Bridge crack repairing and maintaining device using concrete material
By using hot melt components and adhesive plastic film in the bridge crack repair device combined with asbestos mesh design, the problems of external impurities intrusion and material leakage are solved, and the stability and long-term durability of the bridge crack repair location are achieved.
Patent Information
- Application Number
- CN202411396627.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-11-22
AI Technical Summary
Existing bridge crack repair and maintenance devices using concrete materials are susceptible to external impurities and leakage of repair materials after filling, resulting in unstable structure.
A device including a rack, rolling roller, material roller, hot melt assembly and adhesive plastic film is designed. The adhesive plastic film is melted and adhered to the repair position through the hot melt assembly and heating resistor wire to form a solid barrier, combined with the asbestos mesh. The material provides physical protection to prevent impurities from entering and stabilizing the repair of the material.
Effectively prevent external impurities from entering and leaking the repair material, ensure the stability and long-term durability of the repair position of the bridge cracks, and reduce the risk of leakage of the repair material.
Smart Images

Figure CN118997026A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of concrete bridge repair, and in particular relates to a bridge crack repair and maintenance device using concrete materials. Background Art
[0002] Concrete bridges will be damaged by many factors during long-term use, including but not limited to the repeated action of vehicle loads, which leads to fatigue cracking of concrete, erosion by chemical substances in the environment, such as acid rain and chloride ions, which damage the internal structure of concrete, and thermal expansion and contraction caused by temperature changes, which may cause concrete cracking. After concrete cracking, the cracks may continue to expand, which may affect the supporting strength and service life of the bridge body. For smaller cracks, the surface sealing method is usually used, and special crack sealing materials are used for coating. Wider and deeper cracks require grouting treatment, and the grouting material is injected into the cracks.
[0003] Chinese patent CN112663517B discloses a bridge crack repair device, including a moving mechanism, a repair mechanism, a treading mechanism, a driving mechanism, a transmission mechanism, an extrusion mechanism and a braking mechanism; the moving mechanism facilitates the movement of the repair mechanism on the bridge deck, the repair mechanism facilitates the placement and addition of the repair agent, so that the repair work is more efficient and reduces the physical exertion of the staff bending over to repair, the treading mechanism is conducive to pressing and leveling the repair agent, and the transmission mechanism and the extrusion mechanism are conducive to the treading mechanism to press and hold the repair agent tightly, the driving mechanism facilitates the driving of the brake mechanism, so as to facilitate the limit braking of the moving mechanism, and facilitate the repair work of the repair mechanism in situ, and the driving mechanism is reversely driven to reset the brake mechanism, so as to facilitate the moving repair work of the mobile mechanism chassis.
[0004] When repairing cracks in existing bridges using concrete materials, it is necessary to mix concrete slurry and inject it into the cracks to fill the cracks. However, the repair position is usually exposed during use, and impurities may easily enter the repair position in a normal traffic position, resulting in an unstable internal structure of the repair position, which may easily cause secondary cracking. Moreover, when the crack is located at the bottom of the bridge, due to the fluidity of the concrete, larger cracks may leak out of the cracks after being filled with concrete materials if there is a large vibration in the environment, resulting in an unstable structural repair.
[0005] Based on the above-mentioned situation, we found that it is difficult for the existing bridge crack repair and maintenance devices to avoid the above problems at the same time. Therefore, we proposed a bridge crack repair and maintenance device using concrete materials, which can stick solid repair materials at the repair position after the concrete repair material is injected to prevent external impurities from entering the repair position, while preventing the repair material at the side and bottom of the bridge from leaking out of the cracks. Summary of the invention
[0006] The purpose of the present invention is to target an existing bridge crack repair and maintenance device using concrete materials. The advantage of the present invention is that after the concrete repair material is injected, solid repair material can be pasted at the repair position to prevent external impurities from entering the repair position, while preventing the repair material at the side and bottom of the bridge from leaking out of the cracks.
[0007] The above technical objectives of the present invention are achieved through the following technical solutions: a bridge crack repair and maintenance device using concrete material, comprising a frame, a winding roller is rotatably connected to the inner side of the left side of the frame, a control motor is bolted to the winding roller at the rear side external output end of the frame, a material roller is rotatably connected to the inner side of the right side of the frame, a repair material is arranged on the outer side of the material roller, and a side of the repair material away from the material roller is fixedly connected to the winding roller, a structural frame is clamped on the outer side of the frame, a hot melt component is arranged at the bottom of the structural frame, a hot air blower is installed on the top of the structural frame, a handle is bolted to the top of the frame, a concrete discharge pipe is arranged on the left side of the frame, a material pump is installed on the outer side of the frame, the output end of the material pump is connected to the concrete discharge pipe, a transfer box is installed on the inner side of the frame, the transfer box is connected to the input end of the material pump, pulleys are arranged at the bottom of the front and rear sides of the frame, and cutting knives are arranged at the bottom of both sides of the material roller;
[0008] The hot melt assembly includes a layer frame, a connecting spring is bolted to the bottom of the layer frame, a heater is installed at the bottom of the connecting spring, a heating resistance wire is installed at the bottom of the heater, an air duct is bolted to the outside of the layer frame, a nozzle is installed at the bottom of the air duct, and the air duct is connected to the output end of the hot air blower.
[0009] By adopting the above technical scheme, by setting up a frame, it is convenient to support and connect the structure, and the setting of the handle allows people to hold the structure in their hands to facilitate repairing the side and ground of the bridge. The transfer box arranged on the inner side of the frame can be connected to the material source of the external concrete repair material to continuously supply materials or temporarily store a small amount of materials. The material pump arranged can facilitate the extraction of concrete repair materials and supply them to the concrete drainage pipe to fill and repair the crack position of the bridge. The arranged repair material is used to protect the repair position after the bridge crack is filled. After the bridge crack is filled, the external control motor drives the winding roller to rotate to pull out the rolled repair material from the outside of the winding roller, and the asbestos mesh material part of the repair material is attached to the starting point of the crack, and the initial filling is performed through the viscosity of the filling concrete material. Fixed. If the crack is too narrow and the viscosity is insufficient, personnel can press the asbestos mesh part of the repair material to make it fit at the repair position, and the adhesive plastic film is torn off. After the structure is pressed at the repair position, the heating resistance wire and the hot air blower are started at the same time. The hot air blower melts the adhesive plastic film part of the repair material, and the melted part is bonded to the outside of the repair position. As the personnel hold the structure and move along the repair position, the hot melt position cools down, and the heating resistance wire of the heater fuses the connection position between the adhesive plastic film and the asbestos mesh material to complete the separation of the winding part and the adhesive protection part on the outside of the winding roller. As the structure moves away from or close to the repair position, the connecting spring is compressed or rebounded, so that the heating resistance wire can always maintain contact with the repair material, while avoiding damage to the heating resistance wire caused by excessive force.
[0010] The present invention is further configured as follows: the repair material comprises an asbestos mesh material, the front side and the rear side of the asbestos mesh material are fixedly connected with an adhesive plastic film, and the adhesive plastic film is fixedly connected to a winding roller.
[0011] By adopting the above technical solution, by setting asbestos mesh material and sticking plastic film as repair material, the asbestos mesh material as the main protective material can form a physical barrier for protection when in use, reduce the penetration of moisture while allowing air circulation, which is conducive to the drying of concrete repair materials. The sticking plastic film can ensure that the gap between the protective material and the repair position is relatively small during hot-melt bonding, reducing the risk of peeling of the structure without the influence of external force or leakage of the repair concrete material.
[0012] The present invention is further configured as follows: a sub-frame is bolted to the top of the heater, a limiting telescopic rod is bolted to the top of the sub-frame, the top of the limiting telescopic rod is bolted to the shelf, and the top of the sub-frame is bolted to the connecting spring.
[0013] By adopting the above technical solution, by setting a sub-frame in conjunction with a limiting telescopic rod, when the vertical position between the sub-frame and the layer frame moves relative to each other, it is possible to limit its movement, thereby preventing the structure from rotating or tilting and causing it to be unable to be used normally, and preventing the connecting spring from radial deformation.
[0014] The present invention is further configured as follows: a guide rail is bolted to the left side of the frame, a bracket is slidably connected to the inner side of the guide rail, and the inner side of the bracket is clamped to the concrete pipe.
[0015] By adopting the above technical solution, by providing a guide rail and a matching bracket, the concrete pipe can be easily supported and the position adjusted to avoid collision and friction between the concrete pipe and the repair position when the repair material is pasted.
[0016] The present invention is further configured as follows: a transmission screw is rotatably connected to the inner side of the guide rail, a transmission motor is fixedly connected to the transmission screw at the top external output end of the guide rail, and the outer side of the transmission screw is threadedly connected to the bracket.
[0017] By adopting the above technical solution and arranging a transmission screw, the vertical position of the bracket connected thereto can be easily adjusted under the drive of an external transmission motor, thereby controlling the vertical position of the concrete pipe.
[0018] The present invention is further configured as follows: an electric telescopic cylinder is bolted to the inner side of the right side of the frame, a knife holder is bolted to the inner side of the right side of the frame and the telescopic end of the electric telescopic cylinder, the inner side of the knife holder is clamped with a cutting knife, and two cutting knives are used in combination.
[0019] By adopting the above technical solution, an electric telescopic cylinder is set up to facilitate the movement of the right tool holder and the inner cutting knife. The cutting surfaces of the two cutting knives are in contact, so the repair material can be cut when it needs to be cut. The set tool holder can facilitate the replacement of the cutting knife to avoid normal cutting due to structural aging.
[0020] The present invention is further configured as follows: wheel frames are installed at the bottom of the front and rear sides of the frame, the bottom of the wheel frames is bolted with a pressure spring, the bottom of the pressure spring is bolted with a rotating shaft frame, and the inner side of the rotating shaft frame is rotatably connected to the pulley.
[0021] By adopting the above technical solution, by setting a wheel frame and a pressure spring, it is convenient to connect the rotating shaft frame and the inner pulley. The pulley can slide when the personnel move the structure horizontally on the repair surface to reduce the friction between the structure and the bridge structure. The pressure spring is compressed when the personnel apply force, and can make the frame closer to or contact the repair surface, and when the force stops, the pressure spring rebounds to facilitate subsequent processing actions.
[0022] The present invention is further configured as follows: a limit rod is bolted to the top of the rotating shaft frame, and the outer side of the limit rod is slidably connected to the wheel frame.
[0023] By adopting the above technical solution and setting a limit rod, the relative movement between the rotating shaft frame and the wheel frame can be limited, so that the relative movement between the structures is more stable.
[0024] The present invention is further configured as follows: a clamping frame is bolted to the inner side of the frame, and the inner side of the clamping frame is clamped to the transfer box.
[0025] By adopting the above technical solution and providing a snap-in frame, the transfer box and the rack can be easily connected, and the transfer box can be easily replaced.
[0026] The present invention is further configured as follows: both sides of the outer sides of the material roller and the winding roller are bolted with limit plates, and the limit plates are arranged on the front side and the rear side of the repair material.
[0027] By adopting the above technical solution, by setting a limit plate, the winding position of the repair material can be limited to avoid the setting position not being able to correspond to the structure such as the heating resistance wire.
[0028] In summary, the present invention has the following beneficial effects:
[0029] By setting up a frame, it is convenient to support and connect the structure. The setting of the handle allows people to hold the structure in their hands to repair the side and ground of the bridge. The transfer box arranged on the inner side of the frame can be connected to the material source of the external concrete repair material to continuously supply materials or temporarily store a small amount of materials. The material pump arranged can easily extract the concrete repair material and supply it to the concrete pipe to fill and repair the crack position of the bridge. The set repair material is used to protect the repair position after the bridge crack is filled. After the bridge crack is filled, the external control motor drives the winding roller to rotate to pull out the rolled repair material from the outside of the winding roller, and the asbestos mesh material part of the repair material is attached to the starting point of the crack, and it is initially fixed by the viscosity of the filling concrete material. If the crack is too narrow and the viscosity is insufficient, personnel can press the asbestos mesh part of the repair material to make it fit at the repair position, and the adhesive plastic film is torn off. After the structure is pressed at the repair position, the heating resistance wire and the hot air blower are started at the same time. The hot air blower melts the adhesive plastic film part of the repair material, and the melted part is bonded to the outside of the repair position. As the personnel hold the structure and move along the repair position, the hot melt position cools down, and the heating resistance wire of the heater fuses the connection position between the adhesive plastic film and the asbestos mesh material to complete the separation of the winding part and the adhesive protection part on the outside of the winding roller. As the structure moves away from or close to the repair position, the connecting spring is compressed or rebounded, so that the heating resistance wire can always maintain contact with the repair material, while avoiding damage to the heating resistance wire caused by excessive force. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0031] Figure 2 It is a schematic diagram of the main structure of the present invention;
[0032] Figure 3 It is a schematic diagram of the bottom of the main structure of the present invention;
[0033] Figure 4 is a schematic diagram of the position of the winding roller of the present invention;
[0034] Figure 5 It is a schematic diagram of the hot melt assembly structure of the present invention;
[0035] Figure 6 It is a schematic diagram of the wheel frame structure of the present invention;
[0036] Figure 7 It is a schematic diagram of the repair material structure of the present invention.
[0037] : 1. frame; 2. winding roller; 3. material roller; 4. repair material; 41. asbestos mesh material; 42. adhesive plastic film; 5. structural frame; 6. hot melt assembly; 601. shelf; 602. connecting spring; 603. heater; 604. heating resistor wire; 605. air duct; 606. nozzle; 7. hot air blower; 8. handle; 9. concrete pipe; 10. material pump; 11. transfer box; 12. pulley; 13. sub-frame; 14. limit telescopic rod; 15. guide rail; 16. bracket; 17. electric telescopic cylinder; 18. knife holder; 19. cutting knife; 20. wheel frame; 21. pressure spring; 22. rotating shaft frame; 23. limit rod; 24. clamping frame; 25. limit plate; 26. driving screw. DETAILED DESCRIPTION
[0038] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0039] Embodiment 1:
[0040] refer to Figure 1-6 A bridge crack repair and maintenance device using concrete material comprises a frame 1, a winding roller 2 is rotatably connected to the inner side of the left side of the frame 1, a control motor whose rear side external output end is bolted to the winding roller 2, a material roller 3 is rotatably connected to the inner side of the right side of the frame 1, a repair material 4 is arranged on the outer side of the material roller 3, and the side of the repair material 4 away from the material roller 3 is fixedly connected to the winding roller 2, a structural frame 5 is clamped on the outer side of the frame 1, a hot melt component 6 is arranged at the bottom of the structural frame 5, a hot air blower 7 is installed on the top of the structural frame 5, a handle 8 is bolted to the top of the frame 1, a concrete discharge pipe 9 is arranged on the left side of the frame 1, a material pump 10 is installed on the outer side of the frame 1, and the output end of the material pump 10 is connected to the concrete discharge pipe 9, the frame 1 A transfer box 11 is installed on the inner side, and the transfer box 11 is connected to the input end of the material pump 10. Pulleys 12 are provided at the bottom of the front and rear sides of the frame 1, and cutting knives 19 are provided at the bottom of both sides of the material roller 3. By setting the frame 1, it is convenient to support and connect the structure. The setting of the handle 8 allows people to hold the structure in their hands to repair the side and ground of the bridge. The transfer box 11 arranged on the inner side of the frame 1 can be connected to the material source of the external concrete repair material 4 for continuous feeding or temporary storage of a small amount of material. The material pump 10 can be convenient for extracting concrete repair materials and supplying them to the concrete drain pipe 9 to fill and repair the cracks in the bridge.
[0041] like Figure 1 As shown, a guide rail 15 is bolted to the left side of the frame 1, and a bracket 16 is slidably connected to the inner side of the guide rail 15. The inner side of the bracket 16 is clamped with the concrete pipe 9. By arranging the guide rail 15 in conjunction with the bracket 16, the concrete pipe 9 can be easily supported and the position adjusted to avoid collision and friction between the concrete pipe 9 and the repair position when the repair material 4 is pasted.
[0042] like Figure 1 As shown, the inner side of the guide rail 15 is rotatably connected to a transmission screw 26, the top external output end of the guide rail 15 is fixedly connected to a transmission motor with the transmission screw 26, and the outer side of the transmission screw 26 is threadedly connected to the bracket 16. By setting the transmission screw 26, the vertical position of the bracket 16 connected thereto can be easily adjusted under the drive of the external transmission motor, thereby controlling the vertical position of the concrete pipe 9.
[0043] like Figure 4 As shown, an electric telescopic cylinder 17 is bolted to the inner side of the right side of the frame 1, and a tool holder 18 is bolted to the inner side of the right side of the frame 1 and the telescopic end of the electric telescopic cylinder 17. The inner side of the tool holder 18 is engaged with a cutting knife 19, and the two cutting knives 19 are used together. By setting the electric telescopic cylinder 17, it is convenient to push the right tool holder 18 and the inner cutting knife 19 to move. The cutting surfaces of the two cutting knives 19 are in contact, so that the repair material 4 can be cut when it is needed. The tool holder 18 can facilitate the replacement of the cutting knife 19 to avoid the failure of normal cutting due to structural aging.
[0044] like Figure 6 As shown, wheel frames 20 are installed at the bottom of the front and rear sides of the frame 1, and a pressure spring 21 is bolted to the bottom of the wheel frame 20, and a rotating shaft frame 22 is bolted to the bottom of the pressure spring 21. The inner side of the rotating shaft frame 22 is rotatably connected to the pulley 12. By arranging the wheel frame 20 to cooperate with the pressure spring 21, it is convenient to connect the rotating shaft frame 22 and the inner pulley 12. The pulley 12 can slide when personnel move the structure horizontally on the repair surface to reduce the friction between the structure and the bridge structure. The pressure spring 21 is compressed when personnel apply force, and can make the frame 1 closer to or contact the repair surface, and when the force stops, the pressure spring 21 rebounds to facilitate subsequent processing actions.
[0045] like Figure 6 As shown, a limit rod 23 is bolted to the top of the rotating shaft frame 22, and the outer side of the limit rod 23 is slidably connected to the wheel frame 20. By setting the limit rod 23, the relative movement between the rotating shaft frame 22 and the wheel frame 20 can be limited, making the relative movement between the structures more stable.
[0046] like Figure 2 As shown, a snap-on frame 24 is bolted to the inner side of the rack 1, and the inner side of the snap-on frame 24 is snap-on with the transfer box 11. By providing the snap-on frame 24, the transfer box 11 and the rack 1 can be easily connected, and the transfer box 11 can be easily replaced.
[0047] Brief description of the use process: When in use, the personnel hold the handle 8 and connect the transfer box 11 on the inner side of the frame 1 with the material source of the external concrete repair material 4 as needed to continuously supply materials. When repairing narrow gaps and other locations, a small amount of material can be temporarily stored, and the concrete repair material in the transfer box 11 is extracted by the material pump 10 and supplied to the concrete pipe 9 to fill and repair the crack position of the bridge. After the filling is completed, the transmission screw 26 driven by the external transmission motor can adjust the vertical position of the bracket 16 on the inner side of the guide rail 15 to lift the concrete pipe 9.
[0048] Embodiment 2:
[0049] refer to Figure 1-7 , a bridge crack repair and maintenance device using concrete material, comprising a frame 1, a winding roller 2 is rotatably connected to the inner side of the left side of the frame 1, a control motor whose rear side external output end is bolted to the winding roller 2, a material roller 3 is rotatably connected to the inner side of the right side of the frame 1, a repair material 4 is arranged on the outer side of the material roller 3, and the side of the repair material 4 away from the material roller 3 is fixedly connected to the winding roller 2, a structural frame 5 is clamped on the outer side of the frame 1, a hot melt component 6 is arranged at the bottom of the structural frame 5, a hot air blower 7 is installed on the top of the structural frame 5, a handle 8 is bolted to the top of the frame 1, a concrete discharge pipe 9 is arranged on the left side of the frame 1, a material pump 10 is installed on the outer side of the frame 1, and the output end of the material pump 10 is connected to the concrete discharge pipe 9, a transfer box 11 is installed on the inner side of the frame 1, and the transfer box 11 is connected to the input end of the material pump 10, pulleys 12 are arranged at the bottom of the front and rear sides of the frame 1, and cutting knives 19 are arranged at the bottom of both sides of the material roller 3;
[0050] The hot melt assembly 6 includes a layer frame 601, a connecting spring 602 is bolted to the bottom of the layer frame 601, a heater 603 is installed at the bottom of the connecting spring 602, a heating resistor 604 is installed at the bottom of the heater 603, an air duct 605 is bolted to the outside of the layer frame 601, a nozzle 606 is installed at the bottom of the air duct 605, and the air duct 605 is connected to the output end of the hot air blower 7. After the bridge crack is filled, the external control motor drives the winding roller 2 to rotate to pull out the rolled repair material 4 from the outside of the winding roller 2, and the asbestos mesh material 41 part of the repair material 4 is attached to the starting point of the crack, and is initially fixed by the viscosity of the filling concrete material. If the crack is too narrow and the viscosity is insufficient, personnel can press the asbestos mesh material 41 part of the repair material 4 to make it fit to the repair The repair position is reached, and the adhesive plastic film 42 is torn off. After the structure is pressed against the repair position, the heating resistor wire 604 and the hot air blower 7 are started at the same time. The hot air blower 7 melts the adhesive plastic film 42 part of the repair material 4, and the melted part is bonded to the outside of the repair position. As the person holds the structure and moves along the repair position, the hot melt position cools down, and the heating resistor wire 604 of the heater 603 melts the connecting position between the adhesive plastic film 42 and the asbestos mesh material 41 to complete the separation of the outer winding part and the adhesive protection part of the winding roller 2. As the structure moves away from or close to the repair position, the connecting spring 602 is compressed or rebounded, so that the heating resistor wire 604 can always maintain contact with the repair material 4, while avoiding damage to the heating resistor wire 604 caused by excessive force.
[0051] like Figure 7 As shown, the repair material 4 includes an asbestos mesh material 41, and the front and rear sides of the asbestos mesh material 41 are fixedly connected with an adhesive plastic film 42, and the adhesive plastic film 42 is fixedly connected to the winding roller 2. By arranging the asbestos mesh material 41 and the adhesive plastic film 42 as the repair material 4, when in use, the asbestos mesh material 41 as the main protective material can form a physical barrier for protection, reduce moisture penetration while allowing air circulation, and help the drying of the concrete repair material. The adhesive plastic film 42 can ensure that the gap between the protective material and the repair position is relatively small during hot-melt bonding, reducing the risk of peeling of the structure without the influence of external force or leakage of the repair concrete material.
[0052] like Figure 5 As shown, the top of the heater 603 is bolted to a sub-frame 13, the top of the sub-frame 13 is bolted to a limiting telescopic rod 14, the top of the limiting telescopic rod 14 is bolted to the layer frame 601, and the top of the sub-frame 13 is bolted to the connecting spring 602. By arranging the sub-frame 13 to cooperate with the limiting telescopic rod 14, when the vertical position between the sub-frame 13 and the layer frame 601 moves relative to each other, it is possible to limit the movement thereof, thereby preventing the structure from rotating or tilting and causing it to be unable to be used normally, and preventing the connecting spring 602 from radial deformation.
[0053] like Figure 2 As shown, both sides of the outer side of the material roller 3 and the winding roller 2 are bolted with limit plates 25, and the limit plates 25 are arranged on the front and rear sides of the repair material 4. By setting the limit plates 25, the winding position of the repair material 4 can be limited to avoid its setting position not being able to correspond to the structure such as the heating resistor wire 604.
[0054] Brief description of the use process: When in use, the external control motor drives the winding roller 2 to rotate, so as to pull out the rolled repair material 4 from the outside of the winding roller 2, and the asbestos mesh material 41 of the repair material 4 is attached to the starting point of the crack, and contacts with the filled concrete repair material, and is fixed by the viscosity of the filling concrete material. When the adhesion is not strong, the staff presses the asbestos mesh material 41 of the repair material 4 to make it fit at the repair position, and tears the connection between the adhesive plastic film 42 and the asbestos mesh material 41, and presses the structure to the repair position. After the repair position is reached, the heating resistor wire 604 and the hot air blower 7 are started at the same time, the hot air blower 7 melts the adhesive plastic film 42 of the repair material 4, and the melted part is bonded to the outside of the repair position, and the personnel hand-held structure moves along the repair position through the pulley 12. When the hot air moves away from the hot melt position, the hot melt position cools down, and the heating resistor wire 604 of the heater 603 melts the connection position between the adhesive plastic film 42 and the asbestos mesh material 41 to complete the separation of the winding part and the adhesive protection part on the outside of the winding roller 2 to complete the protection of the bridge repair position.
[0055] This specific embodiment is merely an explanation of the present invention and is not a limitation of the present invention. After reading this specification, those skilled in the art may make non-creative modifications to the present embodiment as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.
Claims
1. A bridge crack repair and maintenance device using concrete material, comprising a frame (1), Features: The inner side of the left side of the frame (1) is rotatably connected to a winding roller (2); the rear side of the frame (1) is connected to a control motor with an external output terminal bolted to the winding roller (2); the inner side of the right side of the frame (1) is rotatably connected to a material roller (3); a repair material (4) is provided on the outer side of the material roller (3); the side of the repair material (4) away from the material roller (3) is fixedly connected to the winding roller (2); a structural frame (5) is clamped on the outer side of the frame (1); a hot melt component (6) is provided at the bottom of the structural frame (5); a hot melt component (6) is installed on the top of the structural frame (5). A fan (7), a handle (8) is bolted to the top of the frame (1), a concrete pipe (9) is provided on the left side of the frame (1), a material pump (10) is installed on the outside of the frame (1), the output end of the material pump (10) is connected to the concrete pipe (9), a transfer box (11) is installed on the inside of the frame (1), the transfer box (11) is connected to the input end of the material pump (10), pulleys (12) are provided at the bottom of the front and rear sides of the frame (1), and cutting knives (19) are provided at the bottom of both sides of the material roller (3); The hot melt assembly (6) comprises a layer frame (601), the bottom of the layer frame (601) is bolted with a connecting spring (602), the bottom of the connecting spring (602) is installed with a heater (603), the bottom of the heater (603) is installed with a heating resistance wire (604), the outer side of the layer frame (601) is bolted with an air duct (605), the bottom of the air duct (605) is installed with a nozzle (606), and the air duct (605) is connected to the output end of the hot air blower (7).
2. A bridge crack repair and maintenance device using concrete material according to claim 1, Features: The repair material (4) comprises an asbestos mesh material (41), the front side and the rear side of the asbestos mesh material (41) are both fixedly connected with an adhesive plastic film (42), and the adhesive plastic film (42) is fixedly connected to the winding roller (2).
3. A bridge crack repair and maintenance device using concrete material according to claim 1, Features: The top of the heater (603) is bolted to a sub-frame (13), the top of the sub-frame (13) is bolted to a limiting telescopic rod (14), the top of the limiting telescopic rod (14) is bolted to the shelf (601), and the top of the sub-frame (13) is bolted to a connecting spring (602).
4. A bridge crack repair and maintenance device using concrete material according to claim 1, Features: A guide rail (15) is bolted to the left side of the frame (1), a bracket (16) is slidably connected to the inner side of the guide rail (15), and the inner side of the bracket (16) is clamped to the concrete pipe (9).
5. A bridge crack repair and maintenance device using concrete material according to claim 4, Features: The inner side of the guide rail (15) is rotatably connected to a transmission screw (26); the top external output end of the guide rail (15) is fixedly connected to a transmission motor connected to the transmission screw (26); and the outer side of the transmission screw (26) is threadedly connected to the bracket (16).
6. A bridge crack repair and maintenance device using concrete material according to claim 1, Features: An electric telescopic cylinder (17) is bolted to the inner side of the right side of the frame (1), a knife holder (18) is bolted to the inner side of the right side of the frame (1) and the telescopic end of the electric telescopic cylinder (17), the inner side of the knife holder (18) is clamped with a cutting knife (19), and the two cutting knives (19) are used in combination.
7. A bridge crack repair and maintenance device using concrete material according to claim 1, Features: Wheel frames (20) are installed at the bottom of the front and rear sides of the frame (1), a pressure spring (21) is bolted to the bottom of the wheel frame (20), a rotating shaft frame (22) is bolted to the bottom of the pressure spring (21), and the inner side of the rotating shaft frame (22) is rotatably connected to the pulley (12).
8. A bridge crack repair and maintenance device using concrete material according to claim 7, Features: The top of the rotating shaft frame (22) is bolted to a limiting rod (23), and the outer side of the limiting rod (23) is slidably connected to the wheel frame (20).
9. The bridge crack repair and maintenance device using concrete material according to claim 1, Features: A clamping frame (24) is bolted to the inner side of the frame (1), and the inner side of the clamping frame (24) is clamped to the transfer box (11).
10. A bridge crack repair and maintenance device using concrete material according to claim 1, Features: Limiting plates (25) are bolted to both sides of the outer sides of the material roller (3) and the winding roller (2), and the limiting plates (25) are arranged on the front and rear sides of the repair material (4).