Construction method for reserving temporary hole in shear wall
By reserving temporary holes on the shear wall and laying reserved ribs, the problem of construction surface segmentation caused by the shear wall is solved, the construction efficiency and structural strength are improved, and the cost of transportation equipment is reduced.
Patent Information
- Application Number
- CN202411662152.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-20
- Publication Date
- 2025-02-14
AI Technical Summary
The existing shear walls lead to the separation of the construction work surface, reducing construction efficiency and increasing the cost of measures for vertical transportation equipment.
A temporary hole is reserved on the shear wall, and reserved ribs are arranged around the hole, protective pads and reverse ridges are installed to ensure that the reserved ribs are buried in the wall, strengthen structural strength, and conveniently arrange fixed steel bars when sealing.
The horizontal transportation of materials and the movement of personnel are achieved, the work efficiency of construction sites is improved, the cost of measures for vertical transportation equipment is reduced, and the structural strength around the temporary hole is enhanced.
Smart Images

Figure CN119434485A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a construction method for reserving a temporary opening on a shear wall. Background Art
[0002] In residential projects, a residential building is usually composed of multiple units, with structural seismic joints between the units, and shear walls on both sides of the seismic joints belonging to different structural units. When adjacent structural units are staggered, due to the separation of the structural shear walls, adjacent units cannot form a connecting passage for material transportation or personnel walking, resulting in the division of the construction work surface, which reduces construction efficiency and increases the cost of measures for the construction personnel and freight elevators equipped separately for each structural unit.
[0003] Therefore, the present invention provides a construction method for reserving a temporary opening on a shear wall. Summary of the invention
[0004] The purpose of the present invention is to overcome the defects of the prior art and provide a construction method for reserving temporary openings on a shear wall, so as to solve the problem that the existing shear wall will cause the construction working surface to be divided, thereby reducing the construction efficiency.
[0005] The invention provides a construction method for reserving a temporary opening on a shear wall, and the technical scheme is as follows: specifically comprising the following steps: S1: arranging wall reinforcement at a designed position of a wall body; S2: arranging reserved reinforcement around the designed position of a temporary opening, so that the reserved reinforcement is located within the designed position of the wall body, and the end of the reserved reinforcement extends to the designed position of the temporary opening; S3: constructing the wall body, so that the lower side surface of the formed temporary opening is consistent with the height of the corresponding lower floor slab; S4: arranging protective pads on the left, right and upper sides of the temporary opening, and the protective pads cover the reserved reinforcement; S5: arranging an anti-slope at the lower side of the temporary opening, so that the anti-slope covers the reserved reinforcement.
[0006] Furthermore, the construction steps of the reserved reinforcement are as follows: provide a plurality of horizontal reserved reinforcements, arrange the plurality of horizontal reserved reinforcements at intervals up and down on both sides of the temporary opening design position, and horizontally sleeve the horizontal reserved reinforcements on the wall steel bars; provide a plurality of upper vertical reserved reinforcements, arrange the plurality of upper vertical reserved reinforcements at intervals left and right on the upper side of the temporary opening design position; provide a plurality of lower vertical reserved reinforcements, arrange the plurality of lower vertical reserved reinforcements at intervals left and right on the lower side of the temporary opening design position.
[0007] Furthermore, after the construction of the wall is completed, the lower vertical reserved reinforcement is extended to one end of the temporary opening, bent and fitted with the wall.
[0008] Furthermore, after the bending of the lower vertical reserved reinforcement is completed, the anti-ridge is cast so that the lower vertical reserved reinforcement is buried in the anti-ridge.
[0009] Furthermore, the protective pad is foam, through holes are opened in the foam, and when the foam is installed, the through holes in the foam are made to correspond to the corresponding horizontal reserved ribs and the upper vertical reserved ribs.
[0010] Furthermore, after the temporary opening is used up, it is sealed, and the specific sealing method is as follows: remove the foam; chisel out the anti-ridge; extend the lower vertical reserved reinforcement to one end of the temporary opening to bend and straighten it; provide a plurality of connecting steel bars, arrange the plurality of connecting steel bars in the temporary opening at intervals in the horizontal and vertical directions, and fix the connecting steel bars to the corresponding reserved reinforcements; support formwork on the front and rear sides of the temporary opening, and make the formwork fit the wall; pour concrete into the formwork.
[0011] Compared with the prior art, the present invention has the following beneficial effects:
[0012] When pouring the shear wall, temporary openings are reserved on the wall to enable horizontal transportation of materials and movement of personnel, thereby improving work efficiency on the construction site and reducing the cost of vertical transportation equipment.
[0013] Arranging reserved reinforcement around the temporary opening and burying the reserved reinforcement in the wall can increase the structural strength of the wall around the temporary opening and reduce construction risks. It can also facilitate the arrangement of fixed reinforcement in the temporary opening when the temporary opening is blocked.
[0014] Foam is laid on the left and right sides and the upper side of the temporary opening, and a counter-slope is poured on the lower side to cover the exposed reserved reinforcement and prevent people from getting injured when passing by. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 The horizontal section view of the temporary opening reserved on the shear wall of the present invention.
[0016] Figure 2 This is a transverse cross-sectional view of the shear wall of the present invention after the temporary opening is reserved and sealed.
[0017] Figure 3 A vertical section view of a temporary opening reserved on the shear wall of the present invention.
[0018] Figures 4 to 5 A vertical cross-sectional view of a portion of the structure with a temporary opening reserved on the shear wall of the present invention.
[0019] Figure 6A schematic diagram of the lower vertical reserved steel bars for reserving a temporary opening on the shear wall of the present invention.
[0020] Figure 7 The vertical section view is a view after the temporary opening reserved on the shear wall of the present invention is blocked.
[0021] Legend: 1. Wall; 2. Horizontal reserved reinforcement; 3. Wall reinforcement; 4. Foam; 5. Temporary opening; 6. Concrete; 7. Floor slab; 8. Upper vertical reserved reinforcement; 9. Lower vertical reserved reinforcement; 10. Counter-bump; 11. Connecting reinforcement. DETAILED DESCRIPTION
[0022] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0023] See also Figure 1 The present invention provides a construction method for reserving temporary openings on a shear wall, which solves the problem that the existing shear wall will cause the construction work surface to be divided and reduce the construction efficiency. When pouring the shear wall, the temporary opening position is reserved on the wall, so that the horizontal transportation of materials and the movement of personnel can be realized, thereby improving the work efficiency of the construction site and reducing the cost of vertical transportation equipment. Reserved reinforcement is arranged around the temporary opening, and the reserved reinforcement is buried in the wall, which can increase the structural strength of the wall around the temporary opening and reduce the construction risk. It is also convenient to arrange fixed steel bars in the temporary opening when the temporary opening is blocked. Foam is arranged on the left and right sides and the upper side of the temporary opening, and the anti-slope is poured on the lower side, which can cover and wrap the exposed reserved reinforcement to prevent people from being injured when passing by.
[0024] The following is a description of a construction method for reserving a temporary opening on a shear wall according to the present invention in conjunction with the accompanying drawings.
[0025] See also Figure 1 , showing the transverse cross-sectional view of the temporary opening reserved on the shear wall of the present invention. Figure 2 , showing the transverse cross-sectional view of the temporary opening reserved on the shear wall of the present invention after being blocked. Figure 3 , showing a vertical cross-sectional view of a temporary opening reserved on a shear wall of the present invention. Figures 1 to 3 , a construction method for reserving a temporary opening on a shear wall of the present invention is described.
[0026] like Figures 1 to 3As shown, a construction method for reserving a temporary opening on a shear wall of the present invention specifically includes the following steps: S1: arranging wall reinforcement 3 at the designed position of the wall 1; S2: arranging reserved reinforcement around the designed position of the temporary opening 5, so that the reserved reinforcement is located within the designed position of the wall 1, and the end of the reserved reinforcement extends to the designed position of the temporary opening 5; S3: constructing the wall 1, so that the lower side of the formed temporary opening 5 is consistent with the height of the corresponding lower floor 7; S4: arranging protective pads on the left and right sides and the upper side of the temporary opening 5, and the protective pads cover the reserved reinforcement; S5: arranging an anti-ridge 10 at the lower side of the temporary opening 5, so that the anti-ridge 10 covers the reserved reinforcement. By burying the reserved reinforcement, the structural strength at the edge of the temporary opening 5 can be enhanced, and it is convenient to fix the internal reinforcement when the temporary opening 5 is subsequently blocked.
[0027] In a specific embodiment, the construction steps of the reserved reinforcement are as follows: provide a plurality of horizontal reserved reinforcements 2, arrange the plurality of horizontal reserved reinforcements 2 at intervals up and down on both sides of the design position of the temporary opening 5, and horizontally sleeve the horizontal reserved reinforcements 2 on the wall reinforcement 3; provide a plurality of upper vertical reserved reinforcements 8, arrange the plurality of upper vertical reserved reinforcements 8 at intervals left and right on the upper side of the design position of the temporary opening 5; provide a plurality of lower vertical reserved reinforcements 9, arrange the plurality of lower vertical reserved reinforcements 9 at intervals left and right on the lower side of the design position of the temporary opening 5.
[0028] In a specific implementation, after the construction of the wall 1 is completed, the lower vertical reserved reinforcement 9 is extended to one end of the temporary opening 5 and bent to fit with the wall 1 .
[0029] In a specific implementation, after the lower vertical reserved ribs 9 are bent, the anti-ridge 10 is cast, so that the lower vertical reserved ribs 9 are buried in the anti-ridge 10 .
[0030] In a specific embodiment, the protective pad is foam 4, and through holes are opened in the foam 4. When the foam 4 is installed, the through holes in the foam 4 correspond to the corresponding horizontal reserved ribs 2 and the upper vertical reserved ribs 8.
[0031] In a specific embodiment, the temporary opening 5 is sealed after use, and the specific sealing method is as follows: remove the foam 4; chisel out the anti-ridge 10; extend the lower vertical reserved reinforcement 9 to one end of the temporary opening 5 to bend and straighten it; provide a plurality of connecting steel bars 11, arrange the plurality of connecting steel bars 11 in the temporary opening 5 at intervals in the horizontal and vertical directions, and fix the connecting steel bars 11 to the corresponding reserved reinforcements; support formwork on the front and rear sides of the temporary opening 5, and make the formwork fit the wall 1; pour concrete 6 into the formwork.
[0032] In a specific implementation, the connecting steel bar 11 is fixed to the reserved steel bar by welding.
[0033] The following is a detailed description of the construction process of reserving a temporary opening on a shear wall according to the present invention.
[0034] The wall reinforcement 3 is arranged at the designed position of the wall 1, and a plurality of horizontal reserved reinforcements 2 are arranged at intervals on the left and right sides of the temporary opening 5, and the plurality of horizontal reserved reinforcements 2 are fixedly tied to the wall reinforcement 3. When the horizontal reserved reinforcements 2 are arranged, the horizontal reserved reinforcements 2 are located in the designed position of the wall 1, and one end of the horizontal reserved reinforcement 2 is extended to the designed position of the temporary opening 5.
[0035] A plurality of upper vertical reserved ribs 8 are arranged at intervals on the left and right sides of the upper side of the temporary opening 5 , so that the upper vertical reserved ribs 8 are located within the designed position of the wall 1 , and one end of the upper vertical reserved ribs 8 extends to the designed position of the temporary opening 5 .
[0036] A plurality of lower vertical reserved ribs 9 are arranged at intervals on the left and right sides of the lower side of the temporary opening 5 so that the lower vertical reserved ribs 9 are located within the designed position of the wall 1 and one end of the lower vertical reserved ribs 9 extends to the designed position of the temporary opening 5 .
[0037] Then, a template is arranged at the designed position of the wall 1, and the wall 1 is poured.
[0038] After the design strength of the wall 1 reaches the standard, the formwork is removed, and foam 4 is arranged on the left and right sides and the upper side of the temporary opening 5, so that the foam 4 wraps and covers the horizontal reserved reinforcement 2 and the upper vertical reserved reinforcement 8 to prevent people from being injured when passing by.
[0039] Then, the exposed end of the lower vertical reserved reinforcement 9 is bent to fit with the wall 1, and then the anti-slope 10 is poured on the lower side of the temporary opening 5, and the anti-slope 10 covers the lower vertical reserved reinforcement 9 to prevent people from being injured when passing by.
[0040] When the temporary opening 5 is used up and blocked, first remove the foam 4, then chisel out the opening 10. Straighten the vertical reserved steel bars 9 on the lower side.
[0041] Then, multiple connecting steel bars 11 are arranged in the temporary opening 5 so that the connecting steel bars 11 are distributed in the horizontal and vertical directions, and the connecting steel bars 11 are welded and fixed to the corresponding horizontal reserved bars 2, upper vertical reserved bars 8 or lower vertical reserved bars 9.
[0042] Then, formwork is set up on both sides of the front and rear of the temporary opening 5, and the formwork is closely fitted to the wall 1, and then concrete 6 is poured in the formwork.
[0043] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.
Claims
1. A construction method for reserving a temporary opening on a shear wall, characterized in that: The specific steps include: S1: Arranging wall reinforcement (3) at the designed position of the wall (1); S2: Arranging reserved reinforcement around the designed position of the temporary opening (5), so that the reserved reinforcement is located within the designed position of the wall (1), and the end of the reserved reinforcement extends to the designed position of the temporary opening (5); S3: constructing the wall (1) so that the lower side of the temporary opening (5) is consistent with the height of the corresponding lower floor slab (7); S4: Protective pads are arranged on the left and right sides and the upper side of the temporary opening (5), and the protective pads cover the reserved reinforcement; S5: Arranging a counter-ridge (10) at the lower side of the temporary opening (5), so that the counter-ridge (10) covers the reserved reinforcement.
2. A construction method for reserving a temporary opening on a shear wall according to claim 1, characterized in that: The construction steps of the reserved reinforcement are as follows: Providing a plurality of horizontal reserved bars (2), arranging the plurality of horizontal reserved bars (2) at intervals on both sides of the designed position of the temporary opening (5) in an upper and lower manner, and horizontally sleeve-mounting the horizontal reserved bars (2) on the wall reinforcement (3); Providing a plurality of upper vertical reserved ribs (8), and arranging the plurality of upper vertical reserved ribs (8) at intervals on the left and right sides on the upper side of the designed position of the temporary opening (5); A plurality of lower vertical reserved ribs (9) are provided, and the plurality of lower vertical reserved ribs (9) are arranged at intervals on the left and right sides below the designed position of the temporary opening (5).
3. A construction method for reserving a temporary opening on a shear wall according to claim 2, characterized in that: After the construction of the wall (1) is completed, the lower vertical reserved reinforcement (9) is extended to one end of the temporary opening (5), bent and fitted with the wall (1).
4. A construction method for reserving a temporary opening on a shear wall according to claim 3, characterized in that: After the lower vertical reserved rib (9) is bent, the anti-ridge (10) is poured so that the lower vertical reserved rib (9) is buried in the anti-ridge (10).
5. The construction method for reserving a temporary opening on a shear wall according to claim 1, characterized in that: The protective pad is a foam (4) with through holes formed in the foam (4). When the foam (4) is installed, the through holes in the foam (4) correspond to the corresponding horizontal reserved ribs (2) and the upper vertical reserved ribs (8).
6. A construction method for reserving a temporary opening on a shear wall according to claim 4 or 5, characterized in that: After the temporary opening (5) is used, it is sealed. The specific sealing method is as follows: removing the foam (4); Chiseling away the anti-ridge (10); Extending the lower vertical reserved rib (9) to one end of the temporary opening (5) and bending and straightening it; Providing a plurality of connecting steel bars (11), arranging the plurality of connecting steel bars (11) in the temporary opening (5) at intervals in the horizontal and vertical directions, and fixing the connecting steel bars (11) to the corresponding reserved bars; Providing formwork on both sides of the front and rear of the temporary opening (5), and making the formwork fit the wall (1); Concrete is poured into the formwork (6).