Dry type pre-cooling system of low-temperature liquid conveying pipe

By adopting a dry pre-cooling system in the low-temperature liquid conveying pipeline, and using multi-layer insulation materials and flexible thermal bridges to transfer the cooling capacity in the vacuum cooling box, the problems of complex pre-cooling process and large losses of low-temperature liquids in the prior art are solved. Achieve more efficient pre-cooling effect and system stability.

CN119062844AActive Publication Date: 2024-12-03ZHEJIANG UNIV
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411077372.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-12-03
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

The existing low-temperature liquid conveying pipeline has complex pre-cooling process, unstable two-phase flow, and large losses of low-temperature liquids, resulting in a long and complex launch mission cycle, which cannot meet the high-frequency and efficient transmission needs.

Method used

Using dry pre-cooling system, multi-layer insulation materials are installed in the interlayer of the inner metal pipes and the outer metal pipes, and cold volume is transferred in the vacuum cooling box using a refrigerator and a flexible thermal bridge to ensure uniform cooling volume and reduce low-temperature fluids. quality consumption.

Benefits of technology

The stable transmission of cold volume is achieved, the pressure pulsation and thermal stress in the pipeline are reduced, the consumption of low-temperature fluid is reduced, and the pre-cooling efficiency and system stability are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062844A_ABST
    Figure CN119062844A_ABST
Patent Text Reader

Abstract

The invention discloses a dry type pre-cooling system for a low-temperature liquid conveying pipe. The dry type pre-cooling system comprises a plurality of pre-cooling pipeline subsystems which are connected in a sealed mode. Each pre-cooling pipeline subsystem comprises a conveying pipe unit, a refrigerator heat conduction unit and a cold box unit; each conveying pipe unit comprises an inner metal pipeline and an outer metal pipeline, and multiple layers of heat insulation materials are arranged in the interlayer space of the inner and outer metal pipelines. The refrigerator heat conduction unit comprises a refrigerator and a flexible heat bridge; the cold box unit comprises a vacuum cold box and a temperature control module; the vacuum cold box is arranged in the middle of the inner metal pipeline, and an interlayer space between the inner metal pipeline and the outer metal pipeline shares a vacuum environment with the vacuum cold box; a cold head of the refrigerator is arranged in the vacuum cold box and is connected with the surface of the inner metal pipeline through a flexible thermal bridge for heat conduction; and the temperature control module is used for monitoring the parameter change of the sensor in the vacuum cold box and completing the power regulation and control of the refrigerator. The problems that a low-temperature liquid conveying pipe is complex in pre-cooling process, unstable in two-phase flow, large in liquid consumption and the like can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of precooling, and in particular relates to a dry precooling system for a cryogenic liquid delivery pipe. Background Art

[0002] The speed of delivery and filling of cryogenic propellants for liquid rockets is the key to increasing the frequency of launches. The current mainstream rocket propellants include liquid hydrogen, liquid oxygen, liquid methane, etc. The liquid saturation temperatures under normal pressure are 20.28K, 90.19K, and 111.66K, respectively, all of which are cryogenic liquids. This type of cryogenic propellant has a long launch preparation cycle and a complex filling process. It generally takes 3-4 days to complete the replacement precooling of the liquid phase delivery pipeline and the filling of the rocket fuel tank. This is because the pipeline for transporting cryogenic fluids must ensure high purity and no gas pollution, and have a strict gas purge replacement process to prevent impurity gases from contacting cryogenic fluids and solidifying to form particles, blocking the pipeline and causing an explosion; on the other hand, the large cryogenic propellant storage tank based on safety design is hundreds of meters away from the launch pad. At the same time, the volume of the rocket fuel tank is huge, and the heat capacity and heat leakage of the delivery pipeline and the tank are large. In order to avoid violent boiling when the cryogenic fluid is directly filled, the pipeline and the tank are subjected to excessive thermal stress in a short time, and pressure pulsation occurs in the space inside the pipe, reducing the consumption of cryogenic propellants, requiring precooling and cooling to be carried out step by step. This leads to another problem: the pipeline under pre-cooling of small-flow cryogenic fluid is in a stratified flow pattern, and the temperature difference between the top and bottom of the pipeline is large, which will also have an adverse effect on the pipeline performance.

[0003] In summary, in order to improve the high frequency and high efficiency of cryogenic launch vehicles, it is necessary to have the ability to quickly transport and refill cryogenic propellants. The traditional pipeline and tank precooling process has a long cycle and high complexity. The process must be repeated at intervals between launch missions, and the process design using cryogenic fluid as the precooling medium has shortcomings that are difficult to make up for and cannot meet the needs. The precooling of cryogenic fluid pipelines is essentially based on the forced flow of cryogenic fluids in pipes based on convective heat transfer. Due to the large fluid-solid temperature difference, strong turbulent instability, high boiling intensity, and complex pipeline design structure, adverse phenomena such as pipeline thermal stress, vibration, water hammer, and cavitation are inevitable. Heat conduction is the most stable form of the three basic heat transfer forms, and its intensity is much lower than that of convection and radiation heat transfer of the same level. At the same time, cryogenic liquid delivery pipes are generally made of metal alloys, which are good conductors of heat.

[0004] The Chinese patent document with publication number CN116928574A discloses a liquefied gas pipeline precooling system and method for a gas filling station, which uses a vaporizer self-pressurization form to replace a transfer pump to promote liquid nitrogen to flow into the liquid phase pipeline, which is actually a traditional wet precooling method.

[0005] The Chinese patent document with publication number CN117419278A discloses a LNG pipeline precooling method based on a liquid nitrogen precooling device, which is also a traditional wet precooling method. It uses pipeline design and valve control to make liquid nitrogen circulate in the liquid phase pipeline in a variable flow form. However, it is inevitable that the liquid nitrogen contacts the normal temperature pipeline, resulting in a huge temperature difference between the top and bottom of the pipeline, uneven precooling, boiling gas-liquid two-phase flow in the pipeline, and pressure pulsation in the pipeline. Summary of the invention

[0006] The invention provides a dry precooling system for a cryogenic liquid delivery pipe, which can fundamentally solve the problems of complex precooling process inside the existing cryogenic liquid delivery pipe, unstable two-phase flow, large cryogenic liquid loss, etc.

[0007] A low-temperature liquid delivery pipe dry precooling system comprises a plurality of sealed precooling pipe subsystems; each precooling pipe subsystem comprises a delivery pipe unit, a refrigerator heat transfer unit and a cold box unit;

[0008] The delivery pipe unit comprises an inner metal pipe and an outer metal pipe, and the interlayer space between the inner metal pipe and the outer metal pipe is provided with multiple layers of heat insulation material;

[0009] The refrigerator heat transfer unit comprises a refrigerator and a flexible thermal bridge; the refrigerator is inserted into the vacuum cold box, the cold head of the refrigerator is arranged inside the vacuum cold box, and is connected to the surface of the inner metal pipe through the flexible thermal bridge for heat conduction and heat transfer;

[0010] The cold box unit comprises a vacuum cold box and a temperature control module; the temperature control unit is used to monitor the changes in sensor parameters in the vacuum cold box and complete the power regulation of the refrigerator;

[0011] The vacuum cold box is arranged in the middle of the inner metal pipe and connected to the outer metal pipes on both sides, so that the interlayer space between the inner metal pipe and the outer metal pipe is interconnected with the vacuum cold box to share the vacuum environment.

[0012] Furthermore, the delivery pipe units of two adjacent pre-cooling pipeline subsystems are sealedly connected, including but not limited to using a vacuum flange and an O-ring for sealing connection.

[0013] Preferably, the flexible thermal bridge is woven from a material with high thermal conductivity, such as a woven copper strip, and is tightly wrapped around the surface of the inner metal pipe in a spirally wound form.

[0014] Preferably, the multi-layer thermal insulation material is a combination of a multi-layer radiation layer and a spacer layer, and the multi-layer thermal insulation material is wrapped on the surface of the inner metal pipe after the flexible thermal bridge is wound.

[0015] Furthermore, the radiation layer of the multi-layer insulation material adopts metal thin layer materials including but not limited to aluminum foil, double-sided aluminum-plated film, etc., and a spacer layer is provided between two adjacent metal thin layers so as not to contact each other.

[0016] Furthermore, the top of the vacuum cold box includes a vacuum port, an electrical interface and an emergency pressure relief valve. The vacuum port is connected to a vacuum pump to evacuate the inside of the chamber to a vacuum, the electrical interface provides power supply for the equipment in the vacuum cold box and feeds back real-time parameters of the sensors in the chamber to the temperature control module, and the emergency pressure relief valve is used to release pressure in the event of abnormal pressure increase in the chamber.

[0017] Furthermore, the vacuum cold box is provided with various sensors, including but not limited to temperature sensors, pressure sensors, vibration sensors and dryness sensors, and these sensors are connected to the temperature control module via electrical interfaces.

[0018] Furthermore, the refrigerator adopts a large cooling capacity refrigerator, such as a high-power pulse tube refrigerator with a first-stage cold head, and the lowest cooling temperature should match the actual use requirements.

[0019] Precooling using the above-mentioned cryogenic liquid delivery pipe dry precooling system includes the following steps:

[0020] S01, install the delivery pipe unit, the refrigerator heat transfer unit, and the cold box unit to form a pre-cooling pipe subsystem, and then seal and connect several pre-cooling pipe subsystems to obtain a low-temperature liquid delivery pipe unit dry pre-cooling system; the system can be tested for gas leaks using helium mass spectrometers and other leak detection equipment to ensure that there are no obvious leaks in the system;

[0021] S02, using a vacuum pump to evacuate the vacuum degree inside the vacuum cold box to 10E-3 to 10E-6 Torr;

[0022] S03, running the heat transfer unit of the refrigerator, setting the target refrigeration temperature of the refrigerator through the temperature control module, adjusting the refrigerator to the pre-cooling mode, at which time the input power of the refrigerator matches the optimal cooling capacity curve, and monitoring the changes in the sensor parameters in the vacuum cold box through the temperature control module until the inner metal pipe is cooled down;

[0023] S04, adjusting the cooling capacity of the refrigerator to the cold preservation mode through the temperature control module, at which time the heat leakage absorbed by the inner metal pipe is equivalent to the cooling capacity of the refrigerator, and the temperature of the inner metal pipe remains basically unchanged;

[0024] S05, the stop valve and flow regulating valve are opened upstream of the delivery pipe unit to control the cryogenic liquid to flow into the pre-cooled pipeline until the transfer is completed.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] 1. In the present invention, the cold is transferred to the inner metal pipe in the form of solid heat conduction. The heat transfer of the refrigerator is more gentle and stable than the convection and boiling phase change heat transfer of the low-temperature fluid, which can reduce the pressure pulsation and thermal stress caused by the sudden cooling of the pipe and avoid the resonance and stress damage of the pipe.

[0027] 2. In the present invention, the flexible thermal bridge can transfer the cold evenly to the surface of the pipeline. During the cold preservation stage, the pipeline is basically at the same temperature everywhere, and the heat exchange with the flexible thermal bridge is very small, which is in a thermally stable state. The large temperature difference between the upper and lower spaces of the pipeline caused by the stratified flow of the low-temperature fluid in the pipeline is avoided, thereby avoiding thermal stress damage.

[0028] 3. The present invention converts the input work of the refrigerator into the form of solid cold energy in the pipeline, instead of converting the cold energy of the cryogenic fluid into the form of solid cold energy in the pipeline, which greatly reduces the mass consumption of the cryogenic fluid in the pre-cooling of the conveying pipe and saves the consumption of expensive cryogenic liquids such as liquid hydrogen and liquid helium. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 This is a schematic diagram of the structure of a precooling pipeline subsystem of the present invention;

[0030] Figure 2 It is a schematic diagram of the two-dimensional connection between the internal metal pipe and the flexible thermal bridge in the present invention;

[0031] Figure 3 It is a connection diagram of several precooling pipeline subsystems;

[0032] Figure 4 The schematic diagram is a layout diagram of the application of the cryogenic liquid delivery pipe dry precooling system of the present invention in a carrier rocket launch site.

[0033] In the figure: 10-inner metal pipe, 11-outer metal pipe, 12-insulating material, 13-vacuum flange, 20-refrigerator, 21-cold head, 22-flexible thermal bridge, 220-woven copper belt, 30-vacuum cold box, 31-temperature control module, 32-vacuum port, A-propellant storage spherical tank, B-liquid hydrogen core transport section, C-refrigeration unit control unit, D-rocket body tank. DETAILED DESCRIPTION

[0034] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be pointed out that the embodiments described below are intended to facilitate the understanding of the present invention and do not have any limiting effect on the present invention.

[0035] A low-temperature liquid delivery pipe dry precooling system comprises a plurality of precooling pipeline subsystems which are sealed and connected.

[0036] like Figure 1As shown, each pre-cooling pipeline subsystem includes a delivery pipe unit and a refrigerator heat transfer unit and a cold box unit arranged on the delivery pipe unit.

[0037] The transport pipe unit includes an inner metal pipe 10 and an outer metal pipe 11 , and a heat insulating material 12 is provided in the interlayer space between the inner metal pipe 10 and the outer metal pipe 11 .

[0038] The refrigerator heat transfer unit includes a refrigerator 20 and a flexible thermal bridge 22 , and the cold box unit includes a vacuum cold box 30 and a temperature control module 31 .

[0039] The vacuum cold box 30 is arranged in the middle position of the inner metal pipe 10 and is sealed and connected to the outer metal pipes 11 on both sides through vacuum flanges and O-rings, so that the interlayer space between the inner metal pipe 10 and the outer metal pipe 11 is interconnected with the vacuum cold box 30 to share the vacuum environment.

[0040] The refrigerator 20 is installed on the vacuum cold box 30, and the cold head 21 of the refrigerator 20 is arranged inside the vacuum cold box 30, and is connected to the surface of the inner metal pipe 10 through a flexible thermal bridge 22 for heat transfer; the temperature control module 31 is used to monitor the changes in sensor parameters in the vacuum cold box 30 and complete the power regulation of the refrigerator 20.

[0041] In this embodiment, the refrigerator 20 adopts a high-power pulse tube refrigerator, and its cold end heat exchanger transfers cold energy to the load first-level cold head, and the load first-level cold head transfers cold energy to the flexible thermal bridge 22.

[0042] The flexible thermal bridge 22 serves as a relay connecting the cold head 21 and the inner metal pipe 10 , and the flexible thermal bridge 22 directly contacts the surfaces of the cold head 21 and the inner metal pipe 10 .

[0043] like Figure 2 As shown, the flexible thermal bridge 22 is made of a braided copper belt 220 with high thermal conductivity, and the braided copper belt 220 is tightly wrapped around the surface of the inner metal pipe 11 in a spirally wound form.

[0044] The multi-layer insulation material 12 is made of a thin layer of aluminum foil. The surface of the inner metal pipe 10 is wrapped with multiple layers of aluminum foil after being wound with the braided copper tape 220. Adjacent aluminum foils are isolated by spacer layers and do not contact each other.

[0045] In the present invention, the vacuum cold box 30 provides a vacuum chamber to accommodate the cold head 21 and the flexible thermal bridge 22 of the refrigerator, and connects the interlayer space of the inner metal pipe 10 and the outer metal pipe 11. The sealed connection uses a vacuum flange 13 and an O-ring for sealing connection.

[0046] A vacuum port 32, an electrical interface and an emergency pressure relief valve are provided on the top of the vacuum cold box 30. The vacuum port 32 is connected to a vacuum pump to evacuate the inside of the chamber, the electrical interface feeds back the real-time parameters of the sensor in the chamber to the temperature control module 31, and the emergency pressure relief valve is used to release the pressure in the case of abnormal pressure increase in the chamber.

[0047] The vacuum cold box 30 is provided with measuring elements such as a temperature sensor, a pressure sensor, a vibration sensor and a dryness sensor, and the measuring signals are connected to the temperature control module 31 through an electrical interface.

[0048] like Figure 1 and Figure 3 As shown, after several precooling pipeline subsystems are sealed and connected through the vacuum flange 13, the dry precooling system of the cryogenic liquid delivery pipe of the present invention is obtained.

[0049] The present invention provides cold air to the internal metal tube of the high-vacuum transport pipe from the outside of the pipe through refrigeration by a refrigerator and heat conduction by a flexible thermal bridge, so that its temperature is maintained in an ideal temperature range. Compared with traditional cryogenic liquid wet precooling, the present invention has a simple principle and obvious advantages. It is suitable for scenarios with high-frequency transfer of cryogenic liquids, such as launch sites for carrier rockets, LNG receiving stations, air separation and distillation plants, etc.

[0050] like Figure 4 As shown in FIG. 1 , it is a schematic diagram of the layout of the low-temperature liquid delivery pipe dry precooling system of the present invention applied in the launch site of a carrier rocket, which mainly includes a liquid hydrogen propellant storage spherical tank A, a liquid hydrogen core delivery section B, a refrigeration unit control unit C and a rocket body tank D. Among them, the liquid hydrogen core delivery section B is the low-temperature liquid delivery pipe dry precooling system of the present invention, which is composed of at least one Figure 1 The precooling piping subsystem shown is connected.

[0051] Before the precooling operation, first complete the overall leak detection of all precooling pipeline subsystems in the liquid hydrogen core transport section B, use a helium mass spectrometer to perform helium leak detection, and ensure that there are no gas leaks at the connection seals. Use a vacuum pump to evacuate the vacuum cold box 30 of all precooling pipeline subsystems.

[0052] The refrigerator 20 is turned on for refrigeration. A suitable refrigerator refrigeration temperature is selected according to the temperature boundary of the three-phase region of the cryogenic liquid, which can be higher than the triple point temperature to near the boiling critical heat flux temperature point. For the liquid hydrogen transfer demand, the temperature range can be 14.9K to 85K, and the refrigerator refrigeration temperature is determined according to the economic evaluation results.

[0053] As the temperature of the cold head 21 gradually decreases to the refrigeration temperature zone, the thermal imbalance causes the cold to be transferred to the flexible thermal bridge 22, which continuously takes away the heat of the inner metal pipe 10. The temperature of the inner metal pipe 10 is monitored by the temperature control module 31 until it reaches the temperature range required for precooling. The refrigerator unit control unit C is connected to each temperature control module 31 to control the refrigerator 20 of the corresponding precooling pipeline subsystem to enter the cold preservation mode. At this time, the input cold is roughly equal to the heat leakage of the inner metal pipe 10. The refrigerator unit control unit C controls all precooling subsystems to complete precooling, marking the completion of dry precooling of the liquid hydrogen core transport section B.

[0054] Start the transfer operation of low-temperature liquid hydrogen, open the outlet stop valve and flow regulating valve of the liquid hydrogen propellant storage spherical tank A, and the liquid hydrogen flows through the liquid hydrogen core conveying section B with sufficient pre-cooling and uniform temperature. If the refrigeration temperature of the refrigerator 20 is higher than the liquid temperature, the liquid hydrogen will undergo a bubbling flow in the nucleate boiling stage, and the fluid in the pipe will quickly transform into a stable single-phase liquid flow after a short period of gas-liquid two-phase flow. If the pipeline temperature is lower than the liquid hydrogen temperature, the liquid hydrogen will be further cooled in the pipeline, and the pipe will always be a stable single-phase liquid flow. After the liquid hydrogen level in the rocket body tank D meets the requirements, close the outlet stop valve and flow regulating valve of the liquid hydrogen propellant storage spherical tank A, and end the transfer.

[0055] The embodiments described above provide a detailed description of the technical solutions and beneficial effects of the present invention. It should be understood that the above are only specific embodiments of the present invention and are not intended to limit the present invention. Any modifications, supplements and equivalent substitutions made within the scope of the principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A cryogenic liquid delivery pipe dry precooling system, characterized in that: It includes several sealed pre-cooling pipeline subsystems; each pre-cooling pipeline subsystem includes a delivery pipe unit and a refrigerator heat transfer unit and a cold box unit arranged on the delivery pipe unit; The transport pipe unit comprises an inner metal pipe (10) and an outer metal pipe (11), and a sandwich space between the inner metal pipe (10) and the outer metal pipe (11) is provided with multiple layers of heat insulating material (12); The refrigerator heat transfer unit comprises a refrigerator (20) and a flexible thermal bridge (22), and the cold box unit comprises a vacuum cold box (30) and a temperature control module (31); The vacuum cold box (30) is arranged in the middle of the inner metal pipe and is sealedly connected to the outer metal pipes (11) on both sides, so that the interlayer space between the inner metal pipe (10) and the outer metal pipe (11) is interconnected with the vacuum cold box (30) to share a vacuum environment; The refrigerator (20) is inserted into the vacuum cold box (30), and the cold head (21) of the refrigerator (20) is arranged inside the vacuum cold box (30) and connected to the surface of the inner metal pipe (10) through a flexible thermal bridge (22) for heat transfer; the temperature control module (31) is used to monitor changes in sensor parameters in the vacuum cold box (30) and complete power regulation of the refrigerator (20).

2. The cryogenic liquid delivery pipe dry precooling system according to claim 1, characterized in that: The delivery pipe units of two adjacent precooling pipe subsystems are sealed and connected.

3. The cryogenic liquid delivery pipe dry precooling system according to claim 1, characterized in that: The flexible thermal bridge (22) is made of a material with high thermal conductivity and tightly surrounds the surface of the inner metal pipe (10).

4. The cryogenic liquid delivery pipe dry precooling system according to claim 3, characterized in that: The multi-layer thermal insulation material (12) is a combination of a multi-layer radiation layer and a spacer layer, and the multi-layer thermal insulation material is wrapped on the surface of the inner metal pipe (10) after the flexible thermal bridge is wound.

5. The cryogenic liquid delivery pipe dry precooling system according to claim 1, characterized in that: The top of the vacuum cold box (30) includes a vacuum port (32), an electrical interface and an emergency pressure relief valve.

6. The cryogenic liquid delivery pipe dry precooling system according to claim 5, characterized in that: The vacuum cold box (30) is provided with multiple types of sensors, which are connected to the temperature control module (31) via an electrical interface.

7. The cryogenic liquid delivery pipe dry precooling system according to claim 1, characterized in that: The refrigerator (20) is a large-capacity refrigerator, and the lowest refrigeration temperature matches the actual use requirements.

8. The cryogenic liquid delivery pipe dry precooling system according to claim 1, characterized in that: Precooling includes the following steps: S01, install the delivery pipe unit, the refrigerator heat transfer unit, and the cold box unit, and seal and connect several pre-cooling pipe subsystems to obtain a low-temperature liquid delivery pipe unit dry pre-cooling system; perform gas leak detection on the system to ensure that there are no leaks in the system; S02, using a vacuum pump to evacuate the vacuum degree inside the vacuum cold box (30) to 10E-3 to 10E-6 Torr; S03, operating the heat transfer unit of the refrigerator, setting the target cooling temperature through the temperature control module (31), adjusting the refrigerator (20) to the pre-cooling mode, at which time the refrigerator input power matches the optimal cooling capacity curve, and monitoring the changes in the sensor parameters in the vacuum cold box (30) through the temperature control module (31) until the inner metal pipe (10) completes the cooling; S04, adjusting the cooling capacity of the refrigerator (20) to a cold preservation mode through the temperature control module (31), at which time the amount of heat leakage absorbed by the inner metal pipe (10) is equivalent to the cooling capacity of the refrigerator (20), and the temperature of the inner metal pipe (10) remains substantially unchanged; S05, the shut-off valve and the flow regulating valve are opened upstream of the delivery pipe unit to control the cryogenic liquid to flow into the pre-cooled delivery pipe until the transfer is completed.

Citation Information

Patent Citations

  • Vacuum low-temperature pipeline system

    CN108397643A

  • Superconducting block cooling device and method for maglev train

    CN113130165A

  • Conduction cooling system and method for high-temperature superconducting cable

    CN114464366A

  • Pipeline with heat preservation function for fluid equipment

    CN216112815U

  • Vacuum insulation pipe

    JP2011179543A