Clamping assembly type rectangular open caisson structure and connecting method

Through the combination of the engaging connector and prestressed rebar, the problem of prefabricated segment-mounted caisson structures being prone to leakage and corrosion at the connections is solved, and a rectangular caisson structure with simple construction and strong waterproof performance is realized. Reduces construction risks and resource consumption.

CN119061924AInactive Publication Date: 2024-12-03GUANGZHOU MUNICIPAL ENGINEERING GROUP LTD +4
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411430775.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-14
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing prefabricated segment-prefabricated caisson structures are prone to leakage and corrosion at the connections, and are time-consuming and labor-intensive to ensure the quality of the connection.

Method used

The engaging connector is used to achieve elastic-type connection through prestressed rebar rods, slot holes and anti-retardation sleeves. It combines trapezoidal projections and groove overlaps, and uses a double engaging method to ensure a tight longitudinal connection, and Lateral fixation is performed by high-strength expansion bolts.

Benefits of technology

It realizes a rectangular caisson structure that is simple and fast to construct, anti-seepage and corrosion, improves the integrity and waterproof performance of the structure, shortens the construction period, and reduces costs and resource consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061924A_ABST
    Figure CN119061924A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of assembly type open caissons, in particular to a clamping assembly type rectangular open caisson structure which comprises prefabricated open caisson sections and connecting parts. Each prefabricated open caisson section is rectangular and comprises a top layer prefabricated section, a plurality of standard layer prefabricated sections and a blade foot which are sequentially arranged from top to bottom; a plurality of clamping groove holes are prefabricated in the bottom face of the top layer prefabricated section, the upper end face and the lower end face of the standard layer prefabricated section and the top face of the blade foot. The clamping groove holes in the top layer prefabricated section, the standard layer prefabricated sections and the blade foot are correspondingly formed in the vertical direction. The connecting part comprises a prestressed deformed steel bar, a clamping connecting piece, a first sleeve, a connecting piece bolt, a second sleeve, a fixed support, a retaining clamping sleeve, an elastic clamp assembly part and a U-shaped elastic clamp; and the connecting piece bolt is clamped and fixed with the elastic clamp assembly piece and the U-shaped elastic clamp. Construction is easy and fast, and waterproof and water seepage performance is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of assembled caissons, and in particular to a snap-fit ​​assembled rectangular caisson structure and a connection method. Background Art

[0002] With the rapid development of urbanization, in order to ease the pressure on urban land and improve the traffic environment, rectangular caissons are widely used in shield tunnels, jacking working shafts, sewage pumping stations, large bridge foundations and other structures in underground space development. Large and medium-sized caissons need to adopt a prefabricated segment assembly construction method because the length of the shaft is limited by the transportation and installation site. The cast-in-place caisson structure can reduce the construction period, reduce the on-site construction area, reduce costs, and can be customized in batches. However, when prefabricating standard blocks of different sizes according to different needs, it is necessary to consider the connection form between segments, as well as the leakage and corrosion problems at the connection points. The construction method of prefabricated segment assembly has the problems of time-consuming and labor-intensive, and the connection quality is difficult to guarantee. In view of the above technical problems, it is urgent to design a snap-fit ​​assembled rectangular caisson. Summary of the invention

[0003] In order to overcome the problems of time-consuming and labor-intensive installation of existing prefabricated segments and easy leakage and corrosion at the joints between prefabricated segments, the present application proposes the following technical solutions through the installation method of snap-fit ​​connection of spring-clip connectors to achieve the purpose of simple and fast construction, anti-leakage and anti-corrosion:

[0004] Technical solution 1: A snap-fit ​​assembled rectangular caisson structure, including prefabricated caisson segments and connecting components;

[0005] The prefabricated caisson segments are all rectangular, including a top prefabricated segment, a plurality of standard layer prefabricated segments and a blade foot arranged in sequence from top to bottom;

[0006] A plurality of slot holes are prefabricated on the bottom surface of the top prefabricated segment, the upper and lower end surfaces of the standard prefabricated segment, and the top surface of the blade foot. The slot holes on the top prefabricated segment, the plurality of standard prefabricated segments, and the blade foot are arranged in corresponding upper and lower positions.

[0007] The connecting parts include a prestressed threaded steel rod, a clamping connector, a first sleeve, a connector pin, a second sleeve, a fixed support, a retaining sleeve, a spring-clip assembly, and a U-shaped spring-clip;

[0008] The first sleeve and the second sleeve are both threadedly connected with the prestressed threaded steel rod 8 and embedded in the slot hole. A retaining sleeve is installed on the inner wall of the first sleeve, and a fixed support is installed in the second sleeve. A connector pin is installed on the bottom surface of the fixed support.

[0009] The anti-retraction clamp comprises a spring card assembly and a U-shaped spring card installed at the bottom of the spring card assembly;

[0010] The connector pin is fixedly engaged with the spring clip assembly and the U-shaped spring clip.

[0011] Furthermore, the inner sides of the top ends of the four sides of the prefabricated caisson segment are provided with connecting protrusions, and the outer sides of the well wall are provided with recesses, and the outer recesses have trapezoidal protrusions; the inner sides of the bottom ends of the four sides of the prefabricated caisson segment are also provided with connecting grooves corresponding to the connecting protrusions, and the outer sides of the well wall are provided with trapezoidal grooves corresponding to the trapezoidal protrusions; the top prefabricated segment, multiple standard layer prefabricated segments and the blade feet are connected by overlapping the grooves and protrusions.

[0012] Furthermore, a water stop strip is installed on the connecting protrusion.

[0013] Technical Solution 2: The present application provides a connection method of the snap-fit ​​assembled rectangular caisson structure described in Technical Solution 1, characterized in that the specific steps are as follows:

[0014] S1, design the caisson according to the actual engineering requirements and prefabricate it in the prefabrication yard;

[0015] The design of prefabricated caisson segments includes: determining the length of the caisson and each segment, the design elevation of the caisson, the reserved assembly holes, and the concave and convex dimensions of the top and top of the prefabricated lightweight high-strength concrete segment according to the actual project; the prefabricated caisson segments include: top prefabricated segments, standard layer prefabricated segments, and blade feet;

[0016] S2, determining the preset position of the caisson cushion layer, and pre-digging a foundation pit at the position, and after the foundation pit excavation is completed, pouring the cushion layer at the position;

[0017] Before hoisting the blade foot, the site needs to be leveled and earth excavated at the preset location;

[0018] S3, after the cast-in-place cushion layer has hardened and reached the strength requirement, the soil is backfilled;

[0019] S4, pre-build a bracket at the position required by the blade foot hoisting design, and then place the blade foot hoist on the bracket for installation and fixation; after the blade foot hoisting is completed, wax is applied to the outer wall of the blade foot layer, and then the blade foot is sunk to a preset distance range;

[0020] S5, hoisting and placing the standard layer prefabricated segment with prestressed threaded steel rods and snap-fit ​​connectors on the top of the blade foot, during the hoisting process, the bottom connecting groove of the standard layer prefabricated segment, the trapezoidal groove and the connecting protrusion on the top of the blade foot and the trapezoidal protrusion need to be assembled and fixed, after the standard layer prefabricated segment is assembled, its outer wall is coated with wax;

[0021] S6, repeat the operation of S5 until the top prefabricated segment is installed, excavate the soil in the blade foot area manually or mechanically, and sink the caisson structure until the bottom of the blade foot sinks to the designed elevation; after all the lifting and installation are completed, seal the bottom of the caisson.

[0022] This application has the following beneficial effects:

[0023] 1. Using slag concrete as the material of the caisson has a light weight, which can reduce carbon emissions and resource consumption, is beneficial to environmental protection, and can also reduce energy consumption and costs of construction;

[0024] 2. The prefabricated segments are composed of flat closed rectangular sections, which allow slight deviations without affecting construction and have strong integrity. They can also reduce construction procedures, reduce construction risks, and shorten construction periods. They are prefabricated in the factory and then transported to the construction site for assembly, which greatly reduces the construction period on site and improves construction efficiency.

[0025] 3. After each rectangular closed segment is assembled, a water-blocking measure is naturally formed, that is, the outer side of the lower end side wall of the upper segment is convex and the inner side is concave, while the inner side of the side wall of the lower segment is convex and the outer side is concave, which has high structural stability, strong self-waterproofing and water-stopping performance;

[0026] 4. The segments are connected longitudinally with toothed snap-in prestressed steel rod connectors, which can effectively solve the problem of connection failure caused by over-insertion or under-insertion of the rods. Double snap-in is used to make the structure densely connected in the longitudinal direction, further playing a role in waterproofing and water seepage; high-strength expansion bolts are used in the transverse direction to connect the top of the lower prefabrication stage and the bottom of the upper prefabrication stage together. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention;

[0028] Figure 2 This is a schematic diagram of the blade foot structure;

[0029] Figure 3 This is a schematic diagram of the standard layer prefabricated segment structure;

[0030] Figure 4 This is a schematic diagram of the top prefabricated segment structure;

[0031] Figure 5 for Figure 1 AA section view;

[0032] Figure 6 It is a schematic diagram of the structure of the top prefabricated segment snap-fit ​​connector;

[0033] Figure 7This is a schematic diagram of the structure of the standard layer prefabricated segment snap-fit ​​connector;

[0034] Figure 8 It is a schematic diagram of the structure of the top prefabricated segment and the standard prefabricated segment being connected by a snap fit;

[0035] Fig. 9 It is a schematic diagram of the connector pin;

[0036] Fig.10 This is a schematic diagram of the stop card sleeve.

[0037] In the figure: 1-top prefabricated segment, 2-standard prefabricated segment, 3-blade foot, 4-waterstop, 5-slot hole, 61-trapezoidal protrusion, 62-trapezoidal groove, 71-connecting protrusion, 72-connecting groove, 81-first prestressed threaded steel rod, 82-second prestressed threaded steel rod, 9-clamping connector, 10-first sleeve, 11-connecting pin, 12-second sleeve, 13-fixed support, 14-retraction sleeve, 15-spring-clip assembly, 16-U-shaped spring-clip. DETAILED DESCRIPTION

[0038] The present application will be described in detail below in conjunction with the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present application. In addition, in the following description, the description of the structure and technical common knowledge is omitted to avoid unnecessary confusion of the concept of the present application.

[0039] Embodiment 1: Combining with Figure 1-10 , the present application provides a snap-fit ​​assembled rectangular caisson structure, including prefabricated caisson segments and connecting components;

[0040] The prefabricated caisson segments are all rectangular, including a top prefabricated segment 1, a plurality of standard layer prefabricated segments 2 and a blade foot 3 arranged in sequence from top to bottom;

[0041] A plurality of slot holes 5 are prefabricated on the bottom surface of the top prefabricated segment 1, the upper and lower end surfaces of the standard prefabricated segment 2, and the top surface of the blade foot 3. The slot holes 5 on the top prefabricated segment 1, the plurality of standard prefabricated segments 2, and the blade foot 3 are arranged in corresponding upper and lower positions.

[0042] The connecting parts include a prestressed threaded steel rod 8, a clamping connector 9, a first sleeve 10, a connector pin 11, a second sleeve 12, a fixed support 13, a retaining sleeve 14, a spring-clip assembly 15, and a U-shaped spring-clip 16;

[0043] The first sleeve 10 and the second sleeve 12 are both threadedly connected with the prestressed threaded steel rod 8 and embedded in the slot hole 5. A retaining sleeve 14 is installed on the inner wall of the first sleeve 10, and a fixed support 13 is installed in the second sleeve 12. The bottom surface of the fixed support 13 is installed with a connector pin 11;

[0044] The anti-retraction clamp 14 includes a spring clamp assembly 15 and a U-shaped spring clamp 16 installed at the bottom of the spring clamp assembly 15;

[0045] The connector pin 11 is engaged and fixed with the spring clip assembly part 15 and the U-shaped spring clip 16 .

[0046] Furthermore, the inner sides of the top well walls of the four sides of the prefabricated caisson segment are provided with connecting protrusions 71, and the outer sides of the well walls are provided with recesses, and the outer recesses have trapezoidal protrusions 61; the inner sides of the bottom well walls of the four sides of the prefabricated caisson segment are also provided with connecting grooves 72 corresponding to the connecting protrusions 71, and the outer sides of the well walls are provided with trapezoidal grooves 62 corresponding to the trapezoidal protrusions 61; the top prefabricated segment 1, multiple standard layer prefabricated segments 2 and the blade feet 3 are connected by overlapping the grooves and protrusions.

[0047] Furthermore, a water stop strip 4 is installed on the connecting protrusion 71 .

[0048] Embodiment 2: A connection method of the snap-fit ​​assembled rectangular caisson structure according to Embodiment 1, characterized in that the specific steps are as follows:

[0049] S1, design the caisson according to the actual engineering requirements and prefabricate it in the prefabrication yard;

[0050] The design of prefabricated caisson segments includes: determining the length of the caisson and each segment, the design elevation of the caisson, the reserved assembly holes, and the concave and convex dimensions of the top and top of the prefabricated lightweight high-strength concrete segment according to the actual project; the prefabricated caisson segments include: the top prefabricated segment 1, the standard layer prefabricated segment 2, and the blade foot 3;

[0051] S2, determining the preset position of the caisson cushion layer, and pre-digging a foundation pit at the position, and after the foundation pit excavation is completed, pouring the cushion layer at the position;

[0052] Before hoisting the blade foot 3, the site needs to be leveled and earth excavated at the preset position;

[0053] S3, after the cast-in-place cushion layer has hardened and reached the strength requirement, the soil is backfilled;

[0054] S4, pre-set up a bracket at the position required by the hoisting design of the blade foot 3, and then hoist the blade foot 3 onto the bracket for installation and fixation; after the hoisting of the blade foot 3 is completed, wax is applied to the outer wall of the blade foot 3, and then the blade foot 3 is sunk to a preset distance range;

[0055] S5, hoist the standard layer prefabricated segment 2 with the prestressed threaded steel rod 8 and the snap-fit ​​connector 9 to the top of the blade foot. During the hoisting process, the bottom connecting groove 72 and the trapezoidal groove 62 of the standard layer prefabricated segment 2 need to be assembled and fixed with the connecting protrusion 71 and the trapezoidal protrusion 61 on the top of the blade foot 3. After the standard layer prefabricated segment 2 is assembled, its outer wall is coated with wax.

[0056] During installation, when the connector pin 11 is placed into the anti-retraction sleeve 14, the bottom enlarged head connection parts on both sides of the connector 11 to be engaged pass through the upper straight section of the anti-retraction sleeve 14 and are subjected to inward pressure. When the bottom enlarged head connection parts on both sides reach the middle arc cavity area of ​​the anti-retraction sleeve 14, the pressure is released so that the protruding area on the top of the enlarged head is engaged with the bottom of the straight section of the anti-retraction sleeve 14. During the engagement process of the bottom enlarged head connection parts of the two side pieces, the bottom enlarged head connection part of the middle piece of the connector pin 11 is engaged in the U-shaped spring clip 16, forming a double engagement, which prevents the connector pin 11 from moving.

[0057] S6, repeat the operation of S5 until the top prefabricated segment 1 is installed, excavate the soil in the blade foot area manually or mechanically, and sink the caisson structure until the bottom of the blade foot sinks to the designed elevation; after all the lifting and installation are completed, seal the bottom of the caisson.

[0058] The above embodiments are merely illustrative of the principles and effects of the present application, and are not intended to limit the present application. Anything within the technical concept disclosed in the present application, and any simple replacement or change based on the technical solution of the present application, shall fall within the protection scope of the present application.

Claims

1. A snap-fit ​​assembled rectangular caisson structure, characterized in that: Including prefabricated caisson segments and connecting parts; The prefabricated caisson segments are all rectangular, and include a top prefabricated segment (1), a plurality of standard layer prefabricated segments (2) and a blade foot (3) arranged in sequence from top to bottom; A plurality of slot holes (5) are prefabricated on the bottom surface of the top prefabricated segment (1), the upper and lower end surfaces of the standard prefabricated segment (2), and the top surface of the blade foot (3); the slot holes (5) on the top prefabricated segment (1), the plurality of standard prefabricated segments (2), and the blade foot (3) are arranged at corresponding upper and lower positions; The connecting component comprises a prestressed threaded steel rod (8), a snap-fit ​​connector (9), a first sleeve (10), a connector latch (11), a second sleeve (12), a fixed support (13), a retaining sleeve (14), a spring-clip assembly (15), and a U-shaped spring-clip (16); The first sleeve (10) and the second sleeve (12) are both threadedly connected to the prestressed threaded steel rod (8) and embedded in the slot hole (5); a retaining sleeve (14) is installed on the inner wall of the first sleeve (10); a fixed support (13) is installed in the second sleeve (12); and a connector pin (11) is installed on the bottom surface of the fixed support (13); The anti-retraction clamp (14) comprises a spring clamp assembly (15) and a U-shaped spring clamp (16) installed at the bottom of the spring clamp assembly (15); The connector latch (11) is engaged and fixed with a spring clip assembly part (15) and a U-shaped spring clip (16).

2. The snap-fit ​​assembled rectangular caisson structure according to claim 1 is characterized in that: The inner sides of the top well walls of the four sides of the prefabricated caisson segment are all provided with connecting protrusions (71), and the outer sides of the well walls are provided with concave platforms, and the outer concave platforms have trapezoidal protrusions (61); the inner sides of the bottom well walls of the four sides of the prefabricated caisson segment are also provided with connecting grooves (72) corresponding to the connecting protrusions (71), and the outer sides of the well walls are provided with trapezoidal grooves (62) corresponding to the trapezoidal protrusions (61); the top prefabricated segment (1), the plurality of standard layer prefabricated segments (2) and the blade foot (3) are connected by overlapping the grooves and the protrusions.

3. The snap-fit ​​assembled rectangular caisson structure according to claim 2 is characterized in that: A water stop strip (4) is installed on the connecting protrusion (71).

4. A method for connecting the snap-fit ​​assembled rectangular caisson structure according to claim 3, characterized in that: The specific steps are as follows: S1, design the caisson according to the actual engineering requirements and prefabricate it in the prefabrication yard; The design of prefabricated caisson segments includes: determining the length of the caisson and each segment, the design elevation of the caisson, the reserved assembly holes, and the concave platform and convex size of the top and top of the prefabricated lightweight high-strength concrete segment according to the actual project; the prefabricated caisson segments include: the top prefabricated segment (1), the standard layer prefabricated segment (2), and the blade foot (3); S2, determining the preset position of the caisson cushion layer, and pre-digging a foundation pit at the position, and after the foundation pit excavation is completed, pouring the cushion layer at the position; Before hoisting the blade foot (3), the site needs to be leveled and earth excavated at the preset location; S3, after the cast-in-place cushion layer has hardened and reached the strength requirement, the soil is backfilled; S4, pre-erecting a bracket at the position required by the blade foot (3) for hoisting design, and then hoisting the blade foot (3) onto the bracket for installation and fixation; after the hoisting of the blade foot (3) is completed, wax treatment is applied to the outer wall of the blade foot (3), and then the blade foot (3) is sunk to a preset distance range; S5, hoisting and placing the standard layer prefabricated segment (2) with the prestressed threaded steel rod (8) and the snap-fit ​​connector (9) to the top of the blade foot. During the hoisting process, the bottom connecting groove (72) and the trapezoidal groove (62) of the standard layer prefabricated segment (2) and the connecting protrusion (71) and the trapezoidal protrusion (61) at the top of the blade foot (3) need to be assembled and fixed. After the standard layer prefabricated segment (2) is assembled, its outer wall is waxed; S6, repeat the operation of S5 until the top prefabricated segment (1) is installed, excavate the soil in the blade foot area manually or mechanically, and sink the caisson structure until the bottom of the blade foot sinks to the designed elevation; after all the lifting and installation are completed, seal the bottom of the caisson.

Citation Information

Patent Citations

  • Elastic clamping type connecting piece for concrete precast pile

    CN114673147A

  • Elastic clamping type connection prestressed concrete pile and construction method

    CN116289901A

  • Invisible self-insertion connecting piece for furniture

    CN211648701U

  • Prefabricated assembly type open caisson

    CN215329981U

  • Precast concrete pile rapid butt joint structure

    CN216238500U