Cantilever floor slab construction method under shaped space constraint condition

By designing a suitable cantilever floor slab mount device in the construction of cantilever floor slabs, the construction difficulties under the constraints of the standardized space are solved, the equipment is efficient, safe, reusable and widely applicable, and the construction process is ensured. Going smoothly.

CN119062123APending Publication Date: 2024-12-03GUANGXI CONSTR FIRST CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411472735.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-22
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Under the constraints of fixed space, the existing technology is difficult to effectively support large eaves formwork during the construction of cantilevered floors, especially when the full scaffolding cannot be installed or the presence of immovable items, the construction is difficult and the stress is poor.

Method used

By determining the appropriate size of long, short, and I-shaped steel beams, combined with the rear end tension device and fixing method, a cantilever floor slab mount device is designed, including I-shaped steel beams, steel sleeves, upper fastening device, The vertical pole positioning device, oblique brace, lower fastening device and rear end tension device ensure horizontal installation and stress of steel beams, and achieve stable erection and removal of the formwork.

Benefits of technology

The construction process is simplified, the equipment can be reused, the loss is low, the installation is fast, the support is uniform, the application is wide, and the lossless installation and disassembly can be achieved under complex space conditions, improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062123A_ABST
    Figure CN119062123A_ABST
Patent Text Reader

Abstract

The invention provides a cantilever floor slab construction method under a shaped spatial constraint condition, and belongs to the technical field of cantilever floor slab construction, a cantilever template erecting device for realizing the method comprises structures such as steel beams, steel columns, cross beams, steel wire ropes and fixing devices, and a template support is arranged on the cantilever template erecting device under the spatial constraint condition. And then a template support is erected on the template, and finally concrete pouring is completed. The construction process is simple, equipment can be recycled repeatedly, the loss is very low, the equipment height is shaped, the device can be mounted and dismounted in a lossless manner, the device can be used repeatedly, the applicability is wide, the turnover performance is high, and mounting is rapid and convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cantilevered floor construction, and in particular to a cantilevered floor construction method under standardized space constraint conditions. Background Art

[0002] During the construction process, it is often encountered that the cantilever length of the eaves board is relatively large. If the support system is too high, it will be difficult to support and reinforce the large eaves formwork.

[0003] The Chinese patent with the announcement number CN102322140A discloses a construction method for supporting a large-span cantilever eaves formwork. One end of the support body is laid on the lower layer of the cantilever eaves, and the other end is tied to the beam of the lower layer through a steel wire rope. The support body is linearly arranged along the periphery of the building at a certain distance. A scaffold is set up on the cantilevered support body, and the cantilever eaves formwork is supported on the top of the scaffold. The cantilever eaves formwork is stressed at the outer side of the outer wall, which is difficult to construct and poorly stressed. Therefore, it is necessary to design a cantilever floor construction method under standardized space constraints. Summary of the invention

[0004] The purpose of the present invention is to provide a cantilever floor construction method under standardized space constraints to solve the technical problems of existing construction difficulties, such as the construction method of formwork erection when it is impossible to erect a full-floor scaffold or a cantilever scaffold below the erection location, and when there are existing buildings or immovable objects below the erection location that cannot withstand the load of formwork pouring.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0006] A cantilever floor construction method under standardized space constraint conditions, the method comprising the following steps:

[0007] 1) Determine the long beam, short beam modulus and I-beam size of the cantilever floor slab erection device: The installation spacing and I-beam size of the cantilever erection device shall be calculated according to 5.6.3 of the "Safety Technical Specifications for Fastener-type Steel Pipe Scaffolding in Building Construction" (JGJ130-2011), and the length of the fixed section of the I-beam in the floor slab shall not be less than 1.25 times the length of the cantilever section of the I-beam. Select the appropriate long beam, short beam modulus and I-beam size according to the calculation results;

[0008] 2) Positioning of the pad of the rear tension device and the base of the steel column: Draw a plan layout according to the determined long beam, short beam modulus and I-beam size, and mark and position on site;

[0009] 3) Fixing of pad and base: At the positioning points of pad and base, select expansion bolts or through-plate U-shaped anchor bolts for fixing according to the actual situation on site;

[0010] 4) Installation of long beam and short beam: Insert the interfaces of long beam and short beam into the transverse slots of two lower fastening devices to ensure firmness;

[0011] 5) Installation of I-beam: After the I-beam passes through the steel sleeve, install the fastening device, diagonal brace and two vertical pole positioning devices;

[0012] 6) Preliminary installation of the rear-end tension device: The upper wire rope passes through the first and second lifting rings of the I-beam respectively, and the lower wire rope passes through the pull ring on the pad. The upper wire rope and the lower wire rope are connected by the basket bolts, and the level ruler is used to ensure that the steel beam remains horizontal;

[0013] 7) Formwork support and formwork erection: After the cantilever formwork erection device is installed, the formwork support and formwork erection begin, and the level of the steel beam is monitored by a level ruler during the process;

[0014] 8) Concrete pouring and curing: Concrete pump pipe brackets and pump pipes should not be placed above the cantilever area, and operators should be prevented from staying on the cantilever area. During the pouring and curing process, real-time adjustments should be made through basket bolts;

[0015] 9) Removal of floor formwork, frame and cantilever formwork installation: after the curing period is reached, the formwork shall be removed first, then the frame and finally the cantilever formwork installation. The cantilever formwork installation shall be removed in the reverse order of the installation process. Before the steel beam is removed, the tension shall be gradually removed from the basket bolts and the horizontal monitoring of the steel beam shall be maintained.

[0016] Furthermore, the cantilever floor slab erection device comprises a plurality of cantilever devices and a support frame, wherein the plurality of cantilever devices are arranged side by side and at intervals on the floor slab, and the front ends of the cantilever devices extend outward from the floor slab, and the support frame is arranged on the ends of the cantilever devices extending outward from the floor slab;

[0017] The cantilever device includes an I-beam, a steel sleeve, an upper fastening device, a vertical pole positioning device, a diagonal brace, a lower fastening device, a steel column and a rear end tension device. The steel column is vertically arranged on the edge of the floor slab, the steel sleeve is arranged on the top of the steel column, the I-beam passes through the steel sleeve and extends out of the outside of the floor slab, the rear end tension device is arranged at the rear end bottom of the I-beam and fixed on the floor slab, the upper fastening device and the vertical pole positioning device are fixedly arranged on the end of the I-beam extending out of the floor slab, the lower fastening device is arranged on the steel column, and the diagonal brace is obliquely arranged between the upper fastening device and the lower fastening device.

[0018] Furthermore, a first lifting ring, a second lifting ring and a round hole are arranged on the I-beam, the first lifting ring and the second lifting ring are arranged at the bottom of the rear end of the I-beam, and the round hole is arranged at the end of the I-beam extending out of the floor slab.

[0019] Furthermore, the upper fastening device includes a frame, an upper fastening device slot is arranged at the bottom of the frame, upper fastening device position holes are arranged on both sides of the frame, upper fastening device bolts are arranged to pass through the upper fastening device position holes, and are tightened using upper fastening device nuts, and upper fastening device gaskets are arranged on the inner side of the upper fastening device nuts.

[0020] Furthermore, the pole positioning device includes a left plate, a right plate, a pole positioning rib and a fixing device, the left plate and the right plate constitute a frame structure, the left plate and the right plate are fixed by the fixing device, and the pole positioning rib is set on the top of the frame structure.

[0021] Furthermore, the lower fastening device includes a frame, and the three sides of the frame are respectively provided with a first slot of the lower fastening device, a second slot of the lower fastening device and a third slot of the lower fastening device, and the other side of the frame is provided with a screw hole of the lower fastening device, and the bolts of the lower fastening device are set to pass through the screw holes of the lower fastening device for fixing.

[0022] Furthermore, the rear end tension device includes two tension rope devices, one end of the two tension rope devices are respectively arranged on the first lifting ring and the second lifting ring, and the other ends of the two tension rope devices are fixed on the floor slab. The tension rope device includes an upper end steel wire rope, a basket bolt, a lower end steel wire rope, a pull ring and a pad. One end of the upper end steel wire rope is connected to the first lifting ring or the second lifting ring, the other end of the upper end steel wire rope is connected to the upper end of the basket bolt, one end of the lower end steel wire rope is connected to the lower end of the basket bolt, the other end of the lower end steel wire rope is connected to the pull ring, the pull ring is connected to the pad, and the pad is fixed to the floor slab.

[0023] Furthermore, the steel columns between two adjacent cantilever device steel columns are connected by a long crossbeam or a short crossbeam buckle, and the long crossbeam or the short crossbeam buckle is between the two lower fastening devices.

[0024] Furthermore, a base is provided at the bottom of the steel column, the steel column is fixedly connected to the base, and the base is fixed to the floor slab by expansion bolts.

[0025] Furthermore, the pad is fixedly arranged by passing through the floor slab through U-bolts.

[0026] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0027] (1) The invention has a simple construction process, the equipment can be recycled repeatedly, the loss is very low, the equipment is highly standardized, the device can be installed and disassembled without loss, can be reused, has wide applicability and high turnover performance, and is quick and convenient to install.

[0028] (2) The installation structure is all carried out on the floor slab, which is easy to install. At the same time, the supporting force is transmitted through the supporting beam to transmit the tension on the floor slab, achieving better vertical force. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a three-dimensional diagram of the invented cantilever device;

[0030] Figure 2 It is the invention of the three-dimensional diagram of steel beams;

[0031] Figure 3 It is a three-dimensional diagram of the formwork frame erected on the cantilever device combination;

[0032] Figure 4 It is an exploded schematic diagram of the invented pole positioning device;

[0033] Figure 5 It is an exploded schematic diagram of the fastening device of the invention;

[0034] Figure 6 It is an exploded schematic diagram of the fastening device under the invention;

[0035] Figure 7 It is a schematic diagram of the connection between the diagonal brace and the upper and lower fastening devices of the invention.

[0036] In the attached drawings, 1-I-beam, 1.1-first lifting ring, 1.2-second lifting ring, 1.3-round hole, 2-steel sleeve, 3-upper fastening device, 3.1-upper fastening device bolt, 3.2-upper fastening device gasket, 3.3-upper fastening device position hole, 3.4-upper fastening device nut, 3.5-upper fastening device slot, 4-pole positioning device, 4.1-left web plate, 4.2-right web plate, 4.3-pole positioning rib, 4.4-pole positioning device nut, 4.5-pole positioning device first gasket, 4.6-pole positioning device Hole positions, 4.7-second gasket of the vertical pole positioning device, 4.8-bolt of the vertical pole positioning device, 5-diagonal brace, 6-lower fastening device, 6.1-first slot of the lower fastening device, 6.2-second slot of the lower fastening device, 6.3-third slot of the lower fastening device, 6.4-screw hole of the lower fastening device, 6.5-gasket of the lower fastening device, 6.6-bolt of the lower fastening device, 7-steel column, 8-upper end steel wire rope, 9-basket bolt, 10-lower end steel wire rope, 11-pull ring, 12-pad, 13-base, 14-long beam, 15-short beam. DETAILED DESCRIPTION

[0037] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and preferred embodiments. However, it should be noted that many details listed in the specification are only for the purpose of enabling the reader to have a thorough understanding of one or more aspects of the present invention, and these aspects of the present invention can be implemented even without these specific details.

[0038] like Figure 1-7As shown, a cantilever floor construction method under standardized space constraints comprises the following steps:

[0039] 1) Determine the modulus of the long beam 14 and short beam 15 of the cantilever floor slab erection device and the size of the I-beam 1: The installation spacing of the cantilever erection device and the size of the I-beam 1 are calculated according to 5.6.3 of the "Safety Technical Specifications for Fastener-type Steel Pipe Scaffolding in Building Construction" (JGJ130-2011), and the length of the fixed section of the I-beam 1 in the floor slab should not be less than 1.25 times the length of the cantilever section of the I-beam 1. According to the calculation results, select the appropriate modulus of the long beam 14 and short beam 15 and the size of the I-beam 1. Set it to more than 1.25 times to achieve better force. According to the principle of lever, the longer the length set at the floor slab end, the better the lever force.

[0040] 2) Positioning of the pad 12 of the rear tension device and the base 13 of the steel column 7: Draw a plan layout according to the determined modulus of the long beam 14 and the short beam 15 and the size of the I-beam 1, and mark and position on site;

[0041] 3) Fixing the pad 12 and the base 13: At the positioning points of the pad 12 and the base 13, select expansion bolts or through-plate U-shaped anchor bolts for fixing according to the actual situation on site.

[0042] 4) Installation of the long beam 14 and the short beam 15: The interfaces of the long beam 14 and the short beam 15 are inserted into the transverse slots of the two lower fastening devices 6 to ensure firmness.

[0043] 5) Installation of the I-beam 1: After the I-beam 1 passes through the steel sleeve 2, the fastening device 3, the diagonal brace 5 and the two vertical pole positioning devices 4 are installed.

[0044] 6) Preliminary installation of the rear end tension device: The upper end wire rope 8 passes through the first lifting ring 1.1 and the second lifting ring 1.2 of the I-beam 1 respectively, and the lower end wire rope 10 passes through the pull ring 11 on the pad 12, and the upper end wire rope 8 and the lower end wire rope 10 are connected by the basket bolt 9, and the level ruler is used to ensure that the steel beam remains horizontal.

[0045] 7 Formwork support and formwork erection: After the cantilever formwork erection device is installed, start the formwork support and formwork erection. During the process, the level of the steel beam is monitored by a spirit level.

[0046] 8. Concrete pouring and maintenance: Concrete pump pipe brackets and pump pipes should not be arranged above the cantilever area, and workers should be prevented from staying in the cantilever area. During the pouring and maintenance process, real-time adjustments should be made through basket bolts.

[0047] 9. Removal of floor formwork, frame and cantilever formwork erection device: after the curing age is reached, the formwork shall be removed first, then the frame and finally the cantilever formwork erection device. The cantilever formwork erection device shall be removed in the reverse order of the installation process. Before the steel beam is removed, the basket bolts shall gradually remove the tension and the horizontal monitoring of the steel beam shall be maintained.

[0048] In an embodiment of the present invention, the cantilever floor slab erection device in step 1 includes a plurality of cantilever devices and a support frame, wherein the plurality of cantilever devices are arranged side by side and spaced apart on the floor slab, and the front end of the cantilever device extends out of the outside of the floor slab, and the support frame is arranged on the end of the cantilever device extending out of the floor slab.

[0049] The cantilever device includes an I-beam 1, a steel sleeve 2, an upper fastening device 3, a vertical pole positioning device 4, a diagonal brace 5, a lower fastening device 6, a steel column 7 and a rear end tension device. The steel column 7 is vertically arranged on the edge of the floor slab, the steel sleeve 2 is arranged at the top of the steel column 7, the I-beam 1 passes through the steel sleeve 2 and extends out of the outside of the floor slab, the rear end tension device is arranged at the rear end bottom of the I-beam 1 and fixed on the floor slab, the upper fastening device 3 and the vertical pole positioning device 4 are fixedly arranged on the end of the I-beam 1 extending out of the floor slab, the lower fastening device 6 is arranged on the steel column 7, and the diagonal brace 5 is obliquely arranged between the upper fastening device 3 and the lower fastening device 6.

[0050] like Figure 2 As shown, the I-beam 1 is provided with a first lifting ring 1.1, a second lifting ring 1.2 and a circular hole 1.3. The first lifting ring 1.1 and the second lifting ring 1.2 are arranged at the bottom of the rear end of the I-beam 1, and the circular hole 1.3 is arranged at the end of the I-beam 1 extending out of the floor slab.

[0051] like Figure 5 As shown, the upper fastening device 3 includes a frame, an upper fastening device slot 3.5 is provided at the bottom of the frame, upper fastening device holes 3.3 are provided on both sides of the frame, upper fastening device bolts 3.1 are provided to pass through the upper fastening device holes 3.3, and are tightened using upper fastening device nuts 3.4, and upper fastening device gaskets 3.2 are provided inside the upper fastening device nuts 3.4.

[0052] like Figure 4 As shown, the pole positioning device 4 includes a left plate 4.1, a right plate 4.2, a pole positioning rib 4.3 and a fixing device. The left plate 4.1 and the right plate 4.2 form a frame structure. The left plate 4.1 and the right plate 4.2 are fixed by the fixing device, and the pole positioning rib 4.3 is set on the top of the frame structure.

[0053] like Figure 6As shown, the lower fastening device 6 comprises a frame, and the three sides of the frame are respectively provided with a lower fastening device first slot 6.1, a lower fastening device second slot 6.2 and a lower fastening device third slot 6.3, and the other side of the frame is provided with a lower fastening device screw hole 6.4, and a lower fastening device bolt (6.6) is arranged to pass through the lower fastening device screw hole 6.4 for fixing. The lower fastening device 6 realizes the force in the horizontal direction and the vertical direction.

[0054] like Figure 1 As shown, the rear-end tension device includes two tension rope devices, one end of which is respectively arranged on the first lifting ring 1.1 and the second lifting ring 1.2, and the other end of which is fixed on the floor slab. The tension rope device includes an upper wire rope 8, a flower basket bolt 9, a lower wire rope 10, a pull ring 11 and a pad 12. One end of the upper wire rope 8 is connected to the first lifting ring 1.1 or the second lifting ring 1.2, and the other end of the upper wire rope 8 is connected to the upper end of the flower basket bolt 9, one end of the lower wire rope 10 is connected to the lower end of the flower basket bolt 9, and the other end of the lower wire rope 10 is connected to the pull ring 11, and the pull ring 11 is connected to the pad 12, and the pad 12 is fixed on the floor slab. The rear-end tension device is provided with a device of corresponding strength according to the force requirement, or a larger number of tension devices are provided, so that the pressure extending out of the floor slab is much smaller than that of the tension end.

[0055] The steel columns 7 between two adjacent cantilever device steel columns 7 are connected by a long crossbeam 14 or a short crossbeam 15, and the long crossbeam 14 or the short crossbeam 15 is buckled between the two lower fastening devices 6. A base 13 is provided at the bottom of the steel column 7, and the steel column 7 is fixedly connected to the base 13, and the base 13 is fixed to the floor slab by expansion bolts. The pad 12 is fixedly set by setting U-bolts through the floor slab. The cantilever device steel column 7 transmits the numerical force to the erection frame through the I-beam 1, and then the force on the I-beam 1 is tightened by the rear end tension device to achieve better fixation.

[0056] The formwork support is set on the device for erecting cantilever formwork under space constraints, and then the formwork support is erected thereon to meet the needs of formwork erection under special space constraints (such as it is impossible to erect a full-floor scaffolding or a cantilever scaffolding below the erection location and there are existing buildings or immovable objects below the erection location that cannot withstand loads such as formwork pouring).

[0057] The arrangement spacing and the load that can be sustained are calculated. The devices are connected by beams of different lengths. The ends of the steel beams are connected to the bottom plate with a tie system consisting of steel wire ropes and basket bolts. The bottom plate is fixed with expansion bolts or through-plate U-shaped anchor bolts.

[0058] The device is highly standardized, can be installed and disassembled without loss, and can be reused. It has wide applicability and high turnover performance, and is quick and easy to install.

[0059] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A cantilever floor construction method under standardized space constraints, characterized by: The method comprises the following steps: 1) Determine the module of the long beam (14), the short beam (15) and the size of the I-beam (1) of the cantilever floor slab erection device: The installation spacing of the cantilever erection device and the size of the I-beam (1) shall be determined in accordance with the "Safety Technical Specifications for Fastener-type Steel Pipe Scaffolding in Building Construction" (JGJ130-2011). 5.6.3 is calculated, and the length of the fixed section of the I-beam (1) in the floor slab should not be less than 1.25 times the length of the cantilevered section of the I-beam (1). According to the calculation results, the appropriate modulus of the long crossbeam (14), the short crossbeam (15) and the size of the I-beam (1) are selected; 2) Positioning of the pad (12) of the rear tension device and the base (13) of the steel column (7): based on the determined modulus of the long beam (14), the short beam (15) and the size of the I-beam (1), draw a plan layout and mark the positioning on site; 3) Fixing the pad (12) and the base (13): At the positioning points of the pad (12) and the base (13), expansion bolts or through-plate U-shaped anchor bolts are selected for fixing according to the actual situation on site; 4) Installation of the long crossbeam (14) and the short crossbeam (15): The interfaces of the long crossbeam (14) and the short crossbeam (15) are inserted into the transverse slots of the two lower fastening devices (6) to ensure firmness; 5) Installation of the I-beam (1): After the I-beam (1) passes through the steel sleeve (2), a fastening device (3), a diagonal brace (5) and two vertical pole positioning devices (4) are installed; 6) Preliminary installation of the rear end tension device: the upper end steel wire rope (8) is passed through the first lifting ring (1.1) and the second lifting ring (1.2) of the I-beam (1), respectively, and the lower end steel wire rope (10) is passed through the pull ring (11) on the pad (12), and the upper end steel wire rope (8) and the lower end steel wire rope (10) are connected by the basket bolt (9), and the steel beam is ensured to remain horizontal by a level ruler; 7) Formwork support and formwork erection: After the cantilever formwork erection device is installed, the formwork support and formwork erection begin, and the level of the steel beam is monitored by a level ruler during the process; 8) Concrete pouring and curing: Concrete pump pipe brackets and pump pipes should not be placed above the cantilever area, and operators should be prevented from staying on the cantilever area. During the pouring and curing process, real-time adjustments should be made through basket bolts; 9) Removal of floor formwork, frame and cantilever formwork installation: after the curing period is reached, the formwork shall be removed first, then the frame and finally the cantilever formwork installation. The cantilever formwork installation shall be removed in the reverse order of the installation process. Before the steel beam is removed, the tension shall be gradually removed from the basket bolts and the horizontal monitoring of the steel beam shall be maintained.

2. The cantilever floor construction method under standardized space constraints according to claim 1 is characterized by: In step 1, the cantilever floor slab erection device includes a plurality of cantilever devices and a support frame, wherein the plurality of cantilever devices are arranged side by side and spaced apart on the floor slab, and the front ends of the cantilever devices extend outward from the floor slab, and the support frame is arranged on the ends of the cantilever devices extending outward from the floor slab; The cantilever device comprises an I-beam (1), a steel sleeve (2), an upper fastening device (3), a vertical pole positioning device (4), a diagonal brace (5), a lower fastening device (6), a steel column (7) and a rear end tension device. The steel column (7) is vertically arranged on the edge of the floor slab, the steel sleeve (2) is arranged at the top of the steel column (7), the I-beam (1) passes through the steel sleeve (2) and extends out of the outside of the floor slab, the rear end tension device is arranged at the rear end bottom of the I-beam (1) and fixed on the floor slab, the upper fastening device (3) and the vertical pole positioning device (4) are fixedly arranged at the end of the I-beam (1) extending out of the floor slab, the lower fastening device (6) is arranged on the steel column (7), and the diagonal brace (5) is obliquely arranged between the upper fastening device (3) and the lower fastening device (6).

3. The cantilever floor construction method under standardized space constraints according to claim 2 is characterized by: The I-beam (1) is provided with a first lifting ring (1.1), a second lifting ring (1.2) and a circular hole (1.3); the first lifting ring (1.1) and the second lifting ring (1.2) are arranged at the bottom of the rear end of the I-beam (1); and the circular hole (1.3) is arranged at the end of the I-beam (1) extending out of the floor slab.

4. The cantilever floor construction method under standardized space constraints according to claim 2 is characterized by: The upper fastening device (3) comprises a frame, the bottom of the frame is provided with an upper fastening device slot (3.5), both sides of the frame are provided with upper fastening device holes (3.3), upper fastening device bolts (3.1) are provided to pass through the upper fastening device holes (3.3), and are tightened using upper fastening device nuts (3.4), and upper fastening device gaskets (3.2) are provided inside the upper fastening device nuts (3.4).

5. The cantilever floor construction method under standardized space constraints according to claim 2 is characterized by: The pole positioning device (4) comprises a left plate (4.1), a right plate (4.2), a pole positioning rib (4.3) and a fixing device. The left plate (4.1) and the right plate (4.2) form a frame structure. The left plate (4.1) and the right plate (4.2) are fixedly arranged by the fixing device. The pole positioning rib (4.3) is arranged on the top of the frame structure.

6. The cantilever floor construction method under standardized space constraints according to claim 2 is characterized by: The lower fastening device (6) comprises a frame, wherein three side surfaces of the frame are respectively provided with a lower fastening device first slot (6.1), a lower fastening device second slot (6.2) and a lower fastening device third slot (6.3), and the other side of the frame is provided with a lower fastening device screw hole (6.4), and a lower fastening device bolt (6.6) is arranged to pass through the lower fastening device screw hole (6.4) for fixing.

7. The cantilever floor construction method under standardized space constraints according to claim 2 is characterized by: The rear end tension device comprises two tension rope devices, one end of the two tension rope devices is respectively arranged on the first lifting ring (1.1) and the second lifting ring (1.2), and the other end of the two tension rope devices is fixed on the floor slab. The tension rope device comprises an upper end steel wire rope (8), a basket bolt (9), a lower end steel wire rope (10), a pull ring (11) and a pad (12). One end of the upper end steel wire rope (8) is connected to the first lifting ring (1.1) or the second lifting ring (1.2), the other end of the upper end steel wire rope (8) is connected to the upper end of the basket bolt (9), one end of the lower end steel wire rope (10) is connected to the lower end of the basket bolt (9), the other end of the lower end steel wire rope (10) is connected to the pull ring (11), the pull ring (11) is connected to the pad (12), and the pad (12) is fixed on the floor slab.

8. The cantilever floor construction method under standardized space constraints according to claim 2 is characterized by: The steel columns (7) between two adjacent cantilever device steel columns (7) are connected by snapping a long crossbeam (14) or a short crossbeam (15), and the long crossbeam (14) or the short crossbeam (15) is snapped between the two lower fastening devices (6).

9. The cantilever floor construction method under standardized space constraints according to claim 2 is characterized by: A base (13) is provided at the bottom of the steel column (7), the steel column (7) is fixedly connected to the base (13), and the base (13) is fixed to the floor slab via expansion bolts.

10. The cantilever floor construction method under standardized space constraints according to claim 7, characterized in that: The backing plate (12) is fixedly arranged by arranging U-shaped bolts to penetrate through the floor slab.