Wind power output simulation method considering distributed energy uncertainty

By considering the potential damage and maintenance time of wind turbines, the distributed energy uncertainty simulation method is adopted to solve the inaccuracy problem of the output prediction of wind power in the existing technology, and the stability of wind power resources and the operation reliability of virtual power plants are improved. .

CN119093493APending Publication Date: 2024-12-06NORTH CHINA ELECTRIC POWER UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411037529.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The existing wind power generation prediction methods fail to effectively consider the potential damage and maintenance time of the wind turbine, resulting in the inability to accurately simulate the real scenario of wind power output, affecting the stable operation of the virtual power plant.

Method used

A wind power output simulation method that considers the uncertainty of distributed energy is adopted. By setting the initial state of the fan equipment, generating random numbers to simulate the sunrise force, establishing an uncertainty probability model, and setting maintenance time parameters under different states, we simulate it. The output of fan equipment in 365 days.

Benefits of technology

This method can more accurately simulate the real scenario of wind power output, reduce the uncertainty borne by virtual power plants, and improve the stability of wind power resources and the operation reliability of virtual power plants.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119093493A_ABST
    Figure CN119093493A_ABST
Patent Text Reader

Abstract

The invention relates to a wind power output simulation method considering distributed energy uncertainty, comprising the following steps: step 1, setting the initial state of a fan device as a normal operation state, and obtaining the rated power of the fan device; 2, randomly generating 365 numbers between 0 and 1 by adopting a random function, and multiplying the numbers by the rated power of the fan equipment obtained in the step 1 to obtain daily output simulation of the fan equipment in 365 days; step 3, establishing an uncertainty probability model and outputting a random operation state of a single fan device; step 4, performing maintenance time parameter setting of different time lengths on the fan equipment; and step 5, obtaining the output simulation condition of the fan equipment in 365 days. According to the method, the potential damage probability and the maintenance time of the fan are considered when power generation of the wind turbine generator is predicted, and the real scene of fan output can be better simulated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of wind power output simulation in a virtual power plant, and relates to a wind power output simulation method, in particular to a wind power output simulation method that takes into account the uncertainty of distributed energy. Background Art

[0002] As the world pays more attention to clean energy, new energy sources such as wind and solar energy are becoming an important part of the power system due to their clean and renewable characteristics. However, the intermittent and unstable nature of new energy generation has brought great challenges to the dispatching and stable operation of the power system.

[0003] Existing wind power research focuses on wind power prediction, which is based on the premise that "wind turbine equipment is in normal operation." However, in actual operation, normally operating wind turbines have the potential to be damaged.

[0004] Power generation resources such as wind power are an important component of the clean energy of virtual power plants. Their stable and efficient operation is of great significance to the stable operation of virtual power plants.

[0005] Therefore, the present invention proposes a wind power output simulation method considering the uncertainty of distributed energy, and takes the uncertain resource of distributed wind turbines (wind power plant, WP) as an example to simulate the wind power output of a virtual power plant.

[0006] After searching, no public documents of the prior art identical or similar to the present invention were found. Summary of the invention

[0007] The purpose of the present invention is to overcome the shortcomings of the prior art and propose a wind power output simulation method that takes into account the uncertainty of distributed energy. When predicting the power generation of wind turbines, the potential damage probability of the wind turbine and its maintenance time are taken into account, which can better simulate the real scenario of wind turbine output.

[0008] The present invention solves the practical problem by adopting the following technical solutions:

[0009] A wind power output simulation method considering the uncertainty of distributed energy resources comprises the following steps:

[0010] Step 1: Set the initial state of the fan equipment to a normal operating state, that is, no abnormal phenomenon occurs, and obtain the rated power of the fan equipment;

[0011] Step 2: Under the premise that the wind turbine equipment in step 1 is operating normally, a random function is used to randomly generate 365 numbers between 0 and 1, and the numbers are multiplied by the rated power of the wind turbine equipment obtained in step 1 to obtain the daily power simulation of the wind turbine equipment in 365 days;

[0012] Step 3: Based on the daily power simulation of the normal wind turbine equipment calculated in step 2, considering the random operating state of the wind turbine equipment itself, an uncertainty probability model is established and the random operating state of a single wind turbine equipment is output;

[0013] Step 4: Based on the different random operating states of each fan device in step 3, setting maintenance time parameters of different lengths for the fan devices;

[0014] Step 5: Output After considering the random operation state of the single wind turbine device in step 3 and the maintenance time parameter in step 4, the output simulation of the wind turbine device in 365 days is finally obtained.

[0015] Moreover, the specific steps of step 3 include:

[0016] (1) Set the potential damage state and probability parameters of the wind turbine equipment. State 1 is normal operation, and the probability is set to P (state c =1); State 2 is partial failure, and the probability is set to P(state c =2); State 3 is a complete failure, and the probability is set to P(state c =3);

[0017] (2) Use a random function to randomly generate a number between 0 and 1. If the xth random number is between 0.05 and 1, the fan state is statec=1; if the xth random number is between 0.01 and 0.05, the fan state is statec=2; if the xth random number is between 0 and 0.01, the fan state is statec=3;

[0018] (3) Establish the wind turbine uncertainty probability model as shown in formula (1):

[0019]

[0020] In the formula, state c It is the operating status parameter of the access device. 1 indicates that the fan device is operating normally, 2 indicates that the fan device is faulty, and 3 indicates that the fan device is completely faulty. I P(state) represents the probability of normal operation of the fan equipment, U2 represents the probability of failure of the fan equipment, and (1-U1-U2) represents the probability of complete failure of the fan equipment. c ) indicates that the device is in state state c The probability of t=1,2,...,365.

[0021] (4) Output the random operating status of a single fan device.

[0022] Moreover, the specific steps of step 4 include:

[0023] Set the maintenance time parameter of the fan equipment. When in state 1, the maintenance time is R_time(1)=0; when in state 2, the maintenance time is R_time(2)=12; when in state 3, the maintenance time is R_time(3)=24. The maintenance time of the unit is shown in formula (2):

[0024]

[0025] Where t=1,2,...,360, when the device state is c When (t) = 1, the equipment is normal and does not need maintenance; when the equipment state c When (t) = 2, the equipment is faulty and needs to be repaired. The repair time is 12 hours. c When (t)=3, the equipment is scrapped and needs major repairs, which takes 24 hours.

[0026] Advantages and beneficial effects of the present invention:

[0027] 1. The present invention proposes a wind power output simulation method that takes into account the uncertainty of distributed energy. Since the output of distributed wind power resources is uncertain, it comes not only from the random fluctuations in the wind turbine output itself, but also from the potential damage probability and maintenance time problems in the process of participating in virtual power plant transactions. Step 3 of the present invention takes into account the random damage probability of the wind turbine, and step 4 takes into account the different maintenance times corresponding to different degrees of damage to the wind turbine, thereby better simulating the actual wind turbine output.

[0028] 2. The present invention proposes a wind power output simulation method that takes into account the uncertainty of distributed energy. For distributed wind power, the higher the capacity of the wind turbines connected to the virtual power plant and the more wind turbines there are, the more stable the overall output is, and the lower the uncertainty that the virtual power plant needs to bear from the wind turbines. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 is a process flow chart of the present invention;

[0030] Figure 2 It is a schematic diagram of different states of the fan device of the present invention and the corresponding maintenance time;

[0031] Figure 3 This is a 365-day output curve diagram of a 100kW wind turbine of the present invention. DETAILED DESCRIPTION

[0032] The embodiments of the present invention are further described in detail below with reference to the accompanying drawings:

[0033] A wind power output simulation method considering the uncertainty of distributed energy resources, such as Figure 1 As shown, the following steps are included:

[0034] Step 1: Set the initial state of the fan equipment to a normal operating state, that is, no abnormal phenomenon occurs, and obtain the rated power of the fan equipment;

[0035] Step 2: Under the premise that the wind turbine equipment in step 1 is operating normally, a random function is used to randomly generate 365 numbers between 0 and 1, and the numbers are multiplied by the rated power of the wind turbine equipment obtained in step 1 to obtain the daily power simulation of the wind turbine equipment in 365 days;

[0036] Step 3: Based on the daily power simulation of the normal wind turbine equipment calculated in step 2, considering the random operating state of the wind turbine equipment itself, an uncertainty probability model is established and the random operating state of a single wind turbine equipment is output;

[0037] Step 4: Based on the different random operating states of each fan device in step 3, setting maintenance time parameters of different lengths for the fan devices;

[0038] Step 5: Output After considering the random operation state of the single wind turbine device in step 3 and the maintenance time parameter in step 4, the output simulation of the wind turbine device in 365 days is finally obtained.

[0039] The specific steps of step 3 include:

[0040] (1) Set the potential damage state and probability parameters of the wind turbine equipment. State 1 is normal operation, and the probability is set to P (state c =1); State 2 is partial failure, and the probability is set to P(state c =2); State 3 is a complete failure, and the probability is set to P(state c =3);

[0041] (2) Use a random function to randomly generate a number between 0 and 1. If the xth random number is between 0.05 and 1, the fan state is statec=1; if the xth random number is between 0.01 and 0.05, the fan state is statec=2; if the xth random number is between 0 and 0.01, the fan state is statec=3;

[0042] (3) Establish the wind turbine uncertainty probability model as shown in formula (1):

[0043]

[0044] In the formula, state cIt is the operating status parameter of the access device. 1 indicates that the fan device is operating normally, 2 indicates that the fan device is faulty, and 3 indicates that the fan device is completely faulty. I P(state) represents the probability of normal operation of the fan equipment, U2 represents the probability of failure of the fan equipment, and (1-U1-U2) represents the probability of complete failure of the fan equipment. c ) indicates that the device is in state state c The probability of t=1,2,...,365.

[0045] (4) Output the random operating status of a single fan device.

[0046] The specific steps of step 4 include:

[0047] Set the maintenance time parameter of the fan equipment. When in state 1, the maintenance time is R_time(1)=0; when in state 2, the maintenance time is R_time(2)=12; when in state 3, the maintenance time is R_time(3)=24. The maintenance time of the unit is shown in formula (2):

[0048]

[0049] Where t=1,2,...,360, when the device state is c When (t) = 1, the equipment is normal and does not need maintenance; when the equipment state c When (t) = 2, the equipment is faulty and needs to be repaired. The repair time is 12 hours. c When (t)=3, the equipment is scrapped and needs major repairs, which takes 24 hours.

[0050] For the sake of convenience in calculation, when the equipment is damaged on the M1th day, the wind turbine equipment will not generate electricity for 12 hours on the M1+1th day due to maintenance, so the power generation of the wind turbine equipment on the M1+1th day is halved; when the equipment is damaged on the M2th day, the wind turbine equipment will not generate electricity for 24 hours (all day) on the M2+1th day due to maintenance, so the wind turbine equipment will not generate electricity on the M2+1th day.

[0051] Different states of wind turbine equipment in virtual power plants and corresponding maintenance times Figure 2 As shown, the top horizontal straight line indicates normal operation of the equipment; the two concave lines represent partial failure and complete failure of the equipment respectively. The more concave areas there are, the more serious the damage to the equipment is and the longer the maintenance time will be.

[0052] The present invention is further described below by means of specific examples:

[0053] (1) The initial state of the wind turbine equipment is set to a normal operating state, that is, no abnormal phenomenon occurs. This paper takes a large wind turbine with a rated power of 1500kW as an example for calculation.

[0054] (2) Under the premise that the wind turbine equipment in step 1 is operating normally, a random function is used to randomly generate 365 numbers between 0 and 1. The number is multiplied by the rated power of the wind turbine equipment in step 1 to obtain: The daily power simulation of the wind turbine equipment in 365 days is shown in the following table:

[0055]

[0056] (3) After calculating the output simulation of the normal wind turbine equipment in steps 1 and 2, further consider the random operating state of the wind turbine equipment itself. Set the potential damage probability parameter of the wind turbine equipment. State 1 is normal operation, and the probability is set to P (state c =1); State 2 is partial failure, and the probability is set to P(state c =2); State 3 is a complete failure, and the probability is set to P(state c =3). Then use the random function to randomly generate 365 numbers between 0 and 1. If the xth random number is between 0.05 and 1, the fan state is statec=1; if the xth random number is between 0.01 and 0.05, the fan state is statec=2; if the xth random number is between 0 and 0.01, the fan state is statec=3. The information of partial failure or complete failure is as follows:

[0057] Day x state Day x state Day x state Day x state 34 3 137 2 163 2 184 2 39 2 140 2 167 2 304 2 76 2 143 2 178 2 346 2 104 2

[0058] (4) Set the maintenance time parameters of the wind turbine equipment. According to the different states of the wind turbine in step (3), set different maintenance time lengths for it: when in state 1, the maintenance time is R_time(1)=0; when in state 2, the maintenance time is R_time(2)=12; when in state 3, the maintenance time is R_time(3)=24. For the sake of convenience in calculation, when the equipment is damaged on the M1th day, the wind turbine equipment will not generate electricity for 12 hours due to maintenance on the M1+1th day, so the power generation of the wind turbine equipment on the M1+1th day is halved; when the equipment is damaged on the M2th day, the wind turbine equipment will not generate electricity for 24 hours (all day) due to maintenance on the M2+1th day, so the wind turbine equipment will not generate electricity on the M2+1th day. From (3), it can be seen that the dates of less or no power generation due to failures are as follows:

[0059] Day x Reduce power generation Day x Reduce power generation Day x Reduce power generation Day x Reduce power generation 35 Suspension 138 Halving 164 Halving 185 Halving 40 Halving 141 Halving 168 Halving 305 Halving 77 Halving 142 Halving 179 Halving 347 Halving 105 Halving

[0060] (5) Output the simulated output of the wind turbine equipment in 365 days after considering the random damage of the wind turbine equipment itself in step 3 and the maintenance time in step 4. The simulated output of a 1500kW wind turbine in 365 days is shown in the following table. The line graph of this data is shown in the following table. Figure 3 shown.

[0061]

[0062] It should be emphasized that the embodiments of the present invention are illustrative rather than restrictive. Therefore, the present invention includes but is not limited to the embodiments described in the specific implementation modes. Any other implementation modes derived by those skilled in the art based on the technical solutions of the present invention also fall within the scope of protection of the present invention.

Claims

1. A wind power output simulation method considering the uncertainty of distributed energy, characterized by: The following steps are involved: Step 1: Set the initial state of the fan equipment to a normal operating state, that is, no abnormal phenomenon occurs, and obtain the rated power of the fan equipment; Step 2: Under the premise that the wind turbine equipment in step 1 is operating normally, a random function is used to randomly generate 365 numbers between 0 and 1, and the numbers are multiplied by the rated power of the wind turbine equipment obtained in step 1 to obtain the daily power simulation of the wind turbine equipment in 365 days; Step 3: Based on the daily power simulation of the normal wind turbine equipment calculated in step 2, considering the random operating state of the wind turbine equipment itself, an uncertainty probability model is established and the random operating state of a single wind turbine equipment is output; Step 4: Based on the different random operating states of each fan device in step 3, setting maintenance time parameters of different lengths for the fan devices; Step 5: Output After considering the random operation state of the single wind turbine device in step 3 and the maintenance time parameter in step 4, the output simulation of the wind turbine device in 365 days is finally obtained.

2. A wind power output simulation method considering the uncertainty of distributed energy according to claim 1, characterized in that: The specific steps of step 3 include: (1) Set the potential damage state and probability parameters of the wind turbine equipment. State 1 is normal operation, and the probability is set to P (state c =1); State 2 is partial failure, and the probability is set to P(state c =2); State 3 is a complete failure, and the probability is set to P(state c =3); (2) Use a random function to randomly generate a number between 0 and 1. If the xth random number is between 0.05 and 1, the fan state is statec=1; if the xth random number is between 0.01 and 0.05, the fan state is statec=2; if the xth random number is between 0 and 0.01, the fan state is statec=3; (3) Establish the wind turbine uncertainty probability model as shown in formula (1): In the formula, state c U is the operating status parameter of the access device. 1 indicates that the fan device is operating normally, 2 indicates that the fan device is faulty, and 3 indicates that the fan device is completely faulty. I represents the probability of normal operation of the fan equipment, U2 represents the probability of failure of the fan equipment, and (1-U1-U2) represents the probability of complete failure of the fan equipment; P(state c ) indicates that the device is in state state c The probability of , t = 1, 2, ..., 365; (4) Output the random operating status of a single fan device.

3. A wind power output simulation method considering the uncertainty of distributed energy according to claim 1, characterized in that: The specific steps of step 4 include: Set the maintenance time parameter of the fan equipment. When in state 1, the maintenance time is R_time(1)=0; when in state 2, the maintenance time is R_time(2)=12; when in state 3, the maintenance time is R_time(3)=24. The maintenance time of the unit is shown in formula (2): Where t=1,2,...,360, when the device state is c When (t) = 1, the equipment is normal and does not need maintenance; when the equipment state c When (t) = 2, the equipment is faulty and needs to be repaired. The repair time is 12 hours. c When (t)=3, the equipment is scrapped and needs major repairs, which takes 24 hours.