Liquid cooling system control method and device, air conditioner and storage medium

By detecting the power changes of the load equipment and adjusting the power component frequency of the liquid cooling system based on historical working conditions, the problem that the liquid cooling system cannot quickly refrigerate when the power of the load equipment changes is solved, and the refrigeration effect of rapid response and stable operation is achieved.

CN118984561APending Publication Date: 2024-11-19GREE ELECTRIC APPLIANCE INC OF ZHUHAI
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411058500.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The liquid cooling system cannot quickly achieve the pre-defined refrigeration effect when the power of the load equipment changes rapidly, due to the small water tank design and coolant transfer delay.

Method used

By detecting the current power and power change amount of the load device, determining the target refrigeration capacity and target duration based on historical operating conditions, adjusting the power change frequency of the power components in the liquid cooling system to output a predetermined refrigeration capacity within the target duration.

Benefits of technology

It realizes the timely and quickly providing the equipment with the cooling capacity required for stable operation when the power of the load equipment changes rapidly, and improves the response speed and stability of the liquid cooling system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118984561A_ABST
    Figure CN118984561A_ABST
Patent Text Reader

Abstract

The embodiment of the invention relates to a liquid cooling system control method and device, an air conditioner and a storage medium, the method is applied to a liquid cooling system, the liquid cooling system is used for refrigerating load equipment, and the method comprises the steps that in the running process of the load equipment, the current power and the power variation of the load equipment are detected; the power variable quantity is the variable quantity of the power of the load equipment changed to the current power within a preset time period; under the condition that it is determined that the power variable quantity is larger than a preset variable quantity threshold value, based on the historical operation working conditions, the target refrigerating capacity needed by the load equipment for operating at the current power and the target duration needed by the load equipment for achieving stable operation at the current power are determined; according to the target refrigerating capacity and the target duration, the power change frequency of a power assembly in the liquid cooling system is determined; and the power assembly is controlled to operate according to the power change frequency, so that the refrigerating capacity output within the target duration reaches the target refrigerating capacity. Therefore, when the operation power of the load equipment changes rapidly, the load equipment can be refrigerated timely and rapidly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present invention relate to the technical field of air conditioning, and in particular to a liquid cooling system control method, device, air conditioning, and storage medium. Background Art

[0002] Liquid cooling systems are widely used in large-scale industrial equipment and special industrial facilities due to their refrigeration function. They can cool the equipment in time during operation, thereby ensuring stable operation of the equipment.

[0003] In actual applications, there are various working conditions during the operation of the equipment. The most common working condition is the rapid change of equipment power. Under this condition, the heat of the equipment will change rapidly. In order to ensure the stable operation of the equipment, the liquid cooling system needs to quickly output the cooling capacity required after the equipment power changes.

[0004] However, due to the limitations of the installation environment, the water tank of the liquid cooling system is designed to be small, which leads to a weakened cold storage capacity of the liquid cooling system. In addition, in the prior art, the cooling capacity of the liquid cooling system is regulated by adjusting the compressor and fan frequency based on the temperature difference between the liquid supply temperature and the user's liquid supply set value. This makes it too late to adjust the liquid cooling system based on the detection of the rapidly rising liquid supply temperature in the case of rapid changes in equipment power. In addition, due to the distance of the coolant transmission pipeline, it also takes time for the coolant to reach the target heat load, which makes it impossible to quickly achieve the predetermined cooling effect. Summary of the invention

[0005] The present application provides a liquid cooling system control method, device, air conditioner and storage medium to solve the technical problem that the control method of the liquid cooling system in the prior art cannot quickly achieve a predetermined cooling effect when the power of the load device changes rapidly.

[0006] In a first aspect, an embodiment of the present invention provides a liquid cooling system control method, which is applied to a liquid cooling system, wherein the liquid cooling system is used to cool a load device, and the method includes:

[0007] During the operation of the load device, the current power and the power change of the load device are detected; the power change is the change from the power of the load device to the current power within a preset time period;

[0008] In the case where it is determined that the power change is greater than a preset change threshold, based on historical operating conditions, determining a target cooling capacity required for the load device to operate at the current power and a target duration required for the load device to achieve stable operation at the current power;

[0009] Determining a power change frequency of a power component in the liquid cooling system according to the target cooling capacity and the target duration;

[0010] The power component is controlled to operate according to the power change frequency so that the cooling capacity output within the target time period reaches the target cooling capacity.

[0011] As a possible implementation, determining, based on the historical operating conditions, the target cooling capacity required for the load device to operate at the current power and the target duration required for the load device to achieve stable operation at the current power includes:

[0012] Obtaining a pre-stored correspondence between the operating power, cooling capacity, and time required for stable operation at the operating power of the load device;

[0013] Determining, according to the current power, whether there is a target power consistent with the current power in the corresponding relationship;

[0014] In the case where it is determined that the target power exists, the cooling capacity corresponding to the target power in the corresponding relationship is determined as the target cooling capacity, and the duration corresponding to the target power in the corresponding relationship is determined as the target duration.

[0015] As a possible implementation, determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration includes:

[0016] Obtaining the current initial operating power of the power component;

[0017] Determining a target operating power corresponding to the power component according to the target cooling capacity;

[0018] The power change frequency of the power component is determined according to the initial operating power, the target operating power, and the target duration.

[0019] As a possible implementation, determining, based on the historical operating conditions, the target cooling capacity required for the load device to operate at the current power and the target duration required for the load device to achieve stable operation at the current power includes:

[0020] Obtaining a pre-stored correspondence between the operating power, cooling capacity, and time required to achieve stable operation at the operating power of the load device;

[0021] Determining, according to the current power, whether there is a target power consistent with the current power in the corresponding relationship;

[0022] In the case where it is determined that the target power does not exist, determining the preset time period as the target time required for the load device to stably operate at the current power;

[0023] Divide the preset time period into a plurality of sub-time periods, and determine the sub-cooling capacity corresponding to each sub-time period according to the corresponding relationship;

[0024] The sub-cooling capacity corresponding to each of the sub-time periods is determined as a target cooling capacity.

[0025] As a possible implementation, determining the sub-cooling capacity corresponding to each sub-time period according to the corresponding relationship includes:

[0026] For each of the sub-time periods, obtaining the sub-power of the load device in the sub-time period;

[0027] Determining, according to the sub-power, whether there is a first target sub-power consistent with the sub-power in the corresponding relationship;

[0028] In a case where it is determined that the first target sub-power exists, the cooling capacity corresponding to the first target sub-power in the corresponding relationship is determined as the sub-cooling capacity corresponding to the sub-time period.

[0029] As a possible implementation, determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration includes:

[0030] For each of the sub-time periods, determining a second target sub-power corresponding to the power component according to the sub-cooling capacity corresponding to the sub-time period;

[0031] The sub-power change frequency of the power component in the sub-time period is determined according to the second target sub-power, the sub-power, and the sub-duration corresponding to the sub-time period.

[0032] As a possible implementation, controlling the operation of the power assembly according to the power change frequency includes:

[0033] In the order of the sub-time periods, perform the following operations for each sub-time period:

[0034] Controlling the operation of the power component according to the sub-power change frequency corresponding to the sub-time period;

[0035] determining whether the cooling capacity output in the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period;

[0036] When it is determined that the cooling capacity output within the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period, the step of controlling the operation of the power component according to the sub-power change frequency corresponding to the sub-time period is continued for the next sub-time period.

[0037] As a possible implementation, before determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration, the method further includes:

[0038] Determining the operation time for outputting the target cooling capacity according to the initial operation mode;

[0039] Comparing the running time with the target time;

[0040] In the case where it is compared that the operating time is less than the target time, the step of determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target time is performed.

[0041] As a possible implementation, after controlling the power assembly to operate according to the power change frequency so that the cooling capacity output within the target time reaches the target cooling capacity, the method further includes:

[0042] Determining whether the supply and return temperature difference of the liquid cooling system is within a preset range;

[0043] When it is determined that the supply and return liquid temperature difference is not within the preset range, the liquid cooling system is controlled to operate according to the initial operation mode until the supply and return liquid temperature difference is within the preset range.

[0044] In a second aspect, the present application provides a liquid cooling system control device, which is applied to a liquid cooling system, wherein the liquid cooling system is used to cool a load device, and the device comprises:

[0045] A detection module, used to detect the current power and power change of the load device during the operation of the load device; the power change is the change in power of the load device from the power of the load device to the current power within a preset time period;

[0046] A first determination module is used to determine, when it is determined that the power change is greater than a preset change threshold, a target cooling capacity required for the load device to operate at the current power and a target duration required for the load device to achieve stable operation at the current power based on historical operating conditions;

[0047] A second determination module is used to determine the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration;

[0048] The control module is used to control the operation of the power component according to the power change frequency so that the cooling capacity output within the target time reaches the target cooling capacity.

[0049] As a possible implementation manner, the first determining module includes:

[0050] A first acquisition submodule is used to acquire a pre-stored correspondence between the operating power, cooling capacity, and time required for stable operation at the operating power of the load device;

[0051] A first determination submodule, configured to determine, according to the current power, whether there is a target power consistent with the current power in the corresponding relationship;

[0052] The second determining submodule is used to determine the cooling capacity corresponding to the target power in the corresponding relationship as the target cooling capacity and determine the duration corresponding to the target power in the corresponding relationship as the target duration when it is determined that the target power exists.

[0053] As a possible implementation manner, the second determining module is specifically configured to:

[0054] Obtaining the current initial operating power of the power component;

[0055] Determining a target operating power corresponding to the power component according to the target cooling capacity;

[0056] The power change frequency of the power component is determined according to the initial operating power, the target operating power, and the target duration.

[0057] As a possible implementation manner, the first determining module includes:

[0058] The second acquisition submodule is used to obtain the pre-stored correspondence between the operating power, cooling capacity, and time required for the load device to achieve stable operation at the operating power;

[0059] A third determination submodule is used to determine whether there is a target power consistent with the current power in the corresponding relationship according to the current power;

[0060] A fourth determination submodule is used to determine the preset time period as the target duration required for the load device to stably operate at the current power when it is determined that the target power does not exist;

[0061] a fifth determination submodule, configured to divide the preset time period into a plurality of sub-time periods, and determine a sub-cooling capacity corresponding to each sub-time period according to the corresponding relationship;

[0062] The sixth determining submodule is used to determine the sub-cooling capacity corresponding to each of the sub-time periods as the target cooling capacity.

[0063] As a possible implementation, the fifth determining submodule is specifically configured to:

[0064] For each of the sub-time periods, obtaining the sub-power of the load device in the sub-time period;

[0065] Determining, according to the sub-power, whether there is a first target sub-power consistent with the sub-power in the corresponding relationship;

[0066] In a case where it is determined that the first target sub-power exists, the cooling capacity corresponding to the first target sub-power in the corresponding relationship is determined as the sub-cooling capacity corresponding to the sub-time period.

[0067] As a possible implementation manner, the second determining module is specifically configured to:

[0068] For each of the sub-time periods, determining a second target sub-power corresponding to the power component according to the sub-cooling capacity corresponding to the sub-time period;

[0069] The sub-power change frequency of the power component in the sub-time period is determined according to the second target sub-power, the sub-power, and the sub-duration corresponding to the sub-time period.

[0070] As a possible implementation, the control module is specifically used to:

[0071] In the order of the sub-time periods, perform the following operations for each sub-time period:

[0072] Controlling the operation of the power component according to the sub-power change frequency corresponding to the sub-time period;

[0073] determining whether the cooling capacity output in the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period;

[0074] When it is determined that the cooling capacity output within the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period, the step of controlling the operation of the power component according to the sub-power change frequency corresponding to the sub-time period is continued for the next sub-time period.

[0075] As a possible implementation, the device further includes:

[0076] A third determination module is used to determine the operation time for outputting the target cooling capacity according to the initial operation mode before determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target time;

[0077] A comparison module, used for comparing the running time with the target time;

[0078] The execution module is used to execute the step of determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration when it is compared that the operating time is less than the target duration.

[0079] As a possible implementation, the device further includes:

[0080] a fourth determination module, configured to determine whether the supply and return liquid temperature difference of the liquid cooling system is within a preset range after the cooling capacity output within the target time reaches the target cooling capacity by controlling the operation of the power assembly according to the power change frequency;

[0081] The operation module is used to control the liquid cooling system to operate according to the initial operation mode when it is determined that the supply and return liquid temperature difference is not within the preset range, until the supply and return liquid temperature difference is within the preset range.

[0082] In a third aspect, the present application provides an air conditioner, comprising: a processor and a memory, wherein the processor is used to execute a liquid cooling system control program stored in the memory to implement the liquid cooling system control method described in any one of the first aspects.

[0083] In a fourth aspect, the present application provides a storage medium storing one or more programs, and the one or more programs can be executed by one or more processors to implement the liquid cooling system control method described in any one of the first aspects.

[0084] The technical solution provided by the embodiment of the present application detects the current power and power change of the load device during the operation of the load device, the above-mentioned power change is the change in the power of the load device from the power of the load device to the current power within a preset time period, and when it is determined that the above-mentioned power change is greater than the preset change threshold, based on historical operating conditions, determines the target cooling capacity required for the load device to operate at the current power and the target duration required for the load device to achieve stable operation at the current power, determines the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration, and controls the operation of the above-mentioned power component according to the above-mentioned power change frequency, so that the cooling capacity output within the target duration reaches the target cooling capacity. This technical solution determines the target cooling capacity required for the load device to operate at the current power and the target duration required for the load device to reach stable operation at the current power according to historical operating conditions when the power of the load device changes rapidly, thereby determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration, and controlling the operation of the power component according to the power change frequency, so that when the load device reaches stable operation, the liquid cooling system can output the cooling capacity required for the load device to operate stably, thereby timely and quickly cooling the load device, thereby achieving the goal of providing the load device with the cooling capacity for stable operation when the operating power of the load device changes rapidly, thereby achieving the goal of timely and quickly cooling the load device when the operating power of the load device changes rapidly. BRIEF DESCRIPTION OF THE DRAWINGS

[0085] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the invention and, together with the description, serve to explain the principles of the invention.

[0086] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0087] One or more embodiments are exemplarily described by pictures in the corresponding drawings, and these exemplified descriptions do not constitute limitations on the embodiments. Elements with the same reference numerals in the drawings represent similar elements, and unless otherwise stated, the figures in the drawings do not constitute proportional limitations.

[0088] Figure 1 A flow chart of an embodiment of a liquid cooling system control method provided in an embodiment of the present application;

[0089] Figure 2 A flow chart of another embodiment of a liquid cooling system control method provided in an embodiment of the present application;

[0090] Figure 3 A flow chart of another embodiment of a liquid cooling system control method provided in an embodiment of the present application;

[0091] Figure 4 A flowchart of building a cooling condition database provided in an embodiment of the present application;

[0092] Figure 5 A flow chart of a method for determining whether to perform special control provided in an embodiment of the present application;

[0093] Figure 6 A flow chart of an embodiment of a special control method provided in an embodiment of the present application;

[0094] Figure 7 A block diagram of an embodiment of a liquid cooling system control device provided in an embodiment of the present application;

[0095] Figure 8 A schematic diagram of the structure of an air conditioner provided in an embodiment of the present application. DETAILED DESCRIPTION

[0096] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described in conjunction with the drawings in the embodiments of the present application. Obviously, the embodiments described in the text are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0097] The disclosure below provides many different embodiments or examples to realize the different structures of the present application. In order to simplify the disclosure of the present application, the parts and settings of specific examples are described in detail below. Of course, they are only examples, and the purpose is not to limit the present application. In addition, the present application can repeat reference numbers and / or letters in different examples. This repetition is for the purpose of simplification and clarity, and does not itself indicate the relationship between the various embodiments and / or settings discussed.

[0098] In order to solve the technical problem that the control method of the liquid cooling system in the prior art cannot quickly achieve a predetermined cooling effect when the power of the load device changes rapidly, the present application provides a liquid cooling system control method, device, air conditioner and storage medium, which can determine the target cooling capacity required for the load device to operate at the current power and the target time required for the load device to reach stable operation at the current power according to the historical operating conditions when the power of the load device changes rapidly, thereby determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target time, and controlling the operation of the power component according to the power change frequency, so that when the load device reaches stable operation, the liquid cooling system can output the cooling capacity required for the load device to operate stably, thereby quickly and timely cooling the load device, thereby achieving that when the operating power of the load device changes rapidly, the cooling capacity for the load device to operate stably can be provided to the load device in time, thereby achieving that when the operating power of the load device changes rapidly, the load device can be cooled in time.

[0099] The liquid cooling system control method provided in the present application is further explained below with reference to specific embodiments in conjunction with the accompanying drawings. The embodiments do not constitute a limitation on the embodiments of the present application.

[0100] join Figure 1 , is a flow chart of an embodiment of a liquid cooling system control method provided in an embodiment of the present application. As an embodiment, Figure 1 The liquid cooling system control method shown can be applied to a liquid cooling system, which can be used to cool load equipment. Figure 1 As shown, the process may include the following steps:

[0101] Step 101 : During the operation of the load device, the current power and the power variation of the load device are detected. The power variation is the variation from the power of the load device to the current power within a preset time period.

[0102] The above-mentioned load equipment refers to the cooling object of the liquid cooling system, which can be equipment used in various industries that generates heat during operation and therefore requires cooling, such as industrial equipment, special industrial facilities, etc.

[0103] The above-mentioned liquid cooling system refers to a system that uses refrigerant to output cooling capacity to achieve a cooling effect, such as an air-conditioning system, which generally includes but is not limited to the following components: a compressor, a four-way valve, a fin heat exchanger, an electronic expansion valve, and a plate heat exchanger, etc.

[0104] In practical applications, the refrigeration system can be connected to the load equipment and output cold air to the load equipment during its operation, thereby eliminating the heat generated by the operation of the load equipment.

[0105] Based on this, in the prior art, the control and regulation of the liquid cooling system is generally based on the temperature difference between the liquid supply temperature and the user's liquid supply set value to adjust the frequency of the compressor, fan, etc. according to time, so as to detect the heat of the load equipment in real time and cool the load equipment in real time.

[0106] However, due to the limitations of the installation environment, the water tank of the liquid cooling system is designed to be small, which leads to a weakened cold storage capacity of the liquid cooling system. In addition, in the prior art, the cooling capacity of the liquid cooling system is regulated by adjusting the compressor and fan frequency based on the temperature difference between the liquid supply temperature and the user's liquid supply set value. This makes it too late to adjust the liquid cooling system based on the detection of the rapidly rising liquid supply temperature in the case of rapid changes in equipment power. In addition, due to the distance of the coolant transmission pipeline, it also takes time for the coolant to reach the target heat load, which makes it impossible to quickly achieve the predetermined cooling effect.

[0107] In this regard, in the embodiment of the present application, the execution subject (liquid cooling system or controller of the liquid cooling system) of the embodiment of the present application can detect the current power and power change of the load device during the operation of the load device. The power change is the change in power of the load device from the power of the load device to the current power within a preset time period.

[0108] As an optional implementation, the execution subject of the embodiment of the present application can obtain the current power of the load device in real time, and determine the change in the power of the load device within a unit time or other preset time period based on the detected current power. For example, the current power is subtracted from the historical power of the load device obtained before the preset time period, and the current power is subtracted from the historical power to obtain the power change.

[0109] Step 102: When it is determined that the power change is greater than a preset change threshold, based on historical operating conditions, determine the target cooling capacity required for the load device to operate at the current power and the target time required for the load device to achieve stable operation at the current power.

[0110] The above-mentioned historical operating conditions refer to the operating conditions of the load equipment and the liquid cooling system in the historical time period, such as the historical operating power of the load equipment in the historical time period, the time required for the load equipment to start running from the historical operating power to stable operation, and the cooling capacity output by the liquid cooling system under the historical operating power, as well as the corresponding relationship between the three.

[0111] The above-mentioned target cooling capacity refers to the cooling capacity required when the load equipment operates stably at the current power. That is, when the liquid cooling system outputs the target cooling capacity, the heat generated by the load equipment operating at the current power can be eliminated, thereby ensuring the normal and stable operation of the load equipment.

[0112] The above target duration refers to the time required for the load equipment to start running at the current power and fully achieve stable operation.

[0113] In one embodiment, after the execution subject of the embodiment of the present application determines the power change amount of the load device, it can determine whether the power change amount is greater than a preset change amount threshold.

[0114] Optionally, when it is determined that the power change is greater than the above-mentioned preset change threshold, it means that the power of the load device is changing rapidly at this time, and the existing control method of the liquid cooling system cannot cool the load device in time. Therefore, in order to cool the load device in time, the execution subject of the embodiment of the present application can obtain the target cooling capacity required for the load device to operate at the current power based on historical operating conditions, and the target time required for the load device to achieve stable operation at the current power.

[0115] As an exemplary implementation, when determining the target cooling capacity required for the load device to operate at the current power and the target duration required for the load device to achieve stable operation at the current power based on historical operating conditions, the pre-stored correspondence between the load device's operating power, cooling capacity, and duration required for stable operation at the operating power can be obtained.

[0116] Afterwards, it may be determined based on the current power whether there is a target power consistent with the current power in the corresponding relationship.

[0117] Optionally, when it is determined that there is a target power, the cooling capacity corresponding to the target power in the corresponding relationship is determined as the target cooling capacity, and the duration corresponding to the target power in the corresponding relationship is determined as the target duration.

[0118] On the contrary, if it is determined that there is no target power, the target power can be increased based on historical operating conditions. Figure 2 As for how to determine the above target cooling capacity and target duration when there is no target power in the corresponding relationship, it can be described below. Figure 2 The process shown is described below and will not be described in detail here.

[0119] Step 103: Determine the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration.

[0120] Step 104: Control the operation of the power assembly according to the power change frequency, so that the cooling capacity output within the target time reaches the target cooling capacity.

[0121] The following is a unified description of step 103 and step 104:

[0122] The above-mentioned power component refers to a power component in the liquid cooling system used to drive the liquid cooling system to cool the load equipment, which may include but is not limited to: a compressor and a fan, etc.

[0123] The power variation frequency refers to the frequency of power variation of the power component.

[0124] In an embodiment of the present application, after determining the target cooling capacity and target duration required for the above-mentioned liquid cooling system to stably operate the load equipment at the current power, the power change frequency of the power component in the liquid cooling system can be determined, so that the operation of the power component is controlled according to the power change frequency, so that the liquid cooling system can output a cooling capacity that reaches the above-mentioned target cooling capacity within the target duration.

[0125] As an optional implementation method, it can be seen from step 102 that when the executing subject of the embodiment of the present application determines the target cooling capacity and the target duration from the above-mentioned corresponding relationship, it indicates that the load equipment has operated at the current power in the historical time period. Therefore, the power change frequency of the power component can be directly determined according to the target cooling capacity and the target duration corresponding to the current power, so as to directly control the operation of the power component according to the power change frequency to achieve the purpose of outputting the target cooling capacity.

[0126] Based on this, the current initial operating power of the power component can be directly obtained first.

[0127] Afterwards, the target operating power corresponding to the power component can be determined based on the target cooling capacity.

[0128] As an optional implementation, the execution subject of the embodiment of the present application may pre-store the power-cooling capacity correspondence between the operating power of the power component and the cooling capacity achieved. Based on this, the execution subject of the embodiment of the present application may determine the target operating power corresponding to the power component according to the target cooling capacity of the liquid cooling system.

[0129] Finally, the power change frequency of the power component can be determined according to the above-mentioned initial operating power, target operating power, and target duration.

[0130] As an optional implementation, the target operating power may be subtracted from the initial operating power to obtain a power difference, and the power difference may be divided by the target duration to obtain the power change frequency of the power component.

[0131] As an exemplary embodiment, the power assembly may include a compressor and a fan. Based on this, the execution subject of the embodiment of the present application may determine the compressor target operating power and the compressor initial operating power of the compressor, and then the compressor target operating power minus the compressor initial operating power may be used to obtain the compressor power difference, and the compressor power difference may be divided by the target duration to obtain the compressor power change frequency. Then, the compressor operation may be controlled according to the compressor power change frequency.

[0132] At the same time, the fan target operating power and the fan initial operating power of the fan can be determined, and then the fan initial operating power can be subtracted from the above fan target operating power to obtain the fan power difference, and then the fan power difference is divided by the target duration to obtain the fan power change frequency. Then, the fan operation can be controlled according to the above fan power change frequency.

[0133] In addition, in order to further determine whether the operation mode in the prior art of the liquid cooling system can cool the load equipment in time, the execution subject of the embodiment of the present application can determine the operation time of outputting the target cooling capacity according to the initial operation mode before determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration. The above-mentioned initial operation mode can be a mode in the prior art that adjusts the compressor and fan frequency according to time based on the temperature difference between the liquid supply temperature and the user's liquid supply set value.

[0134] Afterwards, the above operating time and the target time may be compared, and when it is found that the operating time is less than the target time, the power change frequency of the power component in the liquid cooling system may be determined according to the target cooling capacity and the target time.

[0135] Furthermore, after controlling the operation of the power component according to the power change frequency so that the cooling capacity output within the target time reaches the target cooling capacity, in order to ensure the stable operation of the liquid cooling system, the executor of the embodiment of the present application can determine whether the supply and return liquid temperature difference of the liquid cooling system is within a preset range.

[0136] Optionally, when it is determined that the supply and return liquid temperature difference is not within the preset range, it means that the liquid cooling system is unstable at this time. In order to ensure the stability of the liquid cooling system, the executing body of the embodiment of the present application can control the liquid cooling system to operate according to the initial operating mode to provide cooling for the supply and return liquid until the supply and return liquid temperature difference is within the preset range and the liquid cooling system is in a stable state.

[0137] The technical solution provided by the embodiment of the present application detects the current power and power change of the load device during the operation of the load device, the above-mentioned power change is the change in the power of the load device from the power of the load device to the current power within a preset time period, and when it is determined that the above-mentioned power change is greater than the preset change threshold, based on historical operating conditions, determines the target cooling capacity required for the load device to operate at the current power and the target duration required for the load device to achieve stable operation at the current power, determines the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration, and controls the operation of the above-mentioned power component according to the above-mentioned power change frequency, so that the cooling capacity output within the target duration reaches the target cooling capacity. This technical solution determines the target cooling capacity required for the load device to operate at the current power and the target duration required for the load device to reach stable operation at the current power according to historical operating conditions when the power of the load device changes rapidly, thereby determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration, and controlling the operation of the power component according to the power change frequency, so that when the load device reaches stable operation, the liquid cooling system can output the cooling capacity required for the load device to operate stably, thereby timely and quickly cooling the load device, thereby achieving the goal of providing the load device with the cooling capacity for stable operation when the operating power of the load device changes rapidly, thereby achieving the goal of timely and quickly cooling the load device when the operating power of the load device changes rapidly.

[0138] See also Figure 2 , which is a flow chart of another embodiment of a liquid cooling system control method provided in an embodiment of the present application. Figure 2 The process shown in Figure 1 Based on the process shown, it describes how to determine the target cooling capacity and target duration when there is no target power in the pre-stored corresponding relationship, and how to determine the power change frequency of the power component in the liquid cooling system and control the operation of the power component according to the power change frequency. Figure 2 As shown, the process may include the following steps:

[0139] Step 201: Obtain the pre-stored correspondence between the operating power, cooling capacity, and time required to achieve stable operation at the operating power of the load device.

[0140] Step 202: Determine whether there is a target power consistent with the current power in the corresponding relationship according to the current power. If so, execute step 203; if not, execute step 204.

[0141] Step 203: determine the cooling capacity corresponding to the target power in the corresponding relationship as the target cooling capacity, and determine the duration corresponding to the target power in the corresponding relationship as the target duration.

[0142] Step 204: determine the preset time period as the target time required for the load device to operate stably at the current power.

[0143] The following is a unified description of steps 201 to 204:

[0144] In an embodiment of the present application, when determining the target cooling capacity required for the load device to operate at the current power and the target time required for the load device to achieve stable operation at the current power based on historical operating conditions, the pre-stored correspondence between the load device's operating power, cooling capacity, and time required for stable operation at the operating power can be obtained.

[0145] Afterwards, it may be determined based on the current power whether there is a target power consistent with the current power in the corresponding relationship.

[0146] Optionally, when it is determined that there is a target power, the cooling capacity corresponding to the target power in the corresponding relationship is determined as the target cooling capacity, and the duration corresponding to the target power in the corresponding relationship is determined as the target duration.

[0147] On the contrary, when it is determined that there is no target power, the preset time period can be determined as the target time required for the load device to operate stably at the current power. The preset time period can be the time period corresponding to the power variation determined by the execution subject of the embodiment of the present application in step 101.

[0148] Step 205: Divide the preset time period into a plurality of sub-time periods, and determine the sub-cooling capacity corresponding to each sub-time period according to the corresponding relationship.

[0149] Step 206: Determine the sub-cooling capacity corresponding to each sub-time period as the target cooling capacity.

[0150] The following is a unified description of step 205 and step 206:

[0151] The above sub-cooling capacity refers to the cooling capacity required when the load equipment operates in the sub-time period.

[0152] In the embodiment of the present application, the execution subject of the embodiment of the present application can divide the above-mentioned preset time period into multiple sub-time periods, and determine the sub-cooling capacity corresponding to each sub-time period according to the above-mentioned corresponding relationship. Then, the sub-cooling capacity corresponding to each sub-time period can be determined as the target cooling capacity.

[0153] As an optional implementation, the above-mentioned preset time period may be averaged into a plurality of sub-time periods.

[0154] As another optional implementation manner, the above preset time period may be randomly divided into a plurality of sub-time periods.

[0155] In one embodiment, the execution subject of the embodiment of the present application may obtain the sub-power of the load device in each sub-time period. The sub-power may be the power of the load device in the sub-time period obtained randomly, or the power corresponding to the last time node of the load device in the sub-time period, and the embodiment of the present application does not limit this.

[0156] Afterwards, it can be determined whether there is a first target sub-power consistent with the sub-power in the above correspondence. Optionally, if there is the first target sub-power, the cooling capacity corresponding to the first target sub-power in the above correspondence can be determined as the sub-cooling capacity corresponding to the sub-time period.

[0157] On the contrary, when the first target sub-power does not exist in the corresponding relationship, other sub-powers of the sub-time period can be reselected, and the cooling capacity corresponding to the other sub-powers can be determined in the corresponding relationship, and the cooling capacity can be determined as the sub-cooling capacity corresponding to the sub-time period.

[0158] Step 207: For each sub-time period, determine a second target sub-power corresponding to the power component according to the sub-cooling capacity corresponding to the sub-time period.

[0159] Step 208: Determine the sub-power change frequency of the power component in the sub-time period according to the second target sub-power, the sub-power, and the sub-duration corresponding to the sub-time period.

[0160] The following is a unified description of step 207 and step 208:

[0161] The second target sub-power refers to the power of the power component corresponding to the sub-cooling capacity that the liquid cooling system wants to output.

[0162] In the embodiment of the present application, the corresponding relationship between the operating power and the cooling capacity of the power component in the liquid cooling system can be pre-stored. Based on this, the second target sub-power can be determined from the corresponding relationship according to the sub-cooling capacity corresponding to each time period.

[0163] Afterwards, the sub-power change frequency of the power component in the sub-time period may be determined based on the second target sub-power, the sub-power, and the sub-duration corresponding to the sub-time period.

[0164] As an exemplary implementation, the sub-power may be subtracted from the second target sub-power to obtain a sub-power difference, and the sub-power difference may be divided by the sub-time length corresponding to the sub-time period to determine the sub-power change frequency of the power component in the sub-time period.

[0165] Step 209: Control the power component to operate in each time period according to the sub-power change frequency corresponding to each sub-time period, so that the cooling capacity output within the target time period reaches the target cooling capacity.

[0166] In one embodiment, after determining multiple sub-time periods and the sub-power change frequency of the power component corresponding to each sub-time period, the executing entity of the embodiment of the present application can control the power component to operate in each time period in turn according to the sub-power change frequency corresponding to each sub-time period, so that the cooling capacity output within the target time period reaches the target cooling capacity.

[0167] As an optional implementation, the following operations may be performed for each sub-time period in sequence according to the order of the sub-time periods: first, the power component may be controlled to operate according to the sub-power change frequency corresponding to the sub-time period, and when it is determined that the cooling capacity output in the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period, the step of controlling the power component to operate according to the sub-power change frequency corresponding to the sub-time period is continued for the next sub-time period. Until the control of the power component is completed in the last sub-time period, the total cooling capacity output by the liquid cooling system can reach the cooling capacity required for the stable operation of the load equipment.

[0168] The technical solution provided by the embodiment of the present application obtains the correspondence between the operating power, cooling capacity, and the time required for stable operation of the load device stored in advance, and determines whether there is a target power consistent with the current power in the correspondence according to the current power. If so, the cooling capacity corresponding to the target power in the correspondence is determined as the target cooling capacity, and the time corresponding to the target power in the correspondence is determined as the target time; if not, the preset time period is determined as the target time required for the load device to operate stably with the current power, the preset time period is divided into a plurality of sub-time periods, and the sub-cooling capacity corresponding to each sub-time period is determined according to the correspondence, and the sub-cooling capacity corresponding to each sub-time period is determined as the target cooling capacity. For each sub-time period, according to the sub-cooling capacity corresponding to the sub-time period, a second target sub-power corresponding to the power component is determined, and according to the second target sub-power, the sub-power, and the sub-time corresponding to the sub-time, the sub-power change frequency of the power component in the sub-time period is determined, and the power component is controlled to operate in each time period according to the sub-power change frequency corresponding to each sub-time period, so that the cooling capacity output within the target time reaches the target cooling capacity. This technical solution can control the operation of the liquid cooling system in time periods according to historical operating conditions in order to match the target cooling capacity and target duration corresponding to the current power of the load device, thereby obtaining the target cooling capacity control frequency under similar historical conditions, so as to achieve the target cooling capacity output within the target duration. In the case of an unmatched target cooling capacity, the sub-power change frequency of the power component in multiple sub-time periods can be determined based on similar historical conditions, so that the cooling capacity output within the target duration reaches the target cooling capacity, thereby achieving timely and rapid cooling of the load device when the power of the load device changes rapidly.

[0169] See also Figure 3 , is a flow chart of another embodiment of a liquid cooling system control method provided in an embodiment of the present application. Figure 3 As shown, the process may include the following steps:

[0170] In the embodiment of the present application, it is first determined that there are N known liquid cooling system cooling and heat loads, each heat load has an operating power of W, and the total operating power of the liquid cooling system is N*W. Secondly, according to the conventional liquid cooling system control method (adjusted by the liquid supply temperature and the liquid supply setting deviation), the cooling demand POWER (N*W) when maintaining temperature balance under the total power of the heat load N*W and the time t required for the heat load power to suddenly change to stabilize are obtained, and finally the liquid cooling system control mode, compressor frequency FreCom, and fan frequency FreFan when outputting POWER cooling are stored. A complete cooling condition database is formed through the above power mutation stabilization time, target cooling capacity and its liquid cooling system control mode parameters.

[0171] See also Figure 4 , is a flow chart of constructing a cooling condition database provided by an embodiment of the present application. Figure 4 As shown, the process may include: using a conventional liquid supply temperature control method to control the load equipment, and storing the working power of the heat source side equipment (ie, the load equipment), and storing the target output cooling capacity corresponding to the working power, and then forming a cooling capacity operating condition database.

[0172] Under thermal load working conditions, the current thermal load power changes are detected in real time, the same historical working conditions are retrieved from the database simultaneously, and machine learning is used to deduce the target cooling demand under the current trend.

[0173] Optionally, if a completely consistent historical operating condition cannot be matched, the time t is divided into n equal parts, and the power change data within the continuous time t / n is continuously detected to fit the data close to the historical operating condition in each n segments. The locked existing historical operating condition is corrected in real time, and the target cooling capacity control frequency under similar historical operating conditions can be obtained.

[0174] Optionally, if completely consistent historical operating conditions can be matched, the target cooling capacity and liquid cooling system control mode corresponding to the stable power Ptar after the power change are obtained, and the liquid cooling control mode is adjusted to output the target cooling capacity.

[0175] Optional, see Figure 5 , is a flow chart of a method for determining whether to perform special control provided in an embodiment of the present application. Figure 5 As shown, if the time required to reach the target cooling capacity under conventional liquid supply temperature control is greater than or equal to the time t for the heat load power to stabilize, it is determined that the conventional control method cannot provide the target cooling capacity in time and special control intervention is required.

[0176] Further, see Figure 6 , is a flow chart of an embodiment of a special control method provided in the embodiment of the present application. Figure 6 As shown, it is known that the time t required for the thermal load power to stabilize is predicted, the compressor frequency of the liquid cooling system in the current working state is freComNow, and the fan frequency is FreFanNow. In order to ensure that the liquid cooling system can output the same cooling capacity in time when the thermal load power suddenly changes, the compressor and fan frequencies need to be changed in advance, which is different from the traditional liquid supply temperature detection frequency modulation method, so that the corresponding cooling capacity can be supplied in time when the thermal load power suddenly changes. Therefore, the liquid cooling system needs to reach the target cooling capacity frequency within the power sudden change time t, and the compressor and fan frequencies change at the rate of RateComfre = (FreCom-freComNow) / t, RateFanfre = (FreCom-freComNow) / t, to achieve the target cooling capacity.

[0177] As the service life of the liquid cooling system increases or the outdoor ambient temperature changes, the cooling capacity output under the same historical operating conditions of the heat load operation may not be able to maintain the temperature balance of the heat load. Therefore, it is necessary to add the cooling capacity compensation of the supply and return liquid temperature difference. In the special control mode, if the adjustment is completed in time t, the supply and return liquid temperature difference still fluctuates greatly. The target cooling capacity is adjusted according to the cooling capacity demand corresponding to the temperature difference, so as to avoid the situation where the target effect cannot be achieved under the same working conditions. When the adjustment is completed or there is no power mutation, it is judged that the normal liquid supply control mode can achieve the target cooling capacity, and the normal liquid supply temperature control is restored to maintain the temperature balance.

[0178] The technical solution provided by the embodiment of the present application realizes rapid temperature control by synchronizing the load change on the heat source side with the change of the liquid cooling system or processing it in advance, and determines the current heat source equipment change trend and target cooling demand by detecting the current working condition change trend of the heat source side equipment and matching it with the same historical working condition. If the current working condition cannot match the same historical working condition, the data close to the historical working condition is fitted in segments according to the current working condition, and the locked existing historical working condition is corrected in real time to deduce the time required for the heat source side equipment to reach the target required cooling capacity, and dynamically adjust the compressor frequency increase and decrease rate within the specified time to synchronously reach the target frequency. It realizes improving the response speed of the liquid cooling system, quickly reaching the cooling capacity required by the heat source equipment, improving the working stability of the heat source equipment, learning the historical cooling demand change trend of the heat source side equipment, predicting the cooling capacity required by the current trend, so that the liquid cooling system can be used efficiently, improving the energy efficiency ratio, and effectively avoiding cooling loss and excess cooling.

[0179] See also Figure 7 , is a block diagram of an embodiment of a liquid cooling system control device provided in an embodiment of the present application. As an embodiment, the device can be applied to a liquid cooling system, and the liquid cooling system can be used to cool a load device. Figure 7 As shown, the device may include:

[0180] The detection module 71 is used to detect the current power and power change of the load device during the operation of the load device; the power change is the change in power of the load device from the power of the load device to the current power within a preset time period;

[0181] A first determination module 72 is used to determine, when it is determined that the power change is greater than a preset change threshold, a target cooling capacity required for the load device to operate at the current power and a target duration required for the load device to achieve stable operation at the current power based on historical operating conditions;

[0182] A second determination module 73, configured to determine a power change frequency of a power component in the liquid cooling system according to the target cooling capacity and the target duration;

[0183] The control module 74 is used to control the operation of the power component according to the power change frequency so that the cooling capacity output within the target time reaches the target cooling capacity.

[0184] As a possible implementation, the first determining module 72 includes:

[0185] A first acquisition submodule is used to acquire a pre-stored correspondence between the operating power, cooling capacity, and time required for stable operation at the operating power of the load device;

[0186] A first determination submodule, configured to determine, according to the current power, whether there is a target power consistent with the current power in the corresponding relationship;

[0187] The second determining submodule is used to determine the cooling capacity corresponding to the target power in the corresponding relationship as the target cooling capacity and determine the duration corresponding to the target power in the corresponding relationship as the target duration when it is determined that the target power exists.

[0188] As a possible implementation, the second determining module 73 is specifically configured to:

[0189] Obtaining the current initial operating power of the power component;

[0190] Determining a target operating power corresponding to the power component according to the target cooling capacity;

[0191] The power change frequency of the power component is determined according to the initial operating power, the target operating power, and the target duration.

[0192] As a possible implementation, the first determining module 72 includes:

[0193] The second acquisition submodule is used to obtain the pre-stored correspondence between the operating power, cooling capacity, and time required for the load device to achieve stable operation at the operating power;

[0194] A third determination submodule is used to determine whether there is a target power consistent with the current power in the corresponding relationship according to the current power;

[0195] A fourth determination submodule is used to determine the preset time period as the target duration required for the load device to stably operate at the current power when it is determined that the target power does not exist;

[0196] a fifth determination submodule, configured to divide the preset time period into a plurality of sub-time periods, and determine a sub-cooling capacity corresponding to each sub-time period according to the corresponding relationship;

[0197] The sixth determining submodule is used to determine the sub-cooling capacity corresponding to each of the sub-time periods as the target cooling capacity.

[0198] As a possible implementation, the fifth determining submodule is specifically configured to:

[0199] For each of the sub-time periods, obtaining the sub-power of the load device in the sub-time period;

[0200] Determining, according to the sub-power, whether there is a first target sub-power consistent with the sub-power in the corresponding relationship;

[0201] In a case where it is determined that the first target sub-power exists, the cooling capacity corresponding to the first target sub-power in the corresponding relationship is determined as the sub-cooling capacity corresponding to the sub-time period.

[0202] As a possible implementation manner, the second determining module is specifically configured to:

[0203] For each of the sub-time periods, determining a second target sub-power corresponding to the power component according to the sub-cooling capacity corresponding to the sub-time period;

[0204] The sub-power change frequency of the power component in the sub-time period is determined according to the second target sub-power, the sub-power, and the sub-duration corresponding to the sub-time period.

[0205] As a possible implementation, the control module 74 is specifically configured to:

[0206] In the order of the sub-time periods, perform the following operations for each sub-time period:

[0207] Controlling the operation of the power component according to the sub-power change frequency corresponding to the sub-time period;

[0208] determining whether the cooling capacity output in the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period;

[0209] When it is determined that the cooling capacity output within the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period, the step of controlling the operation of the power component according to the sub-power change frequency corresponding to the sub-time period is continued for the next sub-time period.

[0210] As a possible implementation, the device further includes (not shown in the figure):

[0211] A third determination module is used to determine the operation time for outputting the target cooling capacity according to the initial operation mode before determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target time;

[0212] A comparison module, used for comparing the running time with the target time;

[0213] The execution module is used to execute the step of determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration when it is compared that the operating time is less than the target duration.

[0214] As a possible implementation, the device further includes (not shown in the figure):

[0215] a fourth determination module, configured to determine whether the supply and return liquid temperature difference of the liquid cooling system is within a preset range after the cooling capacity output within the target time reaches the target cooling capacity by controlling the operation of the power assembly according to the power change frequency;

[0216] The operation module is used to control the liquid cooling system to operate according to the initial operation mode when it is determined that the supply and return liquid temperature difference is not within the preset range, until the supply and return liquid temperature difference is within the preset range.

[0217] like Figure 8 As shown, it is a structural schematic diagram of an air conditioner provided in an embodiment of the present application, including a processor 81, a communication interface 82, a memory 83, a communication bus 84 and at least two drive modules 85, wherein the processor 81, the communication interface 82, and the memory 83 communicate with each other through the communication bus 84.

[0218] A memory 83, for storing computer programs;

[0219] A driving module 85 is used to drive the vehicle;

[0220] In one embodiment of the present application, the processor 81 is used to execute the program stored in the memory 83 to implement the liquid cooling system control method provided by any of the above method embodiments, including:

[0221] During the operation of the load device, the current power and the power change of the load device are detected; the power change is the change from the power of the load device to the current power within a preset time period;

[0222] In the case where it is determined that the power change is greater than a preset change threshold, based on historical operating conditions, determining a target cooling capacity required for the load device to operate at the current power and a target duration required for the load device to achieve stable operation at the current power;

[0223] Determining a power change frequency of a power component in the liquid cooling system according to the target cooling capacity and the target duration;

[0224] The power component is controlled to operate according to the power change frequency so that the cooling capacity output within the target time period reaches the target cooling capacity.

[0225] An embodiment of the present application further provides a storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the steps of the liquid cooling system control method provided in any of the aforementioned method embodiments are implemented.

[0226] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the present embodiment.

[0227] Through the text of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a general hardware platform, and of course, by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the relevant technology can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiment.

[0228] It should be understood that the terms used in the text are only for the purpose of the specific example implementation of the text, and are not intended to be limited. Unless the context clearly indicates otherwise, the singular forms "one", "an" and "said" as used in the text can also be represented to include plural forms. The terms "include", "comprise", "contain", and "have" are inclusive, and therefore specify the existence of the stated features, steps, operations, elements and / or parts, but do not exclude the existence or addition of one or more other features, steps, operations, elements, parts, and / or their combinations. The method steps, processes, and operations of the text in the text are not interpreted as necessarily requiring them to be performed in the specific order of the text or description, unless the execution order is clearly indicated. It should also be understood that additional or alternative steps can be used.

[0229] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A liquid cooling system control method, characterized in that: Applied to a liquid cooling system, the liquid cooling system is used to cool a load device, the method comprising: During the operation of the load device, the current power and the power change of the load device are detected; the power change is the change from the power of the load device to the current power within a preset time period; In the case where it is determined that the power change is greater than a preset change threshold, based on historical operating conditions, determining a target cooling capacity required for the load device to operate at the current power and a target duration required for the load device to achieve stable operation at the current power; Determining a power change frequency of a power component in the liquid cooling system according to the target cooling capacity and the target duration; The power component is controlled to operate according to the power change frequency so that the cooling capacity output within the target time period reaches the target cooling capacity.

2. The method according to claim 1, characterized in that The determining, based on the historical operating conditions, a target cooling capacity required for the load device to operate at the current power and a target duration required for the load device to achieve stable operation at the current power includes: Obtaining a pre-stored correspondence between the operating power, cooling capacity, and time required for stable operation at the operating power of the load device; Determining, according to the current power, whether there is a target power consistent with the current power in the corresponding relationship; In the case where it is determined that the target power exists, the cooling capacity corresponding to the target power in the corresponding relationship is determined as the target cooling capacity, and the duration corresponding to the target power in the corresponding relationship is determined as the target duration.

3. The method according to claim 2, characterized in that The step of determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration includes: Obtaining the current initial operating power of the power component; Determining a target operating power corresponding to the power component according to the target cooling capacity; The power change frequency of the power component is determined according to the initial operating power, the target operating power, and the target duration.

4. The method according to claim 1, characterized in that: The determining, based on the historical operating conditions, a target cooling capacity required for the load device to operate at the current power and a target duration required for the load device to achieve stable operation at the current power includes: Obtaining a pre-stored correspondence between the operating power, cooling capacity, and time required for stable operation at the operating power of the load device; Determining, according to the current power, whether there is a target power consistent with the current power in the corresponding relationship; In the case where it is determined that the target power does not exist, determining the preset time period as the target time required for the load device to operate stably at the current power; Divide the preset time period into a plurality of sub-time periods, and determine the sub-cooling capacity corresponding to each sub-time period according to the corresponding relationship; The sub-cooling capacity corresponding to each of the sub-time periods is determined as a target cooling capacity.

5. The method according to claim 4, characterized in that The determining, according to the corresponding relationship, the sub-cooling capacity corresponding to each sub-time period includes: For each of the sub-time periods, obtaining the sub-power of the load device in the sub-time period; Determining, according to the sub-power, whether there is a first target sub-power consistent with the sub-power in the corresponding relationship; In a case where it is determined that the first target sub-power exists, the cooling capacity corresponding to the first target sub-power in the corresponding relationship is determined as the sub-cooling capacity corresponding to the sub-time period.

6. The method according to claim 5, characterized in that The step of determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration includes: For each of the sub-time periods, determining a second target sub-power corresponding to the power component according to the sub-cooling capacity corresponding to the sub-time period; The sub-power change frequency of the power component in the sub-time period is determined according to the second target sub-power, the sub-power, and the sub-duration corresponding to the sub-time period.

7. The method according to claim 6, characterized in that The step of controlling the operation of the power assembly according to the power change frequency includes: In the order of the sub-time periods, perform the following operations for each sub-time period: Controlling the operation of the power component according to the sub-power change frequency corresponding to the sub-time period; determining whether the cooling capacity output in the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period; When it is determined that the cooling capacity output within the sub-time period reaches the sub-cooling capacity corresponding to the sub-time period, the step of controlling the operation of the power component according to the sub-power change frequency corresponding to the sub-time period is continued for the next sub-time period.

8. The method according to claim 1, characterized in that Before determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration, the method further includes: Determining the operation time for outputting the target cooling capacity according to the initial operation mode; Comparing the running time with the target time; In the case where it is found that the operating time is less than the target time, the step of determining the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target time is performed.

9. The method according to claim 8, characterized in that After controlling the power assembly to operate according to the power change frequency so that the cooling capacity output within the target time reaches the target cooling capacity, the method further includes: Determining whether the supply and return temperature difference of the liquid cooling system is within a preset range; When it is determined that the supply and return liquid temperature difference is not within the preset range, the liquid cooling system is controlled to operate according to the initial operation mode until the supply and return liquid temperature difference is within the preset range.

10. A liquid cooling system control device, characterized in that: Applied to a liquid cooling system, the liquid cooling system is used to cool a load device, and the device comprises: A detection module, used for detecting the current power and power variation of the load device during the operation of the load device; the power variation is the variation of the power of the load device from the power of the load device to the current power within a preset time period; A first determination module is used to determine, when it is determined that the power change is greater than a preset change threshold, a target cooling capacity required for the load device to operate at the current power and a target duration required for the load device to achieve stable operation at the current power based on historical operating conditions; A second determination module is used to determine the power change frequency of the power component in the liquid cooling system according to the target cooling capacity and the target duration; The control module is used to control the operation of the power component according to the power change frequency so that the cooling capacity output within the target time reaches the target cooling capacity.

11. An air conditioner, characterized in that: include: A processor and a memory, wherein the processor is used to execute a liquid cooling system control program stored in the memory to implement the liquid cooling system control method according to any one of claims 1 to 9.

12. A storage medium, characterized in that: The storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the liquid cooling system control method according to any one of claims 1 to 9.

Citation Information

Cited By

  • Water tank temperature control method and device, electronic equipment, storage medium and program product

    CN120122746A

  • Industrial control system of micro-module moving ring system

    CN121634793A