Dam body joint circulating grouting device

By designing a circulation grouting device in the joints of the dam body and using pipe frames and pipelines to form a circulation loop, the blockage and backflow problems in the traditional filling method are solved, and the slurry circulation is realized, ensuring the stability and overall stability of the dam body are ensured. sex.

CN119021221APending Publication Date: 2024-11-26ZHEJIANG GUANGCHUAN ENG CONSULTING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411078625.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The traditional intermittent slurry filling method can easily cause blockage of joint surfaces and pipeline accidents in the joints of the dam body, and it is difficult to maintain the circulating state of the slurry, affecting the stability and integrity of the dam body, especially when horizontal cracks appear in cold areas. More serious.

Method used

Design a dam joint circulation grouting device, by setting up a pipe frame in the dam grouting channel unit, an independent slurry inlet space and slurry outlet space is formed, and a circulation circuit is formed through the slurry inlet pipe and slurry outlet pipe to avoid slurry Reflow, use a slurry return tube and a check valve to ensure slurry circulating filling.

Benefits of technology

The slurry circulating filling is realized, which avoids the slurry backflow and blockage problems, ensures the stability and integrity of the dam body, and improves the efficiency and safety of grouting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021221A_ABST
    Figure CN119021221A_ABST
Patent Text Reader

Abstract

The invention discloses a dam body joint circulating grouting device which comprises a pipe frame, the inner side of the pipe frame is divided into independent length slurry inlet space and slurry outlet space, one side of the slurry inlet space is communicated with a slurry inlet pipe, the same side of the slurry outlet space is communicated with a slurry outlet pipe, and the slurry outlet pipe and the slurry inlet pipe are respectively communicated with two adjacent hole channels through pipelines. And a circulation loop is formed. According to the method, firstly, a hole channel unit needs to be drilled in the drilling process, the hole channel unit comprises two hole channels which are correspondingly drilled to be adjacent and locally communicated, so that one-way grouting can achieve grouting circulation, a grout outlet pipe and a grout inlet pipe which are communicated with the two adjacent dam foundation hole channels are pertinently arranged to be communicated through a pipeline, and a circulation loop is formed; and meanwhile, the slurry backflow problem is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of dam body joint grouting construction, in particular to a dam body joint circulation grouting device. Background Art

[0002] During the pouring of the dam, the seams parallel to the axis of the dam are called longitudinal seams, and the seams perpendicular to the axis of the dam are called transverse seams. Longitudinal seams are not good for the stress and stability of the dam body, and the design requires the use of cement slurry for grouting. The purpose of grouting is to pour the cementitious material into the joints of the dam body through the pipeline to make it evenly distributed, to cement the dam body into a whole to bear the force, and to transfer stress to ensure the stability and safe operation of the dam body. Dam body cracking is a common phenomenon, especially when horizontal cracks appear on the joint surface in cold weather, which may affect the integrity and stability of the dam body. If the cracks run through the upstream and downstream, water seepage will occur. The traditional grouting method is intermittent grouting, and the slurry cannot maintain a circulation state in the seam, which is easy to cause blockage of the seam surface and pipeline accidents.

[0003] This case was created to solve the above problems. Summary of the invention

[0004] 1. Technical issues to be solved

[0005] In view of the deficiencies in the prior art, the present invention provides an assembled building steel beam hoisting device and a construction method thereof, which solve the problems raised in the above-mentioned background technology.

[0006] (II) Technical solution

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: a dam body joint circulation grouting device, which is used on the grouting channel unit of the dam body, and the channel unit includes two corresponding adjacent and partially penetrated channels, including a pipe rack, and the inner side of the pipe rack is separated to form independent length slurry inlet space and slurry outlet space, a slurry inlet pipe is connected to one side of the slurry inlet space, and a slurry outlet pipe is connected to the same side of the slurry outlet space, wherein the slurry outlet pipe and the slurry inlet pipe are connected to the two adjacent channels respectively through pipelines, thereby forming a circulation loop.

[0008] As a preferred embodiment, the slurry outlet space and the slurry inlet space are further provided with a slurry return pipe, the lower end of the slurry return pipe leads to the same channel as the slurry inlet pipe, and the other end is connected from the slurry outlet space to the slurry inlet space, and a one-way valve is provided on the slurry return pipe.

[0009] As a preferred solution, further, the outflow direction of the slurry outlet space is downward, and the distal end of the reflux pipe is connected to the upper side of the slurry inlet space and flows downward into the slurry.

[0010] As a preferred solution, further, one or more connecting channels are opened between two adjacent channels so that the two channels are connected and interlinked.

[0011] A method for using a dam body joint circulation grouting device comprises the following steps:

[0012] Step 1: After the dam foundation excavation is accepted, the grouting holes are drilled, and two adjacent and partially connected holes need to be drilled;

[0013] Step 2: Place the slurry inlet pipe and the slurry outlet pipe on the pipe rack into the hole openings accordingly, and seal them with sealing plugs. When the slurry inlet pipe and the slurry outlet pipe cannot completely correspond to the hole positions, a hose can be used to achieve this;

[0014] Step 3: The slurry inlet pipe pours grout into the channel, and the slurry is discharged from the outlet space after entering the pipe rack through the outlet pipe. Finally, it reaches the mixing barrel, and finally pours grout into the channel through the grouting pump from the slurry inlet pipe, and this is repeated to form a closed slurry flow cycle.

[0015] (III) Beneficial effects

[0016] After adopting the above technical scheme, a dam body joint circulating grouting device provided by the present invention has the following beneficial effects compared with the prior art: firstly, a channel unit needs to be drilled when drilling a hole, and the channel unit includes two corresponding adjacent and partially connected channels, so that one-way grouting can realize the grouting circulation, and a slurry outlet pipe and a slurry inlet pipe connected to the two adjacent dam foundation channels are arranged respectively through pipelines, thereby forming a circulation loop, and avoiding the problem of slurry backflow during the period. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the pore unit of the present invention;

[0018] Figure 2 It is a schematic diagram of the horizontal direction of the channel unit of the present invention;

[0019] Figure 3 A cross-sectional front view of the first embodiment of the present invention is shown;

[0020] Figure 4 This is a cross-sectional front view of the second embodiment of the present invention.

[0021] In the figure, 1, pipe rack; 2, slurry inlet space; 3, slurry outlet space; 4, slurry inlet pipe; 5, slurry outlet pipe; 6, channel unit; 7, channel; 8, slurry return pipe; 9, one-way valve; 10, dam foundation; 11, sealing plug; 12, connecting channel. DETAILED DESCRIPTION

[0022] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments and with reference to the accompanying drawings.

[0023] like Figure 1-2 As shown, after the dam foundation excavation is accepted, the grouting holes are drilled. Secondly, the drilled holes are flushed before grouting. After cleaning, they are processed through the dam body joint circulating grouting device.

[0024] like Figure 3-4 As shown, as a first embodiment, a dam body joint circulation grouting device includes a pipe rack 1, and the inner side of the pipe rack 1 is divided into an independent length of slurry inlet space 2 and slurry outlet space 3. A slurry inlet pipe 4 is connected to one side of the slurry inlet space 2, and a slurry outlet pipe 5 is connected to the same side of the slurry outlet space 3, wherein the slurry outlet pipe 5 and the slurry inlet pipe 4 are respectively connected to the two adjacent dam foundation 10 channels 7 through pipelines, thereby forming a circulation loop. The slurry inlet pipe 4, the slurry outlet pipe 5 and the channel 7 are connected with a sealing plug 11 to complete the orifice plugging to prevent leakage caused by a large slurry flow.

[0025] A channel unit 6 needs to be drilled when drilling a hole. The channel unit 6 includes two corresponding adjacent and partially interpenetrating channels 7, so that grouting circulation can be achieved by unidirectional grouting.

[0026] Secondly, the radial dimension of the slurry outlet pipe 5 is preferably larger than the radial dimension of the slurry inlet pipe 4 to avoid the problem of slurry backflow during the circulation process.

[0027] like Figure 3 As shown, as a second embodiment, a return pipe 8 is provided between the slurry discharge space 3 and the slurry inlet space 2, the lower end of the return pipe 8 is connected to one of the channels 7, and the other end is connected from the slurry discharge space 3 to the slurry inlet space 2. A one-way valve 9 is provided on the return pipe 8, so that the slurry can only enter the return pipe 8 and cannot be discharged. The purpose of setting the return pipe 8 is to play a certain buffering and diversion effect when the slurry flow is too large and backflow occurs.

[0028] The outflow direction of the slurry outlet space 3 is downward, and the distal end of the reflux pipe is connected to the upper side of the slurry inlet space 2, so that the slurry pressure discharged upward from the reflux tank is smaller, making the discharge of the reflux pipe relatively smoother.

[0029] Furthermore, the slurry returned from the return pipe is all returned to the mixing barrel, and then the slurry is configured in situ, such as configuring the required water-cement ratio, and then continued to be returned to the slurry inlet pipe 4 to form a circulating grouting process, thereby achieving a circulating grouting process.

[0030] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A dam body joint circulation grouting device, used on the grouting channel unit of the dam body, the channel unit includes two corresponding adjacent and partially connected channels, characterized in that: The invention comprises a pipe rack, the inner side of which is divided into a pulp inlet space and a pulp outlet space of independent lengths, a pulp inlet pipe is connected to one side of the pulp inlet space, and a pulp outlet pipe is connected to the same side of the pulp outlet space, wherein the pulp outlet pipe and the pulp inlet pipe are respectively connected to two adjacent channels through pipelines to form a circulation loop.

2. A dam joint circulation grouting device according to claim 1, characterized in that: The slurry discharge space and the slurry inlet space are provided with a slurry return pipe, the lower end of the slurry return pipe leads to the same channel as the slurry inlet pipe, and the other end is connected from the slurry discharge space to the slurry inlet space, and a one-way valve is provided on the slurry return pipe.

3. A dam joint circulation grouting device according to claim 2, characterized in that: The outflow direction of the slurry outlet space is downward, and the distal end of the reflux pipe is connected to the upper side of the slurry inlet space and flows downward into the slurry.

4. The dam body joint circulation grouting device according to claim 1, characterized in that: One or more connecting channels are provided between two adjacent holes so that the two holes are connected and interlinked.

5. The method for using the dam body joint circulation grouting device according to claim 1 comprises the following steps: Step 1: After the dam foundation excavation is accepted, the grouting holes are drilled, and two adjacent and partially connected holes need to be drilled; Step 2: Place the slurry inlet pipe and the slurry outlet pipe on the pipe rack into the hole openings accordingly, and seal them with sealing plugs. When the slurry inlet pipe and the slurry outlet pipe cannot completely correspond to the hole positions, a hose can be used to achieve this; Step 3: The slurry inlet pipe pours grout into the channel, and the slurry is discharged from the outlet space after entering the pipe rack through the outlet pipe. Finally, it reaches the mixing barrel, and finally pours grout into the channel through the grouting pump from the slurry inlet pipe, and this is repeated to form a closed slurry flow cycle.