Operation channel for steel truss bridge construction
By designing the working channel for steel truss bridge construction, using rack and pinion and motor-driven transportation parts to build guardrails and shielding parts, the problems of warping of steel plates and difficulty in transporting materials in the existing working channel have been solved, and construction efficiency and safety have been improved. .
Patent Information
- Application Number
- CN202323519383.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2033-12-22
AI Technical Summary
Most of the working channels in the construction of existing steel truss bridges are built in the open air. The edges of the steel plates are easy to warp, making it inconvenient for construction workers to pass, difficult to transport materials, and high human labor intensity.
A working channel for steel truss bridge construction is designed, including beams, bridge decks, guardrails, shielding parts, transmission parts, transportation parts and steel pipe piles. It is connected through a gear and rack structure. The motor and pulley drive the material frame to build the guardrail. and shielding to protect construction workers and equipment.
It has achieved smoother material transportation and improved labor efficiency, reduced labor intensity and construction risks, and protected the safety and health of construction workers.
Smart Images

Figure CN221822744U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction and provides an operating channel for steel truss bridge construction. Background Art
[0002] A steel truss bridge is a bridge structure that uses a truss composed of steel box girders and I-beams welded or riveted together as the main load-bearing structure. Common steel truss bridges are generally composed of a brake connection system, a bridge deck, bearings, piers and abutments. Compared with conventional concrete beam bridges, steel truss bridge components have smaller cross-sections, lighter weight, better spanning capacity, and are easier to repair and replace.
[0003] The existing bridge piers are built using underwater bored pile construction. Bored pile construction requires the construction of a drilling platform to facilitate underwater construction operations by construction workers. An operating channel is sometimes built between the drilling platform and the shore abutment to facilitate the passage of construction workers and the transportation of materials. The existing operating channels are mostly built in the open air, and a number of simple steel plates are laid on the upper part of the channel as bridge panels for passage. Construction workers use material transport carts to transport materials back and forth. Long-term squeezing and rolling can easily cause the edges of the steel plates to warp and deform, causing inconvenience to the construction workers. The transportation of materials is more troublesome and the labor intensity is high. Utility Model Content
[0004] The utility model aims to provide a working channel for steel truss bridge construction to solve the problems raised in the above-mentioned background technology.
[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0006] A working channel for steel truss bridge construction is arranged between a bridge abutment and a drilling platform, and comprises a crossbeam, a bridge deck, a guardrail, a shielding part, a transmission part, a transport part, a steel pipe pile and a connecting part. Two steel pipe piles are vertically arranged, and the upper part of each steel pipe pile is connected to two crossbeams through a connecting part. The two crossbeams on each steel pipe pile form a group, and the two groups of crossbeams on the two steel pipe piles are parallel to each other. A number of bridge decks are laid between the two groups of crossbeams, and guardrails are installed on the crossbeams. A shielding part is installed between the guardrails on both sides, and a transmission part is installed on the guardrail on one side. The transport part and the transmission part are connected by a gear rack structure. The crossbeam is an H-shaped steel.
[0007] Furthermore, the transmission part includes a rack, a connecting plate and a supporting slide rail, a connecting plate is fixed on the upper side of the rack, the connecting plate is fastened to the cross brace by bolts, two supporting slide rails are respectively fixed on the connecting frame on one side of the bridge deck, and the transportation part includes a material frame, a support plate and a fixed plate are horizontally arranged on one side of the material frame, and the ends of the support plate and the fixed plate away from the material frame are respectively inserted into the two supporting slide rails.
[0008] Furthermore, the transport part also includes a motor, a gear and a pulley. The motor and the gear are arranged between the support plate and the fixed plate. Pullies are fixed on the side of the support plate and the fixed plate away from the material frame. The pulleys roll in the supporting slide rail. The gear is fixedly connected to the output shaft of the motor. The gear is meshed with the side of the rack away from the cross brace. The motor is fixed on the fixed plate, and the output shaft of the motor is arranged on the support plate.
[0009] Furthermore, the guardrail includes a connecting frame and a cross brace, the connecting frame and the cross brace are detachably connected, the connecting frame includes a support rod and a connecting block, and the lower end of the support rod is fixedly connected to the connecting block.
[0010] Furthermore, the connecting block is detachably connected to the wing plate at the upper end of the crossbeam, a plurality of fixing grooves are arranged at intervals on the support rod, a cross brace is arranged between two adjacent connecting frames, and the ends of the cross brace are inserted into the fixing grooves and fastened by bolts.
[0011] Furthermore, the shielding part includes a vertical rod, a horizontal rod and a connecting rod. Two horizontal rods are arranged in parallel. The two horizontal rods are connected by a plurality of connecting rods. The plurality of connecting rods are evenly arranged. Both ends of the horizontal rods are vertically connected to the vertical rods.
[0012] Furthermore, one end of the vertical rod away from the cross rod is plugged into the cross brace and fastened by bolts, and a canopy is arranged on the cross rod, and the canopy is arc-shaped.
[0013] Furthermore, the connecting part includes a connecting platform and a fixing block, positioning grooves are symmetrically provided at both ends of the connecting platform, the wing plates at the lower end of the beam are plugged into the positioning grooves and fastened with bolts, and the webs of the two beams on each steel pipe pile are fixedly connected by a fixing block.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] 1. The utility model provides an operation channel for steel truss bridge construction, which can easily transport materials, reduce labor intensity, improve labor efficiency, and speed up the construction process through the coordinated use of a transmission part and a transportation part.
[0016] 2. The utility model provides a working channel for steel truss bridge construction, which uses guardrails to build a transmission part and a transportation part on the side to prevent the material transport vehicle from squeezing on the bridge deck and causing the bridge deck to warp and deform, so that materials can be transported more smoothly.
[0017] 3. The utility model provides a working channel for steel truss bridge construction, which can protect the safety and health of construction workers and reduce labor risks by building guardrails and shielding parts. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1This is a schematic structural diagram of a working channel for steel truss bridge construction according to Embodiment 1 of the utility model;
[0019] Figure 2 This is a structural schematic diagram of a transmission part and a transportation part of a working channel for steel truss bridge construction of the utility model;
[0020] Figure 3 It is a side view of a transmission part and a transportation part of a working channel for steel truss bridge construction of the utility model;
[0021] Figure 4 This is a schematic diagram of the structure of a working channel guardrail for steel truss bridge construction according to the utility model;
[0022] Figure 5 This is a structural schematic diagram of a shielding portion of an operation channel for steel truss bridge construction according to the utility model;
[0023] Figure 6 For this utility model Figure 5 The enlarged view at N;
[0024] Figure 7 For this utility model Figure 1 The enlarged view of M;
[0025] Figure 8 The utility model is a structural schematic diagram of a working channel connecting platform for steel truss bridge construction.
[0026] In the figure: 1. crossbeam; 2. bridge deck; 3. guardrail; 4. shielding part; 5. transmission part; 6. transportation part; 7. steel pipe pile; 8. connection part; 9. abutment; 10. drilling platform; 31. connecting frame; 32. cross brace; 41. vertical rod; 42. cross rod; 43. connecting rod; 44. awning; 51. rack; 52. connecting plate; 53. supporting slide rail; 61. supporting plate; 62. fixing plate; 63. material frame; 64. motor; 65. gear; 66. pulley; 81. connecting platform; 82. fixing block; 83. positioning groove; 311. support rod; 312. connecting block; 313. fixing groove. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0028] In the following description of the utility model, it should be noted that the terms "upper", "lower", "left", "right", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, which are only for the convenience of describing the utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation or be constructed and operated in a specific orientation. The term "connection" only indicates the connection between devices and has no special meaning.
[0029] In addition, the technical fields and installation methods involved in the embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0030] Specific implementation: Please refer to Figure 1-Figure 8 A working channel for steel truss bridge construction is arranged between a bridge abutment 9 and a drilling platform 10, and includes a crossbeam 1, a bridge deck 2, a guardrail 3, a shielding part 4, a transmission part 5, a transportation part 6, a steel pipe pile 7 and a connecting part 8. Two steel pipe piles 7 are vertically arranged, and the upper part of each steel pipe pile 7 is connected to two crossbeams 1 by a connecting part 8. The two crossbeams 1 on each steel pipe pile 7 form a group, and the two groups of crossbeams 1 on the two steel pipe piles 7 are parallel to each other. A number of bridge decks 2 are laid between the two groups of crossbeams 1, and guardrails 3 are installed on the crossbeams 1. A shielding part 4 is installed between the guardrails 3 on both sides, and a transmission part 5 is installed on the guardrail 3 on one side. The transportation part 6 is connected to the transmission part 5 through a gear rack structure. The crossbeam 1 is an H-shaped steel.
[0031] The guardrail 3 includes a connecting frame 31 and a cross brace 32, and the connecting frame 31 and the cross brace 32 are detachably connected. The connecting frame 31 includes a support rod 311 and a connecting block 312. The lower end of the support rod 311 is fixedly connected to the connecting block 312, and the connecting block 312 is detachably connected to the wing plate at the upper end of the crossbeam 1. A plurality of fixing grooves 313 are arranged at intervals on the support rod 311, and a cross brace 32 is arranged between two adjacent connecting frames 31. The ends of the cross brace 32 are inserted into the fixing grooves 313 and are fastened by bolts.
[0032] The shielding part 4 includes a vertical rod 41, a horizontal rod 42, a connecting rod 43 and a canopy 44. Two horizontal rods 42 are arranged in parallel. The two horizontal rods 42 are connected by a plurality of connecting rods 43. The plurality of connecting rods 43 are evenly arranged. Both ends of the connecting rod 43 are vertically connected to the two horizontal rods 42 respectively. Both ends of the horizontal rod 42 are vertically connected to the vertical rod 41. One end of the vertical rod 41 away from the horizontal rod 42 is plugged into the cross brace 32 and fastened by bolts. A canopy 44 is arranged on the horizontal rod 42. The canopy 44 is arc-shaped. The canopy 44 can block sunlight and rain and snow to avoid open air and protect the staff.
[0033] The transmission part 5 includes a rack 51, a connecting plate 52 and a supporting slide rail 53. A connecting plate 52 is fixed on the upper side of the rack 51, and the connecting plate 52 is fastened to the cross brace 32 by bolts. Two supporting slide rails 53 are fixed on the connecting frame 31 on one side of the bridge deck 2, and the two supporting slide rails 53 are respectively located above and below the rack 51. The transportation part 6 includes a material frame 63. A support plate 61 and a fixing plate 62 are horizontally arranged on one side of the material frame 63. The support plate 61 and the fixing plate 62 are T-shaped. The ends of the support plate 61 and the fixing plate 62 away from the material frame 63 are respectively inserted into the two supporting slide rails 53. The supporting slide rail 53 is provided with a T-shaped groove for cooperating with the support plate 61 or the fixing plate 62. To prevent the material frame 63 from falling off, the support plate 61 is plugged into the support rail 53 above the rack 51, and the fixed plate 62 is plugged into the support rail 53 below the rack 51; the transport part 6 also includes a motor 64, a gear 65 and a pulley 66, the motor 64 and the gear 65 are arranged between the support plate 61 and the fixed plate 62, and the side of the support plate 61 and the fixed plate 62 away from the material frame 63 are fixed with a pulley 66, the pulley 66 can roll in the T-slot of the support rail 53, the gear 65 is fixedly connected to the output shaft of the motor 64, the gear 65 is meshedly connected to the side of the rack 51 away from the cross brace 32, the motor 64 is fixed on the fixed plate 62, and the output shaft of the motor 64 is arranged on the support plate 61.
[0034] The connecting portion 8 includes a connecting platform 81 and a fixing block 82. Positioning grooves 83 are symmetrically provided at both ends of the connecting platform 81. The wing plate at the lower end of the beam 1 is plugged into the positioning groove 83 and fastened with bolts. The webs of the two beams 1 on each steel pipe pile 7 are fixedly connected by the fixing block 82.
[0035] The installation process of the device is as follows: when in use, first set up two steel pipe piles 7 in the water, fix the connecting platform 81 on the upper end of each steel pipe pile 7, place the two beams 1 in the positioning groove 83, and use bolts to fix the beams 1 and the connecting platform 81. After fixing, use the fixing block 82 to fix the two beams 1 again. After the four beams 1 are fixed, lay a number of bridge panels 2 on the beams 1, and evenly fix a number of connecting frames 31 on the wing plates of the beams 1. The connecting frames 31 are evenly arranged on both sides of the bridge panels 2. A number of cross braces 32 are used to connect every two connecting frames 31. The cross braces 32 The end is fastened to the fixing groove 313 with bolts; the vertical rod 41, the horizontal rod 42, and the connecting rod 43 are connected, the lower end of the vertical rod 41 is fixed on the cross brace 32, and the awning 44 is fixed on the cross rod 42; the connecting plate 52 is fixed on the rack 51, and the connecting plate 52 connected to the rack 51 is fixed on the cross brace 32 located on one side of the bridge deck 2, and the two supporting rails 53 are fixed on the cross brace 32 on the same side, and the supporting plate 61 and the fixing plate 62 are respectively inserted on the two supporting rails 53, and the rack 51 and the gear 65 are meshed to complete the connection between the transmission part 5 and the transportation part 6.
[0036] Through the coordinated use of the transmission part 5 and the transportation part 6, this device can easily transport materials, reduce labor intensity, improve labor efficiency, and speed up the construction process; through the detachable bridge panel 2, guardrail 3, steel pipe pile 7 and connection part 8, the device can be repeatedly recycled, easy to build and disassemble, and convenient for construction workers to pass, saving economic expenditure; by building guardrail 3 and shielding part 4, the safety and health of construction workers can be protected and labor hazards can be reduced.
[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A working channel for steel truss bridge construction, arranged between a bridge abutment (9) and a drilling platform (10), characterized in that: The invention comprises a cross beam (1), a bridge deck (2), a guardrail (3), a shielding part (4), a transmission part (5), a transport part (6), a steel pipe pile (7) and a connecting part (8), wherein two steel pipe piles (7) are vertically arranged, and the upper part of each steel pipe pile (7) is connected to two cross beams (1) through a connecting part (8), and the two cross beams (1) on each steel pipe pile (7) form a group, and the two groups of cross beams (1) on the two steel pipe piles (7) are parallel to each other, and a plurality of bridge decks (2) are laid between the two groups of cross beams (1), and a guardrail (3) is installed on the cross beam (1), and a shielding part (4) is installed between the guardrails (3) on both sides, wherein a transmission part (5) is installed on the guardrail (3) on one side, and the transport part (6) is connected to the transmission part (5) through a gear rack structure, and the cross beam (1) is an H-shaped steel.
2. The working channel for steel truss bridge construction according to claim 1 is characterized by: The transmission part (5) comprises a rack (51), a connecting plate (52) and a supporting slide rail (53); a connecting plate (52) is fixed on the upper side of the rack (51); the connecting plate (52) is fastened to the cross brace (32) by bolts; two supporting slide rails (53) are respectively fixed to the connecting frame (31) on one side of the bridge deck (2); the transport part (6) comprises a material frame (63); a supporting plate (61) and a fixing plate (62) are horizontally arranged on one side of the material frame (63); the ends of the supporting plate (61) and the fixing plate (62) away from the material frame (63) are respectively inserted into the two supporting slide rails (53).
3. The working channel for steel truss bridge construction according to claim 2 is characterized by: The transport part (6) further comprises a motor (64), a gear (65) and a pulley (66). The motor (64) and the gear (65) are arranged between the support plate (61) and the fixed plate (62). A pulley (66) is fixed to one side of the support plate (61) and the fixed plate (62) away from the material frame (63). The pulley (66) rolls in the support rail (53). The gear (65) is fixedly connected to the output shaft of the motor (64). The gear (65) is meshingly connected to one side of the rack (51) away from the cross brace (32). The motor (64) is fixed to the fixed plate (62), and the output shaft of the motor (64) is arranged on the support plate (61).
4. The working channel for steel truss bridge construction according to claim 1 is characterized by: The guardrail (3) comprises a connecting frame (31) and a cross brace (32), wherein the connecting frame (31) and the cross brace (32) are detachably connected, the connecting frame (31) comprises a support rod (311) and a connecting block (312), and the lower end of the support rod (311) and the connecting block (312) are fixedly connected.
5. The working channel for steel truss bridge construction according to claim 4 is characterized by: The connecting block (312) is detachably connected to the wing plate at the upper end of the crossbeam (1); a plurality of fixing grooves (313) are arranged at intervals on the support rod (311); a cross brace (32) is arranged between two adjacent connecting frames (31); the ends of the cross brace (32) are inserted into the fixing groove (313) and are fastened by bolts.
6. The working channel for steel truss bridge construction according to claim 1 is characterized by: The shielding portion (4) comprises a vertical rod (41), a horizontal rod (42) and a connecting rod (43); two horizontal rods (42) are arranged in parallel; the two horizontal rods (42) are connected by a plurality of connecting rods (43); the plurality of connecting rods (43) are evenly arranged; and both ends of the horizontal rod (42) are vertically connected to the vertical rod (41).
7. The working channel for steel truss bridge construction according to claim 6 is characterized by: One end of the vertical rod (41) away from the cross rod (42) is plugged into the cross brace (32) and fastened by bolts. A canopy (44) is arranged on the cross rod (42), and the canopy (44) is arc-shaped.
8. The working channel for steel truss bridge construction according to claim 1 is characterized by: The connecting portion (8) comprises a connecting platform (81) and a fixing block (82), positioning grooves (83) are symmetrically provided at both ends of the connecting platform (81), the wing plates at the lower end of the cross beam (1) are plugged into the positioning grooves (83) and are fastened and connected by bolts, and the webs of the two cross beams (1) on each steel pipe pile (7) are fixedly connected by the fixing block (82).