Gas supply system

By designing a spare pipeline composed of storage tanks and vaporizers in semiconductor production equipment, combined with the use of air liquefiers and condensers, the problems of high cost, large footprint and long manufacturing cycle of compressed air backup solutions are solved, and in an emergency situation, it has been realized Continuous production and supply under the sequential supply, and ensure long-term storage and purity of air.

CN119042530AInactive Publication Date: 2024-11-29PROCHIP GAS (SHANGHAI) CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411444728.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-16
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In existing semiconductor production equipment, the backup solution for compressed air has problems such as high cost, large footprint and long manufacturing cycle, especially in emergencies, it is difficult to ensure the supply of compressed air, which affects production continuity.

Method used

A gas supply system was designed, using storage tanks and vaporizers to form a spare pipeline, and the liquefied air was quickly vaporized into gaseous air in an emergency situation to supply gas production equipment, and the air liquefied and liquid pump was used to replenish liquid air, combined with The condenser is cooled with liquid nitrogen to ensure long-term storage of liquid air.

Benefits of technology

This solution reduces the footprint and procurement costs, shortens the construction time of spare pipes, can ensure long-term production continuity in emergencies, and prevents the increase in liquid air pressure through the use of condensers, ensuring long-term air Storage and purity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119042530A_ABST
    Figure CN119042530A_ABST
Patent Text Reader

Abstract

The invention discloses a gas supply system, and relates to the technical field of semiconductor production equipment.The gas supply system comprises a purifier and gas production equipment, the purifier is used for purifying air input into the supply system, the gas production equipment is used for producing pure air, and the purifier communicates with the gas production equipment through a main conveying pipeline; a common pipeline and a standby pipeline which are parallel are arranged at the middle section of the main conveying pipeline, a storage tank and a vaporizer are sequentially arranged on the standby pipeline, the output end of the storage tank is communicated with the input end of the vaporizer, the storage tank is used for storing liquefied air, and the vaporizer is used for vaporizing the liquefied air input by the storage tank into gaseous air; under the normal working condition, compressed air is conveyed to production gas equipment through a common pipeline; and under the emergency working condition, liquefied air stored in the storage tank is used for supplying air. The method has the effects of reducing the gas supply cost and shortening the construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of semiconductor production equipment, and in particular to a gas supply system. Background Art

[0002] The semiconductor and TFT-LED (thin-film transistor-light-emitting diode) industries require a large amount of compressed air during the production process, some of which is used as instrument air, some as breathing, and some directly involved in the process reaction of production equipment. Therefore, CDA (compressed air) is a key production gas. Once pressure fluctuations and gas outages occur, it will directly affect the operation of the entire factory, and even directly lead to the cessation of production processes and the entire factory. Therefore, the backup plan for CDA, that is, in emergency situations (such as high-voltage 10KV power fluctuations, power outages, and water outages), how to ensure that in such special circumstances, within a certain period of time (usually 30-60 minutes), customers can continue to be provided with compressed air is a difficult point.

[0003] The existing conventional solution is to use high-pressure storage tanks as backup. Generally, due to transportation problems, the maximum capacity of high-pressure storage tanks is only 200M. 3 If the site needs a spare 30000Nm 3 If there is enough compressed air reserve, at least 6 compressed air storage tanks must be installed on site, which will lead to large space and high cost. Another conventional solution is to use high-pressure spherical tanks manufactured on site as backup, usually 500M 3 The number of spherical tanks is one or two. The disadvantage is that the on-site manufacturing cycle is very long, generally taking 5-6 months, it occupies a large area, and has very high requirements for the ground foundation (tank weight + water filling test = 600 tons). Summary of the invention

[0004] In order to improve the problems of conventional CDA backup solutions such as high cost, large space occupation, and long manufacturing cycle, the present application provides a gas supply system.

[0005] The present application provides a gas supply system, which adopts the following technical solution: A gas supply system comprising A purifier and a production gas equipment, wherein the purifier is used to purify the air input into the supply system, and the production gas equipment is used to use the pure air for production, and the purifier and the production gas equipment are connected through a main transmission pipeline; The middle section of the main delivery pipeline is provided with a common pipeline and a spare pipeline in parallel, and a storage tank and a vaporizer are sequentially provided on the spare pipeline. The output end of the storage tank is connected with the input end of the vaporizer. The storage tank is used to store liquefied air, and the vaporizer is used to vaporize the liquefied air input from the storage tank into gaseous air. Under normal working conditions, compressed air is transported to production gas equipment through the common pipeline; under emergency conditions, gas is supplied by the liquefied air stored in the storage tank.

[0006] By adopting the above technical scheme, a spare pipeline is provided for compressed air so that normal production can be guaranteed for a long period of time in an emergency. Under normal working conditions, compressed air is transported to production gas equipment by common pipelines. Sufficient liquefied air can be stored in the storage tank first, and the output end of the storage tank is connected to the input end of the vaporizer. Under emergency conditions, the storage tank is opened, and the liquefied air in the storage tank is passed into the vaporizer. The vaporizer can vaporize the liquefied air input from the storage tank into gaseous air, and then the pure air can continue to supply gas to the production gas equipment. The storage tank and the vaporizer occupy a small area, and only one set of storage tanks and vaporizers is needed to meet production needs, which greatly saves procurement costs.

[0007] Optionally, an air liquefier and a liquid pump are also provided on the backup pipeline, the air liquefier is connected to the main delivery pipeline, the output end of the air liquefier is connected to the input end of the liquid pump, and the output end of the liquid pump is connected to the input end of the storage tank.

[0008] By adopting the above technical solution, the air liquefier is connected to the main delivery pipeline, and the compressed air in the main delivery pipeline can be input into the air liquefier itself for condensation and liquefaction. The liquefied liquid air is then transported to the storage tank via a liquid suction pump for easy storage. Therefore, when the liquid air in the storage tank is insufficient, the storage tank can be replenished at any time using the air liquefier and the liquid suction pump.

[0009] Optionally, a condenser is further provided on the standby pipeline, the input end of the condenser is connected to the output end of the air liquefier, and the output end of the condenser is connected to the input end of the storage tank.

[0010] By adopting the above technical solution, a condenser is further provided on the standby pipeline, and the output end of the condenser is connected to the input end of the storage tank. When the liquid air is passed into the storage tank for storage, the volume of the liquid air will expand due to changes in conditions such as temperature and air pressure, causing the pressure in the storage tank to rise. At this time, liquid nitrogen is passed into the storage tank through the condenser, and external liquid nitrogen is used as a cold source to cool and liquefy the liquid air vapor in the storage tank, so that the liquid air can be stored for a long time without changing its composition.

[0011] Optionally, the storage tank is a double-layer structure, including an outer layer and an inner layer, the output end of the condenser is connected to the outer layer, and the condenser forms a circulation passage with the outer layer through a reflux pipe, and the output end of the liquid pump is connected to the input end of the inner layer.

[0012] By adopting the above technical solution, the storage tank includes an outer layer and an inner layer. The liquid nitrogen output by the condenser is passed into the outer layer of the storage tank, and the liquid air in the inner layer can also be cooled. Then, the gaseous nitrogen mixed with the liquid nitrogen can also flow back into the condenser through the reflux pipe, so that the liquid nitrogen can be recycled between the outer layer and the condenser without interfering with the liquid air in the inner layer.

[0013] Optionally, a check valve is provided at one end of the main delivery pipeline close to the purifier, and the output end of the check valve is connected to the input ends of the common pipeline and the spare pipeline at the same time.

[0014] By adopting the above technical solution, a check valve is provided at one end of the main delivery pipeline close to the purifier. The compressed air enters the common pipeline or the spare pipeline after passing through the check valve. The check valve can effectively prevent the air in the common pipeline or the spare pipeline from flowing back to the purifier, thereby avoiding damage to the purifier caused by gas reflux.

[0015] Optionally, a regulating valve is provided at one end of the main delivery pipeline close to the production gas equipment to adjust the delivery pressure in the main delivery pipeline.

[0016] By adopting the above technical solution, a regulating valve is provided at one end of the main transmission pipeline close to the production gas equipment. When the air in the spare pipeline is used, the pure air after re-vaporization may have insufficient pressure. At this time, the pressure of the air can be readjusted through the regulating valve and sent to the production gas equipment.

[0017] Optionally, a flow meter is provided at one end of the main delivery pipeline close to the production gas equipment, the input end of the flow meter is connected to the output end of the regulating valve, and the flow meter is used to monitor the gas flow in the main delivery pipeline in real time.

[0018] By adopting the above technical solution, a flow meter is provided at one end of the main transmission pipeline close to the production gas equipment, and the input end of the flow meter is connected to the output end of the regulating valve. The flow meter can detect the internal pressure of the pipeline after being adjusted by the regulating valve in real time, and feed back the monitored pressure value to the external control unit. The regulating valve can be automatically controlled by the external control unit, or the pressure can be readjusted manually.

[0019] Optionally, a filtering device is further provided on the main delivery pipeline, the input end of the filtering device is connected to the output end of the flow meter, and a filtering element for filtering impurities is provided in the filtering device.

[0020] By adopting the above technical solution, In summary, the present application includes at least one of the following beneficial effects: 1. By using storage tanks and vaporizers to form a backup pipeline, compared with conventional backup solutions, it has the advantages of small footprint and low procurement cost. At the same time, the construction time of the backup pipeline can also be further shortened; 2. By using an air liquefier and a liquid pump to replenish the storage tank with liquid air, the air liquefier can input the compressed air in the main transmission pipeline into its own interior for condensation and liquefaction, and then transport the liquefied liquid air to the storage tank through the liquid pump. When the liquid air in the storage tank is insufficient, the air liquefier and the liquid pump can be used to replenish the storage tank at any time; 3. By using a condenser to provide liquid nitrogen to cool the liquid air in the storage tank, the pressure increase of the liquid air during the storage process can be effectively reduced, making it easier for the liquid air to be stored for a long time without changing its composition. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 is a schematic structural diagram showing a gas supply system in Example 1 of the present application; Figure 2 is a schematic diagram showing the working principle of the condenser in Example 2 of the present application; Figure 3 This is a schematic diagram showing the connection structure between the condenser and the storage tank in Example 3 of the present application.

[0022] Explanation of the reference numerals: 1. Purifier; 2. Production gas equipment; 3. Main delivery pipeline; 31. Check valve; 32. Regulating valve; 33. Flow meter; 34. Filter device; 4. Common pipeline; 5. Spare pipeline; 51. Storage tank; 511. Outer layer; 512. Inner layer; 52. Vaporizer; 53. Air liquefier; 54. Liquid pump; 6. Condenser; 7. Reflux pipe. DETAILED DESCRIPTION

[0023] The following is combined with Figure 1-3 This application is described in further detail.

[0024] Embodiment 1: Embodiment 1 of the present application discloses a gas supply system, referring to Figure 1 The gas supply system includes a purifier 1 and a production gas equipment 2, which are respectively located at the head and tail ends of the gas supply system. The purifier 1 can be an air separation pre-purifier 1. Since a large amount of compressed air is required in the production process of semiconductors, and the compressed air needs to maintain a high degree of purity, the purifier 1 can purify the air input into the supply system to ensure that the air entering the system can remain pure, which is conducive to various subsequent processing procedures for semiconductors by various production equipment.

[0025] The purifier 1 is connected to the production gas equipment 2 through a main delivery pipeline 3. The middle section of the main delivery pipeline 3 includes a parallel common pipeline 4 and a spare pipeline 5. Under normal working conditions, pure compressed air is directly delivered from the common pipeline 4 to the production gas equipment 2 for use.

[0026] The standby pipeline 5 is provided with a storage tank 51 and a vaporizer 52 in sequence, and the output end of the storage tank 51 is connected to the input end of the vaporizer 52. The storage tank 51 can be a conventional liquid nitrogen storage tank for storing liquefied air; and the vaporizer 52 can be a liquid source vaporizer 52, which can vaporize the liquefied air input from the storage tank 51 into gaseous air. In an emergency condition, the liquefied air stored in the storage tank 51 supplies gas to the production gas equipment 2.

[0027] The compressed air is provided with a backup pipeline 5 so as to ensure normal production for a long period of time in an emergency. Under normal working conditions, the compressed air is transported to the production gas equipment 2 by the common pipeline 4. Sufficient liquefied air can be stored in the storage tank 51 first, and the output end of the storage tank 51 is connected to the input end of the vaporizer 52. Under emergency conditions, the storage tank 51 is opened, and the liquefied air in the storage tank 51 is passed into the vaporizer 52. The vaporizer 52 can vaporize the liquefied air input from the storage tank 51 into gaseous air, and then the pure air can continue to supply the production gas equipment 2. The storage tank 51 and the vaporizer 52 occupy a small area, and only one set of storage tanks 51 and vaporizers 52 is needed to meet production needs, which greatly saves procurement costs.

[0028] The standby pipeline 5 is also provided with an air liquefier 53 and a liquid pump 54, wherein the input end of the air liquefier 53 is connected to the main delivery pipeline 3, the output end of the air liquefier 53 is connected to the input end of the liquid pump 54, and the output end of the liquid pump 54 is connected to the input end of the storage tank 51. The air liquefier 53 is connected to the main delivery pipeline 3, and the compressed air in the main delivery pipeline 3 can be input into the air liquefier 53 for condensation and liquefaction, and then the liquefied liquid air is transported to the storage tank 51 via the liquid pump 54 for convenient storage. Therefore, when the liquid air in the storage tank 51 is insufficient, the storage tank 51 can be replenished at any time by using the air liquefier 53 and the liquid pump 54.

[0029] Furthermore, a check valve 31 is provided at one end of the main delivery pipeline 3 close to the purifier 1, and the output end of the check valve 31 is connected to the input ends of the common pipeline 4 and the backup pipeline 5 at the same time. After passing through the check valve 31, the compressed air enters the common pipeline 4 or the backup pipeline 5. The check valve 31 can effectively prevent the air in the common pipeline 4 or the backup pipeline 5 from flowing back to the purifier 1, thereby preventing the gas reflux from damaging the purifier 1. In order to prevent the gas from flowing back into the purifier 1, the check valve 31 can also be a non-return valve.

[0030] Furthermore, a regulating valve 32, a flow meter 33, and a filtering device 34 are sequentially provided at one end of the main delivery pipeline 3 close to the production gas equipment 2, wherein the input end of the regulating valve 32 is connected to the main delivery pipeline 3, the input end of the flow meter 33 is connected to the output end of the regulating valve 32, the input end of the filtering device 34 is connected to the output end of the flow meter 33, and the output end of the filtering device 34 is connected to the production gas equipment 2.

[0031] When the air in the spare pipeline 5 is used, the re-vaporized pure air may have insufficient pressure. At this time, the air pressure can be re-adjusted through the regulating valve 32, so that the air after passing through the regulating valve 32 can be compressed to the required pressure and sent to the production gas equipment 2. The regulating valve 32 can be a solenoid valve, which is directly electrically connected to the external control unit, and the opening and closing of the regulating valve 32 is automatically controlled by the external control unit to adjust the delivery pressure in the main delivery pipeline 3.

[0032] The flow meter 33 can detect the internal pressure of the pipeline after being adjusted by the regulating valve 32 in real time, and feed back the monitored pressure value to the external control unit. The regulating valve 32 can be automatically controlled by the external control unit, or the pressure can be readjusted manually.

[0033] The filter device 34 is provided with a filter element for filtering impurities, which can effectively filter the compressed air passing through the filter device 34, remove larger impurities in the compressed air, and ensure the purity of the gas.

[0034] The implementation principle of a gas supply system in Example 1 of the present application is as follows: a storage tank 51 and a vaporizer 52 are used to form a backup pipeline 5. Compared with conventional backup schemes, this method has the advantages of small footprint and low procurement cost. At the same time, the construction time of the backup pipeline 5 can also be further shortened; the air liquefier 53 can input the compressed air in the main delivery pipeline 3 into its own interior for condensation and liquefaction, and then the liquefied liquid air is transported to the storage tank 51 via a liquid pump 54. When the liquid air in the storage tank 51 is insufficient, the storage tank 51 can be replenished at any time by using the air liquefier 53 and the liquid pump 54.

[0035] Embodiment 2: The difference between Example 2 and Example 1 is that: Figure 2 A condenser 6 is also provided on the standby pipeline 5 , the input end of the condenser 6 is connected to the output end of the air liquefier 53 , and the output end of the condenser 6 is connected to the input end of the storage tank 51 .

[0036] When the supercooled high-pressure liquid air is filled into the cryogenic liquid storage tank, it automatically balances to a low-pressure saturated liquid. Due to the influence of adiabatic loss, the liquid temperature will rise and the liquid will vaporize. During the vaporization process, the N2 component in the liquid phase will decrease, the O2 component will condense, the N2 component in the gas phase will increase, and the O2 component will decrease. Without emptying the liquid storage tank, the pressure will increase until the equilibrium pressure corresponding to the new temperature is reached. As the temperature of the liquid increases, although there will be partial vaporization, the liquid will increase in volume due to the influence of thermal expansion and contraction. If the pressure of the liquid air inside the storage tank increases, the volume of the liquid will expand and the pressure rise will increase. At this time, liquid nitrogen is introduced into the storage tank 51 by using the condenser 6, and the external liquid nitrogen is used as a cold source to cool and liquefy the liquid air vapor in the storage tank, so that the liquid air can be stored for a long time without component changes.

[0037] Embodiment 3: The difference between Example 3 and Example 2 is that: Figure 3 The storage tank 51 is a double-layer structure, including an outer layer 511 and an inner layer 512 that are independent of each other. The output end of the condenser 6 is connected to the outer layer 511, and the condenser 6 forms a circulation passage with the outer layer 511 through the reflux pipe 7. The output end of the liquid pump 54 is connected to the input end of the inner layer 512.

[0038] The liquid nitrogen output from the condenser 6 is passed into the outer layer 511 of the storage tank 51, and can also cool the liquid air in the inner layer 512. Then, the gaseous nitrogen mixed with the liquid nitrogen can flow back into the condenser 6 through the reflux pipe 7, so that the liquid nitrogen can be recycled between the outer layer 511 and the condenser 6 without interfering with the liquid air in the inner layer 512.

[0039] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A gas supply system, characterized in that: include A purifier (1) and a production gas device (2), wherein the purifier (1) is used to purify air input into a supply system, and the production gas device (2) is used to utilize the pure air for production, and the purifier (1) and the production gas device (2) are connected via a main delivery pipeline (3); The middle section of the main delivery pipeline (3) is provided with a common pipeline (4) and a spare pipeline (5) in parallel, and the spare pipeline (5) is provided with a storage tank (51) and a vaporizer (52) in sequence, the output end of the storage tank (51) is connected to the input end of the vaporizer (52), the storage tank (51) is used to store liquefied air, and the vaporizer (52) is used to vaporize the liquefied air input from the storage tank (51) into gaseous air; Under normal working conditions, compressed air is transported to the production gas equipment (2) via the common pipeline (4); under emergency working conditions, gas is supplied from liquefied air stored in the storage tank (51).

2. The gas supply system according to claim 1, characterized in that: The standby pipeline (5) is also provided with an air liquefier (53) and a liquid extraction pump (54); the air liquefier (53) is in communication with the main delivery pipeline (3); the output end of the air liquefier (53) is in communication with the input end of the liquid extraction pump (54); and the output end of the liquid extraction pump (54) is in communication with the input end of the storage tank (51).

3. The gas supply system according to claim 2, characterized in that: A condenser (6) is also provided on the standby pipeline (5), and the input end of the condenser (6) is connected to the output end of the air liquefier (53), and the output end of the condenser (6) is connected to the input end of the storage tank (51).

4. The gas supply system according to claim 3, characterized in that: The storage tank (51) is a double-layer structure, comprising an outer layer (511) and an inner layer (512); the output end of the condenser (6) is connected to the outer layer (511), and the condenser (6) forms a circulation passage with the outer layer (511) through a reflux pipe (7); the output end of the liquid pump (54) is connected to the input end of the inner layer (512).

5. The gas supply system according to claim 1, characterized in that: A check valve (31) is provided at one end of the main delivery pipeline (3) close to the purifier (1), and the output end of the check valve (31) is simultaneously connected to the input ends of the common pipeline (4) and the standby pipeline (5).

6. The gas supply system according to claim 1, characterized in that: A regulating valve (32) is provided at one end of the main delivery pipeline (3) close to the production gas equipment (2) so as to adjust the delivery pressure in the main delivery pipeline (3).

7. The gas supply system according to claim 6, characterized in that: A flow meter (33) is provided at one end of the main delivery pipeline (3) close to the production gas equipment (2); the input end of the flow meter (33) is connected to the output end of the regulating valve (32); the flow meter (33) is used to monitor the gas flow in the main delivery pipeline (3) in real time.

8. The gas supply system according to claim 7, characterized in that: The main delivery pipeline (3) is also provided with a filtering device (34), the input end of the filtering device (34) is connected to the output end of the flow meter (33), and a filtering element for filtering impurities is provided in the filtering device (34).

Citation Information

Patent Citations

  • Cooling water circulation device used in health food production

    CN102032753A

  • Constant-temperature overflow device applied to rumen simulation research

    CN104845865A

  • Method for promoting low temperature disproportionation reaction of toluene

    CN106866338A

  • Instrument air supply system

    CN110671608A

  • Liquefied air storage system and method

    CN116105058A