Storage ring tunnel sawtooth wall crack control formwork structure and construction method

By using a combined structure of support formwork and prestressed anchors in the storage ring tunnel serrated wall construction, prestressed tensioning is performed in stages, which solves the crack problem in serrated wall construction and improves the rigidity and crack resistance of the wall performance.

CN119021272AActive Publication Date: 2024-11-26SHANGHAI CONSTRUCTION FIRST CONSTRUCTION (GROUP) CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411363953.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-28
Publication Date
2024-11-26
Estimated Expiration
2044-09-28

AI Technical Summary

Technical Problem

The serrated walls in the storage ring tunnel are prone to cracks during construction, which affects the normal progress of scientific research and experiments. It is difficult for the existing technology to effectively control the cracking risk of serrated walls.

Method used

Using a structure including support formwork and prestressed anchors, the first tensioning formwork and the post-tensioning formwork are in a 'L' shape, and the inducing joints and prestressed anchors are set. Stress is released through staged prestressing tensioning and concrete pouring. , avoid cracks.

Benefits of technology

Effectively reduce the occurrence of cracks in serrated walls, strengthen the rigidity and crack resistance of the walls, and improve the overall construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021272A_ABST
    Figure CN119021272A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel construction, in particular to a storage ring tunnel sawtooth wall crack control formwork structure and a construction method.The storage ring tunnel sawtooth wall crack control formwork structure comprises a supporting formwork and a pre-stressed anchor, and the supporting formwork comprises a pre-tensioning formwork and a post-tensioning formwork; reinforcement cage nets are arranged in the pre-tensioning template and the post-tensioning template; the pre-tensioning formworks and the post-tensioning formworks are both in an L shape, and the multiple pre-tensioning formworks and the multiple post-tensioning formworks are connected end to end to form the storage ring tunnel sawtooth wall formwork. Two partition plates are arranged in the post-tensioning template, and an inducing seam is formed between the two partition plates; according to the formwork structure, an inducing joint is arranged on a post-tensioning formwork, prestress tensioning is carried out on the wall body of a pre-tensioning side formwork section, so that the inducing joint is in an expansion trend to release the stress of the pre-tensioning wall section, and then after the inducing joint is poured, prestress tensioning is carried out on the wall body of the post-tensioning side formwork. Crack control can be conveniently conducted on the whole sawtooth wall, and the rigidity and the crack resistance of the wall are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel construction, and in particular to a storage ring tunnel sawtooth wall crack control template structure and a construction method. Background Art

[0002] The storage ring tunnel is the core of the high-energy synchrotron radiation light source project and the most important part of scientific research experiments. The storage ring tunnel is a ring-shaped structure used to accommodate and maintain the stable operation of high-energy particle beams or electron beams. It provides a closed environment to ensure that the particle beams can be accelerated, collided or produce synchrotron radiation without external interference. Storage ring tunnels usually have specific geometric shapes and sizes to meet the needs of different experiments.

[0003] The surrounding side of the storage ring tunnel is usually surrounded by multiple sections of serrated walls, which form a circular area. The storage ring tunnel is located on the inner side of the multiple sections of serrated walls. The serrated walls are "L" shaped. Each section of the serrated wall includes a long wall and a short wall. The long wall and the short wall are arranged vertically so that high-energy particles can collide and move in the tunnel surrounded by the serrated walls.

[0004] During the construction of the storage ring, multiple sections of serrated walls are cast in sections and finally connected into a whole. Due to the long circumference of the storage ring tunnel and the large span of the long wall of the serrated wall, cracks are prone to occur on the side walls of the long wall, affecting the normal progress of scientific research experiments. Summary of the invention

[0005] In order to control the risk of cracking of the sawtooth wall, the present application provides a storage ring tunnel sawtooth wall crack control template structure and construction method.

[0006] The present application provides a storage ring tunnel sawtooth wall crack control template structure and construction method using the following technical solutions: A storage ring tunnel sawtooth wall crack control template structure, comprising a support template and a prestressed anchor, the support template comprising a pre-tensioning template and a post-tensioning template; the pre-tensioning template and the post-tensioning template are both provided with a steel cage mesh; the pre-tensioning template and the post-tensioning template are both "L" shaped, a plurality of the pre-tensioning templates and the post-tensioning templates are arranged at intervals, and the plurality of the pre-tensioning templates and the post-tensioning templates are connected end to end to form a storage ring tunnel sawtooth wall template; The pre-tensioning formwork includes a pre-tensioning elongated side formwork section and a pre-tensioning short side formwork section, and the post-tensioning formwork includes a post-tensioning elongated side formwork section and a post-tensioning short side formwork section; one end of the pre-tensioning elongated side formwork section is connected to the pre-tensioning short side formwork section, and the other end is connected to the post-tensioning short side formwork section; a plurality of prestressed anchors are respectively arranged in the pre-tensioning elongated side formwork section and the post-tensioning elongated side formwork section, and the prestressed anchors are fixedly connected to the steel cage mesh; Two partitions are arranged in the post-tensioning template, the two partitions are arranged in parallel, and an induced seam is formed between the two partitions.

[0007] By adopting the above technical scheme, the template structure is set, and an induced joint is set on the post-tensioned side template section. When the serrated wall of the storage ring is constructed, the supporting template is cast and constructed, and the wall of the pre-tensioned side template section after casting is prestressed, so that the wall of the pre-tensioned side template section shrinks. At the same time, during the tensioning, the induced joint in the post-tensioned side template section tends to expand, and the stress inside the wall of the pre-tensioned side template section is released from the position of the induced joint; after the tensioning of the wall of the pre-tensioned side template section is completed, the induced joint is cast, and then the wall of the post-tensioned side template section is tensioned, so that the wall of the post-tensioned side template section shrinks, which is convenient for avoiding cracks in the serrated wall and improving the rigidity of the serrated wall and the overall crack resistance.

[0008] In a specific possible implementation scheme, the prestressed anchor comprises a prestressed steel strand, a fixed end anchor assembly and a tension end anchor assembly; The fixed end anchor assembly and the tension end anchor assembly are respectively arranged at both ends of the length direction of the prestressed steel strand; the prestressed steel strand is fixedly arranged on the steel cage net, and the extension direction of the prestressed steel strand is parallel to the length direction of the pre-tensioned elongated side template section or the post-tensioned elongated side template section; The fixed-end anchor assembly comprises an extruded anchor head, a fixed-end pressure plate and a fixed-end spiral rib; the extruded anchor head is coaxially fixedly connected to one end of the prestressed steel strand, the fixed-end pressure plate and the fixed-end spiral rib are both sleeved on the prestressed steel strand, the fixed-end pressure plate is located between the extruded anchor head and the fixed-end spiral rib, and the two side walls of the fixed-end pressure plate are respectively connected to the extruded anchor head and the fixed-end spiral rib; The tensioning end anchor assembly comprises a tensioning end spiral rib, a tensioning end pressure plate, a cavity mold and a tensioning anchor; the tensioning end spiral rib, the tensioning end pressure plate and the cavity mold are all sleeved on the prestressed steel strand, the tensioning end pressure plate is located between the tensioning end spiral rib and the cavity mold, one end of the tensioning end pressure plate is fixedly connected to the tensioning end spiral rib, and the other end is abutted against the cavity mold; one end of the cavity mold away from the tensioning end pressure plate is abutted against the end template of the first tensioning elongated side template section or the second tensioning elongated side template section; the tensioning anchor is arranged in the inner cavity of the cavity mold; The prestressed steel strand passes through the end formwork of the pre-tensioned elongated side formwork section or the post-tensioned elongated side formwork section close to the tensioning end anchor assembly.

[0009] By adopting the above technical scheme, the prestressed anchor is set, and when prestressing is carried out, the prestressed steel strand and the fixed-end anchor assembly are buried in the poured concrete, and the fixed-end pressure plate supports the extrusion anchor head, so as to avoid the prestressed steel strand driving the extrusion anchor head to move in the concrete when the prestressed steel strand is subjected to force, thereby affecting the quality of tensioning; at the same time, the tensioning end anchor assembly, the tensioning end spiral reinforcement, the hole mold and the tensioning end pressure plate are all buried in the concrete wall, and the hole mold provides an installation space for the tensioning anchor. During tensioning, by applying force to one end of the prestressed steel strand passing through the hole mold, the tensioning anchor squeezes the hole mold and the tensioning end pressure plate, and the tensioning end pressure plate supports the tensioning anchor and the hole mold, so as to avoid damage to the concrete wall.

[0010] In a specific possible implementation scheme, the tensioning end anchor assembly also includes a clip, the tensioning anchor is provided with an anchor hole, the clip is engaged in the anchor hole, the tensioning anchor is embedded in the inner cavity of the hole mold, and the prestressed steel strand extends out of the hole mold at one end and passes through the clip; the end of the clip is flush with the side wall of the tensioning anchor, and the end of the prestressed steel strand away from the fixed end anchor assembly is sleeved with a tensioning jack, and the end face of the tensioning jack is abutted against the end face of the tensioning anchor away from the tensioning end pressure plate.

[0011] By adopting the above technical solution, the clip is engaged in the anchor hole, and the prestressed steel strand is passed through the clip. The tensioning jack applies force to the prestressed steel strand to stretch the prestressed steel strand. The clip limits the movement direction of the prestressed steel strand, thereby preventing the prestressed steel strand from shrinking and improving the quality of prestressed stretching.

[0012] In a specific possible implementation scheme, the supporting formwork further includes diagonal braces, and a plurality of the diagonal braces are respectively arranged on both sides of the supporting formwork.

[0013] By adopting the above technical solution, the inclined braces are provided to support the side walls of the support formwork that are far away from each other. When pouring the wall, it is convenient to prevent the support formwork from tilting to one side as a whole, thereby affecting the verticality of the wall.

[0014] In a specific feasible implementation scheme, the support formwork also includes an operating platform and a plurality of support rods, wherein the operating platform is fixedly disposed on the top wall of the support formwork, and one end of the support rod is fixedly connected to the outer wall of the support formwork, and the other end is fixedly connected to the bottom wall of the operating platform, and the plurality of support rods are evenly distributed along the length direction of the operating platform.

[0015] By adopting the above technical solution, the operating platform is set up, which makes it convenient to set up equipment and tools on the operating platform during wall pouring construction. At the same time, it is also convenient for operators to observe the quality and progress of the construction through the operating platform.

[0016] A construction method for a storage ring tunnel serrated wall crack control template structure comprises the following steps: S1. Measure and mark, determine the construction position of the storage ring sawtooth wall according to the requirements of the design drawings, reserve the induction joint, and determine the construction position of the sawtooth wall on both sides of the induction joint; S2. Binding and welding of steel cages within the construction position of the sawtooth wall; S3, installing prestressed anchors on the steel cage net; S4. Set up supporting formwork and operating platform around the steel cage; S5, concrete pouring; S6, prestressing the wall of the multiple sections of pre-tensioned long side formwork sections multiple times; S7. Remove the supporting formwork and operating platform, and perform grouting backfill on the induced joints; S8. Prestress the walls of multiple sections of post-tensioned long side formwork sections respectively; the overall construction of the storage ring serrated wall is completed.

[0017] By adopting the above technical solution, the casting position of the storage ring serrated wall is first measured and marked to determine the construction position of the serrated wall and the reserved position of the induced joint. Then, according to the design requirements, the steel cage mesh is tied and welded in the marked area of ​​the serrated wall, and then the prestressed anchor is installed on the steel cage mesh to provide preliminary preparation for prestressing. Then, the support formwork and the operating platform are installed on the surrounding side of the steel cage mesh, and the partition is installed in the post-tensioning long side formwork section to form the induced joint. Then, the support formwork is provided through the operating platform. Concrete is poured in the cavity of the plate to form a sawtooth wall. After the concrete is solidified and formed, the wall of the pre-tensioned long side formwork section after pouring is prestressed to shrink the wall of the pre-tensioned long side formwork section. The wall of multiple sections of pre-tensioned long side formwork sections is constructed in the same way, the supporting formwork and the operating platform are removed, the induced joint is poured, and finally the wall of multiple sections of post-tensioned long side formwork sections is tensioned to shrink the wall of the post-tensioned long side formwork section, thereby improving the rigidity of the sawtooth wall and the overall crack resistance.

[0018] In a specific implementation scheme, S6 comprises the following steps: S61. After the concrete strength reaches 40%, the end formwork of the pre-tensioned long side formwork section close to the tensioning end is removed, and the wall of the pre-tensioned long side formwork section is tensioned for the first time, and the tensioning control stress is maintained at 50% of the design stress; S62. After the concrete strength reaches 80%, the wall of the pre-tensioned long side formwork section is tensioned for the second time, and the tension control stress is maintained at 110% of the design stress; S63, remove the tensioning jack and cut off the excess prestressed steel strands; S64, sealing the anchor; injecting concrete into the cavity mold to seal the prestressed steel strand; S65. Repeat steps S61-S64 to prestress the walls of multiple sections of pre-tensioned long side formwork.

[0019] By adopting the above technical solution, tensioning is carried out when the concrete strength of the wall is 40% and 80% respectively, so as to ensure that the tensioning of the prestressed steel strands meets the design requirements, thereby improving the tensioning quality and overall stability of the wall.

[0020] In a specific implementation scheme, the S61 comprises the following steps: S611. Use the testing equipment to test the concrete wall. After the concrete strength reaches 40%, remove the end formwork of the pre-tensioned long side formwork section close to the tensioning end anchor assembly, and pull out the plastic plug mold of the cavity mold to expose the inner cavity of the cavity mold. S612, clean the concrete and debris in the cavity of the hole mold, embed the tension anchor into the cavity of the hole mold, and place the prestressed steel strand in the anchor hole of the tension anchor; then sleeve the clip on the prestressed steel strand, move the clip, so that the clip is engaged in the anchor hole, and the end face of the clip is flush with the end face of the tension anchor; S613, sleeve the tensioning jack on the prestressed steel strand, the end of the tensioning jack is in contact with the side wall of the tensioning anchor, connect the hydraulic drive device to the tensioning jack, adjust the hydraulic drive device so that the tensioning jack applies 10% of the design stress, the tensioning jack pulls the prestressed steel strand to stretch, after holding the load for 2 minutes, increase the force of the tensioning jack to 20% of the design stress, hold the load for another 2 minutes, continue to increase the force of the tensioning jack to 50% of the design stress, and unload to zero after holding the load for 2 minutes; S614. Remove the tensioning jack and temporarily cover the hole mold and the working surface of the prestressed tensioning end.

[0021] By adopting the above technical solution, during the first tensioning, tension is applied to the prestressed steel strands in stages, and the local loads of the prestressed steel strands and the serrated wall are slowly changed, thereby facilitating avoiding damage to the steel strands and the serrated wall.

[0022] In a specific implementation scheme, the S62 comprises the following steps: S621. Use testing equipment to test the concrete wall. After the concrete strength reaches 80%, remove the temporary cover on the working surface of the prestressed tension end. S622. Reinstall the tensioning jack and the hydraulic drive device; adjust the hydraulic drive device so that the tensioning jack applies 50% of the design stress. After holding the load for 2 minutes, increase the force of the tensioning jack to 110% of the design stress. After holding the load for 2 minutes, unload the load to zero.

[0023] By adopting the above technical solution, during the second tensioning, the load of the prestressed steel strands is gradually increased to 110% of the design stress for over-tensioning, thereby avoiding stress relaxation of the first-tensioned long side formwork section wall when tensioning the post-tensioned long side formwork section wall, thereby improving the tensioning quality and overall stability of the serrated wall.

[0024] In a specific implementation scheme, the S8 comprises the following steps: S81, pulling out the plastic plug mold in the cavity mold on one side of the tensioning end anchor assembly of the rear tensioning long side template section, so that the inner cavity of the cavity mold is exposed; S82, cleaning the concrete and debris in the cavity of the hole mold, embedding the tension anchor into the cavity of the hole mold, and positioning the prestressed steel strand in the anchor hole of the tension anchor; then sleeve the clip on the prestressed steel strand, and move the clip so that the clip is engaged in the anchor hole, and the end face of the clip is flush with the end face of the tension anchor; S83, sleeve the tensioning jack on the prestressed steel strand, the end of the tensioning jack is in contact with the side wall of the tensioning anchor, connect the hydraulic drive device to the tensioning jack, adjust the hydraulic drive device so that the tensioning jack applies 50% of the design stress, the tensioning jack pulls the prestressed steel strand to stretch, after holding the load for 2 minutes, increase the force of the tensioning jack to 80% of the design stress, hold the load for another 2 minutes, continue to increase the force of the tensioning jack to 105% of the design stress, and unload to zero after holding the load for 2 minutes; S83, remove the tensioning jack and cut off the excess prestressed steel strands; S84, Anchor sealing: Inject concrete into the cavity mold to seal the prestressed steel strand.

[0025] By adopting the above technical solution, the post-tensioned side formwork section wall is tensioned, which makes it easy to avoid cracks in the post-tensioned side formwork section wall, thereby improving the overall strength and crack resistance of the serrated wall.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. The pre-tensioned elongated side formwork section wall is tensioned in stages, and the tension of the prestressed steel strand assembly is increased to slowly change the local load of the prestressed steel strand and the serrated wall, so that the stress is released from the induced joint, which is convenient for reducing the cracks in the pre-tensioned elongated side formwork section, strengthening the crack control of the serrated wall, and also convenient for avoiding damage to the steel strand and the serrated wall.

[0027] 2. The pre-tensioned long side formwork section wall is tensioned multiple times to facilitate crack control at each stage of the solidification of the pre-tensioned long side formwork section wall concrete.

[0028] 3. Over-tension the wall of the pre-tensioned long side formwork section to avoid stress relaxation in the pre-tensioned long side formwork section after the post-tensioned long side formwork section wall is tensioned, which affects the tensioning quality.

[0029] 4. After the induced joint is backfilled, a single over-tensioning is performed on the post-tensioned side formwork section wall to reduce the occurrence of cracks in the post-tensioned side formwork section wall and further improve the overall crack resistance of the serrated wall. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the overall structure of a serrated wall of a storage ring tunnel in this embodiment.

[0031] Figure 2 It is a partial enlarged view of a serrated wall of a storage ring tunnel in this embodiment.

[0032] Figure 3 It is a schematic diagram of a storage ring tunnel sawtooth wall crack control template structure of this embodiment.

[0033] Figure 4 This is a schematic diagram of the installation of prestressed anchors of a storage ring tunnel serrated wall crack control template structure in this embodiment.

[0034] Figure 5 yes Figure 4 The enlarged view of part A is intended to illustrate the fixed end anchor assembly.

[0035] Figure 6 yes Figure 4 The enlarged view of part B is intended to illustrate the tension end anchor assembly.

[0036] Figure 7 It is a schematic diagram of the tensioning of a serrated wall of a storage ring tunnel in this embodiment.

[0037] Figure 8 yes Figure 7 The enlarged view of part C is intended to illustrate the installation structure of the tensioning jack and the tensioning anchor.

[0038] Description of the drawings: 1. Support formwork; 11. Pre-tensioning formwork; 111. Pre-tensioning long side formwork section; 112. Pre-tensioning short side formwork section; 12. Post-tensioning formwork; 121. Post-tensioning long side formwork section; 1211. Partition; 122. Post-tensioning short side formwork section; 13. Steel cage mesh; 14. Induced joint; 15. Diagonal brace; 16. Operating platform; 17. Support rod; 2. Prestressed anchor; 21. Prestressed steel strand; 22. Fixed end anchor assembly; 221. Extruded anchor head; 222. Fixed end pressure plate; 223. Fixed end spiral reinforcement; 23. Tensioning end anchor assembly; 231. Tensioning end spiral reinforcement; 232. Tensioning end pressure plate; 233. Hole mold; 234. Tensioning anchor; 235. Clip; 3. Tensioning jack. DETAILED DESCRIPTION

[0039] The embodiments of the present application disclose a storage ring tunnel sawtooth wall crack control template structure and a construction method.

[0040] Reference Figure 1 and Figure 2 The serrated wall of the storage ring tunnel is formed by connecting multiple sections of independent serrated walls end to end, and an induced joint 14 is arranged between two adjacent sections of the serrated wall.

[0041] Reference Figure 3 and Figure 4 A storage ring tunnel sawtooth wall crack control template structure, a single section sawtooth wall is provided with a support template 1 and a prestressed anchor 2 before construction, the support template 1 includes a pre-tensioning template 11 and a post-tensioning template 12; a steel cage 13 is provided in the pre-tensioning template 11 and the post-tensioning template 12; the pre-tensioning template 11 and the post-tensioning template 12 are both in an "L" shape, a plurality of pre-tensioning templates 11 and the post-tensioning template 12 are arranged at intervals, and a plurality of pre-tensioning templates 11 and the post-tensioning template 12 are connected end to end to form a storage ring tunnel sawtooth wall template; the pre-tensioning template 11 includes a pre-tensioning long side template segment 111 with a pre-tensioning long side template segment 111 and a pre-tensioning long side template segment 112; and the pre-tensioned short side template section 112, the post-tensioned template 12 includes a post-tensioned elongated side template section 121 and a post-tensioned short side template section 122; one end of the pre-tensioned elongated side template section 111 is connected to the pre-tensioned short side template section 112, and the other end is connected to the post-tensioned short side template section 122; a plurality of prestressed anchors 2 are respectively arranged in the pre-tensioned elongated side template section 111 and the post-tensioned elongated side template section 121, and the prestressed anchors 2 are fixedly connected to the steel cage mesh 13; two partitions 1211 are arranged in the post-tensioned template 12, the two partitions 1211 are arranged in parallel, and an induced joint 14 is formed between the two partitions 1211. A plurality of diagonal braces 15 are respectively arranged on both sides of the support template 1, and the plurality of diagonal braces 15 provide lateral support for the support template 1 to prevent the support template 1 from tilting and affecting the construction quality. An operating platform 16 is fixedly provided on the top of the supporting formwork 1, and a support rod 17 is provided between the supporting formwork 1 and the operating platform 16. One end of the support rod 17 is fixedly connected to the outer wall of the supporting formwork 1, and the other end is fixedly connected to the bottom wall of the operating platform 16. A plurality of support rods 17 are evenly distributed along the length direction of the operating platform 16. When performing wall pouring construction, the operator sets up equipment and tools on the operating platform 16, and the operator can observe the quality and progress of the construction through the operating platform 16.

[0042] Reference Figure 4The prestressed anchor 2 includes a prestressed steel strand 21, a fixed-end anchor assembly 22 and a tensioning-end anchor assembly 23; the fixed-end anchor assembly 22 and the tensioning-end anchor assembly 23 are respectively arranged at both ends of the length direction of the prestressed steel strand 21; the prestressed steel strand 21 is fixedly arranged on the steel cage mesh 13, and the extension direction of the prestressed steel strand 21 is parallel to the length direction of the pre-tensioned side formwork section 111 or the post-tensioned side formwork section 121; the prestressed steel strand 21 on the post-tensioned side formwork section 121 passes through the two partitions 1211 and the induced seam 14.

[0043] Reference Figure 5 The fixed-end anchor assembly 22 includes an extruded anchor head 221, a fixed-end pressure plate 222 and a fixed-end spiral rib 223; the extruded anchor head 221 is coaxially fixedly connected to one end of the prestressed steel strand 21, the fixed-end pressure plate 222 and the fixed-end spiral rib 223 are both sleeved on the prestressed steel strand 21, the fixed-end pressure plate 222 is located between the extruded anchor head 221 and the fixed-end spiral rib 223, and the two side walls of the fixed-end pressure plate 222 are respectively connected to the extruded anchor head 221 and the fixed-end spiral rib 223.

[0044] Reference Figure 6 The tensioning end anchor assembly 23 includes a tensioning end spiral rib 231, a tensioning end pressure plate 232, a hole mold 233 and a tensioning anchor 234; the tensioning end spiral rib 231, the tensioning end pressure plate 232 and the hole mold 233 are sleeved on the prestressed steel strand 21, the tensioning end pressure plate 232 is located between the tensioning end spiral rib 231 and the hole mold 233, one end of the tensioning end pressure plate 232 is fixedly connected to the tensioning end spiral rib 231, and the other end is abutted against the hole mold 233; one end of the hole mold 233 away from the tensioning end pressure plate 232 is abutted against the end mold of the first tensioning elongated side template segment 111 or the second tensioning elongated side template segment 121; the tensioning anchor 234 is arranged in the inner cavity of the hole mold 233; the prestressed steel strand 21 passes through the first tensioning elongated side template segment 111 or the second tensioning elongated side template segment 121 close to the end mold of the tensioning end anchor assembly 23.

[0045] Reference Figure 7 and Figure 8 The tensioning end anchor assembly 23 also includes a clip 235. An anchor hole is provided on the tensioning anchor 234. The clip 235 is engaged in the anchor hole. When prestressing is performed, the tensioning anchor 234 is embedded in the inner cavity of the hole mold 233, and one end of the prestressed steel strand 21 extends out of the hole mold 233 and passes through the clip 235; the end of the clip 235 is flush with the side wall of the tensioning anchor 234, and the end of the prestressed steel strand 21 away from the fixed end anchor assembly 22 is sleeved with a tensioning jack 3, and the end face of the tensioning jack 3 is in contact with the end face of the tensioning anchor 234 away from the tensioning end pressure plate 232.

[0046] The implementation principle of the crack control template structure of the serrated wall of a storage ring tunnel in the present embodiment is as follows: when constructing the serrated wall of the storage ring tunnel, multiple single-segment serrated walls are enclosed to form an annular area, and the storage ring tunnel is arranged on the inner side of the serrated wall. The span of the serrated wall is large, and there is a risk of cracking after the construction is completed, causing damage to the wall structure and affecting the quality of the building. When constructing the serrated wall, firstly, measurement and marking are carried out to determine the casting position of the serrated wall, and then the steel cage mesh 13 is tied and welded in the marked area of ​​the serrated wall, and then the prestressed anchor 2 is installed on the steel cage mesh 13 to provide preliminary preparation for prestressing, and then the pre-tensioning template 11 and the post-tensioning template 12 are installed on the surrounding side of the steel cage mesh 13, and the pre-tensioning template 11 and the post-tensioning template 12 together constitute the support template 1, and the induced seam 14 is set on the post-tensioning long side template segment 121 An operating platform 16 is arranged on the top of the supporting formwork 1, and then the position of the induced joint 14 is reserved through the operating platform 16, and concrete is poured into the cavity of the supporting formwork 1 to form a sawtooth wall. The wall of the first tensioned elongated side formwork section 111 after pouring is prestressed, so that the wall of the first tensioned elongated side formwork section 111 shrinks. At the same time, during the tensioning, the induced joint 14 in the post-tensioned elongated side formwork section 121 tends to expand, and the stress inside the wall of the first tensioned elongated side formwork section 111 is released from the position of the induced joint 14; after the wall of the first tensioned elongated side formwork section 111 is tensioned, the induced joint 14 is poured, and then the wall of the post-tensioned elongated side formwork section 121 is tensioned, so that the wall of the post-tensioned elongated side formwork section 121 shrinks, so as to avoid cracks in the sawtooth wall and improve the rigidity of the sawtooth wall and the overall crack resistance.

[0047] In a second aspect, a construction method of a storage ring tunnel serrated wall crack control template structure comprises the following steps: S1. Measure and mark, determine the construction position of the storage ring serrated wall according to the requirements of the design drawings, reserve the induction joint 14, and determine the construction position of the serrated wall on both sides of the induction joint 14.

[0048] S2. Binding and welding of the steel cage mesh 13 are performed within the construction position of the sawtooth wall.

[0049] S3. Install the prestressed anchor 2 on the steel cage mesh 13; first, sleeve an outer sheath on the prestressed steel strand 21. The outer sheath can be set as a high-density polyethylene extruded plastic tube, and a rust-proof and anti-corrosion lubricating grease coating is used between the plastic tube and the prestressed steel strand 21. Then use an extruder to install the extruded anchor head 221 at one end of the prestressed steel strand 21. Place the prestressed steel strand 21 with the extruded anchor head 221 on the steel cage mesh 13 of the pre-tensioned long side template section 111 or the post-tensioned long side template section 121 to ensure that the prestressed steel strand 21 is placed horizontally; then sleeve the fixed end pressure plate 222 and the fixed end spiral reinforcement 223 on one end of the prestressed steel strand 21 close to the extruded anchor head 221, the fixed end pressure plate 222 is fixedly connected to the extruded anchor head 221, and the fixed end spiral reinforcement 223 is fixedly connected to the fixed end pressure plate 222; the tensioning end spiral reinforcement 231 , the tensioning end pressure plate 232 and the hole mold 233 are sleeved on the other end of the prestressed steel strand 21, the tensioning end pressure plate 232 is located between the tensioning end spiral rib 231 and the hole mold 233, one end of the tensioning end pressure plate 232 is fixedly connected to the tensioning end spiral rib 231, and the other end is abutted against the hole mold 233, the prestressed steel strand 21 extends out of the steel cage mesh 13, the steel cage mesh 13 is tied to the plastic tube on the prestressed steel strand 21, the position of the prestressed steel strand 21 is fixed, and a plastic plug mold is inserted into the inner cavity of the hole mold 233.

[0050] S4. Set up supporting formwork 1 and operating platform 16 around the steel cage mesh 13; bolt the formwork at both ends of the pre-tensioned elongated side formwork section 111 or the post-tensioned elongated side formwork section 121 to the fixed end pressure plate 222 and the tensioning end pressure plate 232 respectively to ensure that the fixed end pressure plate 222 and the tensioning end pressure plate 232 are firmly installed. At the same time, the end of the prestressed steel strand 21 close to the tensioning end anchor assembly 23 should pass through the end formwork of the pre-tensioned elongated side formwork section 111 or the post-tensioned elongated side formwork section 121, and the hole form 233 should be tightly against the end formwork.

[0051] S5. Concrete pouring. Before pouring prestressed concrete, the support formwork 1, steel cage 13 and prestressed anchor 2 should be checked. The gap between the hole form 233 and the formwork should be filled. The operator controls the pouring progress and pouring quality on the operating platform 16. At the same time, when pouring concrete in the support formwork 1, vibration should be carried out simultaneously. The vibrating rod should not directly squeeze the prestressed anchor 2 to prevent damage to the connection part of the prestressed anchor 2. In key areas with dense steel bars such as prestressed tensioning ends and hidden column nodes, it is advisable to use a small-diameter vibrating rod or vibrating sheet to carefully vibrate and compact. When pouring, pay attention to checking the position and size of the support formwork 1 and prestressed anchor 2. If loose, repair it in time.

[0052] S6. Prestressing is performed multiple times on the wall of the multiple pre-tensioned long side formwork sections 111; before tensioning, a tensioning scaffolding needs to be set up on one side of the tensioning end of the serrated wall, and a tensioning jack 35 and a hydraulic drive device are arranged on the tensioning scaffolding so that the tensioning jack 3 is aligned with the tensioning anchor 234.

[0053] S6 includes the following steps: S61. After the concrete strength reaches 40%, the end formwork of the pre-tensioned long side formwork section 111 close to the tensioning end is removed, and the wall of the pre-tensioned long side formwork section 111 is tensioned for the first time, and the tensioning control stress is maintained at 50% of the design stress.

[0054] S61 includes the following steps: S611. Use the testing equipment to test the concrete wall. After the concrete strength is measured to reach 40%, remove the end formwork of the pre-tensioned long side formwork section 111 close to the tensioning end anchor assembly 23, pull out the plastic plug mold of the hole mold 233, so that the inner cavity of the hole mold 233 is exposed.

[0055] S612, clean the concrete and debris in the inner cavity of the hole mold 233, embed the tensioning anchor 234 into the inner cavity of the hole mold 233, and the prestressed steel strand 21 is located in the anchor hole of the tensioning anchor 234; then put the clip 235 on the prestressed steel strand 21, move the clip 235 so that the clip 235 is engaged in the anchor hole, and the end face of the clip 235 is flush with the end face of the tensioning anchor 234.

[0056] S613. Sleeve the tensioning jack 3 on the prestressed steel strand 21, with the end of the tensioning jack 3 abutting against the side wall of the tensioning anchor 234. Connect the hydraulic drive device to the tensioning jack 3, and adjust the hydraulic drive device so that the tensioning jack 3 applies 10% of the design stress. The tensioning jack 3 pulls the prestressed steel strand 21 to stretch. After holding the load for 2 minutes, record the elongation value L1, and then increase the force of the tensioning jack 3 to 20% of the design stress. Hold the load for another 2 minutes and record the elongation value L2. Continue to increase the force of the tensioning jack 3 to 50% of the design stress. After holding the load for 2 minutes, record the elongation value L3, and finally unload the load to zero.

[0057] S614, remove the tensioning jack 3, and temporarily cover the cavity mold 233 and the working surface of the prestressed tensioning end to ensure that the prestressed steel strand 21 at the tensioning end will not be exposed to the outside, so as to prevent the prestressed steel strand 21 from rusting.

[0058] S62. After the concrete strength reaches 80%, the pre-tensioned long side formwork section 111 wall is tensioned for the second time, and the tensioning control stress is maintained at 110% of the design stress.

[0059] S62 includes the following steps: S621. Use testing equipment to test the concrete wall. When the concrete strength reaches 80%, remove the temporary cover on the working surface of the prestressed tensioning end.

[0060] S622. Reinstall the tensioning jack 3 and the hydraulic drive device; adjust the hydraulic drive device so that the tensioning jack 3 applies 50% of the design stress, and after holding the load for 2 minutes, record the elongation value L4, then increase the force of the tensioning jack 3 to 110% of the design stress, and after holding the load for 2 minutes, record the elongation value L5, and finally unload the load to zero; compare the elongation values ​​of multiple stretching with the elongation values ​​calculated theoretically, and control the error within 6%. When the elongation value error exceeds 6%, the machine should be stopped to check the cause, and adjustments should be made before continuing tensioning.

[0061] S63, remove the tensioning jack 3, and cut off the redundant prestressed steel strand 21; after the tensioning is completed, remove the tensioning jack 3 from the prestressed steel strand 21, and cut off the prestressed steel strand 21 extending out of the cavity mold 233. When cutting, use a grinding wheel cutter to cut the material, and do not use gas cutting or electric welding to cut, so as to avoid annealing of the prestressed steel strand 21 and affect its mechanical properties.

[0062] S64, sealing the anchor; injecting concrete into the cavity mold 233, sealing the prestressed steel strand 21, and ensuring that the prestressed steel strand 21 will not be exposed from the concrete wall.

[0063] S65, repeating steps S61-S64 to perform prestressing on the wall of the multiple sections of pre-tensioned long side formwork sections 111.

[0064] S7, remove the support formwork 1 and the operating platform 16, and perform grouting backfill on the induced joints 14; first remove the diagonal braces 15 and the support rods 17, remove the operating platform 16 from the top of the support formwork 1, and finally remove the support formwork 1 around the serrated wall, and then perform grouting backfill on the induced joints 14 between the multiple wall sections.

[0065] S8. Prestress the walls of the plurality of post-tensioned long side formwork segments 121 respectively.

[0066] S62 includes the following steps: S81, pull out the plastic plug mold in the hole mold 233 on one side of the tensioning end anchor assembly 23 of the rear tensioning long side template segment 121, so that the inner cavity of the hole mold 233 is exposed.

[0067] S82. Clean the concrete and debris in the inner cavity of the hole mold 233, embed the tensioning anchor 234 into the inner cavity of the hole mold 233, and position the prestressed steel strand 21 in the anchor hole of the tensioning anchor 234; then, sleeve the clip 235 on the prestressed steel strand 21, and move the clip 235 so that the clip 235 is engaged in the anchor hole, and the end face of the clip 235 is flush with the end face of the tensioning anchor 234.

[0068] S83. Sleeve the tensioning jack 3 on the prestressed steel strand 21, with the end of the tensioning jack 3 abutting against the side wall of the tensioning anchor 234. Connect the hydraulic drive device to the tensioning jack 3, and adjust the hydraulic drive device so that the tensioning jack 3 applies 50% of the design stress. The tensioning jack 3 pulls the prestressed steel strand 21 to stretch. After holding the load for 2 minutes, increase the force of the tensioning jack 3 to 80% of the design stress, hold the load for another 2 minutes, continue to increase the force of the tensioning jack 3 to 105% of the design stress, and unload the load to zero after holding the load for 2 minutes.

[0069] S83, remove the tensioning jack 3, and cut off the redundant prestressed steel strands 21.

[0070] S84, sealing the anchor; injecting concrete into the hole mold 233, sealing the prestressed steel strand 21, and completing the overall construction of the sawtooth wall.

[0071] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A template structure for controlling cracks in the serrated wall of a storage ring tunnel. Features: The invention comprises a support formwork (1) and a prestressed anchor (2), wherein the support formwork (1) comprises a pre-tensioning formwork (11) and a post-tensioning formwork (12); a steel cage (13) is arranged in each of the pre-tensioning formwork (11) and the post-tensioning formwork (12); the pre-tensioning formwork (11) and the post-tensioning formwork (12) are both in an "L" shape, a plurality of the pre-tensioning formwork (11) and the post-tensioning formwork (12) are arranged at intervals, and a plurality of the pre-tensioning formwork (11) and the post-tensioning formwork (12) are connected end to end to form a sawtooth wall formwork of a storage ring tunnel; The pre-tensioning formwork (11) comprises a pre-tensioning elongated side formwork section (111) and a pre-tensioning short side formwork section (112), and the post-tensioning formwork (12) comprises a post-tensioning elongated side formwork section (121) and a post-tensioning short side formwork section (122); one end of the pre-tensioning elongated side formwork section (111) is connected to the pre-tensioning short side formwork section (112), and the other end is connected to the post-tensioning short side formwork section (122); a plurality of prestressed anchors (2) are respectively arranged in the pre-tensioning elongated side formwork section (111) and the post-tensioning elongated side formwork section (121), and the prestressed anchors (2) are fixedly connected to the steel cage mesh (13); Two partitions (1211) are arranged in the post-tensioning template (12); the two partitions (1211) are arranged in parallel, and an induced seam (14) is formed between the two partitions (1211).

2. A storage ring tunnel sawtooth wall crack control template structure according to claim 1, Features: The prestressed anchor (2) comprises a prestressed steel strand (21), a fixed end anchor assembly (22) and a tension end anchor assembly (23); The fixed end anchor assembly (22) and the tension end anchor assembly (23) are respectively arranged at both ends of the length direction of the prestressed steel strand (21); the prestressed steel strand (21) is fixedly arranged on the steel cage mesh (13), and the extension direction of the prestressed steel strand (21) is parallel to the length direction of the pre-tensioned side template section (111) or the post-tensioned side template section (121); The fixed-end anchor assembly (22) comprises an extruded anchor head (221), a fixed-end pressure plate (222) and a fixed-end spiral rib (223); the extruded anchor head (221) is coaxially fixedly connected to one end of the prestressed steel strand (21); the fixed-end pressure plate (222) and the fixed-end spiral rib (223) are both sleeved on the prestressed steel strand (21); the fixed-end pressure plate (222) is located between the extruded anchor head (221) and the fixed-end spiral rib (223); and the two side walls of the fixed-end pressure plate (222) are respectively connected to the extruded anchor head (221) and the fixed-end spiral rib (223); The tensioning end anchor assembly (23) comprises a tensioning end spiral rib (231), a tensioning end pressure plate (232), a cavity mold (233) and a tensioning anchor (234); the tensioning end spiral rib (231), the tensioning end pressure plate (232) and the cavity mold (233) are all sleeved on the prestressed steel strand (21), and the tensioning end pressure plate (232) is located between the tensioning end spiral rib (231) and the cavity mold (233). ), one end of the tensioning end pressure plate (232) is fixedly connected to the tensioning end spiral rib (231), and the other end is in contact with the cavity mold (233); one end of the cavity mold (233) away from the tensioning end pressure plate (232) is in contact with the end template of the first tensioning elongated edge template section (111) or the second tensioning elongated edge template section (121); the tensioning anchor (234) is arranged in the inner cavity of the cavity mold (233); The prestressed steel strand (21) passes through the end formwork of the pre-tensioned elongated side formwork section (111) or the post-tensioned elongated side formwork section (121) close to the tensioning end anchor assembly (23).

3. A storage ring tunnel sawtooth wall crack control template structure according to claim 2, Features: The tensioning end anchor assembly (23) also includes a clip (235), an anchor hole is provided on the tensioning anchor (234), the clip (235) is engaged in the anchor hole, the tensioning anchor (234) is embedded in the inner cavity of the cavity mold (233), and one end of the prestressed steel strand (21) extends out of the cavity mold (233) and passes through the clip (235); the end of the clip (235) is flush with the side wall of the tensioning anchor (234), and the end of the prestressed steel strand (21) away from the fixed end anchor assembly (22) is sleeved with a tensioning jack (3), and the end face of the tensioning jack (3) is in contact with the end face of the tensioning anchor (234) away from the tensioning end pressure plate (232).

4. The storage ring tunnel sawtooth wall crack control template structure according to claim 1, Features: The support formwork (1) further comprises diagonal braces (15), and a plurality of the diagonal braces (15) are respectively arranged on both sides of the support formwork (1).

5. The storage ring tunnel sawtooth wall crack control template structure according to claim 1, Features: The support formwork (1) further comprises an operating platform (16) and a plurality of support rods (17); the operating platform (16) is fixedly arranged on the top wall of the support formwork (1), and one end of the support rod (17) is fixedly connected to the outer wall of the support formwork (1), and the other end is fixedly connected to the bottom wall of the operating platform (16); the plurality of support rods (17) are evenly distributed along the length direction of the operating platform (16).

6. A method for constructing a storage ring tunnel sawtooth wall crack control template structure, comprising the storage ring tunnel sawtooth wall crack control template structure according to any one of claims 1 to 5, It is characterized in that The following steps are involved: S1. Measure and mark, determine the construction position of the storage ring sawtooth wall according to the requirements of the design drawings, reserve an induction joint (14), and determine the construction position of the sawtooth wall on both sides of the induction joint (14); S2, tying and welding the steel cage mesh (13) within the construction position range of the sawtooth wall; S3, installing a prestressed anchor (2) on the steel cage (13); S4, setting up a supporting template (1) and an operating platform (16) around the steel cage mesh (13); S5, concrete pouring; S6, prestressing the wall of the multiple pre-tensioned long side formwork sections (111) for multiple times; S7, dismantling the supporting formwork (1) and the operating platform (16), and backfilling the induced joint (14) with grouting; S8. Prestressing is performed on the walls of the multiple sections of post-tensioned long side formwork sections (121) respectively.

7. A construction method for a storage ring tunnel sawtooth wall crack control template structure according to claim 6, It is characterized in that The S6 comprises the following steps: S61, after the concrete strength reaches 40%, the end formwork of the pre-tensioned long side formwork section (111) close to the tensioning end is removed, and the wall of the pre-tensioned long side formwork section (111) is tensioned for the first time, and the tensioning control stress is maintained at 50% of the design stress; S62, after the concrete strength reaches 80%, the wall of the pre-tensioned long side formwork section (111) is tensioned for the second time, and the tensioning control stress is maintained at 110% of the design stress; S63, removing the tensioning jack (3), and cutting off the redundant prestressed steel strands (21); S64, sealing the anchor; injecting concrete into the cavity mold (233) to seal the prestressed steel strand (21); S65, prestressing the wall of the multiple sections of post-tensioned long side formwork sections (121).

8. The construction method of the storage ring tunnel serrated wall crack control template structure according to claim 7, It is characterized in that The S61 comprises the following steps: S611, using a testing device to test the concrete wall, after measuring that the concrete strength reaches 40%, remove the end template of the pre-tensioned long side template segment (111) close to the tensioning end anchor assembly (23), and pull out the plastic plug mold of the cavity mold (233) to expose the inner cavity of the cavity mold (233); S612, clean the concrete and debris in the inner cavity of the cavity mold (233), embed the tension anchor (234) into the inner cavity of the cavity mold (233), and place the prestressed steel strand (21) in the anchor hole of the tension anchor (234); then sleeve the clip (235) on the prestressed steel strand (21), and move the clip (235) so that the clip (235) is engaged in the anchor hole, and the end face of the clip (235) is flush with the end face of the tension anchor (234); S613, sleeve the tensioning jack (3) on the prestressed steel strand (21), the end of the tensioning jack (3) abuts against the side wall of the tensioning anchor (234), connect the hydraulic drive device to the tensioning jack (3), adjust the hydraulic drive device so that the tensioning jack (3) applies 10% of the design stress, the tensioning jack (3) pulls the prestressed steel strand (21) to stretch, after holding the load for 2 minutes, increase the force of the tensioning jack (3) to 20% of the design stress, hold the load for another 2 minutes, continue to increase the force of the tensioning jack (3) to 50% of the design stress, and unload to zero after holding the load for 2 minutes; S614, dismantle the tensioning jack (3), and temporarily cover the cavity mold (233) and the prestressed tensioning end working surface.

9. The construction method of the storage ring tunnel serrated wall crack control template structure according to claim 7, It is characterized in that The S62 comprises the following steps: S621. Use testing equipment to test the concrete wall. After the concrete strength reaches 80%, remove the temporary cover on the working surface of the prestressed tension end. S622. Install the tensioning jack (3) and the hydraulic drive device again; adjust the hydraulic drive device so that the tensioning jack (3) applies 50% of the design stress. After holding the load for 2 minutes, increase the force applied by the tensioning jack (3) to 110% of the design stress. After holding the load for 2 minutes, unload the load to zero.

10. The construction method of the storage ring tunnel serrated wall crack control template structure according to claim 7, It is characterized in that The S8 comprises the following steps: S81, pulling out the plastic plug mold in the cavity mold (233) on one side of the tensioning end anchor assembly (23) of the rear tensioning elongated side template segment (121), so that the inner cavity of the cavity mold (233) is exposed; S82, clean the concrete and debris in the inner cavity of the cavity mold (233), embed the tension anchor (234) into the inner cavity of the cavity mold (233), and place the prestressed steel strand (21) in the anchor hole of the tension anchor (234); then sleeve the clip (235) on the prestressed steel strand (21), move the clip (235), so that the clip (235) is engaged in the anchor hole, and the end face of the clip (235) is flush with the end face of the tension anchor (234); S83, sleeve the tensioning jack (3) on the prestressed steel strand (21), the end of the tensioning jack (3) abuts against the side wall of the tensioning anchor (234), connect the hydraulic drive device to the tensioning jack (3), adjust the hydraulic drive device so that the tensioning jack (3) applies 50% of the design stress, the tensioning jack (3) pulls the prestressed steel strand (21) to stretch, after holding the load for 2 minutes, increase the force of the tensioning jack (3) to 80% of the design stress, hold the load for another 2 minutes, continue to increase the force of the tensioning jack (3) to 105% of the design stress, and unload to zero after holding the load for 2 minutes; S83, removing the tensioning jack (3), and cutting off the redundant prestressed steel strands (21); S84, sealing the anchor; injecting concrete into the hole mold (233), sealing the prestressed steel strand (21), and completing the overall construction of the sawtooth wall.

Citation Information

Patent Citations

  • Method for controlling cracks of composite shear wall by prestress

    CN110835967A

  • Construction method of prestressed waffle plate of large-scale clean electronic workshop

    CN112627540A

  • Construction method for controlling ultra-thick and heavy concrete cracks of linear accelerator chamber

    CN114856224A