Reinforcing system construction method for high-rise building parapet wall formwork
By welding vertical angle steel and horizontal angle steel on the roof steel beams of high-rise buildings, and combining components such as reinforced angle steel and pulling screws to form a stable support system, the high safety risk problem of strengthening the daughter wall formwork under the condition of no outer frame is solved. It achieves the effects of simple construction, high safety and recyclable materials.
Patent Information
- Application Number
- CN202411312312.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-12-06
AI Technical Summary
The reinforcement of the steel structure roof of high-rise buildings has problems of insufficient operating surface and high safety risks when the wall formwork is reinforced without outer frames.
The roof steel beam is welded with vertical angle steel and horizontal angle steel to form a temporary front-edge guardrail, combined with reinforced angle steel to weld the web of the steel beam, and the pulling screw, double nut, mountain card, rotating fastener and other components are used to form a stable Support the system, and remove the wooden formwork and reinforce the support system after concrete pouring.
It realizes the installation and reinforcement of the daughter wall formwork under the condition of no outer shelf, with simple construction, low safety risks, recyclable materials, low cost, and reliable quality.
Smart Images

Figure CN119083722A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of housing construction equipment, in particular to a reinforcement system construction method for a parapet formwork of a high-rise building. Background Art
[0002] The present invention provides a reinforcement system construction method for parapet formwork of high-rise buildings. The method comprises an outer reinforcement angle steel of the parapet, an inner reinforcement wood square and steel pipe, wooden formworks on both sides, tension bolts, nuts and mountain-shaped clamps. The present invention helps to solve the problem that the parapet formwork reinforcement of the steel structure roof of a high-rise building has no operating surface and high safety risks under the condition of no external frame; the present invention is simple to construct, easy to operate, reliable in quality, low in safety risks, and the materials used are recyclable and low in cost. Summary of the invention
[0003] The object of the present invention is to provide a construction method for a reinforcement system of a parapet formwork of a high-rise building, so as to solve the problems raised in the above-mentioned background technology.
[0004] In order to solve the above technical problems, the present invention is achieved through the following technical solutions: The invention discloses a reinforcement system construction method for parapet formwork of a high-rise building, comprising a roof steel beam. Vertical angle steels and horizontal angle steels are welded to the side of the roof steel beam before the beam is hoisted. The vertical angle steels are welded to the side of the steel beam flanges, and the vertical angle steels are strengthened in stability by welding the reinforcement angle steels to the web of the steel beams.
[0005] After the steel beam is hoisted into place, the vertical angle steel and the horizontal angle steel together form a temporary edge protection railing. The horizontal angle steel is drilled in advance, the hole diameter is 1mm larger than the diameter of the tension bolt, and the drilling spacing is evenly distributed at 400mm.
[0006] Furthermore, the roof decking is laid, the roof reinforcement and parapet reinforcement are tied, and L-shaped reinforcement is embedded in the roof.
[0007] Furthermore, the roof concrete is poured, and the concrete flange at the base of the parapet is poured together. After the concrete has finally set, the joint surface between the new and old concrete is roughened, the garbage is cleaned up, and an expansion water stop is placed in the center.
[0008] Furthermore, wooden formworks and plastic sleeves are installed on both sides of the parapet, and prefabricated cement inner braces are placed at appropriate positions in the parapet reinforcement.
[0009] Further, the tension screws are installed, and the tension screws pass through the plastic sleeves and the wooden formworks and horizontal angle steels on both sides.
[0010] Furthermore, the outer wooden formwork of the parapet is fixed with double nuts.
[0011] Furthermore, the inner side is fixed with horizontal wood and vertical steel pipes, and the ends of the tension screws are fixed with mountain clamps and double nuts. The nuts at both ends of the tension screws are tightened to fully tighten the templates on both sides and the prefabricated cement inner support bars.
[0012] Furthermore, the vertical steel pipes and the diagonal bracing steel pipes are connected by rotating fasteners, and the bottoms of the diagonal bracing steel pipes are welded to the embedded L-shaped steel bars, so that the parapet formwork forms a stable support system.
[0013] Furthermore, the parapet concrete is poured, and after the curing period reaches the specified age, the wooden formwork is removed and the support system is reinforced; the exposed part of the embedded L-shaped steel bars is cut off, polished and rust-proofed.
[0014] The present invention has the following beneficial effects: (1) The method of the present invention is used for the template installation and reinforcement of the parapet of the steel structure roof of a high-rise building without an external frame. The method has simple construction, convenient operation, reliable quality, low safety risk, and the materials used are recyclable and low cost.
[0015] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0017] Figure 1 It is a schematic diagram of the structure plane of the present invention; Figure 2 It is a schematic cross-sectional view of the structure of the present invention; Figure 3 It is a schematic elevation diagram of the structure of the present invention.
[0018] In the accompanying drawings, the components represented by the reference numerals are listed as follows: In the figure: 1. Roof steel beam; 2. Roof floor slab; 3. L-shaped steel bar; 4. Parapet steel bar; 5-1. Concrete joint surface; 5-2. Expansion water stop strip; 6. Vertical angle steel; 7. Reinforcement angle steel; 8. Horizontal angle steel; 9. Wooden formwork; 10. Plastic sleeve; 11. Tension screw; 12. Nut; 13. Wooden square; 14. Mountain-shaped card; 15. Vertical steel pipe; 16. Rotary fastener; 17. Diagonal brace steel pipe; 18. Precast cement inner brace. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] See also Figure 1-Figure 3 As shown, the present invention is a reinforcement system construction method for high-rise building parapet formwork, including a roof steel beam 1. Before the roof steel beam 1 is hoisted, a vertical angle steel 6 and a horizontal angle steel 8 are welded on the side thereof. The vertical angle steel 6 is welded to the side of the steel beam flange, and is welded to the web of the steel beam by a reinforcement angle steel 7 to enhance the stability of the vertical angle steel.
[0021] After the steel beam is hoisted into place, the vertical angle steel 6 and the horizontal angle steel 8 together form a temporary edge protection railing. The horizontal angle steel 8 is drilled in advance, the hole diameter is 1mm larger than the diameter of the tension bolt, and the drilling spacing is evenly distributed at 400mm.
[0022] Lay the roof decking slab 2, tie the roof reinforcement and parapet reinforcement 4, and embed L-shaped reinforcement 3 in the roof.
[0023] Pour the roof concrete and pour the concrete flange at the root of the parapet together. After the concrete is finally set, the surface of the new and old concrete joints is roughened 5-1, the garbage is cleaned up, and an expansion water stop strip is placed in the center 5-2.
[0024] The wooden formworks 9 and the plastic sleeves 10 on both sides of the parapet are installed, and prefabricated cement inner braces 18 are placed at appropriate positions in the parapet reinforcement bars 4.
[0025] Install the tension screw 11, which passes through the plastic sleeve 10 and the wooden formwork 9 and horizontal angle steel 8 on both sides.
[0026] The outer wooden formwork of the parapet is fixed with double nuts 12.
[0027] The inside is fixed with horizontal wood square 13 and vertical steel pipe 15, and the ends of the tension screw 11 are fixed with mountain-shaped card 14 and double nut 12. The nuts 12 at both ends of the tension screw are tightened to fully tighten the templates 9 on both sides and the prefabricated cement inner support strip 18.
[0028] The vertical steel pipe 15 and the diagonal bracing steel pipe 17 are connected by a rotating fastener 16, and the bottom of the diagonal bracing steel pipe 17 is welded to the embedded L-shaped steel bar 3, so that the parapet formwork forms a stable support system.
[0029] Pour the parapet concrete, and after the curing period reaches the specified age, remove the wooden formwork and reinforce the support system; cut off the exposed part of the embedded L-shaped steel bars, grind them flat and perform anti-rust treatment.
[0030] When in use, all welding parts should be fully welded to ensure construction safety; before pouring roof concrete, check whether the embedded steel bars and L-shaped steel bars are accurate; the anti-slope at the root of the parapet should be poured together with the roof, and the joint surface of the new and old concrete must be roughened, and the garbage should be cleaned up to prevent leakage from the construction joint; the spacing between vertical angle steels shall not exceed 1m, the spacing between horizontal angle steels, wooden squares, and steel pipes shall be 0.4m, and the spacing between tension screws and internal support strips shall be 0.4m×0.4m. The nuts should be fully tightened to prevent deformation of the formwork during concrete pouring; the connecting fastener bolts between the diagonal bracing steel pipe and the vertical steel pipe should be tightened, and the welding with the L-shaped steel bar should be firm to prevent the parapet from overturning during concrete pouring; after the formwork and support system are removed, the holes of the tension screws and the embedded L-shaped steel bars should be carefully handled to prevent damage to the waterproofing project and leakage; the angle steel on the outside of the steel beam and the wooden formwork on the outside of the parapet can be removed with the help of lifting equipment such as hanging baskets during facade construction, and care should be taken not to damage the steel beam when cutting the angle steel.
[0031] The preferred embodiments of the present invention disclosed above are only used to help illustrate the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.
Claims
1. A method for constructing a reinforcement system for a parapet formwork of a high-rise building, comprising a roof steel beam (1), characterized in that: Before the roof steel beam (1) is hoisted, a vertical angle steel (6) and a horizontal angle steel (8) are welded to the side of the roof steel beam (1), the vertical angle steel (6) is welded to the side of the steel beam flange, and the vertical angle steel (6) is welded to the web of the steel beam by a reinforcing angle steel (7), thereby enhancing the stability of the vertical angle steel; After the steel beam is hoisted into place, the vertical angle steel (6) and the horizontal angle steel (8) together form a temporary edge protection railing. The horizontal angle steel (8) is pre-drilled with holes 1 mm larger than the diameter of the tension bolts, and the drilling spacing is evenly distributed at 400 mm.
2. The reinforcement system construction method for high-rise building parapet formwork according to claim 1 is characterized in that: The roof decking (2) is laid, the roof reinforcement and the parapet reinforcement (4) are tied, and L-shaped reinforcement (3) is embedded in the roof.
3. The reinforcement system construction method for high-rise building parapet formwork according to claim 2 is characterized in that: Pour the roof concrete and pour the concrete flange at the base of the parapet together. After the concrete has finally set, the surface of the new and old concrete joints is roughened (5-1), the garbage is cleaned up, and an expansion water stop strip (5-2) is placed in the center.
4. The reinforcement system construction method for high-rise building parapet formwork according to claim 3 is characterized in that: The wooden formwork (9) and plastic sleeve (10) are installed on both sides of the parapet wall, and prefabricated cement inner support bars (18) are placed at appropriate positions in the parapet wall reinforcement (4).
5. The reinforcement system construction method for high-rise building parapet formwork according to claim 4 is characterized in that: Install the tension screw rod (11), which passes through the plastic sleeve (10) and the wooden formwork (9) and horizontal angle steel (8) on both sides.
6. The reinforcement system construction method for high-rise building parapet formwork according to claim 5 is characterized in that: The outer wooden formwork of the parapet is fixed with double nuts (12).
7. The reinforcement system construction method for high-rise building parapet formwork according to claim 6 is characterized in that: The inner side is fixed with horizontal wood (13) and vertical steel pipe (15), and the ends of the tension screw (11) are fixed with mountain clamps (14) and double nuts (12). The nuts (12) at both ends of the tension screw are tightened to fully tighten the templates (9) on both sides and the prefabricated cement inner support strips (18).
8. The reinforcement system construction method for high-rise building parapet formwork according to claim 7 is characterized in that: The vertical steel pipe (15) and the diagonal bracing steel pipe (17) are connected by a rotating fastener (16), and the bottom of the diagonal bracing steel pipe (17) is welded to the embedded L-shaped steel bar (3), so that the parapet wall formwork forms a stable support system.
9. The reinforcement system construction method for high-rise building parapet formwork according to claim 8, characterized in that: Pour the parapet concrete, and after the curing period reaches the specified age, remove the wooden formwork and reinforce the support system; cut off the exposed part of the embedded L-shaped steel bars, grind them flat and perform anti-rust treatment.
Citation Information
Cited By
UHPC (Ultra High Performance Concrete) outer side mold suitable for reinforced concrete parapet wall and construction method of UHPC outer side mold
CN122522870A