Novel high-temperature and high-dust SCR soot blowing system for cement kiln
By using low-pressure hot air devices and air supply devices in cement kilns, the high energy consumption and catalyst damage problems of high-pressure compressed air soot blowing system are solved, and low-energy consumption and efficient catalyst cleaning and purge is achieved, protecting the catalyst and preventing blockage.
Patent Information
- Application Number
- CN202411335137.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-12-03
AI Technical Summary
The existing high-pressure compressed air soot blowing system in cement kilns has problems such as high energy consumption and catalyst damage, resulting in high electricity costs and catalyst blockage.
Using a low-pressure hot air device, a low-pressure hot air of 100-150°C is generated through a screw blower as the purge medium for the rake soot blower, eliminating the compressed air station and electric heater, and using a screw blower to directly output air at specific pressures and temperatures. Perform purge and use the air supply device to prevent the rake pipe blowing hole from being blocked.
It realizes cleaning and purge of catalysts with low energy consumption and low investment, maximizes the protection of catalysts, avoids catalyst damage and blockage, and reduces the overall energy consumption and investment of the system.
Smart Images

Figure CN119056808A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of SCR denitration of cement kilns, and in particular to a novel high-temperature and high-dust SCR sootblowing system for cement kilns. Background Art
[0002] With the further improvement of environmental protection requirements, the use of SCR denitrification technology in cement kilns has become an industry consensus. For new dry cement production kilns, the high-temperature and high-dust SCR denitrification process has the advantages of low investment, small footprint, relatively flexible layout, and slightly lower operation and maintenance costs, and has a certain market demand.
[0003] The soot blowing system currently used in the industry generates compressed air through an air compressor, which is then heated by an electric heater or heat exchange coil and sent to a rake soot blower after being stabilized by a gas storage tank. It also needs to be supplemented by a sonic soot blowing system. Although this method can effectively remove dust deposits attached to the catalyst surface, it has the following disadvantages:
[0004] 1. High electricity cost: The compressed air pressure is relatively high, generally 0.6-0.8Mpa, which requires higher compression work, and must be cold-dried and decompressed before use, so it has high power and high electricity consumption.
[0005] 2. High energy consumption: Compressed air needs to be heated twice before use. If point heating is used, the electricity consumption will be huge. If coil and flue gas heat exchange are used, the system temperature drop will be increased and the power generation of the downstream waste heat boiler will be reduced.
[0006] 3. Catalyst damage: Since the soot blowers currently used in China use high-pressure compressed air to blow soot, the blowing pressure is generally around 6 kg. The high-pressure air flow will impact the catalyst, making it easy for the catalyst to be blown down, leading to problems such as catalyst blockage. Summary of the invention
[0007] The purpose of the present invention is to provide a novel high-temperature and high-dust SCR sootblowing system for cement kilns, which solves the problem in the prior art that high-pressure compressed air sootblowing not only has high energy consumption but also is prone to catalyst collapse due to high blowing pressure.
[0008] The purpose of the present invention can be achieved by the following technical solutions:
[0009] A new type of cement kiln high temperature and high dust SCR soot blowing system, the SCR soot blowing system includes:
[0010] A sootblowing device, the sootblowing device comprising a plurality of rake sootblowers arranged in the denitration tower, the rake sootblowers being used to reciprocately blow away the dust on the surface of the catalyst layer;
[0011] A low-pressure hot air device, the low-pressure hot air device comprising a plurality of screw blowers arranged in parallel, the screw blowers being used to generate hot air as a blowing medium for the rake soot blower;
[0012] A first pipeline component is installed between the sootblower device and the low-pressure hot air device, and is used to introduce the hot air generated by the screw blower into the rake sootblower.
[0013] As a further solution of the present invention: the first pipeline assembly includes a first main pipeline, a plurality of first air supply branch pipes and a plurality of second air supply branch pipes respectively installed at both ends of the first main pipeline, the plurality of first air supply branch pipes are respectively connected to the air outlet ends of the plurality of screw blowers, the plurality of second air supply branch pipes are respectively connected to the air inlet ends of the plurality of rake soot blowers, and an electric heating device is installed on the first main pipeline.
[0014] As a further solution of the present invention: the electric heating device includes an electric heater, the air inlet and air outlet ends of the electric heater are respectively connected to bypass branches connected to the first main line, a second switching valve is installed on the bypass branch, and a first switching valve is installed on the first main line.
[0015] As a further solution of the present invention: the temperature of the purge air of the screw blower is 100-150°C, the pressure is 0.5-1.5 bar, the travel speed of the rake soot blower is 10-30 mm / s, and the purge pressure of the rake soot blower is 0.5-1.5 bar.
[0016] As a further solution of the present invention: a plurality of the second air supply branch pipes are respectively connected to the second sealed branch pipes, a plurality of the second sealed branch pipes are commonly connected to the second main pipe, an air supply device is installed at one end of the second main pipe away from the second sealed branch pipe, and the air supply device is used to supply air to the stopped rake soot blower to prevent the rake pipe blowing holes of the rake soot blower from being blocked.
[0017] As a further solution of the present invention: the first switching valve located on the first main pipe is arranged between the two bypass branches.
[0018] As a further solution of the present invention: the air supply device includes a plurality of sealed fans arranged in parallel, the air outlet ends of the plurality of sealed fans are respectively connected to a first sealed branch pipe, and one end of the first sealed branch pipe away from the sealed fan is connected to the second main pipeline.
[0019] As a further solution of the present invention: a third valve and a fourth valve are respectively installed on the first sealed branch pipe and the second sealed branch pipe, a first valve and a second valve are respectively installed on the first air supply branch pipe and the second air supply branch pipe, and the second valve is arranged in parallel with the fourth valve.
[0020] As a further solution of the present invention: the first valve, the third valve, the first switching valve and the second switching valve are preferably manual valves, the second valve is preferably an automatic valve, and the fourth valve is preferably a check valve.
[0021] As a further solution of the present invention: the SCR sootblowing system also includes an automatic control system, the automatic control system includes a PLC, and the PLC is electrically connected to the rake sootblower, the screw blower, the electric heater, the sealed fan, and the second valve respectively.
[0022] Beneficial effects of the present invention:
[0023] 1. In the present invention, the low-pressure hot air generated by the screw blower is used as the blowing medium of the rake soot blower. The screw blower utilizes the compression work to heat and directly outputs the air of specific pressure and temperature to blow the catalyst layer surface back and forth, so that the catalyst layer is kept clean. The low-pressure blowing technology adopted by the present invention is specially suitable for high-dust environments, eliminating the investment in equipment such as compressed air stations. It not only has low energy consumption and low investment, but also can keep the catalyst layer clean while protecting the catalyst layer from damage caused by blowing to the maximum extent.
[0024] 2. In the present invention, the air supply device conveniently provides a certain amount of sealing air to the stopped rake soot blower to prevent the dust in the denitrification tower from clogging the rake pipe spray hole when the rake soot blower stops working, thereby making the rake soot blower have a good anti-clogging effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present invention will be further described below in conjunction with the accompanying drawings.
[0026] Figure 1 This is a system principle diagram of Embodiment 1 of a novel high-temperature and high-dust SCR sootblowing system for a cement kiln according to the present invention;
[0027] Figure 2 This is a system principle diagram of Embodiment 2 of a novel cement kiln high-temperature and high-dust SCR sootblowing system according to the present invention;
[0028] Figure 3 This is a system principle diagram of Embodiment 3 of the novel high-temperature and high-dust SCR sootblowing system for cement kiln according to the present invention;
[0029] Figure 4 It is a schematic diagram of the automatic control system in the new cement kiln high-temperature and high-dust SCR sootblowing system of the present invention.
[0030] In the figure: 1. rake soot blower; 2. screw blower; 3. first main line; 4. first air supply branch; 5. second air supply branch; 6. electric heater; 7. bypass branch; 8. second switching valve; 9. first switching valve; 10. second sealed branch; 11. second main line; 12. sealed fan; 13. first sealed branch; 14. third valve; 15. fourth valve; 16. first valve; 17. second valve. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] Embodiment 1:
[0033] like Figure 1 As shown, a new type of cement kiln high-temperature and high-dust SCR sootblowing system provided by an embodiment of the present invention, the SCR sootblowing system includes a sootblowing device, a low-pressure hot air device and a first pipeline assembly, the sootblowing device includes a plurality of rake sootblowers 1 arranged in the denitrification tower, in this embodiment, the blowing pressure of the rake sootblowers 1 is 0.5-1.5bar, the rake sootblowers 1 are used to reciprocately blow the surface dust of the catalyst layer, and the walking speed of the rake sootblowers 1 is 10-30mm / s.
[0034] It should be noted that the present application does not limit the specific number and installation position of the catalyst layers in the denitration tower, and the number of rake sootblowers 1 is determined according to the arrangement of the specific catalyst layers.
[0035] like Figure 1 As shown, the low-pressure hot air device includes a plurality of screw blowers 2 arranged in parallel. In this embodiment, the temperature of the purge air blown by the screw blower 2 is 100-150°C and the pressure is 0.5-1.5 bar. The screw blower 2 is used to generate low-pressure hot air as the purge medium of the rake soot blower 1.
[0036] It should be noted that the screw blower 2 is an oil-free screw blower with variable frequency control. The number of screw blowers 2 running simultaneously and the number of rake soot blowers 1 running simultaneously have a rated corresponding relationship. The simultaneous operation of rake soot blowers 1 exceeding the rated number will result in a decrease in the purge temperature and pressure.
[0037] For example, two screw blowers 2 are designed, one for use and one for backup, and the corresponding rated operating condition is to operate one rake soot blower 1 at the same time. At this time, the purge temperature is in the range of 100-150°C, and the pressure is in the range of 0.5-1.5 bar. When one screw blower 2 is operated corresponding to the simultaneous operation of two or more rake soot blowers 1 (or when two screw blowers 2 are operated corresponding to the simultaneous operation of three or more rake soot blowers 1), the temperature and pressure will be lower than the rated operating condition. This non-rated application scenario is generally used during startup and shutdown for comprehensive purging and replacement of the equipment system. At this time, an electric heater is required to meet the use effect.
[0038] The catalyst layer in the SCR denitration system usually works best within a certain temperature range. Using heated compressed air for soot blowing can ensure that the temperature inside the catalyst layer will not be significantly reduced due to the soot blowing operation, thereby protecting the activity of the catalyst layer.
[0039] Therefore, high-pressure compressed air soot blowing in the prior art is usually electrically heated. In addition, since moisture is inevitably present in the transported air and water is easily produced under a high-pressure compression environment, it is also dried by a cold dryer (the cold dryer uses refrigeration technology to lower the dew point temperature of the compressed air, so that the moisture condenses and is discharged from the system) to remove the moisture. Compared with high-pressure compressed air soot blowing, the screw blower 2 in the present application uses compression work to heat and directly output air of a specific pressure and temperature (temperature is 100-150°C, pressure is 0.5-1.5 bar) for blowing. No cold dryer is required (low-pressure blowing does not produce water) and no electric heater is required, resulting in lower energy consumption.
[0040] like Figure 1 As shown, the first pipeline assembly is installed between the sootblower device and the low-pressure hot air device. The first pipeline assembly is used to introduce the low-pressure hot air generated by the screw blower 2 into the rake sootblower 1. The first pipeline assembly includes a first main line 3, a plurality of first air supply branch pipes 4 and a plurality of second air supply branch pipes 5 respectively installed at both ends of the first main line 3. The plurality of first air supply branch pipes 4 are respectively connected to the air outlet ends of the plurality of screw blowers 2, and the plurality of second air supply branch pipes 5 are respectively connected to the air inlet ends of the plurality of rake sootblower 1. The first air supply branch pipe 4 and the second air supply branch pipe 5 are respectively installed with a first valve 16 and a second valve 17. In order to save costs, in this embodiment, the first valve 16 is preferably a manual valve. In order to facilitate the linkage between the second valve 17 and the rake sootblower 1, in this embodiment, the second valve 17 is preferably an automatic valve.
[0041] It should be noted that by controlling the opening and closing of the first valve 16 corresponding to the screw blower 2, multiple screw blowers 2 can be switched. When the screw blower 2 is working, the first valve 16 corresponding to it is opened, and the second valve 17 on the second air supply branch pipe 5 is controlled to open, so as to facilitate the low-pressure hot air generated by the screw blower 2 to be introduced into the corresponding rake soot blower 1.
[0042] Embodiment 2:
[0043] On the basis of Example 1, considering that the dust concentration inside the denitration tower is high and the spray hole of the rake tube of the rake soot blower 1 is small, when one rake soot blower 1 is working, the other rake soot blowers 1 stop working, and dust easily enters the rake tube of the stopped rake soot blower 1 to block the spray hole, in this embodiment, Figure 2 As shown, a plurality of second air supply branch pipes 5 are respectively connected to the second sealed branch pipes 10, and a plurality of second sealed branch pipes 10 are commonly connected to the second main pipe 11. An air supply device is installed at one end of the second main pipe 11 away from the second sealed branch pipe 10. The air supply device is used to supply air to the stopped rake soot blower 1 to prevent the rake pipe blowing hole of the rake soot blower 1 from being blocked.
[0044] It should be noted that, an air flow is generated by the air supply device and transported to the second main pipeline 11. When a rake soot blower 1 stops working, the corresponding second sealed branch pipe 10 is controlled to remain unobstructed, so that the air flow in the second main pipeline 11 enters the stopped rake soot blower 1 through the corresponding second sealed branch pipe 10, so that dust will not enter the rake pipe of the rake soot blower 1 and cause clogging of the blowing hole. It should be noted that when the second air supply branch pipe 5 transports low-pressure hot air, the corresponding second sealed branch pipe 10 needs to remain disconnected (at this time, the rake soot blower 1 is working and no anti-blocking treatment is required).
[0045] like Figure 2 As shown, the air supply device includes a plurality of sealed fans 12 arranged in parallel, and the air outlet ends of the plurality of sealed fans 12 are respectively connected to a first sealed branch pipe 13, and the end of the first sealed branch pipe 13 away from the sealed fan 12 is connected to the second main pipeline 11, and a third valve 14 and a fourth valve 15 are respectively installed on the first sealed branch pipe 13 and the second sealed branch pipe 10. In order to save costs, in this embodiment, the third valve 14 is preferably a manual valve. In order to achieve the switching of the sealed air by simpler means, in this embodiment, the fourth valve 15 is preferably a check valve, and the second valve 17 is arranged in parallel with the fourth valve 15.
[0046] It should be noted that the air supply device of the present application is not limited to the sealed fan 12, and any equipment that can generate airflow can be used as a replacement. It can be understood that the present application does not limit the number of sealed fans 12, and each sealed fan 12 can correspond to one or more rake soot blowers 1. It is only necessary to ensure that when the sealed fan 12 is running, an airflow of a certain pressure can be delivered to the stopped rake soot blower 1 (the input airflow pressure can achieve anti-blocking). Before the sealed fan 12 is operated, the third valve 14 on the corresponding first sealed branch pipe 13 needs to be opened, and the fourth valve 15 has the characteristic of one-way flow, so that the low-pressure hot air delivered by the second air supply branch pipe 5 can only flow into the rake soot blower 1.
[0047] Embodiment three:
[0048] On the basis of Embodiment 1 or 2, it is considered that when one screw blower 2 corresponds to multiple rake soot blowers 1, for example: the catalyst layer in the denitration tower of the present application is set to three layers from bottom to top, and each catalyst layer specifically corresponds to three reciprocating rake soot blowers 1. Under normal circumstances, the rake soot blowers 1 can ensure that each catalyst layer can be fully cleaned by intermittent cross-working (no more than three rake soot blowers 1 work each time), while avoiding soot blowing dead corners and improving the cleaning effect;
[0049] During the start-up and shutdown process, large flow and high temperature air are required for purging. The main purpose is to heat the catalyst and replace the harmful gases adsorbed in the catalyst to prevent condensation from causing accelerated degradation of the catalyst. At this time, it can be considered that the rake soot blowers 1 corresponding to the multiple catalyst layers are operated simultaneously (more than three rake soot blowers 1 are operated each time). However, since the screw blower 2 produces low-pressure hot air, when corresponding to multiple rake soot blowers 1, the compressed air pressure will be lower, resulting in the generated purge air temperature not meeting the requirements, causing the catalyst layer to deteriorate faster. In order to solve this problem;
[0050] In this embodiment, Figure 3 As shown, an electric heating device is installed on the first main line 3, and the electric heating device includes an electric heater 6. The air inlet end and the air outlet end of the electric heater 6 are respectively connected to a bypass branch pipe 7 connected to the first main line 3, and a second switching valve 8 is installed on the bypass branch pipe 7. A first switching valve 9 is installed on the first main line 3. The first switching valve 9 located on the first main line 3 is located between the two bypass branches 7. In order to save costs, in this embodiment, the first switching valve 9 and the second switching valve 8 are preferably manual valves.
[0051] It should be noted that when each screw blower 2 corresponds to multiple rake soot blowers 1, the temperature of the generated purge air cannot meet the requirements due to pressure reasons, so the generated purge air needs to be heated. By closing the first switching valve 9 and opening the second switching valve 8 on the bypass branch 7, the electric heater 6 and the corresponding screw blower 2 can be connected in series. The air generated by the screw blower 2 will first be heated by the electric heater 6 before being transported to the rake soot blower 1, so that the rake soot blower 1 can blow out the purge air with suitable temperature to avoid accelerated degradation of the catalyst layer.
[0052] Embodiment 4:
[0053] On the basis of the first, second or third embodiment, in order to facilitate automatic control of the SCR soot blowing system and reduce the error caused by manual operation, in this embodiment, Figure 4 As shown, the SCR sootblowing system also includes an automatic control system, which includes a PLC, and the PLC is electrically connected to the rake sootblower 1, the screw blower 2, the electric heater 6, the sealing fan 12, and the second valve 17 respectively.
[0054] It should be noted that when the rake soot blower 1 stops running, the second valve 17 on the corresponding second air supply branch pipe 5 is conveniently closed by PLC, so that the airflow generated by the sealing fan 12 is smoothly introduced into the non-operating rake soot blower 1 to achieve an anti-blocking effect;
[0055] When the number of rake soot blowers 1 running each time exceeds the total number of screw blowers 2, the temperature of the hot air generated by the screw blower 2 will not meet the purging requirement due to the decrease in compressed air pressure, so the electric heater 6 is started, the first switching valve 9 is closed and the second switching valve 8 is opened, so that the airflow generated by the screw blower 2 is heated by the electric heater 6 and then transported to the corresponding rake soot blower 1, thereby ensuring that the temperature of the purge air is within the required range and avoiding accelerated degradation of the catalyst layer due to the low temperature of the purge air.
[0056] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.
Claims
1. New cement kiln high temperature and high dust SCR soot blowing system, characterized by: The SCR soot blowing system comprises: A sootblowing device, the sootblowing device comprising a plurality of rake sootblowers (1) arranged in the denitration tower, the rake sootblowers (1) being used for reciprocatingly sweeping away the dust accumulated on the surface of the catalyst layer; A low-pressure hot air device, the low-pressure hot air device comprising a plurality of screw blowers (2) arranged in parallel, the screw blowers (2) being used to generate hot air as a blowing medium for the rake soot blower (1); A first pipeline component is installed between the sootblower device and the low-pressure hot air device, and the first pipeline component is used to introduce the hot air generated by the screw blower (2) into the rake sootblower (1).
2. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 1 is characterized in that: The first pipeline assembly comprises a first main pipeline (3), a plurality of first air supply branch pipes (4) and a plurality of second air supply branch pipes (5) respectively installed at both ends of the first main pipeline (3), the plurality of first air supply branch pipes (4) are respectively connected to the air outlet ends of the plurality of screw blowers (2), the plurality of second air supply branch pipes (5) are respectively connected to the air inlet ends of the plurality of rake soot blowers (1), and an electric heating device is installed on the first main pipeline (3).
3. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 2 is characterized in that: The electric heating device comprises an electric heater (6), the air inlet end and the air outlet end of the electric heater (6) are respectively connected to a bypass branch pipe (7) connected to the first main pipe (3), a second switching valve (8) is installed on the bypass branch pipe (7), and a first switching valve (9) is installed on the first main pipe (3).
4. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 1 is characterized in that: The temperature of the purge air of the screw blower (2) is 100-150°C, and the pressure is 0.5-1.5 bar. The travel speed of the rake soot blower (1) is 10-30 mm / s, and the purge pressure of the rake soot blower (1) is 0.5-1.5 bar.
5. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 3 is characterized in that: A plurality of the second air supply branch pipes (5) are respectively connected to the second sealed branch pipes (10), and a plurality of the second sealed branch pipes (10) are commonly connected to the second main pipe (11). An air supply device is installed at one end of the second main pipe (11) away from the second sealed branch pipe (10). The air supply device is used to supply air to the stopped rake soot blower (1) to prevent the rake pipe spray hole of the rake soot blower (1) from being blocked.
6. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 3 is characterized in that: The first switching valve (9) located on the first main pipeline (3) is arranged between the two bypass branch pipes (7).
7. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 5 is characterized in that: The air supply device comprises a plurality of sealed fans (12) arranged in parallel, the air outlet ends of the plurality of sealed fans (12) are respectively connected to a first sealed branch pipe (13), and one end of the first sealed branch pipe (13) away from the sealed fan (12) is connected to the second main pipe (11).
8. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 7 is characterized in that: A third valve (14) and a fourth valve (15) are respectively installed on the first sealed branch pipe (13) and the second sealed branch pipe (10); a first valve (16) and a second valve (17) are respectively installed on the first air supply branch pipe (4) and the second air supply branch pipe (5); and the second valve (17) is arranged in parallel with the fourth valve (15).
9. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 8 is characterized in that: The first valve (16), the third valve (14), the first switching valve (9) and the second switching valve (8) are preferably manual valves, the second valve (17) is preferably an automatic valve, and the fourth valve (15) is preferably a check valve.
10. The new cement kiln high temperature and high dust SCR soot blowing system according to claim 8 is characterized in that: The SCR sootblowing system further comprises an automatic control system, wherein the automatic control system comprises a PLC, and the PLC is electrically connected to the rake sootblower (1), the screw blower (2), the electric heater (6), the sealing fan (12), and the second valve (17) respectively.
Citation Information
Patent Citations
Movable impulse type compressed air soot blower and using method thereof
CN105478009A
Supporting quick catalyst regeneration device of SCR denitration
CN206103713U
High-pressure micro-fog dust suppression system with anti-blocking function
CN214610466U
Vacuum cleaner and its manufacture