Cooling and energy-saving device for concrete pouring

By embedding core and annular cooling pipes inside the concrete, using cooling water tanks to provide cooling water, and using cooling water and hot water alternately to adjust the temperature difference, the cost and energy problems caused by temperature differences during the concrete pouring process are solved, and the project cost is reduced. and energy consumption effects.

CN221799252UActive Publication Date: 2024-10-01HUNAN UNIV OF SCI & TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420325175.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-01
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

During the large-volume concrete pouring process, the heat generated by the hydration of the gel material causes the internal temperature of the concrete to rise, resulting in a temperature difference between the inside and outside. It is usually necessary to provide external hot water for insulation, which increases project costs and energy consumption.

Method used

Design an energy-saving cooling device for poured concrete, which includes a core cooling pipe and an annular cooling pipe embedded inside the concrete. Cooling water is provided through a cooling water tank. The core cooling pipe and annular cooling pipe are used to alternately use cooling water and heat. water to adjust the temperature difference between the inside and outside of the concrete and reduce dependence on external hot water facilities.

Benefits of technology

Effectively controlling the temperature difference between the inside and outside of the concrete reduces project costs and energy consumption, avoids the need for external hot water facilities, prevents local overcooling of the concrete, and improves the cooling and insulation effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221799252U_ABST
    Figure CN221799252U_ABST
Patent Text Reader

Abstract

The utility model relates to a poured concrete cooling and energy-saving device which comprises a cooling water tank, a core cooling pipeline and an annular cooling pipeline, the core cooling pipeline and the annular cooling pipeline are pre-buried in concrete, the annular cooling pipeline surrounds the core cooling pipeline, and the cooling water tank is in branch connection with a first water inlet pipeline and a second water inlet pipeline. The first water inlet pipeline is connected with the water inlet end of the core cooling pipeline, the second water inlet pipeline is connected with the water inlet end of the annular cooling pipeline, a water outlet end branch of the core cooling pipeline is connected with a first water outlet pipeline and a backflow pipeline, the backflow pipeline is connected with the water inlet end of the annular cooling pipeline, and the water outlet end of the annular cooling pipeline is connected with a second water outlet pipeline. A first valve is arranged on the second water inlet pipeline, a second valve is arranged on the first water outlet pipeline, and a third valve is arranged on the backflow pipeline. The device can perform external heat preservation by utilizing hydration heat when the temperature difference between the inside and outside of the concrete is controlled, so that the engineering cost is reduced, and the energy is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of concrete construction, and in particular to a cooling and energy-saving device for pouring concrete. Background Art

[0002] During the pouring of large-volume concrete, a large amount of heat will be generated inside the concrete due to the hydration of the gel material, and the temperature inside the concrete will rise significantly, resulting in a large temperature difference between the inside and outside of the concrete, which will cause cracks on the concrete surface. In order to prevent the occurrence of temperature cracks, cooling water pipes are usually laid in the concrete to discharge the hydration heat. However, the existing layout of cooling water pipes requires external hot water for external insulation when adjusting the temperature difference between the inside and outside of the concrete, which increases the project cost and energy consumption. Utility Model Content

[0003] Based on this, the present application provides a cooling and energy-saving device for pouring concrete, which can use hydration heat for external insulation while controlling the temperature difference between the inside and outside of the concrete, so as to reduce engineering costs and save energy.

[0004] The technical solutions adopted in this application are as follows:

[0005] A pouring concrete cooling and energy-saving device comprises a cooling water tank, a core cooling pipeline and an annular cooling pipeline, wherein the core cooling pipeline and the annular cooling pipeline are pre-buried in concrete, and the annular cooling pipeline surrounds the core cooling pipeline, the cooling water tank branch is connected with a first water inlet pipeline and a second water inlet pipeline, the first water inlet pipeline is connected to the water inlet end of the core cooling pipeline, the second water inlet pipeline is connected to the water inlet end of the annular cooling pipeline, the water outlet end branch of the core cooling pipeline is connected with a first water outlet pipeline and a return pipeline, the return pipeline is connected to the water inlet end of the annular cooling pipeline, and the water outlet end of the annular cooling pipeline is connected to the second water outlet pipeline; a first valve is arranged on the second water inlet pipeline, a second valve is arranged on the first water outlet pipeline, and a third valve is arranged on the return pipeline.

[0006] Furthermore, the second water inlet pipeline terminal and the return pipeline terminal are connected in parallel and then branched to connect the two ports of the annular cooling pipeline. The two ports of the annular cooling pipeline are respectively connected to the second water outlet pipeline. One port of the annular cooling pipeline is provided with a fourth valve, and the other port is provided with a fifth valve. By alternately opening the fourth valve and the fifth valve, the two ports of the annular cooling pipeline alternately become the water inlets of the annular cooling pipeline.

[0007] Furthermore, the fourth valve and the fifth valve are digitally controlled switch valves, and the fourth valve and the fifth valve are communicatively connected to a control module, and the control module is used to control the fourth valve and the fifth valve to exchange switch states once every preset time.

[0008] Furthermore, the fourth valve and the fifth valve are respectively selected from one of an electric butterfly valve, an electric ball valve, and an electric gate valve.

[0009] Furthermore, the core cooling pipeline includes two planar serpentine condensation pipelines arranged side by side and symmetrically, the water inlet ends of the two planar serpentine condensation pipelines are connected to form the water inlet end of the core cooling pipeline, and the water outlet ends of the two planar serpentine condensation pipelines are connected to form the water outlet end of the core cooling pipeline.

[0010] Furthermore, the port of the planar serpentine condensation pipeline close to the middle of the concrete is the water inlet end, and the port of the planar serpentine condensation pipeline close to the concrete surface is the water outlet end.

[0011] Furthermore, the annular cooling pipeline is a rectangular loop, and the corners of the rectangular loop are set as circular arc guide angles.

[0012] Furthermore, the first valve, the second valve and the third valve are respectively selected from one of a butterfly valve, a ball valve and a gate valve.

[0013] Furthermore, the cooling water tank is connected to a main water inlet pipeline, a terminal branch of the main water inlet pipeline is connected to the first water inlet pipeline and the second water inlet pipeline, and a sixth valve is arranged on the main water inlet pipeline.

[0014] The poured concrete cooling and energy-saving device of the present application comprises a cooling water tank for providing cooling water, a core cooling pipeline for cooling the middle part of the concrete, an annular cooling pipeline for cooling or insulating the peripheral part close to the concrete surface, a first water inlet pipeline for guiding the cooling water to the core cooling pipeline, a second water inlet pipeline for guiding the cooling water to the annular cooling pipeline, a first water outlet pipeline for guiding and discharging the hot water that has absorbed heat and has passed through the core cooling pipeline, and a return pipeline for guiding the hot water that has absorbed heat and has passed through the core cooling pipeline to the annular cooling pipeline.

[0015] The poured concrete cooling and energy-saving device of the present application can use cooling water to cool the concrete in the core cooling pipeline and the annular cooling pipeline at the same time by opening the first valve and the second valve and closing the third valve when a large amount of heat needs to be taken away during the heating period of the concrete. When external insulation is required during the cooling period of the concrete, the hot water in the core cooling pipeline can be flowed to the annular cooling pipeline by closing the first valve and the second valve and opening the third valve, thereby adjusting the temperature difference between the inside and outside of the concrete so that the temperature difference between the inside and outside of the concrete meets the requirements of the specifications. At this time, since the hot water in the annular cooling pipeline comes from the core cooling pipeline, there is no need for external hot water facilities, thereby reducing engineering costs and saving energy. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application.

[0018] Description of reference numerals:

[0019] 10. Cooling water tank; 20. Core cooling pipeline; 21. Planar serpentine condensing pipeline; 22. Planar serpentine condensing pipeline; 30. Annular cooling pipeline; 41. Main water inlet pipeline; 42. First water inlet pipeline; 43. Second water inlet pipeline; 44. First water outlet pipeline; 45. Return pipeline; 46. Second water outlet pipeline; 51. First valve; 52. Second valve; 53. Third valve; 54. Fourth valve; 55. Fifth valve; 56. Sixth valve. DETAILED DESCRIPTION

[0020] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below with reference to the accompanying drawings. The present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0021] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0022] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0023] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0024] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0025] refer to Figure 1The present application provides a pouring concrete cooling and energy-saving device, comprising a cooling water tank 10, a core cooling pipeline 20 and an annular cooling pipeline 30, wherein the core cooling pipeline 20 and the annular cooling pipeline 30 are pre-buried in the concrete, and the annular cooling pipeline 30 surrounds the core cooling pipeline 20, the cooling water tank 10 is used to provide cooling water, the core cooling pipeline 20 is used to cool the middle part of the concrete, and the annular cooling pipeline 30 is used to cool or keep warm the surrounding part close to the concrete surface.

[0026] The cooling water tank 10 is connected to a main water inlet pipeline 41 through a water pump, and the terminal branch of the main water inlet pipeline 41 is connected to a first water inlet pipeline 42 and a second water inlet pipeline 43, the first water inlet pipeline 42 is connected to the water inlet end of the core cooling pipeline 20, the second water inlet pipeline 43 is connected to the water inlet end of the annular cooling pipeline 30, the water outlet end branch of the core cooling pipeline 20 is connected to a first water outlet pipeline 44 and a return pipeline 45, the return pipeline 45 is connected to the water inlet end of the annular cooling pipeline 30, and the water outlet end of the annular cooling pipeline 30 is connected to the second water outlet pipeline 46. The first water inlet pipe 42 is used to guide the cooling water to the core cooling pipe 20, the second water inlet pipe 43 is used to guide the cooling water to the annular cooling pipe 30, the first water outlet pipe 44 is used to guide and discharge the hot water that absorbs heat through the core cooling pipe 20, the return pipe 45 is used to guide the hot water that absorbs heat through the core cooling pipe 20 to the annular cooling pipe 30, and the second water outlet pipe 46 is used to guide and discharge the hot water in the annular cooling pipe 30.

[0027] A first valve 51 is provided on the second water inlet pipeline 43 , a second valve 52 is provided on the first water outlet pipeline 44 , a third valve 53 is provided on the return pipeline 45 , and a sixth valve 56 is provided on the main water inlet pipeline 41 .

[0028] The pouring concrete cooling and energy-saving device of the present application can deliver cooling water to the core cooling pipeline 20 by opening the water pump and the sixth valve 56. When a large amount of heat needs to be taken away during the heating of the concrete, the first valve 51 and the second valve 52 can be opened and the third valve 53 can be closed to allow the core cooling pipeline 20 and the annular cooling pipeline 30 to use cooling water to cool the concrete at the same time. When external insulation is required during the cooling of the concrete, the first valve 51 and the second valve 52 can be closed and the third valve 53 can be opened to allow the hot water at the terminal of the core cooling pipeline 20 to flow to the annular cooling pipeline 30, thereby adjusting the temperature difference between the inside and outside of the concrete so that the temperature difference between the inside and outside of the concrete meets the specification requirements. At this time, since the hot water of the annular cooling pipeline 30 comes from the core cooling pipeline 20, there is no need for external hot water facilities, thereby reducing engineering costs and saving energy.

[0029] refer to Figure 1 In this embodiment, the second water inlet pipeline 43 and the return pipeline 45 are connected in parallel and then branched to connect the two ports of the annular cooling pipeline 30. The two ports of the annular cooling pipeline 30 are respectively connected to the second water outlet pipeline 46. A fourth valve 54 is provided at one port of the annular cooling pipeline 30, and a fifth valve 55 is provided at the other port. During construction, one of the fourth valve 54 and the fifth valve 55 is opened while the other is closed. By alternately opening the fourth valve 54 and the fifth valve 55, the two ports of the annular cooling pipeline 30 alternately become the water inlet of the annular cooling pipeline 30, that is, after each exchange of the opening and closing states, the original water inlet becomes the water outlet, and the original water outlet becomes the water inlet. In this way, by exchanging the opening and closing states of the fourth valve 54 and the fifth valve 55 at regular intervals, hot water flows through the annular cooling pipeline 30 in the reverse direction, which can effectively prevent local overcooling of concrete and improve the external thermal insulation effect during the concrete cooling period.

[0030] Furthermore, the fourth valve 54 and the fifth valve 55 are digitally controlled switch valves, and the fourth valve 54 and the fifth valve 55 are communicatively connected with a control module, and the control module is used to control the fourth valve 54 and the fifth valve 55 to exchange switch states once every preset time.

[0031] The fourth valve 54 and the fifth valve 55 are respectively selected from one of an electric butterfly valve, an electric ball valve and an electric gate valve.

[0032] refer to Figure 1 In this embodiment, the core cooling pipeline 20 includes two planar serpentine condensation pipelines (21, 22) arranged side by side and symmetrically, the water inlet ends of the two planar serpentine condensation pipelines (21, 22) are connected in parallel to form the water inlet end of the core cooling pipeline 20, and the water outlet ends of the two planar serpentine condensation pipelines are connected in parallel to form the water outlet end of the core cooling pipeline 20.

[0033] Furthermore, the port of the planar serpentine condensation pipeline (21, 22) close to the middle of the concrete is the water inlet port, and the port of the planar serpentine condensation pipeline (21, 22) close to the concrete surface is the water outlet port. The temperature in the middle of the concrete is higher, and such an arrangement enables the cooling water to first pass through the middle of the concrete to take away the heat, thereby optimizing the cooling effect.

[0034] In this embodiment, the annular cooling pipeline 30 is a rectangular loop, and the corners of the rectangular loop are set as circular arc guide angles. When the poured concrete is rectangular concrete, the rectangular loop is set along the periphery of the rectangular concrete to enhance the cooling and heat preservation effect, and the corners are set as circular arc guide angles to avoid water flow obstruction.

[0035] In this embodiment, the first valve 51, the second valve 52 and the third valve 53 are respectively selected from one of a butterfly valve, a ball valve and a gate valve.

[0036] In the pouring concrete cooling and energy-saving device of the present application, after the cooling water passes through the core cooling pipeline 20, the concrete is cooled, and the cooling water is heated and converted into hot water, which directly enters the annular cooling pipeline 30 to perform external insulation on the concrete. In this way, there is no need to add hot water facilities, thereby reducing engineering costs and saving energy. The water inlet and outlet of the annular cooling pipeline 30 can be interchanged, which can effectively prevent local overcooling of the concrete and improve the external insulation effect during the concrete cooling period.

[0037] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0038] The above-described embodiments only express several implementation methods of the present application and should not be construed as limiting the scope of the patent application. It should be noted that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present application, and these all fall within the scope of protection of the present application. Therefore, the scope of protection of the present patent application shall be subject to the attached claims.

Claims

1. A concrete pouring cooling and energy-saving device, characterized in that: It includes a cooling water tank, a core cooling pipeline and an annular cooling pipeline, the core cooling pipeline and the annular cooling pipeline are pre-buried in concrete, and the annular cooling pipeline surrounds the core cooling pipeline, the cooling water tank branch is connected with a first water inlet pipeline and a second water inlet pipeline, the first water inlet pipeline is connected to the water inlet end of the core cooling pipeline, the second water inlet pipeline is connected to the water inlet end of the annular cooling pipeline, the water outlet end branch of the core cooling pipeline is connected with a first water outlet pipeline and a return pipeline, the return pipeline is connected to the water inlet end of the annular cooling pipeline, the water outlet end of the annular cooling pipeline is connected to the second water outlet pipeline, a first valve is arranged on the second water inlet pipeline, a second valve is arranged on the first water outlet pipeline, and a third valve is arranged on the return pipeline.

2. The pouring concrete cooling and energy-saving device according to claim 1 is characterized in that: The second water inlet pipeline terminal and the return pipeline terminal are connected in parallel and then branched to connect the two ports of the annular cooling pipeline. The two ports of the annular cooling pipeline are respectively connected to the second water outlet pipeline. One port of the annular cooling pipeline is provided with a fourth valve, and the other port is provided with a fifth valve. By alternately opening the fourth valve and the fifth valve, the two ports of the annular cooling pipeline alternately become the water inlets of the annular cooling pipeline.

3. The pouring concrete cooling and energy-saving device according to claim 2 is characterized in that: The fourth valve and the fifth valve are digitally controlled switch valves, and the fourth valve and the fifth valve are communicatively connected with a control module, and the control module is used to control the fourth valve and the fifth valve to exchange switch states once every preset time.

4. The pouring concrete cooling and energy-saving device according to claim 3 is characterized in that: The fourth valve and the fifth valve are respectively selected from one of an electric butterfly valve, an electric ball valve and an electric gate valve.

5. The pouring concrete cooling and energy-saving device according to claim 1 is characterized in that: The core cooling pipeline includes two planar serpentine condensation pipelines arranged side by side and symmetrically, the water inlet ends of the two planar serpentine condensation pipelines are connected in parallel to form the water inlet end of the core cooling pipeline, and the water outlet ends of the two planar serpentine condensation pipelines are connected in parallel to form the water outlet end of the core cooling pipeline.

6. The pouring concrete cooling and energy-saving device according to claim 5 is characterized in that: The end of the planar serpentine condensation pipeline close to the middle of the concrete is the water inlet end, and the end of the planar serpentine condensation pipeline close to the concrete surface is the water outlet end.

7. The pouring concrete cooling and energy-saving device according to claim 1 is characterized in that: The annular cooling pipeline is a rectangular loop, and the corners of the rectangular loop are set as circular arc guide angles.

8. The pouring concrete cooling and energy-saving device according to claim 1 is characterized in that: The first valve, the second valve and the third valve are respectively selected from one of a butterfly valve, a ball valve and a gate valve.

9. The pouring concrete cooling and energy-saving device according to claim 1, characterized in that: The cooling water tank is connected to a main water inlet pipeline, a terminal branch of the main water inlet pipeline is connected to the first water inlet pipeline and the second water inlet pipeline, and a sixth valve is arranged on the main water inlet pipeline.