Cable laying structure
By setting up a cable hanger and patrol channel in the cable trench, the power cable is arranged under the platform large plate, and the control cable is arranged above the platform large plate. Combined with the drainage pipe, the loss of function and increase in engineering volume caused by the cable trench design is solved. The problem has achieved the effect of cable heat dissipation, material saving and engineering cost reduction.
Patent Information
- Application Number
- CN202411040932.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-19
AI Technical Summary
The design of the existing cable trench results in the loss of cable function and the system being paralyzed, and the control cable and power cable need to be laid separately, which increases the project volume and cost.
The cable hanger is suspended in the inspection channel, connecting the cable trenches and inspection channels through the cable well, the power cable is arranged under the platform plate, and the control cable is arranged above the platform plate, and combined with the drainage pipe for drainage and ventilation and heat dissipation. Reduced the engineering volume and footprint of the cable trench.
It realizes cable heat dissipation, saves engineering volume and fire-proof materials, enhances fire-proof performance, makes full use of space, reduces project cost, and improves the utilization rate of cable trench.
Smart Images

Figure CN118983744A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of cable laying, and in particular to a cable laying structure. Background Art
[0002] Cable is one of the important materials to ensure the power distribution of the power system in the substation and the signal transmission of the control and protection system. It is the "blood vessels" and "nerves" of the safe and stable operation of the substation. Improper cable laying will lead to the loss of the original cable function, the paralysis of the connected system function, the inability to effectively control the substation, and major production accidents such as withdrawal from operation, and even personal injury accidents.
[0003] In order to prevent water from entering the cables, brackets are set in the existing cable trenches, which makes the cable trenches insufficiently utilized. In addition, control cables and power cables need to be laid separately. The existing method is to set up cable trenches separately, which increases the workload. Summary of the invention
[0004] Therefore, the present invention aims to overcome the technical problems that need to be solved in the prior art, thereby providing a cable laying structure.
[0005] The present invention provides a cable laying structure, comprising:
[0006] Cable trench;
[0007] Cable hanger, suspended in the inspection channel;
[0008] The inspection channel is located below the cable trench. The cable trench and the inspection channel are connected via a cable well. The control cable is laid in the cable trench, and the power cable is laid on the cable hanger.
[0009] Furthermore, a platform plate is provided below the cable trench, and the platform plate and the trench wall of the cable trench are integrally cast.
[0010] Furthermore, a drainage pipe is connected below the cable trench, and the drainage pipe passes through the platform slab and is led out through a pipeline.
[0011] Furthermore, the top of the trench wall of the cable trench is higher than the ground, and a cover plate is provided above the cable trench.
[0012] Furthermore, the inspection channel is arranged below the platform plate.
[0013] Furthermore, the cable hanger is a semi-passage steel structure cable hanger and adopts a galvanized angle steel lattice structure.
[0014] Furthermore, the cable hanger is connected to the platform plate via embedded parts arranged in the platform plate.
[0015] Furthermore, a walkway is suspended in the inspection passage.
[0016] Furthermore, it also includes:
[0017] The inspection port is set between the ground and the inspection passage.
[0018] Furthermore, the power cable is arranged on one side of the inspection channel.
[0019] The technical solution of the present invention has the following advantages:
[0020] The present invention provides a cable laying structure, in which the cables in the cable trench enter the cable hanger through the cable well for laying, and the cables on the cable hanger are led out to the cable trench through the cable well. The power cable is integrated with the inspection channel. This way of arranging the power cable is beneficial to the heat dissipation of the cable and saves the engineering workload of the cable trench.
[0021] The present invention provides a cable laying structure, in which power cables are arranged on hangers below a platform plate, and control cables are arranged above the platform plate, so that the upper and lower spaces of the platform are fully utilized and space is saved.
[0022] The cable laying structure provided by the present invention can separate the power cable from the control cable without adopting additional fire prevention measures, thereby saving fire prevention materials and enhancing fire prevention performance.
[0023] The present invention provides a cable laying structure, wherein a platform plate is arranged below the cable trench, and the platform plate and the trench wall of the cable trench are integrally cast and formed, thereby reducing the floor space occupied by the cable trench foundation and facilitating the compression of the project floor space.
[0024] The present invention provides a cable laying structure, wherein a drainage pipe is connected below the cable trench, the drainage pipe penetrates the platform plate and is led out through a pipeline, and drainage, ventilation and heat dissipation can be performed through the drainage pipe.
[0025] The present invention provides a cable laying structure, wherein the power cable is arranged on one side of an inspection channel, so as to prevent the power cable from affecting the smoothness of the inspection channel. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0027] Figure 1 This is a schematic diagram of a commonly used cable trench structure;
[0028] Figure 2 It is a schematic diagram of the structure of the present invention;
[0029] Figure 3 This is a schematic diagram of the position of the cable hanger of the present invention.
[0030] Description of reference numerals;
[0031] 1. Cable trench;
[0032] 2. Cable hanger;
[0033] 3. Platform slab;
[0034] 4. Drain pipe;
[0035] 5. Cover plate;
[0036] 6. Inspection port;
[0037] 7. Ditch wall. DETAILED DESCRIPTION
[0038] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0041] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0042] Cable is one of the important materials to ensure the power distribution of the power system in the substation and the signal transmission of the control and protection system. It is the "blood vessels" and "nerves" of the safe and stable operation of the substation. Improper cable laying will lead to the loss of the original cable function, the paralysis of the connected system function, the inability to effectively control the substation, and major production accidents such as withdrawal from operation, and even personal injury accidents.
[0043] In order to prevent water from entering the cables, brackets are set in the existing cable trenches, which makes the cable trenches insufficiently utilized. In addition, control cables and power cables need to be laid separately. The existing method is to set up cable trenches separately, which increases the workload.
[0044] The choice of cable trench type and the number of cable trenches will affect the engineering quantity and directly affect the engineering cost. The trenches are made of bricks, plain concrete and reinforced concrete according to the different burial depths. Reinforced concrete structures have strong bending and shear resistance, high impermeability and frost resistance, and are a commonly used cable trench form. For details, see Figure 1 .
[0045] The construction process of reinforced concrete cable trench is complicated, the construction period is long, the cost is high, the concrete maintenance is greatly affected by seasonal factors, and the cable trench buried underground still has the following aspects to be improved:
[0046] (1) When determining the cross-section of the underground trench, in addition to the space required for laying cables, a gap of about 100 mm must be reserved between the cable support and the trench bottom to prevent the cables from being immersed in water. This results in insufficient utilization of the cable trench cross-section.
[0047] (2) When electrical equipment is arranged compactly, the cable trench and the equipment foundation are prone to collision, making trench layout difficult.
[0048] (3) To ensure that the accumulated water in the ditch is discharged into the sewer, the drainage outlet elevation of the sewer should be 200 to 300 mm lower than the bottom elevation of the water pit in the ditch. The buried depth of the underground pipeline network is determined by the depth of the ditch. When the ditch is buried deeper, the underground engineering workload of laying the pipeline network will increase.
[0049] In line with the principle of saving engineering costs and reducing energy consumption, it is necessary to conduct in-depth research on the selection of cable trench types and the optimization of cable trench channels. Therefore, conducting research on substation cable laying methods and determining the optimal laying method is an important part of substation design.
[0050] Example 1
[0051] like Figures 2 to 3A specific implementation of a cable laying structure is shown, and the cable laying structure includes:
[0052] Cable trench 1;
[0053] Cable hanger 2 is suspended in the inspection channel; the cable trench 1 passing through the road and the square adopts a semi-passable steel structure cable hanger structure. The cables in the cable trench 1 enter the cable hanger 2 through the cable well for laying, and the cables on the cable hanger 2 are led out to the cable trench 1 through the cable well.
[0054] The inspection channel is located below the cable trench 1 . The cable trench 1 and the inspection channel are connected via a cable well. The control cable is laid in the cable trench 1 , and the power cable is laid on the cable hanger 2 .
[0055] The method of the present invention is a design scheme for an overhead platform of a substation. Taking a 500kV substation as an example, after adopting the scheme, the cable trench 1 adopts an open trench form on a reinforced concrete slab. The net height in the cable trench 1 is 200-300mm. For a cable trench 1 with fewer cables, a compact arrangement of cables can be adopted.
[0056] Combined with the substation platform solution, the space above and below the platform is fully utilized. This application arranges the control cable above the platform slab 3, and the control cable crossing part is arranged below the road, using the trough method. The power cable is arranged below the platform slab 3. In the case of a small number of control cables and optical cables, the cable trench 1 above the platform slab 3 adopts a cable trench, and the trench wall 7 is integrally cast with the platform slab 3.
[0057] The power cables arranged under the platform slab 3 are arranged in a trough box manner and integrated with the inspection channel. This arrangement of power cables is beneficial to the heat dissipation of the cables and saves the engineering workload of the cable trench 1.
[0058] The requirements for laying cables and optical cables based on the platform solution of this application are the same as those for laying cables and optical cables in the traditional cable trench 1 type. The minimum bending radius requirements for cable laying and operation still need to be met. Among them, the radius of the power cable is larger than that of the control cable, and the required minimum bending radius is larger.
[0059] The difference is that when the platform solution is adopted, the power cable is arranged under the platform using a hanger, which can take advantage of the natural height difference between the upper and lower parts of the platform and easily meet the minimum bending radius during the laying and operation of the power cable.
[0060] This application combines the platform solution, the power cable is arranged on the hanger below the platform plate 3, and the control cable adopts the cable groove method above the platform plate 3, which fully utilizes the upper and lower space of the platform and saves space;
[0061] This application takes advantage of the natural advantages of the platform solution and does not require additional fire prevention measures, that is, separating the power cables from the control cables, which not only saves fire prevention materials but also enhances fire prevention performance;
[0062] Furthermore, a platform plate 3 is provided below the cable trench 1, and the platform plate 3 and the trench wall 7 of the cable trench 1 are integrally cast and formed, thereby reducing the floor space occupied by the foundation of the cable trench 1 and facilitating the reduction of the project floor space.
[0063] Furthermore, a drainage pipe 4 is connected below the cable trench 1, and the drainage pipe 4 penetrates the platform plate 3 and is led out through a pipeline. The cable trench 1 uses the pre-buried drainage pipe 4 penetrating the platform plate 3 for drainage, ventilation and heat dissipation.
[0064] Furthermore, the top of the trench wall 7 of the cable trench 1 is higher than the ground, and a cover plate 5 is provided above the cable trench 1 .
[0065] Furthermore, the inspection channel is arranged below the platform plate 3 .
[0066] Furthermore, the cable hanger 2 is a semi-passage steel structure cable hanger and adopts a galvanized angle steel lattice structure.
[0067] Furthermore, the cable hanger 2 is connected to the platform plate 3 via embedded parts arranged in the platform plate 3 .
[0068] Example 2
[0069] The same thing as Example 1 in this embodiment is that:
[0070] A cable laying structure, comprising:
[0071] Cable trench 1;
[0072] Cable hanger 2 is suspended in the inspection channel; the cable trench 1 passing through the road and the square adopts a semi-passable steel structure cable hanger structure. The cables in the cable trench 1 enter the cable hanger 2 through the cable well for laying, and the cables on the cable hanger 2 are led out to the cable trench 1 through the cable well.
[0073] The inspection channel is located below the cable trench 1 . The cable trench 1 and the inspection channel are connected via a cable well. The control cable is laid in the cable trench 1 , and the power cable is laid on the cable hanger 2 .
[0074] The method of the present invention is a design scheme for an overhead platform of a substation. Taking a 500kV substation as an example, after adopting the scheme, the cable trench 1 adopts an open trench form on a reinforced concrete slab. The net height in the cable trench 1 is 200-300mm. For a cable trench 1 with fewer cables, a compact arrangement of cables can be adopted.
[0075] Combined with the substation platform solution, the space above and below the platform is fully utilized. This application arranges the control cable above the platform slab 3, and the control cable crossing part is arranged below the road, using the trough method. The power cable is arranged below the platform slab 3. In the case of a small number of control cables and optical cables, the cable trench 1 above the platform slab 3 adopts a cable trench, and the trench wall 7 is integrally cast with the platform slab 3.
[0076] The power cables arranged under the platform slab 3 are arranged in a trough box manner and integrated with the inspection channel. This arrangement of power cables is beneficial to the heat dissipation of the cables and saves the engineering workload of the cable trench 1.
[0077] The requirements for laying cables and optical cables based on the platform solution of this application are the same as those for laying cables and optical cables in the traditional cable trench 1 type. The minimum bending radius requirements for cable laying and operation still need to be met. Among them, the radius of the power cable is larger than that of the control cable, and the required minimum bending radius is larger.
[0078] The difference is that when the platform solution is adopted, the power cable is arranged under the platform using a hanger, which can take advantage of the natural height difference between the upper and lower parts of the platform and easily meet the minimum bending radius during the laying and operation of the power cable.
[0079] This application combines the platform solution, the power cable is arranged on the hanger below the platform plate 3, and the control cable adopts the cable groove method above the platform plate 3, which fully utilizes the upper and lower space of the platform and saves space;
[0080] This application takes advantage of the natural advantages of the platform solution and does not require additional fire prevention measures, that is, separating the power cables from the control cables, which not only saves fire prevention materials but also enhances fire prevention performance;
[0081] Furthermore, a platform plate 3 is provided below the cable trench 1, and the platform plate 3 and the trench wall 7 of the cable trench 1 are integrally cast and formed, thereby reducing the floor space occupied by the foundation of the cable trench 1 and facilitating the reduction of the project floor space.
[0082] Furthermore, a drainage pipe 4 is connected below the cable trench 1, and the drainage pipe 4 penetrates the platform plate 3 and is led out through a pipeline. The cable trench 1 uses the pre-buried drainage pipe 4 penetrating the platform plate 3 for drainage, ventilation and heat dissipation.
[0083] Furthermore, the top of the trench wall 7 of the cable trench 1 is higher than the ground, and a cover plate 5 is provided above the cable trench 1 .
[0084] Furthermore, the inspection channel is arranged below the platform plate 3 .
[0085] Furthermore, the cable hanger 2 is a semi-passage steel structure cable hanger, and adopts a galvanized angle steel lattice structure.
[0086] Furthermore, the cable hanger 2 is connected to the platform plate 3 via embedded parts arranged in the platform plate 3 .
[0087] The difference is:
[0088] Furthermore, a walkway is suspended in the inspection passage.
[0089] Furthermore, it also includes:
[0090] The inspection port 6 is arranged between the ground and the inspection channel to facilitate manual laying and inspection of the cable.
[0091] Furthermore, the power cable is arranged on one side of the inspection channel. To prevent the power cable from affecting the smoothness of the inspection channel, it is arranged on one side of the inspection channel.
[0092] Specifically, a 500kV substation is equipped with 3 station transformers. The power supply of the station transformers is taken from the low-voltage side of 2 sets of main transformers, and a dedicated station standby transformer is set. The 3 station transformers are arranged near the main control building and close to the 400V station power panel. The low-voltage side of the station transformer adopts copper busbar direct incoming line, which not only ensures the reliability of power supply, but also saves a large number of large-section incoming cables.
[0093] Therefore, the power cables mainly consider the cables between the low-voltage side of the main transformer and the station transformer, and the cables between the 400V station panel and each power box in the station area and each building including the prefabricated cabin. The power cables are arranged under the platform slab 3 in the form of cable trough boxes. The layout path is combined with the inspection path, and the relative position relationship between the station panel, the power box and each building is comprehensively considered.
[0094] After comprehensive analysis of the number of cables and their directions in the entire station, combined with the layout of the inspection platform, it is preliminarily estimated that the largest number of cables passing through the inspection platform board 3 is about 17, and the smallest number is about 1 to 3. Therefore, the width of the cable hanger 2 of the power cable is set to 200mm, and a multi-layer layout is adopted in places where there are many local cables. Analysis shows that the largest number of cables in this station is 17, and a 5-layer layout is required.
[0095] In summary, the present invention can fully combine the layout of the inspection channel and meet the requirements of cable laying.
[0096] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.
Claims
1. A cable laying structure, characterized in that: include: Cable trench (1); A cable hanger (2) is suspended in the inspection passage; The inspection channel is located below the cable trench (1); the cable trench (1) and the inspection channel are connected via a cable well; the control cable is laid in the cable trench (1); and the power cable is laid on a cable hanger (2).
2. The cable laying structure according to claim 1, characterized in that: A platform plate (3) is provided below the cable trench (1), and the platform plate (3) and the trench wall of the cable trench (1) are integrally cast and formed.
3. The cable laying structure according to claim 2, characterized in that: A drainage pipe (4) is connected below the cable trench (1), and the drainage pipe (4) passes through the platform plate (3) and is led out through a pipeline.
4. The cable laying structure according to claim 1, characterized in that: The top of the trench wall of the cable trench (1) is higher than the ground, and a cover plate (5) is provided above the cable trench (1).
5. The cable laying structure according to claim 2, characterized in that: The inspection channel is arranged below the platform plate (3).
6. The cable laying structure according to claim 1, characterized in that: The cable hanger (2) is a semi-passage steel structure cable hanger and adopts a galvanized angle steel lattice structure.
7. The cable laying structure according to claim 2, characterized in that: The cable hanger (2) is connected to the platform slab (3) via embedded parts arranged in the platform slab (3).
8. The cable laying structure according to claim 1, characterized in that: A walkway is suspended in the inspection passage.
9. The cable laying structure according to claim 1, characterized in that: Also includes: An inspection port (6) is provided between the ground and the inspection passage.
10. The cable laying structure according to claim 1, characterized in that: The power cable is arranged on one side of the inspection channel.