Steel pipe with gradient change and negative Poisson's ratio characteristics and steel pipe concrete column
By aligning the ovate line holes of the steel pipe concrete column, the negative Poisson ratio characteristics and gradient changes are achieved, and the problems of large self-weight and insufficient compressive performance of the existing steel pipe concrete column are solved, which significantly improves its compressive performance and energy absorption capacity.
Patent Information
- Application Number
- CN202411367182.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-11-15
AI Technical Summary
Due to the large self-weight and radial expansion problems of existing steel pipe concrete columns, the burden on the foundation and support system has increased, and the compressive resistance is insufficient, making it difficult to meet the changing needs in construction projects.
Design a steel pipe with gradient variation and negative Poisson's ratio characteristics. By uniformly bucassini oval wire holes on the steel pipe, stable deformation mode and impact deformation can be achieved, axial compression resistance can be improved, and through simplified manufacturing and installation process reduce costs.
It significantly enhances the compressive resistance of steel pipe concrete columns, inhibits the radial expansion of concrete, achieves a longer crush stroke and higher energy absorption capacity, and adapts to the needs of different application scenarios.
Smart Images

Figure CN118958594A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction engineering, and in particular to a steel tube and a steel tube concrete column with negative Poisson's ratio characteristics. Background Art
[0002] During the construction process, steel tube concrete columns are often used as supports to improve the structural strength of the building. The existing steel tube concrete columns include a hollow steel column filled with concrete. The steel column mainly provides tensile and torsion resistance, and the concrete mainly bears vertical pressure. Steel tube concrete columns have many advantages such as high strength, durability, flexibility, seismic performance, construction efficiency and environmental protection, and have become one of the commonly used structural materials in construction projects. In the prior art, such as the Chinese invention patent "A multi-cavity steel tube concrete column" (CN112942682B), a square steel tube is used to divide a circular steel tube into a square cavity and a four-divided fan-shaped cavity, which increases the selectivity in construction. "A combined steel tube concrete column" (CN114809451B) is to improve the structural strength of the combined steel tube concrete column by pouring a first concrete layer between the outer steel column and the inner steel column, and pouring a second concrete in the inner steel column. "Steel tube concrete column with anti-concrete shrinkage ring device and installation method" (CN117627278B) effectively reduces the shrinkage of concrete by setting a device with an anti-concrete shrinkage ring in the steel tube concrete column, and makes the inner and outer steel tubes and concrete bear force together, thereby improving the bearing capacity and safety of the structure. However, the steel tube concrete column in the prior art increases the burden on the foundation and support system due to its heavy weight, and even restricts construction in some cases. At the same time, when axially compressed, the existing steel tube concrete column will expand radially, resulting in the destruction of the concrete. In order to cope with the ever-changing needs and challenges of construction projects, especially to improve the overall energy absorption and compressive performance and economy of the components, it is necessary to invent a new type of steel tube concrete column that can solve the above problems. At present, negative Poisson's ratio metamaterials have excellent energy absorption and compressive performance and are light in weight. Therefore, it will be of great significance to use negative Poisson's ratio metamaterials to design a new type of steel tube concrete column. Summary of the invention
[0003] In view of the shortcomings of the above prior art, the present invention provides a steel tube and a steel tube concrete column with gradient change and negative Poisson's ratio characteristics. When subjected to axial compression load, the steel tube concrete column with negative Poisson's ratio characteristics can achieve a stable deformation mode and maximize impact deformation. At the same time, the longer crushing stroke of the steel tube concrete column effectively improves its axial compressive performance as a whole. It is specifically achieved through the following technologies.
[0004] A steel pipe with gradient change and negative Poisson's ratio characteristics, with a number of Cassini oval holes evenly distributed on the steel pipe. In a two-dimensional Cartesian coordinate system, the expression of the Cassini oval is:
[0005] (x 2 +y 2 ) 2 +(s 2 -d 2 )(y 2 -x 2 )-s 2 d 2 =0,
[0006] Where s is half of the major axis of the Cassini oval, and d is half of the minor axis of the Cassini oval.
[0007] The steel pipe of the present invention is evenly distributed with a number of Cassini oval holes having a negative Poisson's ratio characteristic. The shape control parameters s, d, the porosity within a single cell and the gradient change pattern of the Cassini oval can be designed according to the evaluation index of axial crashworthiness. There is no need to add other complex structural designs or complex installation procedures, which greatly saves manufacturing and installation costs.
[0008] The expression of the Cassini oval of the present invention is (x 2 +y 2 ) 2 +(s 2 -d 2 )(y 2 -x 2 )-s 2 d 2 = 0, which can be specifically described as two fixed points in the plane The locus of a moving point P(x,y) whose product of distances is a constant.
[0009] Furthermore, the relationship between s and d is
[0010] Furthermore, the major axis 2s of the Cassini oval aperture is 6-600 mm; the minor axis 2d of the Cassini oval aperture is 2-100 mm.
[0011] Furthermore, the Cassini oval holes are arranged on the steel pipe in such a manner that the long axes of two adjacent Cassini oval holes are perpendicular to each other.
[0012] Furthermore, the minimum distance m between two adjacent Cassini oval holes satisfies the formula: Where A is the area of a single Cassini oval hole and satisfies the formula: E(·)(i.e. ) is the second kind of elliptic integral, k is the porosity and satisfies the formula L is the side length of the unit cell.
[0013] In the present invention, Figure 2 As shown, the unit cell includes four quarter Cassini oval holes (respectively at the four corners of the unit cell), two half Cassini oval holes (separated by the long axis of the Cassini oval, located on the left and right sides of the unit cell respectively), two half Cassini oval holes (separated by the short axis of the Cassini oval, located on the upper and lower sides of the unit cell respectively) and a complete Cassini oval hole (located in the middle of the unit cell).
[0014] Furthermore, the porosity k of the steel pipe decreases gradually from top to bottom, and the side length L of the unit cell remains unchanged.
[0015] Furthermore, the thickness t of the steel pipe is 5-50 mm.
[0016] Furthermore, the thickness t of the steel pipe is 5-12 mm.
[0017] A steel tube concrete column comprises the above-mentioned steel tube with gradient change and negative Poisson's ratio characteristics.
[0018] A method for preparing a steel tube concrete column with negative Poisson's ratio characteristics comprises the following steps:
[0019] The bottom of the steel pipe is plugged, the Cassini oval hole is plugged with a detachable component, and a sticky stretch film is pasted on the pipe wall;
[0020] Pour concrete into the steel pipe and compact it. After the concrete has initially set, tear off the stretch film and remove the detachable components. After the concrete has finally set, it is ready.
[0021] In the present invention, the concrete is concrete that meets the strength standard C20 and above in the "Concrete Structure Design Standard" (GB / T50010-2010).
[0022] Furthermore, the detachable component is at least one of foam, silicone rubber, stainless steel, high-strength acrylonitrile-butadiene-styrene copolymer, and high-density polyethylene.
[0023] Furthermore, the foam is polyurethane foam.
[0024] Furthermore, after the concrete has been cured for 28 days, high-strength mortar is used to fill the gap between the steel pipe and the concrete.
[0025] Compared with the prior art, the present invention is beneficial in that:
[0026] 1. The novel steel tube concrete column structure of the present invention uses a steel tube with negative Poisson's ratio. When subjected to axial compression load, the radial contraction deformation of the steel tube during the axial compression process can effectively suppress the radial expansion of the embedded concrete column, thereby significantly enhancing its compressive performance;
[0027] 2. The new steel tube concrete column structure of the present invention uses a steel tube design with gradient changes. When subjected to axial compression load, the gradient perforated structure can achieve a stable deformation mode and maximize the absorption of impact energy. The longer crushing stroke significantly improves the axial compressive performance of the overall steel tube concrete column;
[0028] 3. The present invention proposes a new steel tube concrete column structure based on performance requirements. The structure changes the gradient distribution of the holes by adjusting the shape control parameters of the Cassini oval holes on the steel tube layer and the pore gradient change mode, thereby meeting the requirements of axial deformation and adapting to the needs of different application scenarios. Compared with traditional steel tube concrete structures, this structure with a negative Poisson's ratio has shown a wide range of application prospects in construction engineering materials in the fields of compression resistance and energy absorption. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 (a) is a schematic diagram of the three-dimensional structure of a steel pipe with gradient change and negative Poisson's ratio characteristics according to the present invention, Figure 1 (b) is a schematic diagram of the three-dimensional structure of the steel tube concrete column with negative Poisson's ratio characteristics of the present invention;
[0030] Figure 2 It is a flattened schematic diagram of a steel pipe with gradient change and negative Poisson's ratio characteristics of the present invention;
[0031] Figure 3 Schematic diagram of the minimum distance m between two adjacent Cassini oval holes of the present invention;
[0032] Figure 4 A schematic diagram of a flattened steel pipe with uniform non-gradient change and negative Poisson's ratio characteristics according to the present invention. DETAILED DESCRIPTION
[0033] In order to further illustrate the present invention, the technical solution provided by the present invention is described in detail below in conjunction with the accompanying drawings and embodiments, but they should not be understood as limiting the protection scope of the present invention.
[0034] like Figure 1-3 As shown, the present invention provides a steel pipe, on which Cassini oval holes are evenly distributed. In a two-dimensional Cartesian coordinate system, the expression of the Cassini oval is:
[0035] (x 2 +y 2 ) 2 +(s2 -d 2 )(y 2 -x 2 )-s 2 d 2 =0,
[0036] Where s is half of the major axis of the Cassini oval, and d is half of the minor axis of the Cassini oval.
[0037] In some examples of the present invention, Figure 2-3 As shown, the long axes 2s of two adjacent Cassini oval holes are perpendicular to each other. That is, the two adjacent Cassini oval holes are arranged perpendicular to each other. Between two adjacent Cassini oval holes, the shortest distance m is between the endpoint of the long axis of one Cassini oval hole and the endpoint of the short axis of the other Cassini oval hole.
[0038] In some examples of the present invention, the major axis 2s of the Cassini oval aperture may be 6-600 mm.
[0039] In some examples of the present invention, the major axis 2s of the Cassini oval aperture may be 28.50-46.72 mm.
[0040] In some examples of the present invention, the minor axis 2d of the Cassini oval aperture may be 2-100 mm.
[0041] In some examples of the present invention, the minor axis 2d of the Cassini oval aperture may be 5.70-14.26 mm.
[0042] In some examples of the present invention, the minimum distance m between two adjacent Cassini oval holes may satisfy the formula: Where A is the area of a single Cassini oval hole and satisfies the formula: E(·)(i.e. ) is the second kind of elliptic integral, k is the porosity and satisfies the formula L is the side length of the unit cell.
[0043] In some examples of the present invention, the thickness t of the steel pipe may be 5-50 mm.
[0044] In some examples of the present invention, the thickness t of the steel pipe may be 5-12 mm.
[0045] like Figure 3 As shown in Figure 2, in practical applications, the shortest distance m between two adjacent Cassini oval holes can be designed according to the load conditions of the steel tube concrete column. Figure 2 The three-dimensional structure of the steel pipe is shown in Figure 1 (a) shown.
[0046] In some examples of the present invention, the Cassini oval holes on the steel tube can be manufactured using laser cutting technology.
[0047] The present invention also provides an exemplary method for preparing a steel tube concrete column having a negative Poisson's ratio characteristic, comprising the following steps:
[0048] S1. Before pouring concrete, weld a stainless steel plate at the bottom of the steel pipe for plugging, use mechanically cut polyurethane foam to plug the Cassini oval holes on the steel pipe, and stick a sticky stretch film on the pipe wall;
[0049] S2. Pour concrete into the steel pipe and compact it using a vibrating table. After the concrete has initially set, tear off the stretch film and take out the polyurethane foam. After the concrete has finally set, it is ready.
[0050] The concrete of the present invention comprises cement, sand, gravel and water in a mass ratio of 1:1.6:3.2:0.4.
[0051] In some examples of the present invention, the concrete may be concrete that meets the strength standard C20 and above in the "Concrete Structure Design Standard" (GB / T50010-2010).
[0052] In some examples of the present invention, in order to reduce the adverse effects of concrete shrinkage, high-strength mortar can be used to fill the gap between the steel pipe and the concrete after the concrete has been cured for 28 days. Any commercially available high-strength mortar can be used.
[0053] The three-dimensional structural schematic diagram of the steel tube concrete column of the present invention is shown in 1(b). In practice, a concrete polishing machine can be used to polish the concrete surface.
[0054] The technical solution of the present invention will be described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0055] In the following embodiments, Figure 2 As shown, the long axes 2s of two adjacent Cassini oval holes are perpendicular to each other.
[0056] In the following examples, the raw materials of concrete all include cement, sand, gravel and water in a mass ratio of 1:1.6:3.2:0.4, wherein the sand is medium sand with a particle size of 0.15 mm-5 mm, and the gravel is fine gravel with a particle size of 0 mm-5 mm.
[0057] In the following embodiments, the preparation method of the steel tube concrete column includes the following steps:
[0058] S1. Before pouring concrete, weld a stainless steel plate at the bottom of the steel pipe for plugging, use mechanically cut polyurethane foam to plug the Cassini oval holes on the steel pipe, and stick a sticky stretch film on the pipe wall;
[0059] S2. Pour concrete into the steel pipe and compact it using a vibrating table. After the concrete has initially set, tear off the stretch film and take out the polyurethane foam. After the concrete has finally set, it is ready.
[0060] In the following embodiments, the unit cell includes four quarter Cassini oval holes (respectively at the four corners of the unit cell), two half Cassini oval holes (separated by the long axis of the Cassini oval, respectively located on the left and right sides of the unit cell), two half Cassini oval holes (separated by the short axis of the Cassini oval, respectively located on the upper and lower sides of the unit cell) and one complete Cassini oval hole (located in the middle of the unit cell).
[0061] Among them, the parameters of the quarter Cassini oval hole located at the two corners above the unit cell and the half Cassini oval hole located above the unit cell separated by the short axis of the Cassini oval are represented by s0, d0, m0, and k0.
[0062] The parameters of the complete Cassini oval located in the middle of the unit cell and the half Cassini oval holes located on the left and right sides of the unit cell, separated by the long axis of the Cassini oval, are represented by s1, d1, m1, and k1.
[0063] The parameters of the quarter Cassini oval holes located at the two corners below the unit cell and the half Cassini oval holes located below the unit cell separated by the minor axis of the Cassini oval are represented by s2, d2, m2, and k2.
[0064] In the following embodiments, the side length of the unit cell is 60 mm. The steel pipe includes five groups of the unit cells, and the subscripts of the parameters of each group of unit cells are increased by 1, 2, 3, 4, and 5 for distinction. For example, the parameters of the first group of unit cells are respectively s 10 ,d 10 、m 10 , k 10 、s 11 ,d 11 、m 11 , k 11 、s 12 ,d 12 、m 12 , k 12 express.
[0065] Example 1
[0066] In the steel pipe of this embodiment,
[0067] The first group of unit cells: L1 = 60 mm;
[0068] s 10 =22.61mm, d 10 =5.65mm, m 10 =1.73mm, k 10 =0.72;
[0069] s 11 =21.98mm, d 11 =5.49mm, m 11 =2.53mm, k 11 =0.68;
[0070] s 12 =21.32mm, d 12 =5.33mm, m 12 =3.35mm, k 12 =0.64;
[0071] The second group of cells: L2 = 60 mm;
[0072] s 20 =21.32mm, d 20 =5.33mm, m 20 =3.35mm, k 20 =0.64;
[0073] s 21 =21.32mm, d 21 =4.26mm,m 21 =4.41mm, k 21 =0.60;
[0074] s 22 =20.60mm, d 22 =4.12mm, m 22 =5.28mm, k 22 =0.56;
[0075] The third group of cells: L3 = 60 mm;
[0076] s 30 =20.60mm, d 30 =4.12mm, m 30 =5.28mm, k 30 =0.56;
[0077] s 31 =19.85mm, d 31 =3.97 mm, m 31 =6.18mm, k 31 =0.52;
[0078] s 32 =19.07mm, d 32 =3.81mm, m 32 =7.11mm, k 32 =0.48;
[0079] The fourth group of cells: L4 = 60 mm;
[0080] s 40 =19.07mm, d 40 =3.81mm, m 40 =7.11mm, k 40 =0.48;
[0081] s 41 =18.26mm, d 41 =3.65mm, m 41 =8.09mm, k 41 =0.44;
[0082] s 42 =17.41mm, d 42 =3.48mm, m 42 =9.11mm, k 42 =0.40;
[0083] The fifth group of cells: L5 = 60 mm;
[0084] s 50 =17.41mm, d 50 =3.48mm, m 50 =9.11mm, k 50 =0.40;
[0085] s 51 =16.52mm, d 51 =3.30mm, m 51 =10.18mm, k 51 =0.36;
[0086] s 52 =15.57mm, d 52 =3.11mm, m 52 =11.31mm, k 52 =0.32;
[0087] The major and minor axes of the Cassini oval holes of each unit cell satisfy the formula:
[0088] (x 2 +y 2 ) 2 +(s2 -d 2 )(y 2 -x 2 )-s 2 d 2 =0.
[0089] The steel pipe of this embodiment is composed of the first group of unit cells, the second group of unit cells, the third group of unit cells, the fourth group of unit cells and the fifth group of unit cells from top to bottom. The thickness of the steel pipe of this embodiment is t=10 mm.
[0090] Example 2
[0091] In the steel pipe of this embodiment,
[0092] The first group of unit cells: L1 = 60 mm;
[0093] s 10 =22.61mm, d 10 =5.65mm, m 10 =1.73mm, k 10 =0.72;
[0094] s 11 =21.98mm, d 11 =5.49mm, m 11 =2.53mm, k 11 =0.68;
[0095] s 12 =21.32mm, d 12 =5.33mm, m 12 =3.35mm, k 12 =0.64;
[0096] The second group of cells: L2 = 60 mm;
[0097] s 20 =21.32mm, d 20 =5.33mm, m 20 =3.35mm, k 20 =0.64;
[0098] s 21 =20.64mm,d 21 =5.16mm,m 21 =4.20mm, k 21 =0.60;
[0099] s 22 =19.94mm, d 22 =4.99mm, m 22 =5.07mm, k 22 =0.56;
[0100] The third group of cells: L3 = 60 mm;
[0101] s 30 =19.94mm, d 30 =4.99mm, m 30 =5.07mm, k 30 =0.56;
[0102] s 31 =19.22mm, d 31 =4.80mm,m 31 =5.98mm, k 31 =0.52;
[0103] s 32 =18.46mm, d 32 =4.62mm, m 32 =6.92mm, k 32 =0.48;
[0104] The fourth group of cells: L4 = 60 mm;
[0105] s 40 =18.46mm, d 40 =4.62mm, m 40 =6.92mm, k 40 =0.48;
[0106] s 41 =17.68mm, d 41 =4.42mm, m 41 =7.90mm, k 41 =0.44;
[0107] s 42 =16.85mm, d 42 =4.21mm, m 42 =8.93mm, k 42 =0.40;
[0108] The fifth group of cells: L5 = 60 mm,
[0109] s 50 =16.85mm, d 50 =4.21mm, m 50 =8.93mm, k 50 =0.40;
[0110] s 51 =15.99mm, d 51 =4.00mm,m 51=10.01mm, k 51 =0.36,
[0111] s 52 =15.08mm,d 52 =3.77 mm, m 52 =11.16mm, k 52 =0.32;
[0112] The major and minor axes of the Cassini oval holes of each unit cell satisfy the formula:
[0113] (x 2 +y 2 ) 2 +(s 2 -d 2 )(y 2 -x 2 )-s 2 d 2 =0.
[0114] The steel pipe of this embodiment is composed of the first group of unit cells, the second group of unit cells, the third group of unit cells, the fourth group of unit cells and the fifth group of unit cells from top to bottom. The thickness of the steel pipe of this embodiment is t=10 mm.
[0115] Example 3
[0116] This embodiment is basically the same as the embodiment 1, except that the steel tube of this embodiment is provided with the same unit cell, in which: L = 60 mm, s = 19.85 mm, d = 3.97 mm, m = 6.18 mm, k = 0.52; the major axis and minor axis of the Cassini oval hole in the unit cell satisfy the formula: (x 2 +y 2 ) 2 +(s 2 -d 2 )(y 2 -x 2 )-s 2 d 2 = 0. The tiling schematic diagram of this embodiment is as follows Figure 4 The thickness of the steel pipe in this embodiment is t=10 mm.
[0117] That is, in this embodiment, there is no gradient distribution of Cassini oval line holes.
[0118] Comparative Example 1
[0119] In the steel pipe of this comparative example,
[0120] The first group of unit cells: L1 = 60 mm;
[0121] s 10 =19.12mm, d 10=9.56mm,m 10 =1.32mm, k 10 =0.72;
[0122] s 11 =18.58mm, d 11 =9.29mm, m 11 =2.13mm, k 11 =0.68;
[0123] s 12 =18.03mm,d 12 =9.01mm,m 12 =2.96mm, k 12 =0.64;
[0124] The second group of cells: L2 = 60 mm;
[0125] s 20 =18.03mm, d 20 =9.01mm,m 20 =2.96mm, k 12 =0.64;
[0126] s 21 =17.45mm, d 21 =8.73mm,m 21 =3.82mm, k 20 =0.60;
[0127] s 22 =16.86mm, d 22 =8.43mm,m 22 =4.71mm, k 22 =0.56;
[0128] The third group of cells: L3 = 60 mm;
[0129] s 30 =16.86mm, d 30 =8.43mm,m 30 =4.71mm, k 30 =0.56;
[0130] s 31 =16.25mm, d 31 =8.12mm,m 31 =5.63mm, k 31 =0.52;
[0131] s 32 =15.61mm, d 32 =7.81mm,m32 =6.58mm, k 32 =0.48;
[0132] The fourth group of cells: L4 = 60 mm;
[0133] s 40 =15.61mm, d 40 =7.81mm,m 40 =6.58mm, k 40 =0.48;
[0134] s 41 =14.95mm, d 41 =7.47 mm, m 41 =7.58mm, k 41 =0.44;
[0135] s 42 =14.25mm, d 42 =7.13mm, m 42 =8.62mm, k 42 =0.40;
[0136] The fifth group of cells: L5 = 60 mm;
[0137] s 50 =14.25mm, d 50 =7.13mm, m 50 =8.62mm, k 50 =0.40;
[0138] s 51 =13.52mm, d 51 =6.76mm,m 51 =9.72mm, k 51 =0.36;
[0139] s 52 =12.75mm, d 52 =6.37mm,m 52 =10.88mm, k 52 =0.32;
[0140] The major and minor axes of the Cassini oval holes of each unit cell satisfy the formula:
[0141] (x 2 +y 2 ) 2 +(s 2 -d 2 )(y 2 -x 2 )-s 2 d2 =0.
[0142] The steel pipe of this embodiment is composed of the first group of unit cells, the second group of unit cells, the third group of unit cells, the fourth group of unit cells and the fifth group of unit cells from top to bottom. The thickness of the steel pipe of this embodiment is t=10 mm.
[0143] That is, in this comparative example,
[0144] Test example
[0145] The steel tube concrete columns of the above-mentioned Examples 1-3 and Comparative Example 1 were subjected to compression tests with reference to the design standard of "Technical Standard for Steel Tube Concrete Hybrid Structure" (GB / T51446-2021), and the initial peak force, axial compression elastic modulus, and specific energy absorption of the steel tube concrete column in the compression test were obtained when the axial compression was 50 mm. The test results are shown in Table 1 below.
[0146] Table 1 Test results of Examples 1-3 and Comparative Example 1
[0147]
[0148] It can be seen from Table 1 that the perforation types of Examples 1-3 and Comparative Example 1 are different when the steel content remains unchanged. Example 1-2 shows a lower initial peak force and a higher specific energy absorption, which means that the energy absorption effect of Example 1-2 is better than that of Example 3 and Comparative Example 1. Furthermore, the energy absorption effect of Example 1 is better than that of Example 2, which means that the steel tube concrete column of the present invention can be adjusted according to actual engineering requirements, and the energy absorption performance can be optimized by adjusting the hole distribution. The initial peak force of the homogeneously distributed hole type (Example 3) is higher than that of Comparative Example 1. Compared with the gradient distributed hole type (Examples 1-2), the energy absorption effect of the homogeneously distributed hole type (Examples 3) is not outstanding, but it has a higher bearing capacity. Therefore, the corresponding selection can be made according to the specific engineering requirements.
[0149] The above specific embodiments describe the implementation of the present invention in detail, but the present invention is not limited to the specific details in the above embodiments. Within the scope of the claims and technical concept of the present invention, the technical solution of the present invention can be modified and changed in many simple ways, and these simple modifications all belong to the protection scope of the present invention.
Claims
1. A steel pipe with gradient change and negative Poisson's ratio characteristics, characterized in that: The steel pipe is provided with a plurality of Cassini oval holes. In a two-dimensional Cartesian coordinate system, the expression of the Cassini oval is: (x 2 +y 2 ) 2 +(s 2 -d 2 )(y 2 -x 2 )-s 2 d 2 =0, Where s is half of the major axis of the Cassini oval, and d is half of the minor axis of the Cassini oval.
2. The steel pipe with gradient change and negative Poisson's ratio characteristics according to claim 1, characterized in that: The relationship between s and d is:
3. The steel pipe with gradient change and negative Poisson's ratio characteristics according to claim 1, characterized in that: The major axis of the Cassini oval aperture is 6-600 mm; the minor axis of the Cassini oval aperture is 2-100 mm.
4. The steel pipe with gradient change and negative Poisson's ratio characteristics according to claim 1, characterized in that: The Cassini oval holes are arranged on the steel pipe in such a manner that the long axes of two adjacent Cassini oval holes are perpendicular to each other.
5. The steel pipe with gradient change and negative Poisson's ratio characteristics according to claim 4, characterized in that: The minimum distance m between two adjacent Cassini oval holes satisfies the formula: Where A is the area of a single Cassini oval aperture and satisfies the formula E(·) is the second kind of elliptic integral, k is the porosity and satisfies the formula L is the side length of the unit cell.
6. The steel pipe with gradient change and negative Poisson's ratio characteristics according to claim 5, characterized in that: The porosity k of the steel pipe decreases gradually from top to bottom, and the side length L of the unit cell remains unchanged.
7. The steel pipe with gradient change and negative Poisson's ratio characteristics according to claim 1, characterized in that: The thickness t of the steel pipe is 5-50 mm.
8. A steel tube concrete column, characterized in that: The invention comprises a steel pipe with gradient change and negative Poisson's ratio characteristics as described in any one of claims 1 to 7.
9. A method for preparing a steel tube concrete column according to claim 8, characterized in that: The following steps are involved: The bottom of the steel pipe is sealed, the Cassini oval hole is sealed with a detachable component, and a sticky stretch film is pasted on the pipe wall; Pour concrete into the steel pipe and compact it. After the concrete has initially set, tear off the stretch film and remove the detachable component. After the concrete has finally set, the product is obtained.
Citation Information
Patent Citations
A two-dimensional periodic negative Poisson ratio controllable expansion material
CN109033486A
A method for designing a circular tube with a negative Poisson's ratio effect
CN109190264A
Round steel pipe concrete with negative Poisson's ratio effect and design method thereof
CN111706003A
Double-layer circular steel tube concrete hollow column with negative Poisson's ratio effect and design method
CN113530088A
Negative Poisson's ratio gradient structure energy absorption box
CN118418923A