By designing a movable construction drilling platform, using height-adjustable support mechanism and stabilization mechanism, the problem of low efficiency of manual handheld drilling equipment is solved, the accuracy and safety of drilling is achieved, and the drilling efficiency is improved. .
Patent Information
- Application Number
- CN202411472969.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-01-14
AI Technical Summary
In the prior art, manual handheld drilling equipment has low drilling efficiency and complex operation.
A construction drilling platform is designed, including a movable base, a support mechanism with adjustable height, a drilling motor, a protective mechanism and a stabilizing mechanism. The support mechanism realizes up and down movement and position adjustment of the drill rod through the drive assembly and screw, and protects the The mechanism blocks the gravel and stabilizes the mechanism to improve the stability of the base.
The accuracy and safety of drilling are achieved, the drilling efficiency is improved, the operation is simplified, and the inefficiency problem caused by manual handheld drilling equipment is solved.
Smart Images

Figure CN119308594A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of highway bridge construction, and in particular to a construction drilling platform. Background Art
[0002] With the rapid development of society, the construction of highways and bridges has been fully developed. When constructing highways and bridges, steel bars and pillars need to be installed. Before installing the steel bars and pillars, holes need to be drilled on the bridge base. When drilling holes, workers usually use handheld drilling equipment to drill holes, which is complicated to operate and reduces the drilling efficiency. Summary of the invention
[0003] In view of this, the present invention proposes a construction drilling platform, which aims to solve the problem of low drilling efficiency caused by drilling with manual handheld drilling equipment in the prior art.
[0004] The present invention proposes a construction drilling platform, which comprises: a movable base, a support mechanism with adjustable height, a drilling motor, a drill rod, a protective mechanism and a stabilizing mechanism; wherein the base is provided with a penetration opening; the support mechanism is arranged on the base, the drilling motor is arranged on the support mechanism and is connected to the drill rod, the drill rod is movably penetrated through the penetration opening, and the support mechanism is used to adjust its own height to drive the drill rod to drill downward; the base itself can be adjusted laterally and longitudinally to adjust the position of the drill rod; the protective mechanism is arranged at the penetration opening to block the gravel splashed during the drilling process; the stabilizing mechanism is arranged on the base to improve the stability of the base.
[0005] Furthermore, in the above-mentioned construction drilling platform, the supporting mechanism includes: two U-shaped supporting frames arranged in parallel, a supporting plate and two driving assemblies; wherein the two supporting frames are respectively placed on both sides of the penetration opening, the opening end of each supporting frame is connected to the base, and the two driving assemblies are arranged on the two supporting frames in a one-to-one correspondence; the supporting plate is horizontally arranged between the two supporting frames and the two ends are respectively connected to the two driving assemblies in a one-to-one correspondence, and the drilling motor is arranged on the supporting plate; the two driving assemblies are used to simultaneously drive the supporting plate to move along the height direction of the supporting frame to move the drill rod downward.
[0006] Furthermore, in the above-mentioned construction drilling platform, each driving assembly includes: a driving motor and a driving screw; wherein the driving motor is arranged at the closed end of the corresponding support frame, the driving end of the driving motor is connected to the first end of the driving screw, and the second end of the driving screw is rotatably connected to the base; the end of the support plate is threadedly connected to the driving screw.
[0007] Furthermore, in the above-mentioned construction drilling platform, the base includes: a first bottom frame, a second bottom frame, a bottom plate and a plurality of wheels; wherein the first bottom frame and the second bottom frame are both quadrilateral and are both frame structures with hollow interiors; the second bottom frame is adjustably arranged inside the first bottom frame along the length direction of the first bottom frame; the bottom plate is adjustably arranged inside the second bottom frame along the width direction of the first bottom frame; the wheels are arranged at intervals at the bottom of the first bottom frame; a through opening is opened in the bottom plate, and a supporting mechanism is arranged on the bottom plate.
[0008] Furthermore, the above-mentioned construction drilling platform also includes: at least two first sliding bars and two positioning blocks; wherein each first sliding bar is arranged at intervals in the second bottom frame, and each first sliding bar extends along the width direction of the first bottom frame; the bottom plate is placed in the second bottom frame and is slidably passed through each first sliding bar; the second bottom frame is provided with a plurality of first positioning grooves at intervals on two opposite side walls corresponding to the width direction of the first bottom frame; the two positioning blocks are respectively arranged on both sides of the bottom plate, the first end of each positioning block is rotatably connected to the corresponding side wall of the bottom plate, and the second end of each positioning block is used to be clamped in the corresponding first positioning groove when the bottom plate moves to the desired position along the first sliding bar.
[0009] Furthermore, the above-mentioned construction drilling platform also includes: at least two second sliding bars, a pulling rod and a positioning rod; wherein, each second sliding bar is arranged at intervals in the first bottom frame, and each second sliding bar extends along the length direction of the first bottom frame; the second bottom frame is placed in the first bottom frame and is slidably passed through each second sliding bar; each second sliding bar is provided with a plurality of second positioning grooves at intervals along the length direction; the second bottom frame is provided with an extension portion protruding outwardly on one side corresponding to the width direction of the first bottom frame, the pulling rod is slidably passed through the extension portion and the bottom is vertically connected to the positioning rod, the positioning rod is horizontally arranged between the two second sliding bars, and the positioning rod is used to be clamped in the corresponding second positioning grooves on the two second sliding bars when the second bottom frame slides to the desired position along the second sliding bar.
[0010] Furthermore, in the above-mentioned construction drilling platform, the stabilizing mechanism includes: two stabilizing components; wherein the two stabilizing components are respectively arranged on opposite sides of the first bottom frame; each stabilizing component includes: an L-shaped connecting plate, a stabilizing plate, at least one driving cylinder and at least one supporting plate; wherein the first end of the connecting plate is connected to one side of the top of the first bottom frame, and the second end of the connecting plate extends away from the first bottom frame; each driving cylinder is arranged at intervals on the side of the second end of the connecting plate facing the ground, and the telescopic end of each driving cylinder is connected to the stabilizing plate; each supporting plate is arranged at intervals on the side of the stabilizing plate facing the ground and is in contact with the ground.
[0011] Furthermore, in the above-mentioned construction drilling platform, the protective mechanism includes: a ring-shaped protective body, two mounting plates, an adjusting screw and a limit rod; wherein, the protective body is made of a transparent material, the protective body can be movably placed in the penetration opening, and the drill rod can be movably penetrated inside the protective body; the two mounting plates are respectively arranged on opposite sides of the protective body; the adjusting screw is penetrated and screwed to one of the mounting plates, and the end of the adjusting screw is rotatably connected to the base; the limit rod is slidably penetrated to the other mounting plate, and the end of the limit rod is connected to the base.
[0012] Furthermore, in the above-mentioned construction drilling platform, the protection mechanism also includes: two annular connecting bodies and an annular protective net; wherein the two connecting bodies are respectively arranged at the top and bottom of the inner side of the protective body; the protective net is placed in the protective body, and the top and bottom of the protective net are respectively connected to the two connecting bodies one by one, so that there is a preset gap between the protective net and the protective body, and the drill rod can be movably passed through the protective net.
[0013] Furthermore, the above-mentioned construction drilling platform also includes: a dust reduction mechanism; wherein the dust reduction mechanism is arranged on the base and close to the drilling opening, and is used to reduce the dust generated by drilling; the dust reduction mechanism includes: a water tank, a connecting pipe, an annular duct and a plurality of nozzles; wherein the annular duct is arranged on the top of the protective body, and each nozzle is arranged on the top of the annular duct at intervals along the circumferential direction; the water tank is arranged on the base and is connected to the annular duct through the connecting pipe to supply water to the annular duct.
[0014] In the present invention, the height of the support mechanism itself is adjustable, and it can drive the drilling motor to move up and down, so that the drill rod can move up and down, thereby realizing drilling. The base itself can be adjusted laterally and longitudinally, and can adjust the position of the support mechanism, that is, adjust the position of the drill rod, so that the position of the drill hole meets the design requirements, and accurate drilling is realized. The protective mechanism can block the gravel splashed during the drilling process, thereby improving the safety during the drilling process. The stabilizing mechanism can make the base stably contact with the ground, improve the stability of the base, and thereby improve the stability of the drilling process. The construction drilling platform does not require manual drilling, is simple to operate, and effectively improves the drilling efficiency, solving the problem of low drilling efficiency caused by drilling with manual handheld drilling equipment in the prior art. The base is movable, so that the construction drilling platform can be moved to a desired position for easy drilling. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0016] Figure 1A schematic diagram of the structure of a construction drilling platform provided in an embodiment of the present invention;
[0017] Figure 2 A schematic cross-sectional structure diagram of a construction drilling platform provided in an embodiment of the present invention;
[0018] Figure 3 A schematic diagram of the structure of the bottom plate and the second bottom frame in the construction drilling platform provided by an embodiment of the present invention;
[0019] Figure 4 A schematic diagram of the structure of the pull rod and the positioning rod in the construction drilling platform provided by an embodiment of the present invention;
[0020] Figure 5 for Figure 2 A partial enlarged view of the middle A;
[0021] Figure 6 A schematic structural diagram of a protection mechanism in a construction drilling platform provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0022] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0023] See also Figures 1 to 6 , the figure shows the preferred structure of the construction drilling platform in this embodiment. As shown in the figure, the construction drilling platform includes: a base 1, a support mechanism 2, a drilling motor 3, a drill rod 4, a protection mechanism 5 and a stabilization mechanism 6. Among them, the base 1 is movable. Specifically, a plurality of wheels 150 are provided at the bottom of the base 1 for easy movement. The base 1 is provided with a penetration opening 110, and the penetration opening 110 can be opened at the center position of the base 1, and the penetration opening 110 corresponds to the position to be drilled.
[0024] The support mechanism 2 is arranged on the base 1, the drilling motor 3 is arranged on the support mechanism 2, and the driving end of the drilling motor 3 is connected to the drill rod 4, and the drilling motor 3 is used to drive the drill rod 4 to rotate. The length direction of the drill rod 4 is perpendicular to the base 1, and the drill rod 4 is movably arranged in the penetration opening 110 along the vertical direction. The height of the support mechanism 2 itself is adjustable, so the support mechanism 2 adjusts its own height, drives the drilling motor 3 to move downward, and then drives the drill rod 4 to move downward, and the drilling motor 3 drives the drill rod 4 to rotate, so that the drill rod 4 can drill a hole.
[0025] The base 1 itself can be adjusted laterally and longitudinally. The adjustment of the base 1 itself drives the adjustment of the position of the support mechanism 2, and then drives the adjustment of the position of the drill rod 4, so that the drill rod 4 can drill at the preset drilling position.
[0026] The protection mechanism 5 is arranged at the drilling opening 110, and the protection mechanism 5 is used to block the flying debris during the drilling process.
[0027] The stabilizing mechanism 6 is disposed on the base 1 , and is used to ensure that the base 1 is in stable contact with the ground, thereby improving the stability of the base 1 and further improving the overall stability of the drilling platform.
[0028] It can be seen that in the present embodiment, the height of the support mechanism 2 itself is adjustable, and it can drive the drilling motor 3 to move up and down, so that the drill rod 4 can move up and down, thereby realizing drilling. The base 1 itself can be adjusted laterally and longitudinally, and can adjust the position of the support mechanism 2, that is, adjust the position of the drill rod 4, so that the position of the drill hole meets the design requirements, and accurate drilling is realized. The protective mechanism 5 can block the gravel splashed during the drilling process, thereby improving the safety during the drilling process. The stabilizing mechanism 6 can make the base 1 stably contact with the ground, improve the stability of the base 1, and thereby improve the stability of the drilling process. The construction drilling platform does not require manual drilling, is simple to operate, effectively improves the drilling efficiency, and solves the problem of low drilling efficiency caused by drilling with manual handheld drilling equipment in the prior art. The base 1 is movable, so that the construction drilling platform can be moved to the desired position for easy drilling.
[0029] See also Figure 1 and Figure 2 In the above embodiment, the support mechanism 2 includes: two support frames 21, a support plate 22 and two drive components. The two support frames 21 are arranged in parallel, and the two support frames 21 are respectively placed on both sides of the penetration opening 110. Each support frame 21 is U-shaped, that is, each support frame 21 has an open end and a closed end that are relatively arranged, and the open end of each support frame 21 is connected to the base 1 so that the support frame 21 is relatively fixed to the base 1, and the closed end of each support frame 21 is away from the base 1, and each support frame 21 is perpendicular to the base 1.
[0030] The two driving components correspond to the two supporting frames 21 one by one, and each driving component is disposed on the corresponding supporting frame 21 .
[0031] The support plate 22 is horizontally arranged between the two support frames 21, and the two ends of the support plate 22 correspond to the two drive assemblies one by one, and each end of the support plate 22 is connected to the corresponding drive assembly. The drilling motor 3 is arranged on the support plate 22, and the drive end of the drilling motor 3 is rotatably arranged in the support plate 22 and connected to the drill rod 4. Specifically, the support plate 22 is parallel to the base 1, and the support plate 22, the drilling motor 3 and the drill rod 4 are all placed between the two support frames 21. The two drive assemblies are used to simultaneously drive the support plate 22 along the height direction of the support frame 21 ( Figure 1 The support plate 22 moves toward or away from the base 1, thereby driving the drill rod 4 up and down (relative to the direction from top to bottom). Figure 1 The support plate 22 moves downward when it is close to the base 1, and moves upward when it is away from the base 1.
[0032] Each driving assembly includes: a driving motor 23 and a driving screw 24. The driving motor 23 is disposed at the closed end of the corresponding support frame 21, and the driving end of the driving motor 23 is connected to the first end ( Figure 1 The upper end shown in FIG. 1 is connected to the second end of the drive screw 24 ( Figure 1 Specifically, the drive screw 24 is placed in the support frame 21 and extends along the height direction of the support frame 21, and the drive motor 23 is placed above the closed end of the support frame 21 (relative to the lower end of the support frame 21). Figure 1 For example, the driving end of the driving motor 23 is rotatably disposed in the closed end of the support frame 21, and the driving end of the driving motor 23 is connected to the first end of the driving screw 24. The corresponding end of the support plate 22 is screwed to the driving screw 24. When the driving motor 23 drives the driving screw 24 to rotate, the rotation of the driving screw 24 drives the support plate 22 to move up and down along the height direction of the support frame 21.
[0033] Preferably, each driving assembly further includes: a guide rod 25. The guide rod 25 is disposed in the support frame 21 and extends along the height direction of the support frame 21, and the guide rod 25 is parallel to the driving screw rod 24. Figure 1 The lower end shown in FIG. 1 is connected to the base 1 so that the guide rod 25 is relatively fixed to the base 1. The second end ( Figure 1 The guide rod 25 is a guide rod 25 for guiding the support plate 22. ...
[0034] It can be seen that in this embodiment, the supporting mechanism 2 has a simple structure and is easy to implement.
[0035] See also Figures 1 to 5 In the above embodiment, the base 1 includes: a first bottom frame 120, a second bottom frame 130, a bottom plate 140 and a plurality of wheels 150. The first bottom frame 120 and the second bottom frame 130 are both quadrilateral, and both of them are hollow frame structures. Specifically, the first bottom frame 120 and the second bottom frame 130 are both rectangular frames. The length direction of the first bottom frame 120 ( Figure 1 The a direction shown in FIG. 1 matches the length direction of the second bottom frame 130, and the width direction of the first bottom frame 120 ( Figure 1 The b direction shown in the figure matches the width direction of the second bottom frame 130.
[0036] The second bottom frame 130 is adjustably disposed inside the first bottom frame 120 along the length direction of the first bottom frame 120 , so that the second bottom frame 130 can be adjusted along the length direction of the first bottom frame 120 , wherein the length direction of the first bottom frame 120 is the horizontal direction.
[0037] The bottom plate 140 is adjustably disposed inside the second bottom frame 130 along the width direction of the first bottom frame 120 , so that the bottom plate 140 can be adjusted along the width direction of the first bottom frame 120 , wherein the width direction of the first bottom frame 120 is the longitudinal direction.
[0038] Each wheel 150 is arranged at intervals at the bottom of the first bottom frame 120 so that the first bottom frame 120 can be moved. Specifically, each wheel 150 can be a universal wheel. During specific implementation, there can be four wheels 150, and the four wheels 150 are respectively arranged at the four corners of the first bottom frame 120.
[0039] The through opening 110 is opened on the bottom plate 140 , and the supporting mechanism 2 is disposed on the bottom plate 140 .
[0040] It can be seen that in the present embodiment, the base plate 140 is sleeved in the second base frame 130, the second base frame 130 is sleeved in the first base frame 120, the support mechanism 2, the drilling motor 3 and the drill rod 4 are all arranged on the base plate 140, then when the base plate 140 is adjusted in the width direction of the first base frame 120, the drill rod 4 is adjusted in the width direction of the first base frame 120, and when the second base frame 130 can be adjusted in the length direction of the first base frame 120, the second base frame 130 drives the base plate 140 to adjust its position in the length direction of the first base frame 120, that is, the drill rod 4 is adjusted in the length direction of the first base frame 120, the structure is simple, and the drill rod 4 is convenient to be adjusted horizontally and vertically, which improves the convenience of the adjustment process and reduces the complexity of the adjustment.
[0041] See also Figure 1 , Figure 2 , Figure 3 and Figure 5 In the above embodiment, the construction drilling platform further includes: at least two first slide bars 7 and two positioning blocks 8. Among them, each first slide bar 7 is arranged in the second bottom frame 130 at intervals, and each first slide bar 7 extends along the width direction of the first bottom frame 120. Specifically, each first slide bar 7 is arranged in the second bottom frame 130 at intervals along the length direction of the second bottom frame 130, and the length direction of each first slide bar 7 is parallel to the width direction of the first bottom frame 120, that is, parallel to the width direction of the second bottom frame 130. Each first slide bar 7 is fixedly connected to the second bottom frame 130.
[0042] The bottom plate 140 is disposed inside the second bottom frame 130, and the bottom plate 140 is slidably disposed through each first slide bar 7. Specifically, each first slide bar 7 can slidably and horizontally penetrate the plate body of the bottom plate 140, so that the bottom plate 140 can slide along the first slide bar 7, that is, the bottom plate 140 can slide along the width direction of the first bottom frame 120.
[0043] The second bottom frame 130 has a plurality of first positioning grooves 131 formed at intervals on two opposite side walls corresponding to the width direction of the first bottom frame 120. Specifically, in the width direction of the first bottom frame 120, a plurality of first positioning grooves 131 are formed at intervals on each of the two opposite side walls of the second bottom frame 130, that is, a plurality of first positioning grooves 131 are formed on each side of the two side walls facing the bottom plate 140 in the width direction of the second bottom frame 130.
[0044] Two positioning blocks 8 are respectively disposed on both sides of the bottom plate 140. Specifically, in the width direction of the first bottom frame 120, a positioning block 8 is disposed on each of the two opposite side walls of the bottom plate 140 facing the second bottom frame 130. The first end of each positioning block 8 is rotatably connected to the corresponding side wall of the bottom plate 140, such as a hinged connection. When the bottom plate 140 moves to a desired position along the first slide bar 7, the second end of each positioning block 8 is clamped in the corresponding first positioning groove 131, so that the positions of the bottom plate 140 and the second bottom frame 130 are relatively fixed.
[0045] In specific implementation, the number of the first slide bars 7 can be determined according to actual conditions, and this embodiment does not impose any restrictions on this. In this embodiment, there are two first slide bars 7, and the two first slide bars 7 are respectively placed on both sides of the penetration opening 110.
[0046] See also Figure 1 , Figure 2 , Figure 4 and Figure 5In the above embodiment, the construction drilling platform further includes: at least two second sliding bars 9, a pull rod 10 and a positioning rod 11. Among them, each second sliding bar 9 is arranged in the first bottom frame 120 at intervals, and each second sliding bar 9 extends along the length direction of the first bottom frame 120. Specifically, each second sliding bar 9 is arranged in the first bottom frame 120 at intervals along the width direction of the first bottom frame 120, and the length direction of each second sliding bar 9 is parallel to the length direction of the first bottom frame 120. Each second sliding bar 9 is fixedly connected to the first bottom frame 120.
[0047] The second bottom frame 130 is placed inside the first bottom frame 120, and the second bottom frame 130 is slidably disposed through each second slide bar 9. Specifically, each second slide bar 9 can slidably and horizontally penetrate the second bottom frame 130, so that the second bottom frame 130 can slide along the second slide bar 9, that is, the bottom plate 140 can slide along the length direction of the first bottom frame 120.
[0048] Each second slide bar 9 is provided with a plurality of second positioning grooves 91 at intervals along the length direction. Preferably, the second positioning grooves 91 are evenly distributed on the second slide bar 9. The positions of the second positioning grooves 91 on the two second slide bars 9 correspond to each other.
[0049] The second bottom frame 130 is provided with an extension portion 132 protruding outwardly on one side in the width direction corresponding to the first bottom frame 120. Specifically, in the width direction of the first bottom frame 120, one of the side walls of the second bottom frame 130 is provided with an extension portion 132 protruding outwardly, and the extension portion 132 is perpendicular to the side wall of the second bottom frame 130. In other words, the extension portion 132 is vertically provided on the outer wall of one of the side walls of the second bottom frame 130 in the width direction.
[0050] The top of the pull rod 10 is placed above the extension portion 132, the pull rod 10 is slidably arranged in the extension portion 132, and the bottom of the pull rod 10 is vertically connected to the positioning rod 11. The positioning rod 11 is horizontally arranged between the two second slide bars 9, and when the second bottom frame 130 slides along the second slide bars 9 to the desired position, the positioning rod 11 is clamped in the corresponding second positioning grooves 91 on the two second slide bars 9. Specifically, the length of the positioning rod 11 should be able to enable the two ends of the positioning rod 11 to be respectively placed in the corresponding second positioning grooves 91 on the two second slide bars 9, so that the positions of the second bottom frame 130 and the first bottom frame 120 are relatively fixed.
[0051] During specific implementation, the number of the second sliding bars 9 can be determined according to actual conditions, and this embodiment does not impose any restriction on this. In this embodiment, there are two second sliding bars 9.
[0052] See also Figure 1 and Figure 2In the above embodiments, the stabilizing mechanism 6 includes two stabilizing components, which are respectively arranged on opposite sides of the first bottom frame 120, and each stabilizing component is used to contact the ground, so that the stabilizing component is in stable contact with the ground.
[0053] Each stabilizing assembly includes: a connecting plate 61, a stabilizing plate 62, at least one driving cylinder 63 and at least one supporting plate 64. The connecting plate 61 is L-shaped, the first end of the connecting plate 61 is vertically connected to one side of the top of the first bottom frame 120, and the second end of the connecting plate 61 extends away from the first bottom frame 120. Specifically, the connecting plate 61 is arranged at the edge of the top of the first bottom frame 120, the first end of the connecting plate 61 is perpendicular to the first bottom frame 120, the second end of the connecting plate 61 is parallel to the first bottom frame 120, and the second end of the connecting plate 61 is suspended. The length of the connecting plate 61 is the same as the width of the first bottom frame 120.
[0054] The driving cylinders 63 are arranged at intervals on the side of the second end of the connecting plate 61 facing the ground. Preferably, the driving cylinders 63 are evenly distributed along the length direction of the connecting plate 61. The telescopic ends of the driving cylinders 63 are connected to the stabilizing plate 62, and the stabilizing plate 62 is parallel to the second end of the connecting plate 61. Specifically, each driving cylinder 63 can be a cylinder.
[0055] Each support plate 64 is arranged at intervals on the side of the stabilizing plate 62 facing the ground. Preferably, each support plate 64 is evenly distributed along the length direction of the stabilizing plate 62. Each support plate 64 is in contact with the ground. Specifically, each support plate 64 can be made of rubber material.
[0056] It can be seen that in this embodiment, the stabilizing plate 62 is driven to move toward the ground by the driving cylinder 63, so that each supporting plate 64 is in stably contact with the ground, thereby supporting the first bottom frame 120, so that the first bottom frame 120 is stably connected to the ground, thereby improving the stability of the drilling process.
[0057] See also Figure 1 , Figure 2 and Figure 6 The protective mechanism 5 includes: a protective body 51, two mounting plates 52, an adjusting screw 53 and a limiting rod 54. The protective body 51 is annular and is made of a transparent material. The protective body 51 is used to block the gravel splashed during the drilling process, thereby improving the safety of the drilling process, and the transparent material enables the staff to observe the progress of the drilling work. The protective body 51 is movably placed in the penetration opening 110, and the drill rod 4 is movably penetrated inside the protective body 51, and the protective body 51 can move up and down in the penetration opening 110 to adjust the position of the protective body. The drill rod 4 can move up and down inside the protective body 51 so that the drill rod 4 can move downward to drill a hole.
[0058] The two mounting plates 52 are respectively disposed on two opposite sides of the protective body 51 , and each mounting plate 52 is fixedly connected to the side wall of the protective body 51 , so that the two mounting plates 52 are relatively fixed to the protective body 51 .
[0059] One end of the adjusting screw 53 is placed above one of the mounting plates 52, the adjusting screw 53 is passed through and screwed to the mounting plate 52, and the other end of the adjusting screw 53 is rotatably connected to the base 1. Specifically, the adjusting screw 53 is perpendicular to the bottom plate 140 and is rotatably connected. The rotation of the adjusting screw 53 drives the mounting plate 52 to move up and down along the adjusting screw 53, thereby driving the protective body 51 to move up and down in the penetration opening 110, so as to adjust the position of the protective body 51 to adapt to different terrains, thereby better blocking the flying gravel.
[0060] One end of the limiting rod 54 is placed above another mounting plate 52, the limiting rod 54 is slidably inserted into the mounting plate 52, and the other end of the limiting rod 54 is connected to the base 1. Specifically, the limiting rod 54 is perpendicular to and fixedly connected to the bottom plate 140, so when the mounting plate 52 moves up and down along the adjusting screw 53, the setting of the limiting rod 54 limits the moving track of the mounting plate 52, and further limits the moving track of the protective body 51, so that the protective body 51 moves up and down in the insertion opening 110.
[0061] The protection mechanism 5 further includes: two connectors 55 and a protection net 56. Each connector 55 is annular, and the two connectors 55 are arranged in parallel, and the two connectors 55 are respectively arranged at the top and bottom of the inner side of the protection body 51. Specifically, the two connectors 55 are both placed inside the protection body 51, one of the connectors 55 is arranged at the top of the protection body 51, and the other connector 55 is arranged at the bottom of the protection body 51.
[0062] The protective net 56 is annular and transparent mesh structure, and is sleeved inside the protective body 51. The top and bottom of the protective net 56 are respectively connected to the two connectors 55 in a one-to-one correspondence, that is, the top of the protective net 56 is vertically connected to the inner wall of the connector 55 placed on the top of the protective body 51, and the bottom of the protective net 56 is vertically connected to the inner wall of the connector 55 placed on the bottom of the protective body 51. There is a preset gap between the protective net 56 and the protective body 51, and the size of the preset gap corresponds to the difference between the outer diameter and the inner diameter of the connector 55. The drill rod 4 is movably inserted into the protective net 56. The protective net 56 can effectively block the gravel, and prevent the gravel from hitting the transparent protective body 51 to cause scratches, thereby affecting the transparency of the protective body 51, thereby affecting the clarity of observation during the drilling process.
[0063] See also Figure 1 and Figure 2 In the above embodiments, the construction drilling platform further includes: a dust reduction mechanism 12. The dust reduction mechanism 12 is arranged on the base 1, and the dust reduction mechanism 12 is arranged near the drilling opening 110, and the dust reduction mechanism 12 is used to reduce dust generated by drilling.
[0064] The dust suppression mechanism 12 includes: a water tank 121, a connecting pipe 122, an annular conduit 123 and a plurality of nozzles 124. The annular conduit 123 is disposed at the top of the protective body 51, specifically, the annular conduit 123 is located above the connecting body 55 disposed at the top of the protective body 51. The nozzles 124 are disposed at intervals at the top of the annular conduit 123 along the circumferential direction of the annular conduit 123, and preferably, the nozzles 124 are evenly distributed on the annular conduit 123.
[0065] The water tank 121 is disposed on the base 1, specifically, the water tank 121 is disposed on the bottom plate 140, and the water tank 121 is disposed near the penetration opening 110, and dust suppression water is stored in the water tank 121. The water tank 121 is connected to the annular conduit 123 through the connecting pipe 122, and the water tank 121 is used to supply water to the annular conduit 123, and the dust suppression water is sprayed out through each nozzle 124.
[0066] In a specific implementation, a water pump 125 is provided in the water tank 121 , and an output end of the water pump 125 is connected to the annular conduit 123 through a connecting pipe 122 .
[0067] It can be seen that in this embodiment, the dust reduction mechanism 12 can reduce the dust generated by drilling, prevent the dust from affecting the surrounding environment, and effectively protect the environment.
[0068] See also Figures 1 to 6 The use process of the construction drilling platform is introduced: the drilling platform is moved to a specified position by each wheel 150, and then each driving cylinder 63 is controlled to drive the stabilizing plate 62 to descend, so that each supporting plate 64 descends and contacts the ground, which greatly improves the stability of the drilling platform.
[0069] When the position of the drill rod 4 needs to be adjusted laterally, that is, when the position of the drill rod 4 is adjusted along the length direction of the first bottom frame 120, the top of the pull rod 10 is pulled upward to move the pull rod 10 upward, and the pull rod 10 drives the positioning rod 11 to move upward, so that the two ends of the positioning rod 11 are moved out of the corresponding two second positioning grooves 91, and then the second bottom frame 130 is slid so that the second bottom frame 130 slides along the second slide bar 9, and the lateral position of the drill rod 4 can be adjusted. After the position of the drill rod 4 is adjusted, the top of the pull rod 10 is released, so that the positioning rod 11 moves downward, and the positioning rod 11 is engaged in the corresponding two second positioning grooves 91, so that the position of the second bottom frame 130 can be fixed, that is, the position of the drill rod 4 can be fixed.
[0070] When the position of the drill rod 4 needs to be adjusted longitudinally, that is, when the position of the drill rod 4 is adjusted along the width direction of the first bottom frame 120, the two positioning blocks 8 are rotated so that the second ends of the two positioning blocks 8 are respectively drawn out from the corresponding first positioning grooves 131, and then the bottom plate 140 is slid so that the bottom plate 140 slides along the first slide bar 7, so that the longitudinal position of the drill rod 4 can be adjusted. After the position of the drill rod 4 is adjusted, the second ends of the two positioning blocks 8 are loosened, and the second ends of the two positioning blocks 8 are respectively engaged in the corresponding first positioning grooves 131, so that the position of the bottom plate 140 can be fixed, that is, the position of the drill rod 4 can be fixed.
[0071] When drilling is required, the bottom of the drill rod 4 is aligned with the drilling position, and then the adjusting screw 53 is rotated to adjust the protective body 51 up and down so that the bottom of the protective body 51 contacts the ground. Then, the drilling motor 3 is started to drive the drill rod 4 to rotate, and the two driving motors 23 are driven at the same time. The two driving motors 23 respectively drive the corresponding driving screws 24 to rotate, drive the support plate 22 to move downward, and then drive the drilling motor 3 and the drill rod 4 to move downward together, and then perform the drilling operation.
[0072] During the drilling process, the protective body 51 blocks the flying gravel, and the protective net 56 effectively blocks the flying gravel to prevent the gravel from hitting the protective body 51 and scratching the inner wall of the protective body 51, which may easily affect the transparency of the protective body 51 for a long time and affect the clarity of observing the drilling process.
[0073] While drilling, start the water pump 125, which transports the dust-reducing water in the water tank 121 to the annular duct 123, and then sprays water mist above the protective body 51 through each nozzle 124, so as to facilitate the dust reduction operation on the dust raised by drilling and prevent the dust from affecting the surrounding environment.
[0074] In summary, in the present embodiment, the height of the support mechanism 2 itself is adjustable, and it can drive the drilling motor 3 to move up and down, so that the drill rod 4 can move up and down, thereby realizing drilling. The base 1 itself can be adjusted laterally and longitudinally, and can adjust the position of the support mechanism 2, that is, adjust the position of the drill rod 4, so that the position of the drill hole meets the design requirements, and accurate drilling is realized. The protective mechanism 5 can block the gravel splashed during the drilling process, thereby improving the safety during the drilling process. The stabilizing mechanism 6 can make the base 1 stably contact with the ground, improve the stability of the base 1, and thereby improve the stability of the drilling process. The construction drilling platform does not require manual drilling, is simple to operate, and effectively improves the drilling efficiency. The base 1 is movable, so that the construction drilling platform can be moved to the desired position for easy drilling.
[0075] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is only for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation on the present invention.
[0076] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0077] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A construction drilling platform, characterized in that: include: A movable base (1), a support mechanism (2) with adjustable height, a drilling motor (3), a drill rod (4), a protection mechanism (5) and a stabilizing mechanism (6); wherein: The base (1) is provided with a penetration opening (110); The support mechanism (2) is arranged on the base (1), the drilling motor (3) is arranged on the support mechanism (2) and is connected to the drill rod (4), the drill rod (4) is movably inserted into the insertion opening (110), and the support mechanism (2) is used to adjust its own height to drive the drill rod (4) to drill downwards; The base (1) itself can be adjusted laterally and longitudinally to adjust the position of the drill rod (4); The protection mechanism (5) is arranged at the drilling opening (110) and is used to block the flying debris during the drilling process; The stabilizing mechanism (6) is arranged on the base (1) and is used to improve the stability of the base (1).
2. The construction drilling platform according to claim 1, characterized in that: The support mechanism (2) comprises: two U-shaped support frames (21) arranged in parallel, a support plate (22) and two drive components; wherein: The two support frames (21) are respectively placed on both sides of the penetration opening (110), the open end of each support frame (21) is connected to the base (1), and the two driving components are arranged on the two support frames (21) in a one-to-one correspondence; The support plate (22) is horizontally arranged between the two support frames (21) and the two ends thereof are respectively connected to the two drive assemblies in a one-to-one correspondence, and the drilling motor (3) is arranged on the support plate (22); The two driving assemblies are used to simultaneously drive the support plate (22) to move along the height direction of the support frame (21), so as to move the drill rod (4) downward.
3. The construction drilling platform according to claim 2, characterized in that: Each of the driving components comprises: a driving motor (23) and a driving screw (24); wherein, The driving motor (23) is arranged at the closed end of the corresponding support frame (21), the driving end of the driving motor (23) is connected to the first end of the driving screw (24), and the second end of the driving screw (24) is rotatably connected to the base (1); The end of the support plate (22) is threadedly connected to the driving screw rod (24).
4. The construction drilling platform according to claim 1, characterized in that: The base (1) comprises: a first bottom frame (120), a second bottom frame (130), a bottom plate (140) and a plurality of wheels (150); wherein: The first bottom frame (120) and the second bottom frame (130) are both quadrilateral and have a hollow frame structure; The second bottom frame (130) is adjustably arranged inside the first bottom frame (120) along the length direction of the first bottom frame (120); The bottom plate (140) is adjustably arranged inside the second bottom frame (130) along the width direction of the first bottom frame (120); The wheels (150) are arranged at intervals on the bottom of the first bottom frame (120); The penetration opening (110) is opened on the bottom plate (140), and the support mechanism (2) is arranged on the bottom plate (140).
5. The construction drilling platform according to claim 4, characterized in that: Also includes: At least two first slide bars (7) and two positioning blocks (8); wherein, The first sliding bars (7) are arranged at intervals in the second bottom frame (130), and each of the first sliding bars (7) extends along the width direction of the first bottom frame (120); The bottom plate (140) is placed in the second bottom frame (130) and is slidably disposed on each of the first sliding rods (7); The second bottom frame (130) is provided with a plurality of first positioning grooves (131) at intervals on two opposite side walls corresponding to the width direction of the first bottom frame (120); The two positioning blocks (8) are respectively placed on both sides of the base plate (140), the first end of each positioning block (8) is rotatably connected to the corresponding side wall of the base plate (140), and the second end of each positioning block (8) is used to be clamped in the corresponding first positioning groove (131) when the base plate (140) moves to a desired position along the first sliding rod (7).
6. The construction drilling platform according to claim 4, characterized in that: Also includes: At least two second sliding rods (9), a pull rod (10) and a positioning rod (11); wherein, The second sliding bars (9) are arranged at intervals in the first bottom frame (120), and each second sliding bar (9) extends along the length direction of the first bottom frame (120); The second bottom frame (130) is placed inside the first bottom frame (120) and is slidably disposed on each of the second sliding rods (9); Each of the second sliding bars (9) is provided with a plurality of second positioning grooves (91) spaced apart along the length direction; The second bottom frame (130) is provided with an extension portion (132) protruding outward on one side in the width direction corresponding to the first bottom frame (120); the pull rod (10) is slidably inserted into the extension portion (132) and the bottom is vertically connected to the positioning rod (11); the positioning rod (11) is horizontally arranged between the two second sliding rods (9); the positioning rod (11) is used to be clamped in the corresponding second positioning grooves (91) on the two second sliding rods (9) when the second bottom frame (130) slides to a desired position along the second sliding rod.
7. The construction drilling platform according to claim 4, characterized in that: The stabilizing mechanism (6) comprises: two stabilizing components; wherein: The two stabilizing components are respectively arranged on two opposite sides of the first bottom frame (120); Each of the stabilizing components comprises: an L-shaped connecting plate (61), a stabilizing plate (62), at least one driving cylinder (63) and at least one supporting plate (64); wherein a first end of the connecting plate (61) is connected to one side of the top of the first bottom frame (120), and a second end of the connecting plate (61) extends away from the first bottom frame (120); The driving cylinders (63) are arranged at intervals on the side of the second end of the connecting plate (61) facing the ground, and the telescopic ends of the driving cylinders (63) are connected to the stabilizing plate (62); The support plates (64) are arranged at intervals on a side of the stabilizing plate (62) facing the ground and in contact with the ground.
8. The construction drilling platform according to claim 1, characterized in that: The protection mechanism (5) comprises: an annular protection body (51), two mounting plates (52), an adjusting screw (53) and a limiting rod (54); wherein: The protective body (51) is made of a transparent material, the protective body (51) is movably placed in the penetration opening (110), and the drill rod (4) is movably penetrated inside the protective body (51); The two mounting plates (52) are respectively arranged on two opposite sides of the protective body (51); The adjusting screw (53) is passed through and screwed to one of the mounting plates (52), and the end of the adjusting screw (53) is rotatably connected to the base (1); The limiting rod (54) is slidably disposed on the other mounting plate (52), and the end of the limiting rod (54) is connected to the base (1).
9. The construction drilling platform according to claim 8, characterized in that: The protection mechanism (5) further comprises: two annular connecting bodies (55) and an annular protection net (56); wherein: The two connecting bodies (55) are respectively arranged at the top and bottom of the inner side of the protective body (51); The protective net (56) is placed inside the protective body (51), and the top and bottom of the protective net (56) are respectively connected to the two connecting bodies (55) in a one-to-one correspondence, so that a preset gap exists between the protective net (56) and the protective body (51), and the drill rod (4) is movably inserted into the protective net (56).
10. The construction drilling platform according to claim 8, characterized in that: Also includes: Dust suppression mechanism (12); wherein, The dust reduction mechanism (12) is arranged on the base (1) and close to the drilling opening (110), and is used to reduce dust generated by drilling. The dust reduction mechanism (12) comprises: a water tank (121), a connecting pipe (122), an annular conduit (123) and a plurality of nozzles (124); wherein the annular conduit (123) is arranged at the top of the protective body (51), and each of the nozzles (124) is arranged at intervals along the circumferential direction at the top of the annular conduit (123); The water tank (121) is arranged on the base (1) and is connected to the annular conduit (123) via the connecting pipe (122) so as to supply water to the annular conduit (123).