Nuclear main pump king bolt tensioner mounting device and method
By designing a combination device of guide studs, elastic support mechanism and support nuts in the nuclear main pump, the central hole thread of the main bolt is used for miniaturization, which solves the problem of inconvenient installation of the main bolt stretcher of the nuclear main pump, and realizes the Simplify installation and avoid thread damage.
Patent Information
- Application Number
- CN202411180227.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-27
AI Technical Summary
In the prior art, the main bolt stretcher of the core main pump is inconvenient to install, especially in the AP1000/CAP1400 main pump. Since the bolt stretcher is heavy and the installation method is flipped, conventional bolt stretchers cannot meet the pretension force. Required, and the large footprint affects the installation of the main bolts.
A installation device for the main bolt stretcher of the core main pump is designed, including a guide stud, an elastic support mechanism and a support nut. The central hole thread of the main bolt is used as the installation interface to provide upward thrust through the elastic support mechanism to avoid thread bearing. Stretcher weight, simplifying installation process.
It realizes a miniaturized installation device, simplifies the installation process of the bolt stretcher, avoids thread damage, and is suitable for the installation of the AP1000/CAP1400 core main pump, overcoming the problems of installation inconvenience and space limitations.
Smart Images

Figure CN119017054A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of nuclear main pump tensioning, and in particular to a nuclear main pump main bolt tensioner installation device and method. Background Art
[0002] In a passive nuclear power plant, the main pump is one of the important equipment in the primary coolant system. The main pump core package is a removable core structure, connected to the pump casing by main bolts.
[0003] Since the pre-tightening force required for the main bolt is very large, conventional methods cannot meet the pre-tightening force requirements, and a bolt tensioner is required to apply the pre-tightening force.
[0004] In some different types of main pumps, such as the AP1000 / CAP1400 main pump, the installation method is inverted, and the main nut must be installed from bottom to top. However, a single bolt tensioner is heavy and is blocked by the main pump casing, so it is inconvenient to install a conventional bolt tensioner. Moreover, conventional bolt tensioners occupy a large area and cannot meet the need to apply pre-tightening force to the main bolts after the AP1000 / CAP1400 nuclear main pump and its accessories are all installed in place.
[0005] Based on this, the inventor of the present application proposed a nuclear main pump main bolt tensioner installation device and method, in order to solve the above-mentioned technical problems. Summary of the invention
[0006] The technical problem to be solved by the present invention is to overcome the defect of inconvenient installation of bolt tensioners in the prior art and to provide a nuclear main pump main bolt tensioner installation device and method.
[0007] The present invention solves the above technical problems through the following technical solutions:
[0008] The present invention provides a nuclear main pump main bolt tensioner installation device, which is characterized in that it includes:
[0009] A guide stud, one end of which is passed through the tensioner cylinder and is threadedly connected to a center hole provided on the main bolt;
[0010] An elastic support mechanism, which is sleeved on the outside of the guide stud and located at the bottom of the tensioner cylinder and connected to the tensioner cylinder;
[0011] A support nut is sleeved on the guide stud, and one end of the support nut abuts against the elastic support mechanism, and the support nut is located on a side of the elastic support mechanism away from the main bolt; wherein,
[0012] The support nut moves with the movement of the tensioner cylinder along the guide stud.
[0013] According to an embodiment of the present invention, the elastic support mechanism includes a first spring support seat and a second spring support seat which are stacked, and the first spring support seat and the second spring support seat are elastically connected via at least one elastic member.
[0014] According to one embodiment of the present invention, a mounting gap is formed in the middle of the first spring support seat and the second spring support seat, and a bearing is sleeved in the mounting gap;
[0015] The guide stud is inserted into the inner ring of the bearing, and the first spring support seat and the second spring support seat are connected to the outer ring of the bearing.
[0016] According to one embodiment of the present invention, the first spring support seat and the second spring support seat are mounted to the tensioner cylinder via at least two threaded connectors.
[0017] According to one embodiment of the present invention, the first spring support seat and the second spring support seat cooperate to form a clamping chamber for clamping the elastic member, and a connecting stud is passed through the elastic member, one end of the connecting stud is fixedly connected to the second spring support seat, and the other end is passed through the first spring support seat and movably cooperates with the first spring support seat.
[0018] According to an embodiment of the present invention, the elastic member is a spring, and the number of the elastic members is multiple;
[0019] The plurality of springs are evenly spaced and arranged around the outer circumference of the elastic support mechanism.
[0020] According to one embodiment of the present invention, the first spring support seat is arranged close to one side of the tensioner cylinder;
[0021] A bearing support plate is provided on a side of the second spring support seat facing away from the first spring support seat, and one end of the support nut abuts against the bearing support plate.
[0022] According to one embodiment of the present invention, the circumferential dimension of the bearing support plate is larger than the circumferential dimension of the bearing.
[0023] The present invention also provides a method for installing a main bolt tensioner of a nuclear main pump, which is implemented by using the above-mentioned main bolt tensioner installation device of the nuclear main pump, and the installation method comprises:
[0024] Step 1, arranging the elastic support mechanism and the tensioner cylinder sleeve on the outside of the guide stud, and connecting the elastic support mechanism with the tensioner cylinder;
[0025] Step 2, installing a support nut on the outside of the guide stud, and screwing the support nut in so that the elastic support mechanism is in an elastic compression state;
[0026] Step 3, move the tensioner cylinder to below the main bolt, and connect the guide stud to the main bolt;
[0027] Step 4: Connect the tensioner cylinder upward to the main bolt by rotating the tensioner cylinder and synchronously rotating the support nut.
[0028] According to an embodiment of the present invention, the elastic force of the elastic support mechanism is consistent with the gravity of the tensioner cylinder.
[0029] The positive and progressive effects of the present invention are:
[0030] The main bolt tensioner installation device of the nuclear main pump of the present invention utilizes the central hole thread of the main bolt as the device installation interface, and no additional interface is required. The size of the installation device is very small, so the installation process will not affect the surrounding accessories of the main pump.
[0031] An elastic support mechanism is used to support the tensioner cylinder, which continuously provides an upward thrust during the installation of the tensioner cylinder. The main bolt thread does not need to bear the weight of the tensioner, avoiding thread damage. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] The above and other features, properties and advantages of the present invention will become more apparent through the following description in conjunction with the accompanying drawings and embodiments, in which:
[0033] Figure 1 It is a schematic diagram of the installation state of the main bolt tensioner installation device of the nuclear main pump of the present invention;
[0034] Figure 2 for Figure 1 Schematic diagram of the matching structure between the middle guide stud and the main bolt;
[0035] Figure 3 for Figure 1 Schematic diagram of the connection structure between the elastic support mechanism and the tensioner cylinder;
[0036] Figure 4 for Figure 1 A schematic diagram of the structure of the elastic support mechanism;
[0037] Figure 5 The present invention is a flow chart of the method for installing the main bolt tensioner of the nuclear main pump.
[0038] 1. Guide stud;
[0039] 2. Tensioner cylinder;
[0040] 3. Main bolt;
[0041] 4. Elastic support mechanism; 41. First spring support seat; 42. Second spring support seat; 421. Bearing support plate; 43. Elastic member; 44. Installation gap; 45. Bearing; 46. Threaded connector; 47. Clamping chamber; 48. Connecting stud;
[0042] 5. Support nut. DETAILED DESCRIPTION
[0043] The present invention is further described below in conjunction with specific embodiments and drawings. More details are elaborated in the following description to facilitate a full understanding of the present invention. However, the present invention can obviously be implemented in a variety of other ways different from the description herein. Those skilled in the art can make similar generalizations and deductions based on actual application situations without violating the connotation of the present invention. Therefore, the protection scope of the present invention should not be limited by the content of this specific embodiment.
[0044] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.
[0045] Please refer to Figures 1 to 4 The present invention proposes a nuclear main pump main bolt tensioner installation device, including a guide stud 1, an elastic support mechanism 4 and a support nut 5, one end of the guide stud 1 is penetrated through the tensioner cylinder 2 and is threadedly connected to the center hole opened on the main bolt 3; the elastic support mechanism 4 is sleeved on the outside of the guide stud 1 and is located at the bottom of the tensioner cylinder 2 and is connected to the tensioner cylinder 2; the support nut 5 is sleeved on the guide stud 1, and one end abuts against the elastic support mechanism 4, and the support nut 5 is located on the side of the elastic support mechanism 4 away from the main bolt 3; wherein the support nut 5 moves with the movement of the tensioner cylinder 2 along the guide stud 1.
[0046] During actual installation, the tensioner cylinder 2 needs to be screwed onto the main bolt 3 from bottom to top. The tensioner cylinder 2 has an internal thread, and the main bolt 3 has an external thread on the outside that can match the internal thread on the outside of the tensioner cylinder 2. During the process of screwing in the tensioner cylinder 2, the tensioner cylinder 2 needs to maintain a high verticality, otherwise the tensioner cylinder 2 cannot be screwed into the main bolt 3 smoothly, and the threads of the main bolt 3 and the tensioner cylinder 2 may be damaged, thus hindering the installation of the tensioner cylinder 2.
[0047] It can be seen that the tensioner cylinder 2 is a part of the tensioner, which is mainly used to be sleeved on the outside of the main bolt 3. In the actual installation process, because the tensioner cylinder 2 needs to overcome its own gravity when screwing in, and also needs to provide its own rotation force, it may be difficult to screw in upwards due to insufficient gravity when applying the rotation force; or it may not be able to screw in smoothly due to insufficient rotation force.
[0048] That is, the tensioner cylinder 2 needs to move upward while rotating synchronously, which causes great trouble to the synchronization of applying the rotation force and overcoming the gravity.
[0049] Based on this, the present invention uses the guide stud 1 to connect with the main bolt 3, and sets an elastic support mechanism 4 and a support nut 5 on the guide stud 1. The elastic support mechanism 4 is used to provide support force for the tensioner cylinder 2 to overcome the upward gravity of the tensioner cylinder 2; at the same time, the support nut 5 supports the elastic support mechanism 4 and the tensioner cylinder 2 with the help of the main bolt 3, and keeps following the tensioner cylinder 2 during the upward movement of the tensioner cylinder 2. In this way, the tensioner cylinder 2 can be more easily moved upward to cooperate with the main bolt 3.
[0050] That is, under the action of the guide stud 1, the elastic support mechanism 4 provides an upward elastic thrust during the upward movement of the tensioner cylinder 2, and there is no need for the main bolt 3 thread to bear the weight of the tensioner cylinder 2, thereby preventing the thread between the main bolt 3 and the tensioner cylinder 2 from being damaged by the gravity of the tensioner cylinder 2.
[0051] Furthermore, because of the continuous elastic support of the elastic support mechanism 4, during the installation of the tensioner cylinder 2, the tensioner cylinder 2 does not need to consider its own gravity, but only needs to provide its own rotational force. The installation process of the bolt tensioner is simple and easy to operate.
[0052] Please refer to Figure 3 and Figure 4 The elastic support mechanism 4 includes a first spring support seat 41 and a second spring support seat 42 which are stacked, and the first spring support seat 41 and the second spring support seat 42 are elastically connected by at least one elastic member 43.
[0053] It can be seen that the elastic member 43 is used to provide a supporting force for the stretcher cylinder 2 , and the elastic support mechanism 4 is divided into a first spring support seat 41 and a second spring support seat 42 , which is more suitable for providing an adaptive supporting force for the stretcher cylinder 2 .
[0054] Specifically, an installation gap 44 is formed in the middle of the first spring support seat 41 and the second spring support seat 42, and a bearing 45 is sleeved in the installation gap 44; the guide stud 1 is passed through the inner ring of the bearing 45, and the first spring support seat 41 and the second spring support seat 42 are connected to the outer ring of the bearing 45.
[0055] During the installation process of the stretcher cylinder 2 and the main bolt 3, the stretcher cylinder 2 itself rotates upward. At this time, the guide stud 1 only plays a guiding role and will not move synchronously with the stretcher cylinder 2. Therefore, a bearing 45 is arranged in the middle of the first spring support seat 41 and the second spring support seat 42. The bearing 45 can reduce the friction force generated by the first spring support seat 41 and the second spring support seat 42 following the movement of the stretcher cylinder 2, so that the first spring support seat 41, the second spring support seat 42 and the stretcher cylinder 2 can rotate flexibly with the guide stud 1 as the axis.
[0056] It should be noted that the first spring support seat 41 and the second spring support seat 42 are mounted on the tensioner cylinder 2 via at least two threaded connectors 46 .
[0057] The threaded connector 46 may be a bolt, a screw, etc., which is not limited here.
[0058] When the tensioner cylinder 2 moves upward, the first spring support seat 41 and the second spring support seat 42 move with the tensioner cylinder 2 , so the first spring support seat 41 and the second spring support seat 42 are connected to the tensioner cylinder 2 using a threaded connector 46 .
[0059] The number of threaded connectors 46 is described here by taking two as an example, but this number is not limited and can also be three, four, etc.
[0060] The elastic support mechanism 4 is detachably connected to the tensioner cylinder 2 via a threaded connector 46, so that when the elastic support mechanism 4 fails and needs to be repaired or replaced, it is easier to disassemble and assemble, thus saving the overall cost of the installation device.
[0061] Please continue to refer to Figure 4 The first spring support seat 41 and the second spring support seat 42 cooperate to form a clamping chamber 47 for clamping the elastic member 43. A connecting stud 48 is passed through the elastic member 43. One end of the connecting stud 48 is fixedly connected to the second spring support seat 42, and the other end is passed through the first spring support seat 41 and movably cooperates with the first spring support seat 41.
[0062] The connecting stud 48 is used to connect the first spring support seat 41 and the second spring connecting seat. Specifically, one end of the connecting stud 48 is fixedly connected to the second spring support seat 42, and the other end is movably matched with the first spring support seat 41 along the axial direction of the guide stud 1.
[0063] In this configuration, the first spring support seat 41 compresses the elastic member 43 under the action of gravity of the tensioner cylinder 2 , and the first spring support seat 41 moves toward the second spring support seat 42 along the axial direction of the connecting stud 48 .
[0064] When the supporting function is completed and the tensioner cylinder 2 is removed, the elastic member 43 will push the first spring support seat 41 back to the initial position.
[0065] It can be seen that the first spring support seat 41 and the second spring support seat 42 are installed on the tensioner cylinder 2 through the threaded connection 46. At this time, the first spring support seat 41 is movably arranged between the tensioner cylinder 2 and the second spring support seat 42. The weight of the tensioner cylinder 2 will be applied to the first spring support seat 41, and the elastic member 43 between the first spring support seat 41 and the second spring support seat 42 will be compressed. The compressed elastic member 43 moves along the axial direction of the connecting stud 48, thereby avoiding compression deformation of the elastic member 43, and also guiding the movement of the first spring support seat 41, thereby avoiding displacement between the first spring support seat 41 and the second spring support seat 42 due to the gravity of the tensioner cylinder 2.
[0066] Preferably, the elastic member 43 is a spring, and there are multiple elastic members 43 ; the multiple springs are evenly spaced and arranged around the outer circumference of the elastic support mechanism 4 .
[0067] The elastic members 43 are evenly distributed to improve the force stability of the tensioner cylinder 2 .
[0068] In one embodiment, the first spring support seat 41 is arranged close to one side of the tensioner cylinder 2 ; the second spring support seat 42 is provided with a bearing support plate 421 on the side away from the first spring support seat 41 , and one end of the support nut 5 abuts against the bearing support plate 421 .
[0069] The bearing support plate 421 is used to support the first spring support seat 41 and the second spring support seat 42 , thereby improving the supporting stability of the support nut 5 for the first spring support seat 41 and the second spring support seat 42 .
[0070] It can be seen that the circumferential dimension of the bearing support plate 421 is larger than the circumferential dimension of the bearing 45 .
[0071] Because the support nut 5 is small in size, the support nut 5 needs to support the elastic support mechanism 4. The inner ring of the bearing 45 in the elastic support mechanism 4 is movable. In order to avoid affecting the movement of the bearing 45, a bearing support plate 421 is arranged at the bottom of the second spring support seat 42. The bearing support plate 421 is spaced apart from the bearing 45 and will not affect the movement of the inner ring of the bearing 45.
[0072] Specifically, a mounting bracket is provided on the side of the second spring support seat 42 facing away from the first spring support seat 41. The mounting bracket is installed on the second spring support seat 42 and has a mounting groove. The bottom of the mounting bracket is spaced apart from the bearing 45, so the bearing support plate 421 is clamped in the mounting groove, and the bearing support plate 421 will not affect the movement of the bearing 45.
[0073] In summary, the main bolt tensioner installation device of the nuclear main pump of the present invention uses the center hole thread of the main bolt 3 as the device installation interface, no additional interface is required, and the installation device is very small in size, so the installation process will not affect the surrounding accessories of the main pump.
[0074] The elastic support mechanism 4 is used to support the tensioner cylinder 2, and an upward thrust is continuously provided during the installation of the tensioner cylinder 2. The main bolt 3 thread is not required to bear the weight of the tensioner, thereby avoiding thread damage.
[0075] Please refer to Figure 5 The present invention also proposes a method for installing a main bolt tensioner of a nuclear main pump, which is implemented by using the above-mentioned main bolt tensioner installation device of the nuclear main pump. The installation method includes:
[0076] Step 1: arrange the elastic support mechanism and the tensioner cylinder sleeve on the outside of the guide stud, and connect the elastic support mechanism to the tensioner cylinder;
[0077] Step 2: Install a support nut on the outside of the guide stud, and screw the support nut in so that the elastic support mechanism is in an elastic compression state;
[0078] Step 3: Move the tensioner cylinder to below the main bolt and connect the guide stud to the main bolt;
[0079] Step 4: Connect the tensioner cylinder upward to the main bolt by rotating the tensioner cylinder and the support nut synchronously.
[0080] It can be seen that the elastic force of the elastic support mechanism is consistent with the gravity of the tensioner cylinder.
[0081] The guide stud is used to connect with the main bolt, and the guide stud is used as the basis to install the elastic support mechanism, the tensioner cylinder and the support nut on the guide stud. The support nut can support the elastic support mechanism and the tensioner cylinder. In this way, during the upward movement of the tensioner cylinder and the installation of the main bolt, the gravity of the tensioner cylinder itself will not affect the thread between the tensioner cylinder and the main bolt, thereby avoiding damage to the main bolt and the tensioner cylinder structure. At the same time, the upward movement of the tensioner cylinder only requires rotation, and the overhead installation is also very convenient.
[0082] That is, the present invention can install the main bolt tensioner upward without affecting the surrounding accessories. Through the tensioner installation method of the present invention, difficulties such as limited on-site space and high-altitude operations can be overcome, making the bolt tensioner installation process simple and easy to operate.
[0083] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "install", "connect", "connect", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can also be a mechanical connection. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0084] The present application uses specific words to describe the embodiments of the present application. For example, "one embodiment", "an embodiment", and / or "some embodiments" refer to a certain feature, structure or characteristic related to at least one embodiment of the present application. Therefore, it should be emphasized and noted that "one embodiment" or "an embodiment" or "an alternative embodiment" mentioned twice or multiple times in different positions in this specification does not necessarily refer to the same embodiment. In addition, some features, structures or characteristics in one or more embodiments of the present application can be appropriately combined.
[0085] Although the present invention is disclosed as above with preferred embodiments, it is not intended to limit the present invention. Any person skilled in the art may make possible changes and modifications without departing from the spirit and scope of the present invention. Therefore, any modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the protection scope defined by the claims of the present invention.
Claims
1. A nuclear main pump main bolt tensioner installation device, characterized in that: include: A guide stud, one end of which is passed through the tensioner cylinder and is threadedly connected to a center hole provided on the main bolt; An elastic support mechanism, which is sleeved on the outside of the guide stud and located at the bottom of the tensioner cylinder and connected to the tensioner cylinder; A support nut is sleeved on the guide stud, and one end of the support nut abuts against the elastic support mechanism, and the support nut is located on a side of the elastic support mechanism away from the main bolt; wherein, The support nut moves with the movement of the tensioner cylinder along the guide stud.
2. The main bolt tensioner installation device for a nuclear main pump according to claim 1 is characterized in that: The elastic support mechanism comprises a first spring support seat and a second spring support seat which are stacked, and the first spring support seat and the second spring support seat are elastically connected via at least one elastic member.
3. The main bolt tensioner installation device for a nuclear main pump according to claim 2 is characterized in that: An installation gap is formed in the middle of the first spring support seat and the second spring support seat, and a bearing is sleeved in the installation gap; The guide stud is inserted into the inner ring of the bearing, and the first spring support seat and the second spring support seat are connected to the outer ring of the bearing.
4. The main bolt tensioner installation device for a nuclear main pump according to claim 3 is characterized in that: The first spring support seat and the second spring support seat are mounted to the tensioner cylinder by at least two threaded connectors.
5. The main bolt tensioner installation device for a nuclear main pump according to claim 3 is characterized in that: The first spring support seat and the second spring support seat cooperate to form a clamping chamber for clamping the elastic member, and a connecting stud is passed through the elastic member, one end of the connecting stud is fixedly connected to the second spring support seat, and the other end is passed through the first spring support seat and movably cooperates with the first spring support seat.
6. The main bolt tensioner installation device for a nuclear main pump according to claim 5 is characterized in that: The elastic member is a spring, and the number of the elastic members is multiple; The plurality of springs are evenly spaced and arranged around the outer circumference of the elastic support mechanism.
7. The main bolt tensioner installation device for a nuclear main pump according to claim 2 is characterized in that: The first spring support seat is arranged close to one side of the tensioner cylinder; A bearing support plate is provided on a side of the second spring support seat facing away from the first spring support seat, and one end of the support nut abuts against the bearing support plate.
8. The main bolt tensioner installation device for a nuclear main pump according to claim 7 is characterized in that: The circumferential dimension of the bearing support plate is larger than the circumferential dimension of the bearing.
9. A method for installing a main bolt tensioner of a nuclear main pump, characterized in that: The installation method is implemented by using the nuclear main pump main bolt tensioner installation device according to any one of claims 1 to 8, and the installation method includes: Step 1, arranging the elastic support mechanism and the tensioner cylinder sleeve on the outside of the guide stud, and connecting the elastic support mechanism with the tensioner cylinder; Step 2, installing a support nut on the outside of the guide stud, and screwing the support nut in so that the elastic support mechanism is in an elastic compression state; Step 3, move the tensioner cylinder to below the main bolt, and connect the guide stud to the main bolt; Step 4: Connect the tensioner cylinder upward to the main bolt by rotating the tensioner cylinder and synchronously rotating the support nut.
10. The method for installing a main bolt tensioner of a nuclear main pump according to claim 9, characterized in that: The elastic force of the elastic support mechanism is consistent with the gravity of the tensioner cylinder.
Citation Information
Patent Citations
Installing and regulating method and device of parabolic antenna sample plate
CN102059547A
Main reduction gearbox spline shaft rapid installation device
CN210550862U
Automatic fastening and returning device of hydraulic bolt stretcher
CN211072546U
Hollow bolt tensioner
CN214213661U
Bearing bushing and vibration-damping connection arrangement
DE202014103932U1