Quick forming method for frozen earth landform

Through the combination of frozen soil composition analysis and crusher mixer, combined with molds and external modification tools, the rapid formation of frozen soil is achieved by using heat conduction technology, solving the problem of low formation efficiency of large-scale frozen soil, and achieving rapid simulation and specialization of frozen soil landforms Customized preparation of the landform supports environmental adaptability tests of vehicles and engineering equipment.

CN119141665APending Publication Date: 2024-12-17CHINA NAT INST OF TEST & TESTING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411454872.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-17
Publication Date
2024-12-17

AI Technical Summary

Technical Problem

The prior art is difficult to achieve rapid formation of large-scale permafrost and customized preparation of special landform permafrost, resulting in low simulation efficiency of permafrost and ineffective support for environmental adaptability tests of vehicles and engineering equipment.

Method used

The frozen soil raw materials are prepared by combining the frozen soil composition analysis and the combination of crushers and mixers, and the mold and external modification tools are used to construct regular and irregular structure frozen soil landforms, and combined with heat conduction technology to accelerate the mold opening of the frozen soil mold to achieve rapid mold formation.

Benefits of technology

It has achieved rapid preparation of large-scale permafrost raw materials and rapid formation of permafrost landforms, saving preparation time, supporting environmental adaptability tests of vehicles and engineering equipment, and improving the equipment's environmental adaptability capabilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119141665A_ABST
    Figure CN119141665A_ABST
Patent Text Reader

Abstract

The invention discloses a quick forming method for a frozen earth landform. The quick forming method comprises the following steps: step 1, analyzing frozen earth components; 2, preparing frozen soil raw materials; step 3, stirring frozen soil raw materials; 4, judging whether the frozen earth landform is of a regular structure or not; and step 5, constructing the frozen earth landform. The problem that materials are taken in different places is solved, rapid preparation of large-batch frozen earth raw materials is achieved, the preparation time of the frozen earth raw materials is effectively saved, and rapid forming of the frozen earth landform of a regular structure and customized preparation of the frozen earth of a special landform are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of frozen soil preparation, and in particular relates to a method for rapid prototyping of frozen landforms. Background Art

[0002] Frozen soil refers to the landform structure composed of rocks, soil and ice below zero degrees Celsius, which can form a variety of shapes such as flat land, slopes, and bulges. As frozen soil is widely distributed in my country, different shapes of frozen landforms have a profound impact on vehicle transportation and engineering construction.

[0003] At present, the research on frozen soil is mainly reflected in the analysis of frozen soil stress characteristics, analysis of frozen soil temperature sensitivity, and preparation of small batches of frozen soil patterns. The rapid prototyping technology for large quantities of frozen soil is still in the exploratory stage, and it is difficult to quickly simulate the frozen soil landform. The present invention sorts out the large-scale frozen soil forming process, and realizes the effective simulation of frozen soil landform through frozen soil landform analysis, frozen soil raw material preparation and frozen soil forming process. The frozen soil mold opening is accelerated by heat conduction means, which effectively saves the frozen soil preparation time. Through the two means of frozen soil unit combination and frozen soil morphology external modification, the frozen soil landform construction is enriched, and the external environment is provided for the frozen soil environment adaptability test of vehicles and other engineering equipment, which effectively supports the improvement of the environmental adaptability of vehicles and other engineering equipment. Summary of the invention

[0004] In order to overcome the shortcomings of the prior art, the present invention provides a method for rapid prototyping of frozen landforms, including step 1, analyzing frozen soil components; step 2, preparing frozen soil raw materials; step 3, stirring frozen soil raw materials; step 4, judging whether the frozen landform is a regular structure; and step 5, constructing the frozen landform. The present invention overcomes the problem of obtaining materials from other places, realizes rapid preparation of large quantities of frozen soil raw materials, effectively saves the preparation time of frozen soil raw materials, realizes rapid prototyping of frozen landforms with regular structures and customized preparation of frozen soil for special landforms.

[0005] The technical solution adopted by the present invention to solve the technical problem is as follows:

[0006] Step 1: Analyze the composition of frozen soil, including soil and rock types and the relative proportions of soil, rock and water;

[0007] Step 2: According to the proportion of frozen soil components, limestone, basalt, granite and quartzite are crushed by a crusher to obtain rock particles of different specifications;

[0008] Step 3: Mix the rocks, soil and water in the specified proportions using a mixer;

[0009] Step 4: Determine the target frozen landform structure;

[0010] If the frozen landform is flat or sloped, it is considered a regular structure; if the frozen landform is undulating or other irregular shapes, it is considered an irregular structure;

[0011] Step 5: Construct frozen landforms;

[0012] When the frozen landform has a regular structure, a mold is used to prepare the frozen landform unit; then the frozen landform units are combined to obtain the target frozen landform; if the frozen landform has an irregular structure, the surface of the frozen soil raw material is modified by an external modification tool, and then it is frozen into shape in a low-temperature environment.

[0013] Preferably, the step 2 is specifically:

[0014] According to the characteristics of frozen soil, the large-sized stones are first crushed by a jaw crusher, and then crushed by a hammer crusher to obtain small-sized frozen soil raw materials.

[0015] Preferably, the mold includes a bevel mold and a cuboid mold.

[0016] Preferably, the external trimming tools include a shovel and a steel file.

[0017] Preferably, the bevel mold includes a first mold body, a first water injection port, a first water outlet and a mold support; the first mold body is a triangular prism structure, the top is not sealed, and the remaining surfaces are composed of stainless steel material to form an internal hollow cavity structure; the mold support support is connected to the first mold body; the first water injection port is located on the left side of the mold body and passes through the internal cavity structure of the first mold body; the first water outlet is lower than the first water injection port, is located on the right side of the first mold body, and passes through the internal cavity structure of the first mold body.

[0018] Preferably, the rectangular mold includes a second mold body, a second water injection port and a second water outlet; the rectangular mold body is a rectangular structure, the top is not sealed, and the remaining surfaces are composed of stainless steel material to form an internal hollow cavity structure, and the second water injection port is located on the left side of the mold body and passes through the internal cavity structure of the second mold body; the second water outlet is lower than the second water injection port, is located on the right side of the second mold body, and passes through the internal cavity structure of the second mold body.

[0019] A computer program enables a computer to execute the above-mentioned method for rapid prototyping of frozen landforms.

[0020] An electronic device comprises: a processor and a memory; the memory is used to store a computer program, and the processor is used to execute the computer program stored in the memory, so that the electronic device executes the above-mentioned frozen landform rapid prototyping method.

[0021] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the above-mentioned method for rapid prototyping of frozen landforms.

[0022] A chip includes: a processor for calling and running a computer program from a memory, so that a device equipped with the chip executes the above-mentioned frozen landform rapid prototyping method.

[0023] The beneficial effects of the present invention are as follows:

[0024] 1. The present invention combines the characteristics of a jaw crusher and a hammer crusher to crush various types of rocks to obtain rock particles of different particle sizes, thereby overcoming the problem of obtaining materials from other places, achieving rapid preparation of large quantities of frozen soil raw materials, and effectively saving the preparation time of frozen soil raw materials.

[0025] 2. The present invention prepares frozen soil units through two types of molds, and uses heat conduction to realize rapid mold opening of frozen soil units. Then, several frozen soil units are combined and spliced ​​by combined splicing to realize rapid molding of frozen landforms with regular structures.

[0026] 3. The present invention realizes customized preparation of frozen soil with special landforms by externally modifying the frozen soil raw materials. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 is a flow chart of the method of the present invention;

[0028] Figure 2 It is a cross-sectional view of the inclined plane mold of the present invention;

[0029] Figure 3 It is a cross-sectional view of a rectangular parallelepiped mold of the present invention;

[0030] Figure 4 This is a schematic diagram of the structure of the slope frozen soil unit of the present invention;

[0031] Figure 5 This is a schematic diagram of the rectangular frozen soil unit structure of the present invention;

[0032] Figure 6 This is a schematic diagram of the combined geomorphic structure of the slope body frozen soil of the present invention;

[0033] Figure 7 It is a schematic diagram of the rectangular frozen soil combined landform structure of the present invention.

[0034] In the figure: 1. first water inlet; 2. first water outlet; 3. first upper side plate; 4. first lower side plate; 5. mold bracket; 6. mold base; 7. first mold cavity; 8. first molding area; 9. second water inlet; 10. second upper side plate; 11. second lower side plate; 12. second mold cavity; 13. second water outlet; 14. second molding area; 15. inclined frozen landform unit; 16. rectangular frozen landform unit; 17. inclined frozen soil combined landform; 18. rectangular frozen soil combined landform 17. DETAILED DESCRIPTION

[0035] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0036] The present invention proposes a method for rapid prototyping of landforms, such as Figure 1 As shown, the following steps are included:

[0037] Step 1: Analyze the frozen soil composition including soil, rock types and the relative proportions of soil, rock and water.

[0038] Step 2: According to the proportion of frozen soil components, crush limestone, basalt, granite, quartzite and other stones using a crusher to obtain rock particles of different specifications. Specifically, according to the characteristics of frozen soil, a jaw crusher is used to first crush large-size stones, and then a hammer crusher is used for secondary crushing to obtain small-size frozen soil raw materials.

[0039] Step 3: Mix the rocks, soil and water in a specific ratio using a mixer.

[0040] Step 4, determining the target frozen landform structure;

[0041] Determine the target permafrost structure. If the permafrost is flat, sloped or other permafrost, it can be regarded as a regular structure. If the permafrost is undulating or other irregular shapes, it can be regarded as an irregular structure.

[0042] Step 5, constructing frozen landforms;

[0043] When the frozen landform is a regular structure, a frozen landform unit is prepared by using a mold. Then, the frozen landform units are combined to obtain the target frozen landform. The mold includes a ramp mold and a cuboid mold. If the frozen landform is an irregular structure, the frozen soil raw material is surface modified by using an external modification tool, and then frozen in a low temperature environment. The external modification tool includes a shovel, a steel file, etc.

[0044] The inclined plane mold is composed of a first mold body, a first water injection port, a first water outlet and a mold support. The first mold body is a triangular prism structure, the top is not sealed, and the remaining surfaces are made of stainless steel materials to form an internal hollow cavity structure. The mold support support is connected to the first mold body. The first water injection port is located on the left side of the mold body and penetrates the internal cavity structure of the first mold body. The first water outlet is lower than the first water injection port, is located on the right side of the first mold body, and penetrates the internal cavity structure of the first mold body.

[0045] The rectangular parallelepiped mold is composed of a second mold body, a second water injection port, and a second water outlet. The rectangular parallelepiped mold body is a rectangular parallelepiped structure, the top is not sealed, and the remaining surfaces are made of stainless steel materials to form an internal hollow cavity structure. The second water injection port is located on the left side of the mold body and passes through the internal cavity structure of the second mold body. The second water outlet is lower than the second water injection port, is located on the right side of the second mold body, and passes through the internal cavity structure of the second mold body.

[0046] Example:

[0047] like Figure 1 As shown, the rapid prototyping process of frozen landforms in the present invention is as follows:

[0048] Step 1, frozen soil composition analysis;

[0049] By collecting frozen soil in the target area, we can comprehensively analyze the internal components of the frozen soil, including the rock and soil types and average particle size in the frozen soil, and the relative proportions of rock, soil and water.

[0050] Step 2, preparation of frozen soil raw materials;

[0051] The jaw crusher inputs rocks with a feed diameter of less than 220mm, outputs rock particles with a diameter of 10mm-50mm, and serves as the input of the hammer crusher. The hammer crusher then crushes the rock particles with a diameter of 0-3mm.

[0052] As preferred in this embodiment, after the diameter of the rock particles reaches 50 mm after the action of the jaw crusher, the hammer crusher is started to perform secondary crushing, and then the frozen soil raw materials are classified according to the rock type and rock particle size. By setting it in this way, the types of frozen soil raw materials are enriched and the material collection time is saved.

[0053] Step 3, stirring the frozen soil raw materials;

[0054] Prepare frozen soil raw materials according to the frozen soil component analysis results of step 1, stir the rock particles, soil and water through a mixer, and proceed to step 4 after the frozen soil raw materials are evenly mixed.

[0055] Step 4, determining whether the frozen landform is a regular structure;

[0056] If the frozen landform has a regular shape and can be expanded according to a single structural unit, it can be regarded as a regular structure. If the frozen landform does not have a regular shape and cannot be expanded according to a single structural unit, it can be regarded as an irregular structure.

[0057] Step 5, constructing frozen landforms;

[0058] If the target frozen landform has a regular structure, the frozen soil units can be prepared by molds first, and then the formed frozen soil units can be combined and spliced ​​to obtain the overall frozen soil landform.

[0059] Figure 2 The figure shows a bevel mold, which is made of stainless steel and has a triangular prism structure as a whole, and the top is not sealed. It consists of a first water inlet 1, a first water outlet 2, a first upper side plate 3, a first lower side plate 4, a mold support 5, a mold base 6, a first mold cavity 7, and a first molding area 8. Among them, the first water inlet 1 is set on the left side of the bevel mold, and the first drain 2 is set on the right side of the bevel mold. The first water inlet 1 is higher than the first water outlet 2. The first lower side template 4 is located above the mold support 5 and connected to the mold support 5, and the mold support 5 is connected to the base 6. The first upper side plate 3 is parallel to the first lower side plate 4 and has no contact, forming a hollow cavity structure 7. During use, the prepared frozen soil raw material is placed in the first molding area 8, and then the bevel mold is placed in a -10℃ environment and frozen for two hours. After the frozen soil raw material is fully condensed, the bevel mold is transferred to a room temperature environment. Hot water is injected from the first water inlet 1 to fill the first inner cavity 7 of the mold, and discharged from the first water outlet 2 for 5 minutes. This process accelerates the temperature rise of the first upper side plate 3 through the principle of heat conduction, thereby effectively promoting the rapid demoulding of the frozen soil structure in the first molding area 8. After the frozen soil structure is demoulded, the inclined surface mold is inverted to obtain Figure 4 The slope body frozen soil unit is shown.

[0060] Figure 3The rectangular mold is shown in the figure. The material is stainless steel, the whole is a rectangular structure, and the top is not sealed. It consists of a second water injection port 9, a second water outlet 13, a second upper side plate 10, a second lower side plate 11, a second mold cavity 12, and a second molding area 14. Among them, the second water injection port 9 is arranged on the left side of the bevel mold, the second drain port 13 is arranged on the right side of the bevel mold, and the second water injection port 9 is higher than the second water outlet 13. The second upper side plate 10 and the second lower side plate 11 constitute a hollow cavity structure. During use, the prepared frozen soil raw material is placed in the second molding area 14, and then the rectangular mold is placed in a -10℃ environment and frozen for two hours. After the frozen soil raw material is fully condensed, the bevel mold is transferred to a room temperature environment. Hot water is injected from the water injection port 9 to fill the mold cavity 11, and discharged from the water outlet 13 for 5 minutes. This process accelerates the temperature rise of the upper side plate 10 through the principle of heat conduction, thereby effectively promoting the rapid demoulding of the frozen soil structure in the molding area 14. After the frozen soil structure is demoulded, the inclined plane mold is inverted to obtain Figure 5 The rectangular frozen soil unit shown.

[0061] Will Figure 4 The slope frozen landform unit 15 shown is combined and spliced ​​to form Figure 6 The slope body frozen soil combination landform shown in Figure 17. Figure 5 The rectangular frozen landform units 16 shown are combined and spliced ​​to form Figure 6 The rectangular frozen soil combined landform 18 is shown. The combination of frozen soil landform units in the present invention is not limited to the above two. According to the test needs, frozen soil landform units of different thicknesses and inclinations can be prepared, and then the frozen soil landform units are spliced ​​and combined to form a target frozen soil environment.

[0062] If the permafrost landform is an irregular landform, the permafrost raw material in step 3 is externally modified to obtain a permafrost landform of a special shape, including an irregular permafrost pit, a permafrost mound, etc.

Claims

1. A method for rapid prototyping of frozen landforms, characterized in that: The steps include: Step 1: Analyze the composition of frozen soil, including soil and rock types and the relative proportions of soil, rock and water; Step 2: According to the proportion of frozen soil components, limestone, basalt, granite and quartzite are crushed by a crusher to obtain rock particles of different specifications; Step 3: Mix the rocks, soil and water in the specified proportions using a mixer; Step 4: Determine the target frozen landform structure; If the frozen landform is flat or sloped, it is considered a regular structure; if the frozen landform is undulating or other irregular shapes, it is considered an irregular structure; Step 5: Construct frozen landforms; When the frozen landform has a regular structure, a mold is used to prepare the frozen landform unit; then the frozen landform units are combined to obtain the target frozen landform; if the frozen landform has an irregular structure, the surface of the frozen soil raw material is modified by an external modification tool, and then it is frozen into shape in a low-temperature environment.

2. A method for rapid prototyping of frozen landforms according to claim 1, characterized in that: The step 2 is specifically as follows: According to the characteristics of frozen soil, the large-sized stones are first crushed by a jaw crusher, and then crushed by a hammer crusher to obtain small-sized frozen soil raw materials.

3. A method for rapid prototyping of frozen landforms according to claim 1, characterized in that: The mold comprises a bevel mold and a cuboid mold.

4. A method for rapid prototyping of frozen landforms according to claim 1, characterized in that: The external modification tools include a shovel and a steel file.

5. A method for rapid prototyping of frozen landforms according to claim 1, characterized in that: The bevel mold includes a first mold body, a first water injection port, a first water outlet and a mold support; the first mold body is a triangular prism structure, the top is not sealed, and the remaining surfaces are composed of stainless steel materials to form an internal hollow cavity structure; the mold support support is connected to the first mold body; the first water injection port is located on the left side of the mold body and passes through the internal cavity structure of the first mold body; the first water outlet is lower than the first water injection port, is located on the right side of the first mold body, and passes through the internal cavity structure of the first mold body.

6. A method for rapid prototyping of frozen landforms according to claim 1, characterized in that: The rectangular mold includes a second mold body, a second water injection port and a second water outlet; the rectangular mold body is a rectangular structure, the top is not sealed, and the remaining surfaces are composed of stainless steel material to form an internal hollow cavity structure, the second water injection port is located on the left side of the mold body and passes through the internal cavity structure of the second mold body; the second water outlet is lower than the second water injection port, is located on the right side of the second mold body, and passes through the internal cavity structure of the second mold body.

7. A computer program, characterized in that The computer program enables a computer to execute the method as claimed in any one of claims 1 / 6.

8. An electronic device, characterized in that: include: Processor and memory; The memory is used to store a computer program, and the processor is used to execute the computer program stored in the memory, so that the electronic device executes the method as claimed in any one of claims 1 to 6.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 6 is implemented.

10. A chip, characterized in that: include: A processor, configured to call and run a computer program from a memory, so that a device equipped with the chip executes a method as claimed in any one of claims 1 to 6.