Drainage channel template device for expressway tunnel and use method

By using lateral movement technology in the highway tunnel drainage tank formwork device and using thread movement to change the installation status of the side formwork, the poor construction effect caused by rotation separation in the prior art is solved, and more efficient arrangement is achieved Sink construction and groove wall integrity.

CN119084030APending Publication Date: 2024-12-06THE SECOND CONSTR OF CHINA CONSTR EIGHTH ENG DIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411184710.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing highway tunnel drainage tank formwork device is separated by rotation, affecting the construction effect of the drainage tank.

Method used

A device for converting the installation state of the side template by transversely moving is designed, including a first side panel, a second side panel, an intermediate support frame device and a pushing device, and the installation state of the side template is converted by thread movement. Solved the problem of connecting and spreading through pins and screws.

Benefits of technology

The construction effect of the drainage tank is improved, the complete performance of the groove wall is ensured, the precise position installation and separation of the side formwork is realized, and the construction accuracy and efficiency are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084030A_ABST
    Figure CN119084030A_ABST
Patent Text Reader

Abstract

The invention discloses a drainage channel template device used in an expressway tunnel and a using method. The first side panel (2) is used as one of the drainage channel templates, the second side panel (3) is used as the other of the drainage channel templates, the middle supporting frame device is arranged on a drainage channel construction station, and the pushing device is arranged between the middle supporting frame device and the first side panel (2) and between the middle supporting frame device and the second side panel (3). According to the device, template forming is carried out on the groove wall of a drainage groove in an expressway tunnel, center supporting is carried out on the drainage groove in the expressway tunnel through the middle supporting frame device, and the first side panel (2) and the second side panel (3) are driven to move towards the middle supporting frame device in a threaded motion mode through the pushing device; according to the drainage channel, the installation state of the side face formwork is converted through transverse movement, the technical problems that two side face formworks which are used on the bottom face portions and connected through pin shafts are used, and the two side face formworks are opened through double-thread screws are solved, and therefore the construction effect of the drainage channel is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a drainage ditch template device and a use method, in particular to a drainage ditch template device and a use method used in a highway tunnel. Background Art

[0002] In order to ensure the performance of the highway tunnel, it is necessary to discharge the accumulated water in the highway tunnel to the outside of the tunnel. Therefore, the drainage trough template device used in the highway tunnel is an important construction component. In the existing drainage trough template device used in the highway tunnel, two side templates connected by a pin shaft are used on the bottom surface and the two side templates are propped open by a double-headed screw. After the construction of the drainage trough in the highway tunnel is completed, the double-headed screw is taken out from the two side templates, and the two side templates are rotated on the pin shaft and are in a closed state by a hoisting method, and then the two side templates are taken out from the drainage trough. Since the two side templates are separated from the inner wall of the drainage trough by rotation, the construction effect of the drainage trough is affected. The present invention uses the technical feature of converting the installation state of the side template by lateral movement, and effectively explores and studies the technical problem of using two side templates connected by a pin shaft on the bottom surface and propping the two side templates apart by a double-headed screw. The statements here only provide background technology related to the present invention and do not necessarily constitute prior art. The technical solution of the present invention is made based on the technical briefing document provided by the applicant on April 29, 2024, which solves actual technical problems in the work process, and the existing technical problems, technical features and technical effects in the similar patent literature and background technology obtained through retrieval. Summary of the invention

[0003] The object of the present invention is a drainage trough template device used in a highway tunnel. The object of the present invention is a method for using a drainage ditch template device used in a highway tunnel.

[0004] In order to overcome the above technical disadvantages, the purpose of the present invention is to provide a drainage ditch template device and a method of use for use in a highway tunnel, thereby improving the construction effect of the drainage ditch.

[0005] To achieve the above-mentioned purpose, the technical solution adopted by the present invention is: a drainage trough formwork device for use in a highway tunnel, comprising a first side panel used as one of the drainage trough formworks, a second side panel used as the second drainage trough formwork, an intermediate support frame device arranged on a drainage trough construction station, and a pushing device arranged between the intermediate support frame device and the first side panel and the second side panel.

[0006] Due to the design of the first side panel, the second side panel, the intermediate support frame device and the pushing device, the groove wall of the drainage ditch in the highway tunnel is template-formed by the first side panel and the second side panel, the central support of the drainage ditch in the highway tunnel is achieved by the intermediate support frame device, and the first side panel and the second side panel are driven to move toward the intermediate support frame device in a threaded motion by the pushing device, so that the installation state of the side template is converted by lateral movement, which solves the technical problem of using two side templates connected by a pin shaft on the bottom surface and propping the two side templates apart by a double-headed screw, thereby improving the construction effect of the drainage ditch.

[0007] The present invention is designed to connect the first side panel, the second side panel, the middle support frame device and the pushing device to each other in a manner of converting the installation state of the side template through lateral movement.

[0008] The present invention is designed to connect the push device with the first side panel, the second side panel and the middle support frame device in a threaded motion manner.

[0009] The present invention designs that the intermediate support frame device is configured to include a bottom plate, a first support frame and a second support frame.

[0010] The present invention designs that the pushing device is arranged to include a sliding frame, a guide rail frame, a power nut and a power lead screw.

[0011] The technical effects of the above five technical solutions are: achieving displacement separation of the first side panel and the second side panel from the groove wall of the drainage groove, thereby ensuring the integrity of the groove wall of the drainage groove.

[0012] The present invention is designed to further include a first accessory device, and the first accessory device is arranged between the middle support frame device and the first side panel and the second side panel, and the first accessory device is arranged as a rope.

[0013] The present invention is designed to further include a second accessory device, and the second accessory device is arranged in the push-out device, and the second accessory device is arranged as a ball.

[0014] The technical effect of the above technical solution is: to realize the integrated installation of other components, and to expand the technical effect of the present invention.

[0015] The present invention is designed to respectively arrange a first bracket and a second bracket on a bottom plate, respectively arrange a sliding frame on a first side panel and a second side panel, and arrange a guide rail frame on the first bracket and the second bracket, arrange a ball bearing between the sliding frame and the guide rail frame, and arrange a power nut on the guide rail frame, arrange a power lead screw between the power nut and the sliding frame, and arrange ropes between the first side panel and the first bracket and between the second side panel and the second bracket.

[0016] The technical effect of the above technical scheme is that the basic technical scheme of the present invention is formed by the base plate, the first side panel, the second side panel, the first bracket, the second bracket, the sliding frame, the guide rail frame, the ball, the power nut, the power screw and the rope, thereby solving the technical problem of the present invention.

[0017] The present invention is designed that the first side panel and the second side panel are respectively arranged to include a plate portion and a reinforcement plate portion and an accommodating hole body I is arranged on the reinforcement plate portion, the reinforcement plate portion is arranged on the curved corner portion of the plate portion and the lower end face of the horizontal portion of the reinforcement plate portion is arranged to be connected to the upper end face of the horizontal portion of the plate portion, the inner end face of the vertical portion of the reinforcement plate portion is arranged to be connected to the inner end face of the vertical portion of the plate portion and the horizontal portion of the plate portion is arranged to be distributed corresponding to the bottom plate, the accommodating hole body I is arranged to be connected to the rope and the inner end face portion of the vertical portion of the plate portion is arranged to be connected to the sliding frame through a connecting rod, the plate portion is arranged to be an L-shaped sheet body and the reinforcement plate portion is arranged to be a right-angled triangle sheet body, the reinforcement plate portion is arranged to be arranged and distributed at intervals along the longitudinal center line of the plate portion and the accommodating hole body I is arranged to be a circular hole body.

[0018] The technical effect of the above technical solution is: to achieve the purpose of increasing the strength of the plate body as a drainage ditch template in a highway tunnel, thereby improving the supporting strength of the drainage ditch template.

[0019] The present invention is designed that the bottom plate is configured as a rectangular sheet body and one side portion of the upper end surface of the bottom plate is configured to be connected to the first bracket, another side portion of the upper end surface of the bottom plate is configured to be connected to the second bracket and one side portion of the bottom plate is configured to be distributed corresponding to the first side panel, and another side portion of the bottom plate is configured to be distributed corresponding to the second side panel.

[0020] The present invention is designed that a receiving hole body II is arranged on the vertical body of the frame part I of the first bracket and the second bracket, and the lower end surface of the vertical body of the frame part I is arranged to be connected to the bottom plate, the frame part I is arranged to be connected to the guide rail frame through a connecting rod and the receiving hole body II is arranged to be connected to the rope, the frame part I is arranged to be a U-shaped frame body and the receiving hole body II is arranged to be a circular hole body, and the receiving hole body II is arranged to be arranged and distributed at intervals along the center line of the vertical body of the frame part I.

[0021] The technical effects of the above two technical solutions are as follows: It realizes the split gantry support in the drainage trough of the highway tunnel, increasing the operation space.

[0022] The present invention designs that the sliding frame is set to include a frame part II and a cylindrical shell part, and a receiving hole body III is arranged on the inner end face part of the vertical part of the frame part II. The end of the horizontal part of the frame part II is set to be connected to the peripheral side face part of the cylindrical shell part, and the receiving hole body III is set to be connected to the power lead screw. The frame part II is respectively set to be connected to the first side panel and the second side panel through a connecting rod, and the cylindrical shell part is set to be connected in a ball receiving manner. The frame part II is set to be a C-shaped frame body, and the cylindrical shell part is set to be a circular spherical shell with upper and lower open bodies. The receiving hole body III is set to be a convex-shaped blind hole body.

[0023] The present invention designs that the guide rail frame is set to include a fork part I, a fork part II and an intermediate block part, and receiving groove bodies I are respectively arranged on the inner end face parts of the upper and lower horizontal parts of the fork part I and the inner end face parts of the upper and lower horizontal parts of the fork part II. One end of the intermediate block part is set to be connected to the inner end face side part of the fork part I, and the other end of the intermediate block part is set to be connected to the inner end face side part of the fork part II. The outer end face side parts of the fork part I and the fork part II are respectively set to be connected to the first support and the second support through a connecting rod, and the intermediate block part is respectively set to be connected to the power nut and the power lead screw. The receiving groove body I is set to be connected in a ball receiving manner, and the fork part I and the fork part II are respectively set to be C-shaped strip bodies with a middle opening body. The intermediate block part is set to be a strip body with a through hole body, and the receiving groove body I is set to be a C-shaped groove body. Receiving groove bodies I are respectively arranged on the inner walls of the middle openings of the fork part I and the fork part II, and the through hole bodies of the intermediate block part are respectively set to be connected to the power nut and the power lead screw. The through hole body of the intermediate block part is set to be a long strip hole body.

[0024] The technical effects of the above two technical solutions are as follows: It realizes the telescopic body setting by clamping the sliding body, preventing the concrete mortar from polluting the moving section. The present invention is designed that the power nut is configured to include a nut portion, a screw portion, an inner nut portion and an outer nut portion, and a receiving groove body II is respectively arranged on the upper and lower end surfaces of the nut portion, the outer end surface portion of the nut portion is configured to be connected to the inner end head of the screw portion, and the screw portion is respectively configured to be threadedly connected to the inner nut portion and the outer nut portion, the nut portion is configured to be threadedly connected to the power lead screw and the screw portion is configured to be through-connected to a guide rail frame, the inner end surface portion of the inner nut portion and the inner end surface portion of the outer nut portion are respectively configured to be contact-connected to the guide rail frame and the receiving groove body II is configured to be connected to the guide rail frame, the nut portion is configured to be a disc-shaped body having a threaded hole body in the middle portion and the threaded hole body of the nut portion is configured to be connected to the power lead screw, the screw portion is configured to be a plain bolt, and the inner nut portion and the outer nut portion are respectively configured to be hexagonal nuts, and the receiving groove body II is configured to be a U-shaped groove-shaped body.

[0025] The present invention designs that the power screw is configured as a bolt having a convex shaft head at the inner end and a through hole at the outer end, and the convex shaft head of the power screw is configured to be rotatably connected to the sliding frame, and the power screw is configured to be threadedly connected to the power nut.

[0026] The technical effects of the above two technical solutions are: realizing the position state conversion of the threaded movement and improving the accuracy of the stable position.

[0027] The present invention designs that the rope is set as a wire rope and one end of the rope is respectively set to be connected to the first side panel and the second side panel through the wire rope buckle, and the other end of the rope is respectively set to be connected to the first bracket and the second bracket through the wire rope buckle.

[0028] The technical effect of the above technical solution is that the rope body can be tightened and fixed.

[0029] The present invention designs that the ball is set as a spherical body, the middle part of the ball is set to be connected with the sliding frame in a sinking manner, and the upper and lower parts of the peripheral side surfaces of the ball are respectively set to be connected with the guide rail frame in a contacting manner.

[0030] The technical effect of the above technical solution is: supporting by rolling motion is achieved.

[0031] The present invention is designed that the first side panel and the second side panel and the bottom plate, the first bracket, the second bracket, the sliding frame, the guide rail frame, the power nut and the power lead screw are arranged to be distributed in the form of a built-in intermediate support, and the first side panel, the second side panel, the bottom plate, the first bracket, the second bracket, the sliding frame, the guide rail frame, the power nut and the power lead screw and the ball are arranged to be distributed in the form of a rolling support, and the first side panel, the second side panel, the bottom plate, the first bracket, the second bracket, the sliding frame, the guide rail frame, the power nut and the power lead screw and the rope are arranged to be distributed in the form of a connection with an intermediate rope body.

[0032] The present invention is designed that a first bracket, a second bracket, two sliding brackets, two guide rail brackets, four ball bearings, two power nuts and two power lead screws are arranged to form a group of intermediate displacement components, at least three intermediate displacement components are arranged between the bottom plate and the first side panel and the second side panel, the accommodating groove body II is respectively arranged to be connected with the fork mouth part I and the fork mouth part II, the inner end face part of the inner nut part and the inner end face part of the outer nut part are respectively arranged to be contact-connected with the end face part of the middle block part, the screw rod part is arranged to be connected with the through hole body of the middle block part, the fork mouth part I and the fork mouth part II are arranged to be connected with the frame part I, the outer end head of the connecting rod located between the frame part I and the fork mouth part I is arranged to be connected with the horizontal part of the frame part I, the outer end head of the connecting rod located between the frame part I and the fork mouth part II is arranged to be connected with the vertical part of the frame part I, and the frame part II is arranged to be connected with the plate part.

[0033] The present invention provides a method for using a drainage ditch template device in a highway tunnel, the steps of which are: the first side panel and the second side panel are used to form the groove wall of the drainage ditch in the highway tunnel, the middle support frame device is used to provide central support for the drainage ditch in the highway tunnel, the pushing device is used to drive the first side panel and the second side panel to move toward the middle support frame device in a threaded motion, and the installation state of the side template is converted by lateral movement.

[0034] The technical effect of the above technical solution is: highlighting the technical feature of converting the installation state of the side formwork by lateral movement, and introducing the application in the technical field of the use method of the drainage trough formwork device in the highway tunnel.

[0035] The present invention is designed, and its steps are: when constructing a drainage ditch in a highway tunnel, a center line is drawn on a drainage ditch construction station, a base plate is placed on the drainage ditch construction station, the center line of the base plate is aligned with the center line of the drainage ditch construction station, the inner nut part and the outer nut part are rotated on the screw part, the inner end face portion of the inner nut part and the inner end face portion of the outer nut part are separated from the end face portion of the middle block part, and at one of the end heads of the base plate, the inner nut part and the outer nut part are rotated in opposite directions on the screw part, the inner end face portion of the inner nut part and the inner end face portion of the outer nut part act on the end face portion of the middle block part, and the power nut on one of the end heads of the base plate is connected with the middle block part. The power lead screw on one end of the bottom plate is rotated on the nut portion and the accommodating hole body III, driving the plate portion on the first side panel and the plate portion on the second side panel to swing, so that the screw portion on other parts of the bottom plate moves in the through hole body of the middle block portion, and the distance between the plate portions on one end of the bottom plate is adjusted so that the distance between the plate portions is equal to the width of the drainage ditch in the highway tunnel, thereby completing the adjustment of the position of the first side panel and the second side panel on one end of the bottom plate, and adjusting the position of the first side panel and the second side panel on other parts of the bottom plate in turn along the center line of the bottom plate, so that the plate portion on the first side panel and the position The distance between the plate parts on the second side panel is equal to the width of the drainage ditch in the highway tunnel. One end of the rope is placed in the receiving hole body I, and the other end of the rope is placed in the receiving hole body II. The end of the rope is connected to the inside of the end through a wire rope buckle. The covering plate is placed on the frame part I. The operator is located on the covering plate and concrete mortar is poured on the end surface of the vertical part of the plate part, thereby completing the construction of the drainage ditch in the highway tunnel. After the concrete mortar solidifies, the covering plate is taken out from the frame part I, and the end of the rope in the receiving hole body II is separated from the inside of the end through a wire rope buckle. The other end of the rope is taken out from the receiving hole body II and connected to one of the ends of the bottom plate. On each end, the power screw is rotated in the opposite direction on the nut part and the receiving hole body III, driving the plate part on the first side panel and the plate part on the second side panel to swing inward, and then the inner nut part and the outer nut part are rotated on the screw part, so that the inner end face part of the inner nut part and the inner end face part of the outer nut part are separated from the end face part of the middle block part, so that the power nut and the middle block part on one of the end heads of the bottom plate are in a separated state, thereby completing the separation of the first side panel and the second side panel on one of the end heads of the bottom plate from the drainage groove in the highway tunnel, and the first side panel and the second side panel on other parts of the bottom plate are separated from the drainage groove in the highway tunnel in sequence along the center line of the bottom plate, and then the other end head of the rope is installed in the receiving hole body II, and the lifting rope is installed in the other receiving hole bodies I and II.The bottom plate is taken out from the drainage trough in the highway tunnel by hoisting and then placed on the next construction station of the drainage trough.

[0036] The technical effect of the above technical solution is that: the first side panel and the second side panel are accurately installed at the drainage trough construction station, and after the construction is completed, they are folded inwards and removed from the drainage trough as a whole.

[0037] In the present technical scheme, the first side panel and the second side panel are basic components and are also the necessary technical features of the present invention; the bottom plate, the first bracket, the second bracket, the sliding frame, the guide rail frame, the ball bearing, the power nut, the power screw and the rope are functional components and are the features for realizing other technical effects of the present invention; the designs of the technical features including the plate portion, the reinforcing plate portion, the accommodating hole body I, the frame portion I, the accommodating hole body II, the frame portion II, the shell portion, the accommodating hole body III, the fork portion I, the fork portion II, the intermediate block portion, the nut portion of the accommodating trough body I, the screw portion, the inner nut portion, the outer nut portion and the accommodating trough body II are technical features that comply with the Patent Law and its implementing rules.

[0038] In the present technical solution, the lateral movement for converting the installation state of the side template is achieved by a pushing device.

[0039] In the present technical solution, the first side panel, the second side panel, the intermediate support frame device and the pushing device for converting the installation state of the side formwork by lateral movement are important technical features. In the technical field of drainage trough formwork devices and use methods used in highway tunnels, it has novelty, creativity and practicality. The terms in the present technical solution can be explained and understood using patent documents in this technical field. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0041] Figure 1 This is a schematic diagram of a drainage trough template device used in a highway tunnel according to the present invention. Base plate-1, first side panel-2, second side panel-3, first bracket-4, second bracket-5, sliding frame-6, guide rail frame-7, ball bearing-8, power nut-9, power screw-91, rope-92, plate part-21, reinforcing plate part-22, accommodating hole body I-23, frame part I-41, accommodating hole body II-42, frame part II-61, cylinder shell part-62, accommodating hole body III-63, fork mouth part I-71, fork mouth part II-72, middle block part-73, accommodating groove body I-74, nut part-99, screw part-98, inner nut part-97, outer nut part-96, accommodating groove body II-95. DETAILED DESCRIPTION

[0042] According to the Examination Guidelines, terms such as “having”, “including” and “comprising” used in the present invention should be understood as not dispensing with the existence or addition of one or more other elements or combinations thereof.

[0043] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0044] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0045] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. In addition, unless otherwise specified, the equipment and materials used in the following examples are commercially available. If the processing conditions are not clearly stated, please refer to the purchased product manual or proceed according to conventional methods in the art.

[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] A drainage trough template device for use in a highway tunnel, Figure 1 This is the first embodiment of the present invention, which is described in detail in conjunction with the accompanying drawings. It includes a base plate 1, a first side panel 2, a second side panel 3, a first bracket 4, a second bracket 5, a sliding frame 6, a guide rail frame 7, a ball 8, a power nut 9, a power screw 91 and a rope 92, and the first bracket 4 and the second bracket 5 are respectively arranged on the base plate 1, the sliding frame 6 is respectively arranged on the first side panel 2 and the second side panel 3, and the guide rail frame 7 is arranged on the first bracket 4 and the second bracket 5, the ball 8 is arranged between the sliding frame 6 and the guide rail frame 7, and the power nut 9 is arranged on the guide rail frame 7, the power screw 91 is arranged between the power nut 9 and the sliding frame 6, and the rope 92 is respectively arranged between the first side panel 2 and the first bracket 4, and between the second side panel 3 and the second bracket 5.

[0048] In this embodiment, the base plate 1 is configured as a rectangular sheet-shaped body and one side portion of the upper end surface of the base plate 1 is configured to be connected to the first bracket 4, another side portion of the upper end surface of the base plate 1 is configured to be connected to the second bracket 5 and one side portion of the base plate 1 is configured to be distributed corresponding to the first side panel 2, and another side portion of the base plate 1 is configured to be distributed corresponding to the second side panel 3.

[0049] The base plate 1 forms supporting connection points for the first side panel 2, the second side panel 3, the first bracket 4 and the second bracket 5. The base plate 1 realizes connection with the first side panel 2, connection with the second side panel 3, connection with the first bracket 4 and connection with the second bracket 5. The technical purpose is to serve as a supporting carrier for the first bracket 4 and the second bracket 5.

[0050] In this embodiment, the first side panel 2 and the second side panel 3 are respectively configured to include a plate portion 21 and a reinforcement plate portion 22, and a receiving hole body Ⅰ23 is provided on the reinforcement plate portion 22, the reinforcement plate portion 22 is arranged on the curved corner portion of the plate portion 21 and the lower end face of the transverse portion of the reinforcement plate portion 22 is arranged to be connected to the upper end face of the transverse portion of the plate portion 21, the inner end face of the vertical portion of the reinforcement plate portion 22 is arranged to be connected to the inner end face of the vertical portion of the plate portion 21 and the transverse portion of the plate portion 21 is arranged to be distributed corresponding to the bottom plate 1, the receiving hole body Ⅰ23 is arranged to be connected to the rope 92 and the inner end face portion of the vertical portion of the plate portion 21 is arranged to be connected to the sliding frame 6 through a connecting rod, the plate portion 21 is arranged to be an L-shaped sheet body and the reinforcement plate portion 22 is arranged to be a right-angled triangle sheet body, the reinforcement plate portion 22 is arranged to be arranged and distributed at intervals along the longitudinal center line of the plate portion 21 and the receiving hole body Ⅰ23 is arranged to be a circular hole body.

[0051] Through the first side panel 2 and the second side panel 3, supporting connection points for the base plate 1, the sliding frame 6 and the rope 92 are formed. The plate portion 21 realizes connection with the base plate 1 and the sliding frame 6. The accommodating hole body Ⅰ23 realizes connection with the rope 92. The reinforcing plate portion 22 realizes increasing the supporting strength of the plate portion 21. The technical purpose is to be used as a component of the drainage trough template in the highway tunnel.

[0052] In this embodiment, a receiving hole body II42 is provided on the vertical body of the frame portion I41 of the first bracket 4 and the second bracket 5, and the lower end surface of the vertical body of the frame portion I41 is arranged to be connected to the base plate 1, the frame portion I41 is arranged to be connected to the guide rail frame 7 through a connecting rod and the receiving hole body II42 is arranged to be connected to the rope 92, the frame portion I41 is arranged to be a U-shaped frame body and the receiving hole body II42 is arranged to be a circular hole body, and the receiving hole body II42 is arranged to be arranged and distributed at intervals along the center line of the vertical body of the frame portion I41.

[0053] Through the first bracket 4 and the second bracket 5, a supporting connection point for the base plate 1, the guide rail frame 7 and the rope 92 is formed. The frame part Ⅰ41 realizes the connection with the base plate 1 and the guide rail frame 7. The accommodating hole body Ⅱ42 realizes the connection with the rope 92. Its technical purpose is to serve as a supporting carrier for the guide rail frame 7 and the rope 92.

[0054] In this embodiment, the sliding frame 6 is arranged to include a frame part II 61 and a cylindrical shell part 62, and a receiving hole body III 63 is arranged on the inner end face part of the vertical part of the frame part II 61. The end of the horizontal part of the frame part II 61 is arranged to be connected to the peripheral side face of the cylindrical shell part 62, and the receiving hole body III 63 is arranged to be connected to the power lead screw 91. The frame part II 61 is respectively arranged to be connected to the first side panel 2 and the second side panel 3 through connecting rods, and the cylindrical shell part 62 is arranged to be connected to the ball 8 in a receiving manner. The frame part II 61 is arranged as a U-shaped frame body, and the cylindrical shell part 62 is arranged as a circular spherical shell with upper and lower openings. The receiving hole body III 63 is arranged as a convex-shaped blind hole body.

[0055] Through the sliding frame 6, support connection points for the first side panel 2, the second side panel 3, the ball 8 and the power lead screw 91 are formed. By the frame part II 61, the connection with the first side panel 2 is achieved, and the connection with the second side panel 3 is achieved. By the cylindrical shell part 62, the connection with the ball 8 is achieved. By the receiving hole body III 63, the connection with the power lead screw 91 is achieved. Its technical purpose is: to be used as one of the components for driving the first side panel 2 and the second side panel 3 to move along the transverse center line of the drainage trough in the highway tunnel.

[0056] In this embodiment, the guide rail frame 7 is arranged to include a fork part I 71, a fork part II 72 and an intermediate block part 73, and receiving groove bodies I 74 are respectively arranged on the inner end face parts of the upper and lower horizontal parts of the fork part I 71 and the inner end face parts of the upper and lower horizontal parts of the fork part II 72. One end of the intermediate block part 73 is arranged to be connected to the inner end face side part of the fork part I 71, and the other end of the intermediate block part 73 is arranged to be connected to the inner end face side part of the fork part II 72. The outer end face side parts of the fork part I 71 and the fork part II 72 are respectively arranged to be connected to the first bracket 4 and the second bracket 5 through connecting rods, and the intermediate block part 73 is respectively arranged to be connected to the power nut 9 and the power lead screw 91. The receiving groove body I 74 is arranged to be connected to the ball 8 in a receiving manner, and the fork part I 71 and the fork part II 72 are respectively arranged as U-shaped strip bodies with middle openings. The intermediate block part 73 is arranged as a strip body with a through hole body, and the receiving groove body I 74 is arranged as a C-shaped groove body. Receiving groove bodies I 74 are respectively arranged on the inner walls of the middle openings of the fork part I 71 and the fork part II 72, and the through hole bodies of the intermediate block part 73 are respectively arranged to be connected to the power nut 9 and the power lead screw 91. The through hole bodies of the intermediate block part 73 are arranged as long strip hole bodies.

[0057] Through the guide rail frame 7, support connection points for the first bracket 4, the second bracket 5, the ball 8, the power nut 9 and the power screw 91 are formed. The fork portion I 71 and the fork portion II 72 realize the connection with the first bracket 4 and the second bracket 5. The accommodating groove body I 74 realizes the connection with the ball 8. The middle block portion 73 realizes the connection with the power nut 9 and the power screw 91. The technical purpose is to serve as the second component for driving the first side panel 2 and the second side panel 3 to move along the transverse center line of the drainage ditch in the highway tunnel.

[0058] In this embodiment, the ball 8 is configured as a spherical body and the middle portion of the ball 8 is configured to be sunk in connection with the sliding frame 6 , and the upper and lower portions of the peripheral side surfaces of the ball 8 are configured to be contact-connected with the guide rail frame 7 .

[0059] The ball bearings 8 form supporting connection points for the sliding frame 6 and the guide rail frame 7. The ball bearings 8 realize connection with the sliding frame 6 and the guide rail frame 7. The technical purpose is to serve as a third component for driving the first side panel 2 and the second side panel 3 to move along the transverse center line of the drainage trough in the highway tunnel.

[0060] In this embodiment, the power nut 9 is configured to include a nut portion 99, a screw portion 98, an inner nut portion 97 and an outer nut portion 96, and a receiving groove body II 95 is respectively provided on the upper and lower end surfaces of the nut portion 99, the outer end surface of the nut portion 99 is configured to be connected to the inner end of the screw portion 98, and the screw portion 98 is respectively configured to be threadedly connected to the inner nut portion 97 and the outer nut portion 96, the nut portion 99 is configured to be threadedly connected to the power lead screw 91, and the screw portion 98 is configured to be threadedly connected to the guide rail frame 7. Through-type connection, the inner end face portion of the inner nut portion 97 and the inner end face portion of the outer nut portion 96 are respectively arranged to be contact-type connected with the guide rail frame 7 and the accommodating groove body II 95 is arranged to be connected with the guide rail frame 7, the nut portion 99 is arranged to be a disc-shaped body with a threaded hole body in the middle portion and the threaded hole body of the nut portion 99 is arranged to be connected with the power lead screw 91, the screw portion 98 is arranged to be a plain bolt and the inner nut portion 97 and the outer nut portion 96 are respectively arranged to be hexagonal nuts, and the accommodating groove body II 95 is arranged to be a U-shaped groove-shaped body.

[0061] A supporting connection point for the guide rail frame 7 and the power screw 91 is formed by the power nut 9, and the connection with the guide rail frame 7 is realized by the screw portion 98, the inner nut portion 97, the outer nut portion 96 and the accommodating groove body II 95. The connection with the power screw 91 is realized by the nut portion 99. The technical purpose is to serve as a fourth component for driving the first side panel 2 and the second side panel 3 to move along the transverse center line of the drainage ditch in the highway tunnel.

[0062] In this embodiment, the power screw 91 is configured as a bolt with a convex shaft head at the inner end and a through hole body at the outer end, and the convex shaft head of the power screw 91 is configured to be rotatably connected to the sliding frame 6, and the power screw 91 is configured to be threadedly connected to the power nut 9.

[0063] A supporting connection point for the sliding frame 6 and the power nut 9 is formed by the power screw 91. The power screw 91 realizes the connection with the sliding frame 6 and the power nut 9. Its technical purpose is to serve as the fifth component for driving the first side panel 2 and the second side panel 3 to move along the transverse center line of the drainage ditch in the highway tunnel.

[0064] In this embodiment, the rope 92 is configured as a steel wire rope and one end of the rope 92 is configured to be connected to the first side panel 2 and the second side panel 3 through a steel wire rope buckle, and the other end of the rope 92 is configured to be connected to the first bracket 4 and the second bracket 5 through a steel wire rope buckle.

[0065] The rope 92 forms supporting connection points for the first side panel 2, the second side panel 3, the first bracket 4 and the second bracket 5. The rope 92 realizes connection with the first side panel 2, connection with the second side panel 3, connection with the first bracket 4 and connection with the second bracket 5. The technical purpose is to serve as a component for driving the connection between the first side panel 2 and the first bracket 4, and between the second side panel 3 and the second bracket 5.

[0066] In this embodiment, the first side panel 2 and the second side panel 3 are arranged to be distributed in a manner of built-in intermediate support with the bottom plate 1, the first bracket 4, the second bracket 5, the sliding frame 6, the guide frame 7, the power nut 9 and the power lead screw 91, and the first side panel 2, the second side panel 3, the bottom plate 1, the first bracket 4, the second bracket 5, the sliding frame 6, the guide frame 7, the power nut 9 and the power lead screw 91 and the ball 8 are arranged to be distributed in a manner of rolling support, the first side panel 2, the second side panel 3, the bottom plate 1, the first bracket 4, the second bracket 5, the sliding frame 6, the guide frame 7, the power nut 9 and the power lead screw 91 and the rope 92 are arranged to be distributed in a manner of intermediate rope connection, a first bracket 4, a second bracket 5, two sliding frames 6, two guide frames 7, four balls 8, two power nuts 9 and two power lead screws The lead screw 91 is configured to form a group of intermediate displacement components, at least three intermediate displacement components are arranged between the base plate 1 and the first side panel 2 and the second side panel 3, the accommodating groove body II 95 is respectively configured to be connected to the fork mouth part I 71 and the fork mouth part II 72, the inner end face part of the inner nut part 97 and the inner end face part of the outer nut part 96 are respectively configured to be contact-connected with the end face part of the intermediate block part 73, the screw rod part 98 is configured to be connected to the through hole body of the intermediate block part 73, the fork mouth part I 71 and the fork mouth part II 72 are configured to be connected to the frame part I 41, the outer end head of the connecting rod located between the frame part I 41 and the fork mouth part II 72 is configured to be connected to the horizontal part of the frame part I 41, the outer end head of the connecting rod located between the frame part I 41 and the fork mouth part II 72 is configured to be connected to the vertical part of the frame part I 41, and the frame part II 61 is configured to be connected to the plate part 21.

[0067] The present invention is further described below in conjunction with examples. The following examples are intended to illustrate the present invention rather than to further limit the present invention.

[0068] A method for using a drainage ditch template device in a highway tunnel, the steps of which are: when constructing a drainage ditch in a highway tunnel, draw a center line on a drainage ditch construction station, place a bottom plate 1 on the drainage ditch construction station, align the center line of the bottom plate 1 with the center line of the drainage ditch construction station, rotate an inner nut portion 97 and an outer nut portion 96 on a screw portion 98, separate the inner end face portion of the inner nut portion 97 and the inner end face portion of the outer nut portion 96 from the end face portion of the middle block portion 73, and at one end of the bottom plate 1 , so that the inner nut portion 97 and the outer nut portion 96 rotate in opposite directions on the screw portion 98, so that the inner end surface of the inner nut portion 97 and the inner end surface of the outer nut portion 96 act on the end surface of the intermediate block portion 73, so that the power nut 9 located on one end of the bottom plate 1 is in a connected state with the intermediate block portion 73, so that the power lead screw 91 located on one end of the bottom plate 1 rotates on the nut portion 99 and the receiving hole body III 63, driving the plate portion 21 located on the first side panel 2 and the plate portion 21 located on the second side panel 3 to swing , so that the screw part 98 located at other parts of the bottom plate 1 moves in the through hole body of the middle block part 73, and the distance between the plate parts 21 located at one end of the bottom plate 1 is adjusted so that the distance between the plate parts 21 is equal to the width of the drainage groove in the highway tunnel, thereby completing the position adjustment of the first side panel 2 and the second side panel 3 located at one end of the bottom plate 1, and the positions of the first side panel 2 and the second side panel 3 located at other parts of the bottom plate 1 are adjusted in sequence along the center line of the bottom plate 1, so that the first side panel 2 and the second side panel 3 located at other parts of the bottom plate 1 are adjusted in sequence, so that the first side panel 2 and the second side panel 3 located at one end of the bottom plate 1 are adjusted in sequence, so that the first side panel 2 and the second side panel 3 located at other parts of the bottom plate 1 are adjusted in sequence, so that the first side panel 2 and the second side panel 3 located at the first side panel 2 are adjusted. The distance between the plate portion 21 on the plate 2 and the plate portion 21 on the second side panel 3 is equal to the width of the drainage ditch in the highway tunnel. One end of the rope 92 is placed in the receiving hole body Ⅰ23, and the other end of the rope 92 is placed in the receiving hole body Ⅱ42. The end of the rope 92 is connected to the inside of the end by a wire rope buckle. The covering plate is placed on the frame portion Ⅰ41. The operator is located on the covering plate and concrete mortar is poured on the end surface of the vertical portion of the plate portion 21, thereby completing the construction of the drainage ditch in the highway tunnel. After the concrete mortar solidifies, the cover plate is taken out from the frame part I41, and the end of the rope 92 in the receiving hole body II42 is separated from the inside of the end by the wire rope buckle, and the other end of the rope 92 is taken out from the receiving hole body II42, and at one of the ends located on the bottom plate 1, the power screw 91 is rotated in the opposite direction on the nut part 99 and the receiving hole body III63, driving the plate part 21 on the first side panel 2 and the plate part 21 on the second side panel 3 to swing inward, and then the inner nut part 97 and the outer nut part 96 are screwed together. The rod 98 is rotated to separate the inner end face of the inner nut part 97 and the inner end face of the outer nut part 96 from the end face of the middle block part 73, so that the power nut 9 located on one of the end heads of the bottom plate 1 is in a separated state from the middle block part 73, thereby completing the separation of the first side panel 2 and the second side panel 3 located on one of the end heads of the bottom plate 1 from the drainage ditch in the highway tunnel, and the first side panel 2 and the second side panel 3 located on other parts of the bottom plate 1 are successively separated from the drainage ditch in the highway tunnel along the center line of the bottom plate 1, and then the other end of the rope 92 is installed in the receiving hole body II 42, and the hoisting rope is installed in the other receiving hole bodies I 23 and the receiving hole body II 42, and the bottom plate 1 is taken out of the drainage ditch in the highway tunnel by hoisting, and then placed on the next construction station of the drainage ditch.

[0069] When verifying the present invention, the inventor abandoned the existing technical features of using two side templates connected by a pin shaft on the bottom surface and propping the two side templates apart by a double-headed screw, and first proposed a technical feature of converting the installation state of the side template by lateral movement, thereby obtaining a first unexpected technical effect: realizing a segmented separation operation of the first side panel 2 and the second side panel 3 from the inner wall of the drainage ditch in the highway tunnel, thereby ensuring the integrity of the inner wall of the drainage ditch, and obtaining a second unexpected technical effect: realizing the movement and separation of the first side panel 2 and the second side panel 3 from the inner wall of the drainage ditch in the highway tunnel, without using rotational separation, thereby ensuring the consistency of the separation gap between the first side panel 2 and the second side panel 3 and the inner wall of the drainage ditch in the highway tunnel, and preventing The first side panel 2 and the second side panel 3 are prevented from deforming, and the third unexpected technical effect is obtained: the middle support frame device is used as the positioning reference line to ensure the construction accuracy of the drainage ditch, and the fourth unexpected technical effect is obtained: the side sliding movement support of the first side panel 2 and the second side panel 3 is achieved, and the smooth movement performance of the first side panel 2 and the second side panel 3 is ensured, and the fifth unexpected technical effect is obtained: the accuracy of the installation position of the first side panel 2 and the second side panel 3 obtained by the threaded movement is achieved, and the sixth unexpected technical effect is obtained: the re-connection support of the first side panel 2 and the second side panel 3 is achieved, and the seventh unexpected technical effect is obtained: the concrete mortar pouring operation space by the covering plate is expanded, and the construction efficiency of the drainage ditch is improved.

[0070] In a second embodiment of the present invention, the first side panel 2, the second side panel 3, the intermediate support frame device and the push device are connected to each other in such a way that the installation state of the side template is converted by lateral movement.

[0071] In this embodiment, the pushing device is connected to the first side panel 2, the second side panel 3 and the intermediate support frame device in a manner of moving in a threaded motion.

[0072] In this embodiment, the intermediate support frame device is configured to include a bottom plate 1 , a first support frame 4 and a second support frame 5 .

[0073] In this embodiment, the pushing device is configured to include a sliding frame 6 , a guide rail frame 7 , a power nut 9 and a power lead screw 91 .

[0074] In this embodiment, a first accessory device is further included and is disposed between the intermediate support frame device and the first side panel 2 and the second side panel 3 . The first accessory device is configured as a rope 92 .

[0075] In this embodiment, a second accessory device is further included and is arranged in the pushing device. The second accessory device is arranged as a ball 8 .

[0076] The second embodiment of the present invention is based on the first embodiment. In the second embodiment of the present invention, the first side panel 2 and the second side panel 3 are used to form the groove wall of the drainage groove in the highway tunnel, the intermediate support frame device is used to provide central support for the drainage groove in the highway tunnel, and the pushing device is used to drive the first side panel 2 and the second side panel 3 to move toward the intermediate support frame device in a threaded motion, thereby converting the installation state of the side template through lateral movement.

[0077] The second embodiment of the present invention is based on the first embodiment.

[0078] The present invention has the following characteristics: 1. Due to the design of the first side panel 2, the second side panel 3, the intermediate support frame device and the pushing device, the groove wall of the drainage groove in the highway tunnel is formed by the template through the first side panel 2 and the second side panel 3, and the central support of the drainage groove in the highway tunnel is achieved through the intermediate support frame device. Through the pushing device, the first side panel 2 and the second side panel 3 are driven to move toward the intermediate support frame device in a threaded motion, and the installation state of the side template is converted by lateral movement, which solves the technical problem of using two side templates connected by a pin shaft on the bottom surface and propping the two side templates apart by a double-headed screw, thereby improving the construction effect of the drainage groove.

[0079] 2. Due to the design of the bottom plate 1, the first bracket 4 and the second bracket 5, a separate independent support body is formed.

[0080] 3. Due to the design of the sliding frame 6, the guide rail frame 7, the power nut 9 and the power lead screw 91, the thread movement drives the lateral movement.

[0081] 4. Due to the design of the rope 92, it is possible to increase the rope body for connection.

[0082] 5. Due to the design of the ball 8, rolling motion support is achieved.

[0083] 6. Since the design limits the numerical range of the structural shape, the numerical range is the technical feature in the technical solution of the present invention, rather than a technical feature calculated by a formula or obtained through a limited number of tests. Tests have shown that the technical feature of this numerical range has achieved good technical effects.

[0084] 7. Due to the design of the technical features of the present invention, the effects of the individual and combined technical features have been shown through experiments to have various performance indicators of the present invention that are at least 1.7 times the existing performance indicators, and have been evaluated to have good market value.

[0085] There are other technical features connected with the first side panel 2, the second side panel 3, the intermediate support frame device and the pushing device for converting the installation state of the side template by lateral movement, which are all embodiments of the present invention, and the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to meet the requirements of the Patent Law, Patent Implementation Rules and Examination Guidelines, all possible combinations of the technical features in the above-mentioned embodiments will no longer be described.

[0086] The above embodiment is only one implementation form of the drainage ditch template device and the method of use provided by the present invention for use in a highway tunnel. Other variations of the scheme provided by the present invention, adding or reducing components or steps therein, or applying the present invention to other technical fields close to the present invention, all fall within the scope of protection of the present invention.

Claims

1. A drainage trough template device for a highway tunnel, characterized by: The invention comprises a first side panel (2) used as one of the drainage trough templates, a second side panel (3) used as the second drainage trough template, an intermediate support frame device arranged on the drainage trough construction station, and a pushing device arranged between the intermediate support frame device and the first side panel (2) and the second side panel (3).

2. The drainage trough template device for a highway tunnel according to claim 1 is characterized in that: The first side panel (2), the second side panel (3), the intermediate support frame device and the pushing device are connected to each other in a manner of converting the installation state of the side template by lateral movement.

3. The drainage trough template device for highway tunnel according to claim 2 is characterized in that: The pushing device is connected to the first side panel (2), the second side panel (3) and the intermediate support frame device in a threaded motion manner.

4. The drainage trough template device for use in a highway tunnel according to claim 1 is characterized in that: The intermediate support frame device is configured to include a bottom plate (1), a first support frame (4) and a second support frame (5). Alternatively, the push device is configured to include a sliding frame (6), a guide rail frame (7), a power nut (9) and a power lead screw (91), Or, it further comprises a first accessory device and the first accessory device is arranged between the intermediate support frame device and the first side panel (2) and the second side panel (3), and the first accessory device is arranged as a rope (92), Or, it further comprises a second accessory device and the second accessory device is arranged in the pushing device, and the second accessory device is arranged as a ball (8).

5. The drainage trough template device for use in a highway tunnel according to claim 4 is characterized in that: A first bracket (4) and a second bracket (5) are respectively arranged on the bottom plate (1), a sliding frame (6) is respectively arranged on the first side panel (2) and the second side panel (3), and a guide rail frame (7) is arranged on the first bracket (4) and the second bracket (5), a ball bearing (8) is arranged between the sliding frame (6) and the guide rail frame (7), and a power nut (9) is arranged on the guide rail frame (7), a power lead screw (91) is arranged between the power nut (9) and the sliding frame (6), and ropes (92) are respectively arranged between the first side panel (2) and the first bracket (4), and between the second side panel (3) and the second bracket (5).

6. The drainage ditch template device for use in a highway tunnel according to claim 5 is characterized in that: The first side panel (2) and the second side panel (3) are respectively configured to include a plate portion (21) and a reinforcing plate portion (22), and a receiving hole body I (23) is provided on the reinforcing plate portion (22), the reinforcing plate portion (22) is provided on the curved corner portion of the plate portion (21), and the lower end face of the horizontal portion of the reinforcing plate portion (22) is configured to be connected to the upper end face of the horizontal portion of the plate portion (21), the inner end face of the vertical portion of the reinforcing plate portion (22) is configured to be connected to the inner end face of the vertical portion of the plate portion (21), and the plate portion The transverse portion of (21) is arranged to correspond to the bottom plate (1), the receiving hole body I (23) is arranged to be connected to the rope (92) and the inner end surface of the vertical portion of the plate portion (21) is arranged to be connected to the sliding frame (6) through a connecting rod, the plate portion (21) is arranged to be an L-shaped sheet body and the reinforcing plate portion (22) is arranged to be a right-angled triangle sheet body, the reinforcing plate portion (22) is arranged to be spaced and distributed along the longitudinal center line of the plate portion (21) and the receiving hole body I (23) is arranged to be a circular hole body.

7. The drainage ditch template device for use in a highway tunnel according to claim 5 is characterized in that: The bottom plate (1) is configured as a rectangular sheet-shaped body, and one side portion of the upper end surface of the bottom plate (1) is configured to be connected to the first bracket (4), and the other side portion of the upper end surface of the bottom plate (1) is configured to be connected to the second bracket (5), and one side portion of the bottom plate (1) is configured to be distributed correspondingly to the first side panel (2), and the other side portion of the bottom plate (1) is configured to be distributed correspondingly to the second side panel (3). Or, a receiving hole body II (42) is provided on the vertical body of the frame part I (41) of the first bracket (4) and the second bracket (5), and the lower end surface of the vertical body of the frame part I (41) is arranged to be connected to the bottom plate (1), the frame part I (41) is arranged to be connected to the guide rail frame (7) through a connecting rod, and the receiving hole body II (42) is arranged to be connected to the rope (92), the frame part I (41) is arranged to be a U-shaped frame body, and the receiving hole body II (42) is arranged to be a circular hole body, and the receiving hole body II (42) is arranged to be arranged and distributed at intervals along the center line of the vertical body of the frame part I (41), Alternatively, the sliding frame (6) is configured to include a frame portion II (61) and a cylindrical shell portion (62), and a receiving hole body III (63) is provided on the inner end face portion of the vertical portion of the frame portion II (61), the transverse end of the frame portion II (61) is configured to be connected to the peripheral side face portion of the cylindrical shell portion (62), and the receiving hole body III (63) is configured to be connected to the power screw (91), the frame portion II (61) is configured to be connected to the first side panel (2) and the second side panel (3) through a connecting rod, respectively, and the cylindrical shell portion (62) is configured to be connected to the ball (8) in a receiving manner, the frame portion II (61) is configured to be a U-shaped frame body, and the cylindrical shell portion (62) is configured to be a circular spherical shell with upper and lower open bodies, and the receiving hole body III (63) is configured to be a convex U-shaped blind hole body, Or, the guide rail frame (7) is configured to include a fork portion I (71), a fork portion II (72), and an intermediate block portion (73). Accommodating grooves I (74) are respectively provided on the inner end face portions of the upper and lower horizontal portions of the fork portion I (71) and on the inner end face portions of the upper and lower horizontal portions of the fork portion II (72). One end of the intermediate block portion (73) is configured to be connected to the side portion of the inner end face of the fork portion I (71), and the other end of the intermediate block portion (73) is configured to be connected to the side portion of the inner end face of the fork portion II (72). The outer end face side portions of the fork portion I (71) and the fork portion II (72) are respectively configured to be connected to the first bracket (4) and the second bracket (5) through connecting rods, and the intermediate block portion (73) is respectively configured to be connected to the power nut (9) and the power lead screw (91). The accommodating groove I (74) is configured to be connected to the ball (8) in a receiving manner, and the fork portion I (71) and the fork portion II (72) are respectively configured to be C-shaped strip-shaped bodies with a middle opening body. The intermediate block portion (73) is configured to be a strip-shaped body with a through-hole body, and the accommodating groove I (74) is configured to be a C-shaped groove body. Accommodating grooves I (74) are respectively provided on the inner walls of the middle openings of the fork portion I (71) and the fork portion II (72), and the through-hole bodies of the intermediate block portion (73) are respectively configured to be connected to the power nut (9) and the power lead screw (91). The through-hole body of the intermediate block portion (73) is configured to be a long strip-shaped hole body. Or, the power nut (9) is configured to include a nut portion (99), a screw portion (98), an inner nut portion (97), and an outer nut portion (96). Accommodating grooves II (95) are respectively provided on the upper and lower end face portions of the nut portion (99). The outer end face portion of the nut portion (99) is configured to be connected to the inner end of the screw portion (98), and the screw portion (98) is respectively configured to be threadedly connected to the inner nut portion (97) and the outer nut portion (96). The nut portion (99) is configured to be threadedly connected to the power lead screw (91), and the screw portion (98) is configured to be connected to the guide rail frame (7) in a penetrating manner. The inner end face portions of the inner nut portion (97) and the outer nut portion (96) are respectively configured to be in contact connection with the guide rail frame (7), and the accommodating groove II (95) is configured to be connected to the guide rail frame (7). The nut portion (99) is configured to be a disc-shaped body with a threaded hole body in the middle, and the threaded hole body of the nut portion (99) is configured to be connected to the power lead screw (91). The screw portion (98) is configured to be a light column bolt, and the inner nut portion (97) and the outer nut portion (96) are respectively configured to be hexagonal nuts. The accommodating groove II (95) is configured to be a C-shaped groove body. Or, the power lead screw (91) is configured to be a bolt with a convex-shaped shaft head at the inner end and a through-hole body at the outer end, and the convex-shaped shaft head of the power lead screw (91) is configured to be rotatably connected to the sliding frame (6). The power lead screw (91) is configured to be threadedly connected to the power nut (9). Alternatively, the rope (92) is configured as a steel wire rope and one end of the rope (92) is configured to be connected to the first side panel (2) and the second side panel (3) through a steel wire rope buckle, and the other end of the rope (92) is configured to be connected to the first bracket (4) and the second bracket (5) through a steel wire rope buckle. Alternatively, the ball (8) is configured as a spherical body and the middle portion of the ball (8) is configured to be sunken in connection with the sliding frame (6), and the upper and lower portions of the peripheral side surfaces of the ball (8) are respectively configured to be contact-connected with the guide rail frame (7).

8. The drainage trough template device and the method of use for a highway tunnel according to any one of claims 1 to 7, characterized in that: The first side panel (2) and the second side panel (3) are arranged to be distributed in a manner of built-in intermediate support with the bottom plate (1), the first bracket (4), the second bracket (5), the sliding frame (6), the guide rail frame (7), the power nut (9) and the power lead screw (91), and the first side panel (2), the second side panel (3), the bottom plate (1), the first bracket (4), the second bracket (5), the sliding frame (6), the guide rail frame (7), the power nut (9) and the power lead screw (91) are arranged to be distributed in a manner of rolling support with the ball (8), and the first side panel (2), the second side panel (3), the bottom plate (1), the first bracket (4), the second bracket (5), the sliding frame (6), the guide rail frame (7), the power nut (9) and the power lead screw (91) are arranged to be distributed in a manner of intermediate rope connection with the rope (92), Alternatively, a first bracket (4), a second bracket (5), two sliding brackets (6), two guide rail brackets (7), four ball bearings (8), two power nuts (9) and two power lead screws (91) are arranged to form a set of intermediate displacement components, at least three intermediate displacement components are arranged between the bottom plate (1) and the first side panel (2) and the second side panel (3), the receiving groove body II (95) is arranged to be connected to the fork mouth part I (71) and the fork mouth part II (72), respectively, and the inner end face portion of the inner nut part (97) and the inner end face portion of the outer nut part (96) are respectively arranged In order to be contact-connected with the end face portion of the middle block portion (73), the screw portion (98) is arranged to be connected with the through hole body of the middle block portion (73), the fork portion I (71) and the fork portion II (72) are arranged to be connected with the frame portion I (41), the outer end of the connecting rod located between the frame portion I (41) and the fork portion I (71) is arranged to be connected with the horizontal portion of the frame portion I (41), the outer end of the connecting rod located between the frame portion I (41) and the fork portion II (72) is arranged to be connected with the vertical portion of the frame portion I (41), and the frame portion II (61) is arranged to be connected with the plate portion (21).

9. A method for using a drainage trough template device in a highway tunnel, characterized in that the steps are: The first side panel (2) and the second side panel (3) enable the groove wall of the drainage groove in the highway tunnel to be molded, the intermediate support frame device enables the drainage groove in the highway tunnel to be centrally supported, and the pushing device drives the first side panel (2) and the second side panel (3) to move toward the intermediate support frame device in a threaded motion, thereby converting the installation state of the side template through lateral movement.

10. The method for using the drainage ditch template device in a highway tunnel according to claim 9, characterized in that the steps are: When constructing a drainage ditch in a highway tunnel, a center line is drawn on a drainage ditch construction station, a base plate (1) is placed on the drainage ditch construction station, the center line of the base plate (1) is aligned with the center line of the drainage ditch construction station, the inner nut part (97) and the outer nut part (96) are rotated on the screw part (98), the inner end face of the inner nut part (97) and the inner end face of the outer nut part (96) are separated from the end face of the middle block part (73), and at one end of the base plate (1), the inner nut part (97) and the outer nut part (96) are rotated in opposite directions on the screw part (98), the inner end face of the inner nut part (97) and the inner end face of the outer nut part (96) act on the middle block part (73) The power nut (9) on one end of the bottom plate (1) is connected to the middle block (73) so that the power lead screw (91) on one end of the bottom plate (1) rotates on the nut portion (99) and the receiving hole body III (63), driving the plate portion (21) on the first side panel (2) and the plate portion (21) on the second side panel (3) to swing, so that the screw portion (98) on other parts of the bottom plate (1) moves in the through hole body of the middle block (73), and the distance between the plate portions (21) on one end of the bottom plate (1) is adjusted so that the distance between the plate portions (21) is equal to the width of the drainage groove in the highway tunnel, thereby completing the The positions of the first side panel (2) and the second side panel (3) located at one end of the bottom plate (1) are adjusted, and the positions of the first side panel (2) and the second side panel (3) located at other parts of the bottom plate (1) are adjusted in sequence along the center line of the bottom plate (1) so that the distance between the plate portion (21) located on the first side panel (2) and the plate portion (21) located on the second side panel (3) is equal to the width of the drainage ditch in the highway tunnel, one end of the rope (92) is placed in the receiving hole body I (23), the other end of the rope (92) is placed in the receiving hole body II (42), the end of the rope (92) is connected to the inside of the end by a wire rope buckle, and the covering plate is placed in the frame portion I (41 ), the operator is located on the covering plate, and pours concrete mortar on the outer end surface of the vertical part of the plate portion (21), thereby completing the construction of the drainage ditch in the highway tunnel. After the concrete mortar solidifies, the covering plate is removed from the frame portion I (41), and the end of the rope (92) located in the receiving hole body II (42) is separated from the end by a wire rope buckle, and the other end of the rope (92) is taken out of the receiving hole body II (42). At one of the ends located on the bottom plate (1), the power screw (91) is rotated in the opposite direction on the nut portion (99) and the receiving hole body III (63), driving the plate portion (21) located on the first side panel (2) and the plate portion (21) located on the second side panel (3) to swing inwards.Then, the inner nut portion (97) and the outer nut portion (96) are rotated on the screw portion (98) to separate the inner end face portion of the inner nut portion (97) and the inner end face portion of the outer nut portion (96) from the end face portion of the intermediate block portion (73), so that the power nut (9) located on one end of the bottom plate (1) and the intermediate block portion (73) are in a separated state, thereby completing the separation of the first side panel (2) and the second side panel (3) located on one end of the bottom plate (1) from the drainage groove in the highway tunnel, and sequentially separating the first side panel (2) and the second side panel (3) located on other parts of the bottom plate (1) from the drainage groove in the highway tunnel along the center line of the bottom plate (1). Then, the other end of the rope (92) is installed in the receiving hole body II (42), and the hoisting rope is installed in the other receiving hole body I (23) and the receiving hole body II (42). By hoisting, the bottom plate (1) is taken out from the drainage trough in the highway tunnel and then placed on the next construction station of the drainage trough.