High-altitude straining beam scaffold integrated construction operation platform and construction method thereof
By designing an integrated construction platform for high-altitude beams and scaffolding, and using locking components and support steel frames to fix them on the pier column, the problems of troubles and safety hazards of high-altitude beams in suspension bridge construction are solved, and an efficient construction process is achieved.
Patent Information
- Application Number
- CN202411744480.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-30
- Publication Date
- 2025-03-18
AI Technical Summary
During the construction of suspension bridges, the construction of the beam at high altitudes is more troublesome and has high safety risks.
A high-altitude collar-scaffolding integrated construction platform is designed, including locking components, support steel frames, sleeve molds, side molds and bottom molds. By assembling and lifting the supporting steel frames on the ground, the locking components are used to fix them on the pier columns to achieve efficient casting of the collars.
It greatly reduces high-altitude construction, reduces safety hazards, and improves construction efficiency.
Smart Images

Figure CN119640678A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of suspension bridge construction, and in particular to a high-altitude tie beam and scaffolding integrated construction work platform and a construction method thereof. Background Art
[0002] A suspension bridge, also known as a suspension bridge, refers to a bridge that uses cables suspended through towers and anchored on both sides as the main load-bearing components of the superstructure.
[0003] The two piers of the cable tower are supported by tie beams, which are generally constructed using tie beam formwork. However, due to the high height of the tie beams, it is more troublesome to construct tie beams at high altitudes, and there are high safety risks. Summary of the invention
[0004] The purpose of this application is to provide a high-altitude tie beam and scaffolding integrated construction work platform and a construction method thereof, so as to improve the problem that the high-altitude construction of the tie beam is relatively troublesome and has high safety hazards.
[0005] The present application provides a high-altitude tie beam and scaffolding integrated construction work platform and a construction method thereof, which adopts the following technical solutions: A high-altitude tie-beam scaffolding integrated construction work platform includes two locking assemblies, which are respectively arranged on two piers; a supporting steel frame, which is sleeved on the two piers and connected to the two locking assemblies at the same time; two sleeve molds, which are respectively sleeved on the two piers, and the two sleeve molds are connected to the supporting steel frame; two side molds, which are both located between the two sleeve molds; a bottom mold, which is arranged below the side mold and the sleeve mold, and the bottom mold is detachably connected to the supporting steel frame.
[0006] By adopting the above technical solution, during construction, the supporting steel frame, sleeve formwork, side formwork and bottom formwork are installed on the ground, and then the supporting steel frame is hoisted, and the supporting steel frame is locked to the pier column through the locking assembly, and then the tie beam is cast, which can greatly reduce high-altitude construction, reduce safety hazards, and improve construction efficiency.
[0007] Optionally, the locking assembly is installed on a supporting steel frame, and the locking assembly is used to temporarily fix the supporting steel frame to the pier.
[0008] Optionally, the locking assembly includes a screw, an arc plate and a handle, the screw is threadedly connected to the supporting steel frame, one end of the screw is rotatably connected to the arc plate, and the other end is fixedly connected to the handle, and the arc plate is used to contact the side wall of the pier.
[0009] Through the above technical solution, the screw is used to drive the arc plate to move, so that the arc plate and the pier are pressed tightly, and then the reaction force is used to relatively fix the supporting steel frame and the pier.
[0010] Optionally, the locking assemblies are arranged in pairs, each pair of the locking assemblies corresponds to a group of piers, and each pair of the locking assemblies are arranged opposite to each other along the radial direction of the piers.
[0011] Through the above technical solution, the locking components arranged in pairs can improve the stability of the fixing of the supporting steel frame.
[0012] Furthermore, a hinge rod is provided at the bottom of the side mold, a hinge shaft is provided on the supporting steel frame, and the hinge rod is hinged to the hinge shaft.
[0013] Optionally, a stopper is provided on the side wall at the top of the side mold, and the stopper is used to abut against the side wall of the sleeve mold.
[0014] Through the above technical scheme, by setting the hinge rod and the hinge shaft, the demoulding method of the side mold is rotational demoulding, which can reduce the difficulty of demoulding. At the same time, the stop block abuts against the side wall of the sleeve mold, which can facilitate the positioning of the side panel, thereby improving the flatness between the sleeve mold and the side mold.
[0015] Optionally, a fixed plate is fixedly connected to the supporting steel frame, the fixed plate is hinged with a hydraulic diagonal brace, the movable end of the hydraulic diagonal brace is connected to a movable rod, a waist-shaped groove is provided on the movable rod, and a matching rod is fixedly connected to the side mold, and the matching rod is located in the waist-shaped groove.
[0016] By adopting the above technical solution, the hydraulic diagonal brace facilitates the support of the side formwork, reducing the possibility of concrete overflow during pouring, and the coordination of the movable rod, waist-shaped groove and matching rod can facilitate the rotation of the side formwork through the hydraulic diagonal brace, thereby facilitating the demoulding of the side formwork.
[0017] Optionally, a support groove is opened on the side wall of the support steel frame in the horizontal direction, and at least a part of the bottom mold is located in the support groove.
[0018] By adopting the above technical solution, the bottom formwork can be supported by the support groove. After the construction of the first tie beam is completed, the bottom formwork can be taken out through the support groove, so that the supporting steel frame can be moved upward as a whole.
[0019] Optionally, a plurality of support rods for supporting the bottom mold are provided on the side walls of the support steel frame, and anti-drop ropes are connected to the ends of the support rods. An end of the anti-drop rope away from the support rods is connected to the bottom of the bottom mold.
[0020] Through the above technical solution, the support rod is convenient for placing the bottom formwork after the bottom formwork is separated from the tie beam, and the anti-drop rope is convenient for reducing the possibility of the bottom formwork falling.
[0021] A construction method thereof, based on the above-mentioned high-altitude tie beam and scaffolding integrated construction work platform, comprises the following steps: S1. Assemble the supporting steel frame so that the supporting steel frame is sleeved on the two piers; S2, assembling the sleeve mold, side mold, bottom mold and locking assembly in sequence; S3, lifting the supporting steel frame, moving the supporting steel frame to the position of the first tie beam to be cast, and casting the first tie beam; S4. After the first tie beam is formed, the supporting steel frame is moved downward to realize demoulding, and the bottom mold is removed; S5, repeat steps S3-S4 until all tie beams are formed; S6. Hoist the supporting steel frame and make it fall to the ground, and disassemble the supporting steel frame, sleeve mold, side mold, bottom mold and locking assembly on the bottom surface.
[0022] By adopting the above technical solution, the supporting steel frame, sleeve formwork, side formwork, locking assembly and bottom formwork are assembled on the ground, and then the supporting steel frame is hoisted to move the supporting steel frame to the position of the first tie beam to be cast, and the supporting steel frame is locked to the pier by the locking assembly, and then the first tie beam is cast, and then the remaining tie beams are cast in sequence through a set of tooling, which can greatly reduce high-altitude construction, reduce safety hazards, and improve construction efficiency.
[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. During construction, assemble the supporting steel frame, sleeve formwork, side formwork, locking assembly and bottom formwork on the ground, then hoist the supporting steel frame, lock the supporting steel frame on the pier column through the locking assembly, and then cast the tie beam, which can greatly reduce high-altitude construction, reduce safety hazards and improve construction efficiency; 2. The hydraulic diagonal brace is convenient for supporting the side formwork, reducing the possibility of concrete overflow during pouring, and the coordination of the movable rod, waist groove and matching rod can facilitate the rotation of the side formwork through the hydraulic diagonal brace, thereby facilitating the demoulding of the side formwork; 3. The support rod is convenient for placing the bottom formwork after it is separated from the tie beam, and the anti-drop rope is convenient for reducing the possibility of the bottom formwork falling; 4. Use the screw to drive the arc plate to move, so that the arc plate and the pier are pressed tightly, and then use the reaction force to fix the supporting steel frame and the pier relatively. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of an integrated construction work platform of high altitude tie beams and scaffoldings in the present invention.
[0025] Figure 2 It is a schematic diagram of the bottom mold in the present invention.
[0026] Figure 3 It is a three-dimensional schematic diagram of the locking assembly in the present invention.
[0027] In the figure, 1. supporting steel frame; 11. fixing plate; 111. fixing bolt; 12. supporting groove; 13. supporting rod; 2. locking assembly; 21. screw rod; 22. arc plate; 23. handle; 3. sleeve mold; 4. side mold; 41. hinged rod; 42. hydraulic diagonal brace; 43. movable rod; 44. waist-shaped groove; 45. matching rod; 5. bottom mold; 6. clamp. DETAILED DESCRIPTION
[0028] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.
[0029] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more. In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be a connection between the two elements. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0030] Embodiment 1 A high-altitude tie beam scaffolding integrated construction work platform, reference Figures 1 to 3, including a locking assembly 2, a supporting steel frame 1, a sleeve mold 3, a side mold 4 and a bottom mold 5. Two locking assemblies 2 are provided, which are respectively provided on two piers. The supporting steel frame 1 is sleeved on the two piers and is connected to the two locking assemblies 2 at the same time. There are two sleeve molds 3, which are respectively sleeved on the two piers, and the two sleeve molds 3 are connected to the supporting steel frame 1. There are two side molds 4, which are both located between the two sleeve molds 3. The bottom mold 5 is provided below the side mold 4 and the sleeve mold 3, and the bottom mold 5 is detachably connected to the supporting steel frame 1. During construction, the supporting steel frame 1, the sleeve mold 3, the side mold 4 and the bottom mold 5 are installed on the ground, and then the supporting steel frame 1 is lifted, and the supporting steel frame 1 is locked to the pier through the locking assembly 2, and then the tie beam is cast, which can greatly reduce high-altitude construction, reduce safety hazards, and improve construction efficiency.
[0031] The locking assembly 2 is installed on the supporting steel frame 1, and the locking assembly 2 is used to temporarily fix the supporting steel frame 1 to the pier.
[0032] Specifically, the locking assembly 2 includes a screw 21, an arc plate 22 and a handle 23. The screw 21 is threadedly connected to the support steel frame 1. One end of the screw 21 is rotatably connected to the arc plate 22, and the other end is fixedly connected to the handle 23. The arc plate 22 is used to contact the side wall of the pier. When working, the handle 23 is rotated, and the screw 21 is used to drive the arc plate 22 to move, so that the arc plate 22 is pressed against the pier, and then the support steel frame 1 and the pier are relatively fixed by the reaction force.
[0033] It should be noted that the locking assemblies 2 are arranged in pairs, each pair of locking assemblies 2 corresponds to a group of piers, and each pair of locking assemblies 2 is arranged opposite to each other along the radial direction of the piers, that is, there are two groups of locking assemblies 2 in this embodiment.
[0034] A hinge rod 41 is provided at the bottom of the side mold 4, and a hinge shaft is provided on the support steel frame 1, and the hinge rod 41 is hinged to the hinge shaft. A stopper is provided on the side wall at the top of the side mold 4, and the stopper is used to abut against the side wall of the sleeve mold 3. Through the arrangement of the hinge rod 41 and the hinge shaft, the demoulding method of the side mold 4 is rotary demoulding, which can reduce the demoulding difficulty. At the same time, the stopper abuts against the side wall of the sleeve mold 3, which can facilitate the positioning of the side plate, thereby improving the flatness between the sleeve mold 3 and the side mold 4.
[0035] In addition, a fixed plate 11 is fixedly connected to the support steel frame 1, and a hydraulic diagonal brace 42 is hingedly connected to the fixed plate 11. A movable rod 43 is fixedly connected to the movable end of the hydraulic diagonal brace 42, and a waist-shaped groove 44 is provided on the movable rod 43. A matching rod 45 is fixedly connected to the side mold 4, and the matching rod 45 is located in the waist-shaped groove 44. The hydraulic diagonal brace 42 can be a jack. The hydraulic diagonal brace 42 is convenient for supporting the side mold 4 to reduce the possibility of concrete overflow during pouring, and the matching of the movable rod 43, the waist-shaped groove 44 and the matching rod 45 can facilitate the rotation of the side mold 4 through the hydraulic diagonal brace 42, thereby facilitating the demoulding of the side mold 4.
[0036] A support groove 12 is provided on the side wall of the support steel frame 1 in the horizontal direction. There are two support grooves 12, which are located on both sides of the bottom mold 5. At least a part of the bottom mold 5 is located in the support groove 12, so as to effectively support the bottom mold 5. At the same time, after the construction of the first tie beam is completed, the support groove 12 is convenient for taking out the bottom mold 5 through the support groove 12, so as to facilitate the continued upward movement of the support steel frame 1 as a whole. There is a certain gap between the bottom mold 5 and the bottom of the side mold 4 and the sleeve mold 3, that is, the top part of the inner side wall of the support steel frame 1 is used as part of the template.
[0037] A plurality of support rods 13 for supporting the bottom mold 5 are fixedly connected to the side wall of the support steel frame 1, and an anti-drop rope is fixedly connected to the end of the support rod 13, and one end of the anti-drop rope away from the support rod 13 is connected to the bottom of the bottom mold 5. The support rod 13 is convenient for placing the bottom mold 5 after the bottom mold 5 is separated from the tie beam, and the anti-drop rope is convenient for reducing the possibility of the bottom mold 5 falling.
[0038] In addition, the fixing plate 11 is also threadedly connected with a fixing bolt 111. When the bottom mold 5 is placed on the support rod 13, the bottom mold 5 located below the fixing plate 11 is locked by the fixing bolt 111 to reduce the possibility of the bottom mold 5 falling when the supporting steel frame 1 moves. At the same time, the fixing bolt 111 is also threadedly connected with the bottom mold 5 when the bottom mold 5 is working, locking and fixing the bottom mold 5 to prevent loosening during pouring. The bottom mold 5 has a screw hole that cooperates with the fixing bolt 111, and the top surface of the bottom mold 5 has a rubber layer to reduce the possibility of leakage during pouring.
[0039] It should be noted that a clamp 6 may be placed on each pier column, and the top surface of the clamp 6 contacts the bottom surface of the supporting steel frame 1 to further support the supporting steel frame 1 .
[0040] Working principle: During construction, assemble the supporting steel frame 1, sleeve formwork 3, side formwork 4, locking assembly 2 and bottom formwork 5 on the ground, then lift the supporting steel frame 1, lock the supporting steel frame 1 to the pier through the locking assembly 2, and then cast the tie beam, which can greatly reduce high-altitude construction, reduce safety hazards, and improve construction efficiency. The hydraulic diagonal brace 42 is convenient for supporting the side formwork 4, reducing the possibility of concrete overflow during pouring, and the coordination of the movable rod 43, waist groove 44 and matching rod 45 can facilitate the rotation of the side formwork 4 through the hydraulic diagonal brace 42, thereby facilitating the demoulding of the side formwork 4. The support rod is convenient for placing the bottom formwork 5 after the bottom formwork 5 is detached from the tie beam, and the anti-drop rope is convenient for reducing the possibility of the bottom formwork 5 falling. A construction method thereof, based on the above-mentioned high-altitude tie beam and scaffolding integrated construction work platform, comprises the following steps: S1. Assemble the supporting steel frame 1 so that the supporting steel frame 1 is sleeved on two piers.
[0041] S2, assemble the sleeve mold 3, the side mold 4, the bottom mold 5 and the locking assembly 2 in sequence.
[0042] S3, lifting the supporting steel frame 1, so that the supporting steel frame 1 moves to the position of the first tie beam to be cast, then turning the handle 23, using the reaction force to fix the supporting steel frame 1 relative to the pier, and casting the first tie beam.
[0043] S4. After the first tie beam is formed, the supporting steel frame 1 is moved downward to realize demoulding, and the bottom mold 5 is moved to the supporting rod 13 through the supporting groove 12, and the bottom mold 5 is fixed by the fixing bolts 111.
[0044] S5. Repeat steps S3-S4 until all tie beams are formed.
[0045] S6. Hoist the supporting steel frame 1 and make it fall to the ground, and disassemble the supporting steel frame 1, the sleeve mold 3, the side mold 4, the bottom mold 5 and the locking assembly 2 on the bottom surface.
[0046] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A high-altitude tie beam and scaffolding integrated construction work platform, characterized in that: include There are two locking assemblies (2), which are respectively arranged on two piers; The supporting steel frame (1) is sleeved on the two piers and is simultaneously connected to the two locking assemblies (2); Two sleeve molds (3) are provided and are respectively sleeved on two piers, and the two sleeve molds (3) are both connected to the supporting steel frame (1); Two side molds (4) are provided and both are located between the two sleeve molds (3); The bottom mold (5) is arranged below the side mold (4) and the sleeve mold (3), and the bottom mold (5) is detachably connected to the supporting steel frame (1).
2. The high-altitude tie beam and scaffolding integrated construction work platform according to claim 1 is characterized by: The locking assembly (2) is installed on the supporting steel frame (1), and the locking assembly (2) is used to temporarily fix the supporting steel frame (1) and the pier.
3. The high-altitude tie beam and scaffolding integrated construction work platform according to claim 1 is characterized by: The locking assembly (2) comprises a screw rod (21), an arc-shaped plate (22) and a handle (23); the screw rod (21) is threadedly connected to the supporting steel frame (1); one end of the screw rod (21) is rotatably connected to the arc-shaped plate (22), and the other end is fixedly connected to the handle (23); the arc-shaped plate (22) is used to contact the side wall of the pier column.
4. The high-altitude tie beam and scaffolding integrated construction work platform according to claim 2 is characterized by: The locking assemblies (2) are arranged in pairs, each pair of the locking assemblies (2) corresponds to a group of piers, and each pair of the locking assemblies (2) are arranged opposite to each other along the radial direction of the piers.
5. The high-altitude tie beam and scaffolding integrated construction work platform according to claim 4 is characterized by: A hinge rod (41) is provided at the bottom of the side mold (4), a hinge shaft is provided on the supporting steel frame (1), and the hinge rod (41) is hinged to the hinge shaft.
6. The high-altitude tie beam and scaffolding integrated construction work platform according to claim 5 is characterized by: A stopper is provided on the side wall at the top of the side mold (4), and the stopper is used to abut against the side wall of the sleeve mold (3).
7. The high-altitude tie beam and scaffolding integrated construction work platform according to claim 6 is characterized by: A fixed plate (11) is fixedly connected to the support steel frame (1), and a hydraulic diagonal brace (42) is hinged to the fixed plate (11). A movable rod (43) is connected to the movable end of the hydraulic diagonal brace (42), and a waist-shaped groove (44) is provided on the movable rod (43). A matching rod (45) is fixedly connected to the side mold (4), and the matching rod (45) is located in the waist-shaped groove (44).
8. The high-altitude tie beam and scaffolding integrated construction work platform according to claim 7 is characterized by: A support groove (12) is provided on the side wall of the support steel frame (1) in the horizontal direction, and at least a part of the bottom mold (5) is located in the support groove (12).
9. The high-altitude tie beam and scaffolding integrated construction work platform according to claim 8, characterized in that: A plurality of support rods (13) for supporting the bottom mold (5) are arranged on the side wall of the support steel frame (1), and an anti-drop rope is connected to the end of the support rod (13), and an end of the anti-drop rope away from the support rod (13) is connected to the bottom of the bottom mold (5).
10. A construction method thereof, based on the high-altitude tie beam and scaffolding integrated construction work platform according to any one of claims 1 to 9, characterized in that: The steps include: S1, assembling the supporting steel frame (1) so that the supporting steel frame (1) is sleeved on the two piers; S2, assembling the sleeve mold (3), the side mold (4), the bottom mold (5) and the locking assembly (2) in sequence; S3, lifting the supporting steel frame (1), moving the supporting steel frame (1) to the position of the first tie beam to be cast, and casting the first tie beam; S4. After the first tie beam is formed, the supporting steel frame (1) is moved downward to realize demoulding, and the bottom mold (5) is removed; S5, repeat steps S3-S4 until all tie beams are formed; S6, hoisting the supporting steel frame (1), and making the supporting steel frame (1) fall to the ground, and disassembling the supporting steel frame (1), the sleeve mold (3), the side mold (4), the bottom mold (5) and the locking assembly (2) on the bottom surface.