbide fine powder (27) is correspondingly dropped into the inner cavity of the boron carbide molding die (15). At this time, the upper pressure rod (26) is in a contracted state. When the high-quality boron carbide fine powder (27) is loaded to a preset weight, the fine material discharging control valve (11) is closed, and then the rotary opening and closing cover (23) is rotated to the top of the boron carbide molding die (15) to seal it, and the rotary opening and closing cover (23) is closed and positioned using the auxiliary limit adjustment block (24); 5) Turning on the hydraulic press (17) and driving the upper pressure rod (26) to output upward, the high-quality boron carbide fine powder (27) loaded into the inner cavity of the boron carbide shaping die (15) is pressed upward, and under the blocking effect of the bottom surface of the rotating opening and closing cover (23), the high-quality boron carbide fine powder (27) is gradually pressed into a preset blank in the boron carbide shaping die (15); 6) After the blank is formed, the rotary opening and closing cover (23) is opened, and then the upper pressure rod (26) is driven to continuously move upward to eject the formed blank from the inner cavity of the boron carbide shaping mold (15), and the formed blank is transferred to the sintering equipment by using a suction cup or a grasping tool for sintering.
Citation Information
Patent Citations
Method and device for removing metallic material of high-speed conveyer belt bulk cargo
CN101264824A
Boron carbide-based precise high-temperature ceramic product manufacturing device and method
CN117047894A
Aluminum silicate fiber refractory brick forming device