Construction technology of combined penetration piece penetrating through nuclear power station room and penetration piece
By prefabricating integrated through-pieces and using hanging chain hoist technology, the installation complexity and long construction period of the through-pieces spanning two walls in nuclear power plant construction is solved, and the effect of simplifying construction and shortening construction period is achieved.
Patent Information
- Application Number
- CN202411156449.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During nuclear power plant construction, when the through parts span two walls, the existing technology needs to be lifted in sections and spliced on site, resulting in complex processes, long installation periods, and the demand for assembly and welding space increases the civil construction period and difficulty.
The prefabricated integrated through-piece is adopted to tilt into the installation space from the opening outside the room. The inclination angle is adjusted through the hanging chain and the hoist, and the two ends of the through-piece are installed into the reserved holes respectively, simplifying the process and reducing construction difficulty.
There is no need for on-site assembly and fixing, which simplifies the construction process, reduces the construction difficulty, and effectively shortens the installation period.
Smart Images

Figure CN119041703A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of nuclear power plant construction, and in particular to a construction process and a penetration piece for a combined penetration piece penetrating a room of a nuclear power plant. Background Art
[0002] During the construction of a nuclear power plant, it is often necessary to install penetration pieces in the room of the nuclear power plant. Currently, there are two situations in which penetration pieces are installed in the room of the nuclear power plant. One is a penetration piece on a single wall, which can be penetrated from the reserved hole on one side of the wall to reach the installation position. The installation is relatively simple and there is no difficulty. The second is that the penetration piece spans two walls, and the reserved holes of the two walls do not penetrate the outside of the walls. Therefore, the penetration piece cannot be directly installed in the reserved hole, and the length of the penetration piece often exceeds the distance between the two walls, and there is insufficient hoisting space.
[0003] In the face of the second situation mentioned above, the only option currently available is to hoist the parts into place in sections and then perform on-site splicing and fixing in the reserved holes of the two walls. This involves many processes with complex sequential logic, resulting in a long installation period. In addition, the on-site assembly and welding space often requires the reservation of a large number of steel bars and civil engineering pouring construction joints, which affects the civil engineering construction period and increases the difficulty of civil engineering pouring. Summary of the invention
[0004] A brief summary of one or more aspects is given below to provide a basic understanding of these aspects. This summary is not an exhaustive overview of all conceived aspects, and is neither intended to identify the key or critical elements of all aspects nor to define the scope of any or all aspects. Its only purpose is to give some concepts of one or more aspects in a simplified form as a prelude to a more detailed description that will be given later.
[0005] The purpose of the present invention is to provide a construction process and a penetration piece for a combined penetration piece penetrating a nuclear power plant room, which can improve the technical problems of complex construction and long installation period when combining penetration pieces in nuclear power construction in the prior art.
[0006] The embodiments of the present invention can be implemented in the following ways:
[0007] A construction process for a combined penetration piece penetrating a nuclear power plant room, used for installing the penetration piece in a nuclear power plant room, wherein the nuclear power plant room has a first wall and a second wall arranged at intervals, an installation space is formed between the first wall and the second wall, and the installation space has an opening located outside the nuclear power plant room; the construction process for the combined penetration piece penetrating a nuclear power plant room comprises:
[0008] The prefabricated integrated penetration piece is extended obliquely from the opening into the installation space; wherein the length of the penetration piece is greater than the size of the opening
[0009] The two ends of the penetration piece are sequentially installed into the first reserved hole set at the first wall and the second reserved hole set at the second wall.
[0010] Optionally, the penetration member includes a main rod and a first lifting hoop and a second lifting hoop provided on the main rod, and the first lifting hoop and the second lifting hoop are provided at intervals;
[0011] The step of obliquely extending the prefabricated integrated penetration piece from the opening into the installation space comprises:
[0012] Connecting two ends of the lifting chain to the first lifting hoop and the second lifting hoop respectively;
[0013] The lifting chain is connected by a crane, and the penetration piece is tilted downward so that the penetration piece extends from the opening into the installation space.
[0014] Optionally, the crane is provided with a hoist, the hoist chain is connected to the hoist, the hoist chain includes a first chain segment located between the hoist and the first lifting hoist and a second chain segment located between the hoist and the second lifting hoist; the hoist is used to drive the hoist chain to move so as to adjust the length of the first chain segment and the second chain segment to achieve adjustment of the inclination angle of the through-piece.
[0015] Optionally, before the step of obliquely extending the prefabricated integrated penetration from the opening into the installation space, the construction process of the combined penetration through the nuclear power plant room further includes:
[0016] The penetration piece is hoisted by the crane, and the inclination angle of the penetration piece is adjusted by the hoisting hoist so that the projection length of the penetration piece on the horizontal plane is smaller than the size of the opening.
[0017] Optionally, before the step of obliquely extending the prefabricated integrated penetration from the opening, the construction process of the combined penetration penetrating the nuclear power plant room further includes the step of prefabricating and integrating the penetration.
[0018] Optionally, the step of prefabricating and integrating the penetration piece comprises:
[0019] Sleeving the sleeve outside the inner process pipe to form a sleeve assembly;
[0020] The casing and the internal process pipe are fixedly connected at both ends of the casing assembly by the fixing clamps;
[0021] The first lifting hoop and the second lifting hoop are fixed outside the casing.
[0022] Optionally, the penetration member obliquely entering the opening has a high end and a low end, the high end is close to the first wall, and the low end is close to the second wall;
[0023] The steps of sequentially installing the two ends of the penetration member into the first reserved hole provided at the first wall and the second reserved hole provided at the second wall include:
[0024] Lowering the penetration member until the high end reaches the first reserved hole, and stopping the lowering;
[0025] Driving the penetration piece to move toward the first wall so that the high end of the penetration piece is installed into the first reserved hole;
[0026] The penetration piece is driven to move toward the second wall so that the other end of the penetration piece is installed into the second reserved hole.
[0027] Optionally, in the process of driving the penetration piece to move toward the first wall so that the high end of the penetration piece is installed into the first reserved hole, the inclination of the penetration piece is reduced.
[0028] A penetration piece is used in the construction process of the above-mentioned combined penetration piece penetrating the room of a nuclear power plant.
[0029] The construction process of the combined penetration piece penetrating a nuclear power plant room and the beneficial effects of the penetration piece provided by the embodiment of the present invention include:
[0030] An embodiment of the present invention provides a construction process for a combined penetration piece that penetrates a nuclear power plant room, which is used to install the penetration piece in a nuclear power plant room, wherein the nuclear power plant room has a first wall and a second wall that are spaced apart, an installation space is formed between the first wall and the second wall, and the installation space has an opening located outside the nuclear power plant room. The construction process for the combined penetration piece that penetrates a nuclear power plant room includes: extending a prefabricated integrated penetration piece from the opening into the installation space at an angle; wherein the length of the penetration piece is greater than the size of the opening; and installing the two ends of the penetration piece into a first reserved hole set at the first wall and a second reserved hole set at the second wall in sequence. This construction process realizes the prefabrication and integration of the penetration piece before installation and construction, so that after the penetration piece is installed in the nuclear power plant room, there is no need to assemble and fix the penetration piece, and there is no need to consider the assembly space and welding space. At the same time, the process is greatly simplified, the construction difficulty is low, and the installation period is effectively shortened.
[0031] An embodiment of the present invention further provides a penetration piece, which is used to carry out the above-mentioned construction process of the combined penetration piece penetrating the nuclear power plant room. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] The above features and advantages of the present invention can be better understood after reading the detailed description of the embodiments of the present disclosure in conjunction with the following drawings. In the drawings, the components are not necessarily drawn to scale, and components with similar related properties or features may have the same or similar reference numerals.
[0033] Figure 1 It shows a schematic structural diagram of the case where the penetration piece is hoisted above the opening during the construction process of the combined penetration piece penetrating the nuclear power plant room provided by one aspect of the present invention;
[0034] Figure 2 It shows a schematic structural diagram of the construction process of the combined penetration piece penetrating the nuclear power plant room provided by one aspect of the present invention after the penetration piece is hoisted into the installation hole space;
[0035] Figure 3 A schematic diagram of the structure of installing one end of the penetration piece to the first reserved hole of the first wall during the construction process of the combined penetration piece penetrating the nuclear power plant room provided by one aspect of the present invention is shown;
[0036] Figure 4 A schematic diagram of the structure of installing the other end of the penetration piece to the second reserved hole of the second wall during the construction process of the combined penetration piece penetrating the nuclear power plant room provided by one aspect of the present invention is shown;
[0037] Figure 5 It shows a top view of the structure after the penetration assembly provided according to one aspect of the present invention is installed in a nuclear power plant room;
[0038] Figure 6 A schematic diagram of the internal structure of a penetration member provided according to one aspect of the present invention is shown.
[0039] Reference numerals:
[0040] 100-through piece; 110-main rod; 111-internal process pipe; 112-casing; 113-fixed clamp; 121-first lifting clamp; 122-second lifting clamp; 131-high end; 132-low end; 210-lifting chain; 211-first chain segment; 212-second chain segment; 220-lifting hoist; 230-crane; 300-nuclear power plant room; 310-first wall; 311-first reserved hole; 320-second wall; 321-second reserved hole; 330-installation space; 331-opening. DETAILED DESCRIPTION
[0041] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. Note that the aspects described below in conjunction with the accompanying drawings and specific embodiments are only exemplary and should not be construed as limiting the scope of protection of the present invention in any way.
[0042] In the description of the present invention, it should be noted that if the terms "upper", "lower", "inside", "outside", "vertical" and the like appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or is the orientation or position relationship in which the product of the invention is usually placed when used, rather than indicating or implying that the device or element referred to must have a specific orientation or be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0043] At the same time, it should be noted that the terms "first", "second", etc. are only used for distinguishing descriptions and cannot be understood as indicating or implying relative importance.
[0044] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified or limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, an integral connection, or a detachable connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or the internal communication of two components, etc. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0045] Figure 1 The schematic diagram shows the structure of the penetration member 100 being hoisted above the opening 331 during the construction process of the combined penetration member penetrating the nuclear power plant room provided in this embodiment. Figure 2 The schematic diagram shows the structure of the penetration piece 100 after it is hoisted into the installation hole space during the construction process of the combined penetration piece penetrating the nuclear power plant room provided by this embodiment. Figure 3 The schematic diagram shows a structure when one end of the penetration piece 100 is installed to the first reserved hole 311 of the first wall 310 during the construction process of the combined penetration piece penetrating the nuclear power plant room provided in this embodiment. Figure 4 The schematic diagram shows the structure of the second reserved hole 321 of the second wall 320 when the construction process of the combined penetration piece penetrating the nuclear power plant room provided in this embodiment is executed, Figure 5 The top view of the structure after the penetration member 100 is assembled and installed in the nuclear power plant room 300 is shown. Figure 1-Figure 5 This embodiment provides a penetration piece 100 and also provides a construction process for a combined penetration piece for penetrating a nuclear power plant room. Through the construction process for a combined penetration piece for penetrating a nuclear power plant room, the penetration piece 100 can be assembled and installed in a nuclear power plant room 300.
[0046] like Figure 1-Figure 5As shown, in this embodiment, the nuclear power plant room 300 includes a first wall 310 and a second wall 320 that are spaced apart, so that a mounting space 330 is formed between the first wall 310 and the second wall 320, and the mounting space 330 is formed with an opening 331 that is connected to the outside of the nuclear power plant room 300. A first reserved hole 311 is provided on the first wall 310, and a second reserved hole 321 is provided on the second wall 320. Both the first reserved hole 311 and the second reserved hole 321 are connected to the mounting space 330, and are respectively located on both sides of the mounting space 330. The first reserved hole 311 is used to install and fix one end of the penetration piece 100, and the second reserved hole 321 is used to install and fix the other end of the penetration piece 100. The penetration piece 100 can only be installed from the installation space 330. However, since the overall length of the penetration piece 100 is greater than the width of the opening 331, the horizontal hoisting space is insufficient. Therefore, for this situation, the penetration piece 100 is generally set as a multi-section structure composed of multiple components. The multiple sections are separately hoisted into the installation space 330 and then assembled in the installation space 330. This method has complicated procedures and great construction difficulty. In order to improve the above problems, the present invention provides a construction process for a combined penetration piece 100 that penetrates the space of a nuclear power plant.
[0047] The specific steps of the construction process of the combined penetration piece for penetrating the nuclear power plant room provided in this embodiment are further explained below. At the same time, it should be explained that since the construction process of the combined penetration piece for penetrating the nuclear power plant room is used to realize the installation of the penetration piece 100 on two walls, the structure of the penetration piece 100 mentioned below is the structure of the penetration piece 100 provided in this embodiment.
[0048] Specifically, the construction process of the combined penetrations through the nuclear power plant room includes:
[0049] S01 : The prefabricated integrated penetration piece 100 is extended obliquely from the opening 331 into the installation space 330 .
[0050] Before installation, the integrated penetration piece 100 is first prefabricated. In other words, the integration of the penetration piece 100 can be completed in a workshop or off-site before installation, and the difficulty of integration is greatly reduced.
[0051] Furthermore, before executing step S01 , a step of prefabricating the integrated penetration component 100 may also be included. Figure 6 This is a schematic diagram of the internal structure of the penetration member 100 provided in this embodiment. Figure 6 Specifically, the penetration member 100 includes a main rod 110 and a first hoisting clamp 121 and a second hoisting clamp 122 disposed on the main rod 110 , wherein the first hoisting clamp 121 and the second hoisting clamp 122 are disposed at intervals. The main rod 110 includes a casing 112 , an internal process pipe 111 and a fixing clamp 113 .
[0052] The steps of prefabricating the integrated penetration 100 include: sleeve the sleeve 112 outside the internal process pipe 111 to form a sleeve 112 assembly; fix the sleeve 112 and the internal process pipe 111 at both ends of the sleeve 112 assembly through fixing clamps 113; fix the first lifting clamp 121 and the second lifting clamp 122 outside the sleeve 112.
[0053] Specifically, when the sleeve 112 is sleeved on the outside of the internal process pipe 111, the internal process pipe 111 can also be manufactured. Optionally, the welding of the internal process pipe 111 and all welding activities related to the internal process pipe 111 can be completed in a workshop or off-site, and then the internal process pipe 111 is pressure tested. After the test passes, the sleeve 112 is assembled. After the sleeve 112 is sleeved on the internal process pipe 111, the sleeve 112 is welded. Thereafter, the fixing clamp 113 is fixed to both ends of the internal process pipe 111 and close to the sleeve 112, thereby fixing the internal process pipe 111 and the sleeve 112; finally, two lifting point positions are determined on the sleeve 112, and the lifting clamp is installed. In this way, the prefabrication and integration of the penetration 100 is completed.
[0054] In this embodiment, the step of obliquely extending the prefabricated integrated penetration member 100 from the opening 331 into the installation space 330 includes:
[0055] S11: Connecting two ends of the lifting chain 210 to the first lifting hoop 121 and the second lifting hoop 122 respectively.
[0056] S12 : Connect the lifting chain 210 through the crane 230 , and lower the penetration piece 100 obliquely, so that the penetration piece 100 extends into the installation space 330 from the opening 331 .
[0057] Furthermore, a hoisting hoist 220 is provided on the crane 230, and the hoisting chain 210 is connected to the hoisting hoist 220. In this way, the hoisting chain 210 is divided into a first segment 211 and a second segment 212 with the location of the hoisting hoist 220 as a dividing point. The first segment 211 is the portion of the hoisting chain 210 located between the hoisting hoist 220 and the first hoisting hoop 121, and the second segment 212 is the portion of the hoisting chain 210 located between the hoisting hoist 220 and the second hoisting hoop 122. The hoisting hoist 220 is used to drive the hoisting chain 210 to move, so as to adjust the length of the first segment 211 and the second segment 212, thereby adjusting the inclination angle of the penetration member 100.
[0058] Specifically, the total length of the lifting chain 210 remains unchanged during the lifting process. In this way, when the length of the first lifting chain 210 is reduced, the length of the second lifting chain 210 is increased, so that one end of the penetration member 100 provided with the first lifting hoist 121 is tilted relative to one end of the penetration member 100 provided with the second lifting hoist 122, thereby being in a state as shown in FIG. Figure 1 and Figure 2 The tilted state shown.
[0059] Furthermore, in order to ensure that the inclined penetration piece 100 can be smoothly lowered into the installation space 330, before the step of extending the prefabricated integrated penetration piece 100 from the opening 331 into the installation space 330, the construction process of the nuclear power plant room combined penetration piece further includes:
[0060] The penetration piece 100 is hoisted by the crane 230, and the inclination angle of the penetration piece 100 is adjusted by the hoist 220, so that the projection length of the penetration piece 100 on the horizontal plane is smaller than the size of the opening 331. Specifically, the minimum inclination angle α of the penetration piece 100 relative to the horizontal direction can be calculated by the following formula:
[0061] Cosα=opening width L1 / through-piece length L2.
[0062] S02: Installing two ends of the penetration piece 100 into the first reserved hole 311 provided at the first wall 310 and the second reserved hole 321 provided at the second wall 320 in sequence.
[0063] Since the penetration piece 100 is placed into the opening 331 in an inclined state, the penetration piece 100 in an inclined state has a high end 131 and a low end 132. In the present embodiment, the inclined direction of the penetration piece 100 makes the high end 131 of the penetration piece 100 be the end close to the first wall 310, and the low end 132 of the penetration piece 100 be the end close to the second wall 320.
[0064] The penetration piece 100 is lowered under the drive of the crane 230 ( Figure 2 The middle arrow indicates the downward movement direction of the penetration member 100) and enters the installation space 330 from the opening 331 until the high end 131 of the penetration member 100 reaches the first reserved hole 311, and then stops descending. Then the penetration member 100 is driven to move toward the first wall 310 (i.e., along the Figure 3 The through-piece 100 is moved horizontally to the right as shown by the arrow in the middle), so that the high end 131 of the through-piece 100 is installed into the first reserved hole 311. After the through-piece 100 is installed into the first reserved hole 311, the through-piece 100 is roughly in a horizontal state, and then drives the through-piece 100 to move toward the second wall 320 (i.e. Figure 4 The other end of the through-piece 100 is installed in the second reserved hole 321, thereby installing the through-piece 100 on two walls. Finally, the hanging chain 210 can be released.
[0065] Furthermore, in the process of driving the penetration piece 100 to move toward the first wall 310 so that the high end 131 of the penetration piece 100 is installed into the first reserved hole 311, the inclination of the penetration piece 100 is reduced, thereby helping to ensure that the penetration piece 100 is smoothly installed into the first reserved hole 311.
[0066] The embodiment of the present invention provides a construction process for a combined penetration piece that penetrates a nuclear power plant room and a penetration piece 100. The penetration piece 100 is prefabricated and integrated before being assembled in the nuclear power plant room 300. Thus, after the penetration piece 100 is installed in the nuclear power plant room 300, there is no need to assemble and fix the penetration piece 100, and there is no need to consider the assembly space and the welding space. At the same time, the process is greatly simplified, the construction difficulty is low, and the installation period is effectively shortened.
[0067] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technology in the field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A construction process for a combined penetration piece penetrating a nuclear power plant room, characterized in that: Used to install a penetration piece in a nuclear power plant room, the nuclear power plant room has a first wall and a second wall arranged at intervals, an installation space is formed between the first wall and the second wall, and the installation space has an opening located outside the nuclear power plant room; characterized in that the construction process of the combined penetration piece penetrating the nuclear power plant room includes: The prefabricated integrated penetration piece is extended obliquely from the opening into the installation space; wherein the length of the penetration piece is greater than the size of the opening The two ends of the penetration piece are sequentially installed into the first reserved hole set at the first wall and the second reserved hole set at the second wall.
2. The construction process of the combined penetration piece penetrating a nuclear power plant room according to claim 1 is characterized in that: The penetration member comprises a main rod and a first lifting hoop and a second lifting hoop arranged on the main rod, wherein the first lifting hoop and the second lifting hoop are arranged at intervals; The step of obliquely extending the prefabricated integrated penetration piece from the opening into the installation space comprises: Connecting two ends of the lifting chain to the first lifting hoop and the second lifting hoop respectively; The lifting chain is connected by a crane, and the penetration piece is tilted downward so that the penetration piece extends from the opening into the installation space.
3. The construction process of the combined penetration piece penetrating a nuclear power plant room according to claim 2 is characterized in that: The crane is provided with a hoist, the hoist chain is connected to the hoist, the hoist chain includes a first chain segment located between the hoist and the first lifting hoop and a second chain segment located between the hoist and the second lifting hoop; the hoist is used to drive the hoist chain to move, so as to adjust the length of the first chain segment and the second chain segment, thereby adjusting the inclination angle of the penetration piece.
4. The construction process of the combined penetration piece penetrating a nuclear power plant room according to claim 3 is characterized in that: Before the step of obliquely extending the prefabricated integrated penetration piece from the opening into the installation space, the construction process of the combined penetration piece penetrating the nuclear power plant room further includes: The penetration piece is hoisted by the crane, and the inclination angle of the penetration piece is adjusted by the hoisting hoist so that the projection length of the penetration piece on the horizontal plane is smaller than the size of the opening.
5. The construction process of the combined penetration piece penetrating a nuclear power plant room according to claim 2, characterized in that: Prior to the step of obliquely extending the prefabricated integrated penetration piece from the opening, the construction process of the combined penetration piece penetrating the nuclear power plant room further includes the step of prefabricating and integrating the penetration piece.
6. The construction process of the combined penetration piece penetrating a nuclear power plant room according to claim 5, characterized in that: The main rod of the penetration piece includes a casing, an internal process pipe and a fixed clamp; The steps of prefabricating and integrating the penetration member include: Sleeving the sleeve outside the inner process pipe to form a sleeve assembly; The casing and the internal process pipe are fixedly connected at both ends of the casing assembly by the fixing clamps; The first lifting hoop and the second lifting hoop are fixed outside the casing.
7. The construction process of the combined penetration piece penetrating a nuclear power plant room according to claim 1, characterized in that: The penetration member obliquely entering the opening has a high end and a low end, the high end is close to the first wall, and the low end is close to the second wall; The steps of sequentially installing the two ends of the penetration member into the first reserved hole provided at the first wall and the second reserved hole provided at the second wall include: Lowering the penetration member until the high end reaches the first reserved hole, and stopping the lowering; Driving the penetration piece to move toward the first wall so that the high end of the penetration piece is installed into the first reserved hole; The penetration piece is driven to move toward the second wall so that the other end of the penetration piece is installed into the second reserved hole.
8. The construction process of the combined penetration piece penetrating a nuclear power plant room according to claim 7, characterized in that: In the process of driving the penetration piece to move toward the first wall so that the high end of the penetration piece is installed into the first reserved hole, the inclination of the penetration piece is reduced.
9. A penetration piece, characterized in that: The penetration piece is used in the construction process of the combined penetration piece penetrating the nuclear power plant room as described in any one of claims 1-8.
Citation Information
Patent Citations
Self-stabilizing operating platform for elevator shaft
CN102121307A
Self-turnover construction system and method for internal-climbing tower crane supporting steel beams in hydraulic formwork climbing system
CN104652807A
Containment dome penetration assembly mounting method, penetration assembly and containment
CN117912727A
Nuclear power station steel cladding penetration piece structure
CN209054187U
Tool for hoisting electrical penetration assembly of nuclear power station
CN211319742U