Highway engineering bridge concrete anti-collision guardrail formwork structure and construction method thereof

By using a combination of suspension, support and pulling mechanisms in the construction of bridge anti-collision guardrails, the problem of poor safety and stability of traditional construction processes is solved, the construction efficiency and safety are improved, and it is suitable for high-pier bridge construction.

CN119615772AInactive Publication Date: 2025-03-14XINJIANG ROAD & BRIDGE CONSTR GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510059992.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-15
Publication Date
2025-03-14
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the construction process of the traditional supporting formwork of anti-collision guardrail has poor safety and stability, which is especially unfavorable for the construction of high-pier bridges.

Method used

The structure including the bridge body, inner formwork and outer formwork is adopted. Through the combination of suspension mechanism, support mechanism and pulling mechanism, the height correction of the outer formwork and the inner formwork and the stable installation of the inner formwork are achieved, avoiding the inclination of the formwork and the waste of construction time.

Benefits of technology

It improves the efficiency and safety of anti-collision guardrail construction, reduces the time to build formwork on the outside of the bridge, and is suitable for high-pier bridge construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119615772A_ABST
    Figure CN119615772A_ABST
Patent Text Reader

Abstract

The invention provides a highway engineering bridge concrete anti-collision guardrail formwork structure and a construction method thereof, and belongs to the technical field of guardrails. The highway engineering bridge concrete anti-collision guardrail formwork structure comprises a bridge body, an inner formwork, an outer formwork and a suspension mechanism, a fixing rib and a bending rib are installed at the top of the bridge body, a supporting mechanism is arranged on the right side of the inner formwork, a traction mechanism is arranged on the right side of the inner formwork, and a first fixing frame is fixedly installed at the top of the inner formwork. The second fixing frame is fixedly mounted at the top of the outer formwork, the second fixing frame is located on the left side of the first fixing frame, and the left end of the hanging pipe penetrates through the first fixing frame and extends to the left side of the second fixing frame. And therefore, the outer formwork and the inner formwork are hung on the same horizontal plane, and the construction efficiency and the construction safety of the guardrail can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of guardrails, and in particular to a concrete anti-collision guardrail template structure for a highway engineering bridge and a construction method thereof. Background Art

[0002] Guardrails are designed on both sides of the bridge. Guardrails are a very important component of the bridge structure. On the one hand, they can prevent out-of-control vehicles from driving off the bridge and minimize damage to people and vehicles. On the other hand, they can give pedestrians a certain sense of psychological security. At the same time, with the continuous development of social economy and the increasing traffic volume, the public has put forward higher requirements on the protective capacity of highway bridge anti-collision railings. It can serve as a safety retaining wall and also beautify the overall appearance of the bridge. At present, the general bridge highway side guardrails are installed on the highway bridge deck. The inner and outer guardrail templates are installed, and the side guardrails are made by integral casting.

[0003] However, the conventional outer formwork of the anti-collision guardrail in the prior art adopts the method of setting up a bracket, installing and fixing the formwork. This construction process has poor safety and stability, which is extremely disadvantageous for the construction of high pier bridges. Summary of the invention

[0004] In order to make up for the above deficiencies, the present invention provides a highway engineering bridge concrete anti-collision guardrail template structure and a construction method thereof that overcomes the above technical problems or at least partially solves the above problems.

[0005] The present invention is achieved in that:

[0006] The present invention provides a concrete anti-collision guardrail template structure for a highway engineering bridge, comprising a bridge body, an inner template and an outer template, wherein the outer template is arranged on the left side of the bridge body, the inner template is arranged on the top of the bridge body, and a fixed rib and a bending rib are installed on the top of the bridge body, and the bending rib is located on the front of the fixed rib, a supporting mechanism is arranged on the right side of the inner template, and a pulling mechanism is arranged on the right side of the inner template;

[0007] A suspension mechanism, the suspension mechanism comprising:

[0008] A first fixing frame, wherein the first fixing frame is fixedly installed on the top of the inner template;

[0009] A second fixing frame, wherein the second fixing frame is fixedly mounted on the top of the outer template and is located on the left side of the first fixing frame;

[0010] The hanging tube is arranged on the top of the inner template, and the left end of the hanging tube passes through the first fixing frame and extends to the left side of the second fixing frame.

[0011] In a preferred solution, an extension rod is installed on the left side of the hanging tube, a movable groove is opened on the top of the extension rod, a connecting plate is installed on the inner wall of the movable groove through a rotating shaft, a rotating plate is installed on the right side of the connecting plate, a first fitting pad is installed on the right side of the rotating plate, a first fixed plate is installed on the left side of the hanging tube surface, a second fitting pad is installed on the left side of the first fixed plate, and both the first fitting pad and the second fitting pad are made of elastic material.

[0012] In a preferred embodiment, a first mounting seat is rotatably mounted on the bottom of the rotating plate, a second mounting seat is rotatably mounted on the bottom of the inner wall of the movable groove, and a first spring and a telescopic rod are mounted on the inner sides of the first mounting seat and the second mounting seat, and the first spring is sleeved on the surface of the telescopic rod.

[0013] In a preferred embodiment, the support mechanism includes a support sleeve, which is sleeved on the surface of the fixed rib, a support rod is installed on the surface of the support sleeve, a rotating ring is rotatably installed on the top of the support rod, a first threaded rod is inserted into the top of the support rod, and the rotating ring is threadedly connected to the surface of the first threaded rod, and a support seat is rotatably installed on the top of the first threaded rod.

[0014] In a preferred solution, a square timber is provided on the right side of the inner template, a first clamping plate is installed on the left side of the square timber, and the first clamping plate is in contact with the right side of the inner template, a second clamping plate is installed on the right side of the square timber, and the second clamping plate is in contact with the fixing rib.

[0015] In a preferred embodiment, the pulling mechanism includes a fixing ring, which is fixedly installed on the top of the inner template, a hook is hung on the surface of the fixing ring, a turnbuckle bolt is threadedly installed on the bottom of the hook, a ring is sleeved on the surface of the bending rib, a connecting steel wire rope is installed on the surface of the ring, a first connecting tube is installed on the end of the connecting steel wire rope away from the ring, a second threaded rod is threadedly installed on the inner cavity of the first connecting tube, and the second threaded rod is threadedly connected to the turnbuckle bolt.

[0016] In a preferred embodiment, a first support plate is installed on the top of the outer template, a second support plate is installed on the top of the inner template, and a rotating rod is provided on the top of the inner template, the left side of the rotating rod passes through the second support plate and is connected to the first support plate, and the rotating rod is threadedly connected to the second support plate.

[0017] In a preferred embodiment, a placement seat is rotatably installed on the top of the outer template and the inner template, a top plate is rotatably installed on the top of the placement seat, and a connecting plate is installed on the inner side of the top plate, a magnetic plate is installed on the right side of the placement seat, and the magnetic plate and the connecting plate are adsorbed, a cross bar is provided on the inner side of the placement seat and the top plate, and a limiting frame is installed at the bottom of the cross bar.

[0018] In a preferred solution, a second fixing plate is installed on the left side of the outer template, a rotating rod is threadedly installed on the bottom of the second fixing plate, a supporting seat is installed on the top of the rotating rod, and a sliding seat is installed on the right side of the supporting seat.

[0019] A highway engineering bridge concrete anti-collision guardrail template construction method, applicable to the above-mentioned highway engineering bridge concrete anti-collision guardrail template structure, comprises the following steps:

[0020] S1: Installation; Use the ink fountain to pop out the positioning line and the inner template positioning rib position, so that the installed positioning ribs limit the inner template, and use square wood to tighten the inner template, so that the inner template can be installed, and the outer template and the edge of the side beam wing plate contact surface are affixed with double-sided tape, and the outer template and the side beam wing plate can be closely fitted by the pull rod at the bottom of the template to prevent leakage, and then the outer template is lifted by a car crane, and the crane continues to lift the outer template;

[0021] S2: Balance correction: pass the hanging tube through the first fixing frame and the second fixing frame, lift the outer template by pressing the hanging tube, so that the height of the outer template and the inner template are kept at the same level, and use foam glue to fill the uneven part of the inner template.

[0022] The present invention provides a highway engineering bridge concrete anti-collision guardrail template structure and a construction method thereof, and its beneficial effects include:

[0023] 1. By setting up a suspension mechanism, after the outer formwork is hoisted to the outside of the bridge, the outer formwork can be lifted by using the suspension mechanism, so that the outer formwork and the inner formwork are suspended on the same horizontal plane, which saves a lot of time in building the formwork on the outside of the bridge and can improve the construction efficiency and safety of the guardrail.

[0024] 2. By setting up a supporting mechanism and a pulling mechanism, the supporting mechanism can support the inner formwork, and then the supporting mechanism cooperates with the positioning pins embedded in the bridge deck to install the inner formwork, and the pulling mechanism can pull the inner formwork to avoid the inner formwork from tilting due to the overall shape of the inner formwork. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those skilled in the art, other relevant drawings can be obtained based on these drawings without creative work.

[0026] Figure 1 is a stereogram provided by an embodiment of the present invention;

[0027] Figure 2 A schematic diagram of a three-dimensional side view structure provided by an embodiment of the present invention;

[0028] Figure 3 A schematic diagram of the suspension tube structure provided in an embodiment of the present invention;

[0029] Figure 4 A schematic diagram of a support rod structure provided in an embodiment of the present invention;

[0030] Figure 5 A schematic diagram of a hook structure provided in an embodiment of the present invention;

[0031] Figure 6 A schematic diagram of a crossbar structure provided in an embodiment of the present invention;

[0032] Figure 7 A schematic diagram of a three-dimensional cross-sectional structure of an extension rod provided in an embodiment of the present invention;

[0033] In the figure: 1, bridge body; 2, inner formwork; 3, outer formwork; 4, fixing ribs; 5, bending ribs; 6, first fixing frame; 7, second fixing frame; 8, hanging tube; 9, extension rod; 10, movable groove; 11, connecting plate; 12, rotating plate; 13, first fitting pad; 14, first fixing plate; 15, second fitting pad; 16, first mounting seat; 17, second mounting seat; 18, first spring; 19, telescopic rod; 20, supporting sleeve; 21, supporting rod; 22, rotating ring; 23, first threaded rod; 24, supporting seat; 25, square wood; 2 6. First clamping plate; 27. Second clamping plate; 28. Fixing ring; 29. ​​Hook; 30. Turnbuckle bolt; 31. Sleeve ring; 32. Connecting wire rope; 33. First connecting tube; 34. Second threaded rod; 35. First supporting plate; 36. Second supporting plate; 37. Rotating rod; 38. Placement seat; 39. Top plate; 40. Connecting plate; 41. Magnetic plate; 42. Cross bar; 43. Limiting frame; 44. Second fixing plate; 45. Rotating rod; 46. Lifting seat; 47. Sliding seat; 48. Connecting rod; 49. Rotating tube; 50. Sealing ring. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] Reference Figure 1-Figure 7The present invention provides a technical solution: a concrete anti-collision guardrail template structure for a highway engineering bridge and a construction method thereof, comprising a bridge body 1, an inner template 2, an outer template 3 and a hanging mechanism, wherein the outer template 3 is arranged on the left side of the bridge body 1, the inner template 2 is arranged on the top of the bridge body 1, and a fixed rib 4 and a bending rib 5 are installed on the top of the bridge body 1, and the bending rib 5 is located in front of the fixed rib 4, a supporting mechanism is provided on the right side of the inner template 2, and a pulling mechanism is provided on the right side of the inner template 2, which can be used to lift the outer template 3 after the outer template 3 is hoisted to the outside of the bridge by using the hanging mechanism, so that the outer template 3 and the inner template 2 are hung on the same horizontal plane, saving a lot of time for building the template on the outside of the bridge, and can improve the construction efficiency and construction safety of the guardrail, and when the inner template 2 is installed, the supporting mechanism can support the inner template 2, so that the supporting mechanism cooperates with the positioning pins embedded on the bridge deck to install the inner template 2, and the pulling mechanism can pull the inner template 2 to avoid the inner template 2 from tilting due to the overall shape of the inner template 2.

[0036] Reference Figure 1-Figure 3 In a preferred embodiment, a suspension mechanism is provided, the suspension mechanism includes a first fixing frame 6, a second fixing frame 7 and a suspension tube 8, the first fixing frame 6 is fixedly mounted on the top of the inner formwork 2, the second fixing frame 7 is fixedly mounted on the top of the outer formwork 3, and the second fixing frame 7 is located on the left side of the first fixing frame 6, the suspension tube 8 is arranged on the top of the inner formwork 2, and the left end of the suspension tube 8 passes through the first fixing frame 6 and extends to the left side of the second fixing frame 7, so that the tube can pass through the first fixing frame 6 and the second fixing frame 7, and by lifting or pressing the suspension tube 8 upward, the outer formwork 3 is moved, the outer formwork 3 and the inner formwork 2 are adjusted to the same horizontal plane, and then the height of the inner formwork 2 and the outer formwork 3 is corrected, so as to facilitate the casting of the bridge anti-collision guardrail, and can save the time of installing a supporting structure to support the outer formwork 3, thereby improving the installation efficiency of the inner formwork 2 and the outer formwork 3.

[0037] Reference Figure 1-Figure 7In a preferred embodiment, an extension rod 9 is installed on the left side of the hanging tube 8, and a movable groove 10 is opened on the top of the extension rod 9. A connecting plate 11 is installed on the inner wall of the movable groove 10 through a rotating shaft, and a rotating plate 12 is installed on the right side of the connecting plate 11. A first bonding pad 13 is installed on the right side of the rotating plate 12, and a first fixing plate 14 is installed on the left side of the surface of the hanging tube 8. A second bonding pad 15 is installed on the left side of the first fixing plate 14, and the first bonding pad 13 and the second bonding pad 15 are both made of elastic material, so that the connecting plate 11 and the rotating plate 12 can be installed through the rotating shaft after the movable groove 10 is opened, so that after the rotating plate 12 is rotated, the first bonding pad 13 is bonded to the second fixing frame 7, and the first bonding pad 13 and the second bonding pad 15 are bonded to the second fixing frame 7. The second fitting pads 15 fit with the second fixing frame 7, thereby limiting the hanging tube 8, so as to facilitate the movement of the outer template 3 for hanging, and the first mounting seat 16 is rotatably installed at the bottom of the rotating plate 12, and the second mounting seat 17 is rotatably installed at the bottom of the inner wall of the movable groove 10, and the first spring 18 and the telescopic rod 19 are installed on the inner sides of the first mounting seat 16 and the second mounting seat 17, and the first spring 18 is sleeved on the surface of the telescopic rod 19, so that the first spring 18 can squeeze the rotating plate 12, and the telescopic rod 19 can limit the rotating plate 12, so that the rotating plate 12 rotates to fit the first fitting pad 13 with the second fixing frame 7, which is convenient for limiting the hanging tube 8, thereby facilitating the hanging of the outer template 3. Figure 7 This is the maximum rotation angle of the rotating plate 12, and this is the maximum extension degree of the telescopic rod 19.

[0038] In addition, a connecting rod 48 is installed on the back of the hanging tube 8, and a rotating cylinder 49 is threadedly installed on the surface of the connecting rod 48. A sealing ring 50 is installed on the right side of the rotating cylinder 49, which can enable the rotating cylinder 49 to squeeze the rotating plate 12 and cover the movable groove 10 when rotating, thereby preventing impurities from solidifying and accumulating in the movable groove 10, resulting in the rotating plate 12 being unable to be squeezed and rotated by the first spring 18.

[0039] Reference Figure 1 and Figure 4In a preferred embodiment, the support mechanism includes a support sleeve 20, which is sleeved on the surface of the fixed rib 4, a support rod 21 is installed on the surface of the support sleeve 20, a rotating ring 22 is rotatably installed on the top of the support rod 21, a first threaded rod 23 is inserted on the top of the support rod 21, and the rotating ring 22 is threadedly connected to the surface of the first threaded rod 23, and a support seat 24 is rotatably installed on the top of the first threaded rod 23, so that the support sleeve 20 can be sleeved on the fixed rib 4 to install the support rod 21 and the first threaded rod 23, so as to facilitate the rotation When the swivel 22 rotates, it drives the first threaded rod 23 to move, so as to facilitate the support of the support seat 24, and the inner template 2 can be installed. A square wood 25 is provided on the right side of the inner template 2, and a first clamping plate 26 is installed on the left side of the square wood 25, and the first clamping plate 26 is fitted with the right side of the inner template 2. A second clamping plate 27 is installed on the right side of the square wood 25, and the second clamping plate 27 is fitted with the fixing rib 4, so that the square wood 25 can be clamped to the inner template 2 through the first clamping plate 26 and the second clamping plate 27, so as to stabilize the inner template 2.

[0040] Reference Figure 1 and Figure 5 In a preferred embodiment, the pulling mechanism includes a fixing ring 28, which is fixedly installed on the top of the inner template 2. A hook 29 is hung on the surface of the fixing ring 28, and a turnbuckle bolt 30 is threadedly installed on the bottom of the hook 29. A collar 31 is sleeved on the surface of the bending rib 5, and a connecting wire rope 32 is installed on the surface of the collar 31. A first connecting tube 33 is installed at the end of the connecting wire rope 32 away from the collar 31, and a second threaded rod 34 is threadedly installed on the inner cavity of the first connecting tube 33, and the second threaded rod 34 is threadedly connected to the turnbuckle bolt 30, so that the fixing ring 28 can be installed through the hook 29 after installation, and the turnbuckle bolt 30 and the connecting wire rope 32 can be pulled through the collar 31, so as to facilitate the pulling of the inner template 2, thereby facilitating the stable installation of the inner template 2, and the second threaded rod 34 and the hook 29 with a threaded groove can be moved by rotating the turnbuckle bolt 30, so as to facilitate the pulling of the inner template 2.

[0041] Reference Figure 1-Figure 6 In a preferred embodiment, a first support plate 35 is installed on the top of the outer template 3, a second support plate 36 is installed on the top of the inner template 2, and a rotating rod 37 is provided on the top of the inner template 2. The left side of the rotating rod 37 passes through the second support plate 36 and is connected to the first support plate 35, and the rotating rod 37 is threadedly connected to the second support plate 36, so that the rotating rod 37 can pass through the second support plate 36 and be connected to the first support plate 35, so as to facilitate pulling the first support plate 35 when the rotating rod 37 is rotated, and the outer template 3 is moved. After the outer template 3 is moved, it cooperates with the inner template 2 to form the required guardrail thickness.

[0042] In addition, a placement seat 38 is rotatably installed on the top of the outer template 3 and the inner template 2, a top plate 39 is rotatably installed on the top of the placement seat 38, and a connecting plate 40 is installed on the inner side of the top plate 39, a magnetic plate 41 is installed on the right side of the placement seat 38, and the magnetic plate 41 is adsorbed with the connecting plate 40, a cross bar 42 is provided on the inner side of the placement seat 38 and the top plate 39, and a limiting frame 43 is installed at the bottom of the cross bar 42, and after the cross bar 42 is placed on the placement seat 38, the limiting frame 43 is located on the inner side of the outer template 3 and the inner template 2, thereby limiting the moving distance of the outer template 3, and the magnetic plate 41 can limit the top plate 39 after being adsorbed with the connecting plate 40, thereby placing the limiting frame 43 on the inner side of the inner template 2 and the outer template 3.

[0043] Reference Figure 1-Figure 3 In a preferred embodiment, a second fixed plate 44 is installed on the left side of the outer template 3, a rotating rod 45 is threadedly installed on the bottom of the second fixed plate 44, and a supporting seat 46 is installed on the top of the rotating rod 45, and a sliding seat 47 is installed on the right side of the supporting seat 46. The rotating rod 45 can be rotated to drive the supporting seat 46 and the sliding seat 47 to move, thereby limiting the hanging tube 8, and the outer template 3 can be tilted and suspended through the hanging tube 8.

[0044] A highway engineering bridge concrete anti-collision guardrail template construction method, applicable to the above-mentioned highway engineering bridge concrete anti-collision guardrail template structure, comprises the following steps:

[0045] S1: Installation; by using the positioning line popped out by the ink fountain and the position of the positioning ribs of the inner template 2, the installed positioning ribs limit the inner template 2, and the square wood 25 is used to tighten the inner template 2, so that the inner template 2 can be installed, and the double-sided tape is pasted on the contact surface of the outer template 3 and the outer edge of the side beam wing plate. The outer template 3 can be closely fitted with the side beam wing plate by using the pull rod at the bottom of the template to prevent leakage, and then the outer template 3 is lifted by a car crane, and the crane continues to lift the outer template 3;

[0046] S2: Balance correction; pass the hanging tube 8 through the first fixing frame 6 and the second fixing frame 7, and lift the outer template 3 by pressing the hanging tube 8 so that the height of the outer template 3 and the inner template 2 are kept at the same level, and use foam glue to fill the uneven ground of the inner template 2.

[0047] Specifically, the working process or working principle of the concrete anti-collision guardrail template structure of a highway engineering bridge and its construction method is as follows: when in use, use an ink fountain to pop out the positioning line and the inner template 2 positioning rib position, and embed the fixed rib 4 and the bending rib on the bridge body 1 without damaging the bridge body 1 structure, and make the installed positioning rib limit the inner template 2, then fit the first clamping plate 26 with the fixed rib 4, so as to facilitate the use of square wood 25 and the second clamping plate 27 to clamp the inner template 2, and sleeve the support sleeve 20 on the surface of the fixed rib 4, Then, the rotating ring 22 is rotated to make the rotating ring 22 drive the first threaded rod 23 to move, and the support seat 24 installed on the top of the first threaded rod 23 is fitted with the inner template 2, thereby supporting the inner template 2. The first threaded rod 23 can be moved by rotating the rotating ring 22 to squeeze the inner template 2, thereby facilitating the adjustment of the inner template 2. Subsequently, the hook 29 is hooked to the fixed ring 28, and the collar 31 is sleeved on the surface of the bending rib 5. The second threaded rod 34 and the hook 29 with a threaded groove are rotated by rotating the turnbuckle bolt 30. The inner formwork 2 is moved, so as to facilitate pulling and limiting the inner formwork 2, thereby installing the inner formwork 2. Then, the outer formwork 3 is pasted with double-sided tape on the contact surface of the outer edge of the side beam wing plate, and the outer formwork 3 can be closely fitted with the side beam wing plate by using the pull rod at the bottom of the formwork to prevent leakage. Then, the outer formwork 3 is lifted by a car crane, and the crane continues to lift the outer formwork 3. Then, the hanging pipe 8 passes through the first fixing frame 6 and the second fixing frame 7, and after the rotating plate 12 is moved to the second fixing frame 7, the first spring 18 supports the rotating plate 12, and the first fitting pad 1 3 is fitted with the second fixing plate 44, thereby limiting the hanging tube 8, and pressing the hanging tube 8 to lift the outer template 3 upward, thereby maintaining the inner template 2 and the outer template 3 at the same horizontal plane, and then installing the rotating rod 37 to the surface of the first supporting plate 35, and moving the outer template 3 toward the inner template 2 by rotating the rotating rod 37, thereby limiting the outer template 3, and then limiting the inner template 2 and the outer template 3 by the pull rod in the template, and after the outer template 3 and the inner template 2 are installed, the anti-collision guardrail can be poured by filling concrete.

Claims

1. A concrete anti-collision guardrail formwork structure for a highway engineering bridge, comprising a bridge body (1), an inner formwork (2) and an outer formwork (3), characterized in that: The outer template (3) is arranged on the left side of the bridge body (1), the inner template (2) is arranged on the top of the bridge body (1), and the top of the bridge body (1) is installed with a fixing rib (4) and a bending rib (5), and the bending rib (5) is located on the front side of the fixing rib (4), the right side of the inner template (2) is provided with a supporting mechanism, and the right side of the inner template (2) is provided with a pulling mechanism; A suspension mechanism, the suspension mechanism comprising: A first fixing frame (6), the first fixing frame (6) being fixedly mounted on the top of the inner template (2); A second fixing frame (7), the second fixing frame (7) is fixedly mounted on the top of the outer template (3), and the second fixing frame (7) is located on the left side of the first fixing frame (6); A hanging tube (8), wherein the hanging tube (8) is arranged on the top of the inner template (2), and the left end of the hanging tube (8) passes through the first fixing frame (6) and extends to the left side of the second fixing frame (7).

2. A highway engineering bridge concrete anti-collision guardrail template structure according to claim 1, characterized in that: An extension rod (9) is installed on the left side of the hanging tube (8), a movable groove (10) is opened on the top of the extension rod (9), a connecting plate (11) is installed on the inner wall of the movable groove (10) through a rotating shaft, a rotating plate (12) is installed on the right side of the connecting plate (11), a first fitting pad (13) is installed on the right side of the rotating plate (12), a first fixing plate (14) is installed on the left side of the surface of the hanging tube (8), a second fitting pad (15) is installed on the left side of the first fixing plate (14), and the first fitting pad (13) and the second fitting pad (15) are both made of elastic material.

3. A highway engineering bridge concrete anti-collision guardrail template structure according to claim 2, characterized in that: A first mounting seat (16) is rotatably mounted on the bottom of the rotating plate (12), a second mounting seat (17) is rotatably mounted on the bottom of the inner wall of the movable groove (10), and a first spring (18) and a telescopic rod (19) are mounted on the inner sides of the first mounting seat (16) and the second mounting seat (17), wherein the first spring (18) is sleeved on the surface of the telescopic rod (19).

4. A highway engineering bridge concrete anti-collision guardrail template structure according to claim 1, characterized in that: The support mechanism comprises a support sleeve (20), the support sleeve (20) is sleeved on the surface of the fixed rib (4), a support rod (21) is installed on the surface of the support sleeve (20), a rotating ring (22) is rotatably installed on the top of the support rod (21), a first threaded rod (23) is inserted into the top of the support rod (21), and the rotating ring (22) is threadedly connected to the surface of the first threaded rod (23), and a support seat (24) is rotatably installed on the top of the first threaded rod (23).

5. The highway engineering bridge concrete anti-collision guardrail template structure according to claim 1 is characterized in that: A square wood (25) is provided on the right side of the inner template (2), a first abutting plate (26) is installed on the left side of the square wood (25), and the first abutting plate (26) is in contact with the right side of the inner template (2), a second abutting plate (27) is installed on the right side of the square wood (25), and the second abutting plate (27) is in contact with the fixing rib (4).

6. A highway engineering bridge concrete anti-collision guardrail template structure according to claim 1, characterized in that: The pulling mechanism comprises a fixing ring (28), wherein the fixing ring (28) is fixedly mounted on the top of the inner template (2), a hook (29) is mounted on the surface of the fixing ring (28), a turnbuckle bolt (30) is threadedly mounted on the bottom of the hook (29), a sleeve (31) is sleeved on the surface of the bending rib (5), a connecting steel wire rope (32) is mounted on the surface of the sleeve (31), a first connecting tube (33) is mounted on the end of the connecting steel wire rope (32) away from the sleeve (31), a second threaded rod (34) is threadedly mounted on the inner cavity of the first connecting tube (33), and the second threaded rod (34) is threadedly connected to the turnbuckle bolt (30).

7. The highway engineering bridge concrete anti-collision guardrail template structure according to claim 1 is characterized in that: A first support plate (35) is installed on the top of the outer template (3), a second support plate (36) is installed on the top of the inner template (2), and a rotating rod (37) is provided on the top of the inner template (2), the left side of the rotating rod (37) passes through the second support plate (36) and is connected to the first support plate (35), and the rotating rod (37) is threadedly connected to the second support plate (36).

8. The highway engineering bridge concrete anti-collision guardrail template structure according to claim 1 is characterized in that: A placement seat (38) is rotatably mounted on the top of the outer template (3) and the inner template (2); a top plate (39) is rotatably mounted on the top of the placement seat (38); a connecting plate (40) is mounted on the inner side of the top plate (39); a magnetic plate (41) is mounted on the right side of the placement seat (38); the magnetic plate (41) is adsorbed to the connecting plate (40); a cross bar (42) is arranged on the inner side of the placement seat (38) and the top plate (39); and a limiting frame (43) is mounted on the bottom of the cross bar (42).

9. The highway engineering bridge concrete anti-collision guardrail template structure according to claim 1 is characterized in that: A second fixing plate (44) is installed on the left side of the outer template (3), a rotating rod (45) is threadedly installed on the bottom of the second fixing plate (44), a supporting seat (46) is installed on the top of the rotating rod (45), and a sliding seat (47) is installed on the right side of the supporting seat (46).

10. A method for constructing a concrete anti-collision guardrail formwork for a highway engineering bridge, applicable to a concrete anti-collision guardrail formwork structure for a highway engineering bridge as described in any one of claims 1 to 9, characterized in that: The steps include: S1: Installation; by using an ink fountain to pop out the positioning line and the positioning rib position of the inner template (2), the installed positioning rib is used to limit the inner template (2), and the inner template (2) is pressed against the square wood (25), so that the inner template (2) can be installed, and the double-sided tape is pasted on the contact surface of the outer template (3) and the outer edge of the side beam wing plate, and the outer template (3) and the side beam wing plate can be tightly fitted by the pull rod at the bottom of the template to prevent leakage, and then the outer template (3) is lifted by a car crane, and the crane continues to lift the outer template (3); S2: Balance correction; pass the hanging tube (8) through the first fixing frame (6) and the second fixing frame (7), and lift the outer template (3) by pressing the hanging tube (8) so that the height of the outer template (3) and the inner template (2) are maintained at the same level, and fill the uneven ground of the inner template (2) with foam glue.