220kV power cable laying system suitable for mountain section

By setting up a concrete cushion and cover plate at the bottom of the cable trench in the mountain section, filling it with soft soil or fine sand, and using full-length grounding bodies and non-magnetic hoops to fix the cables, the problem of difficult cable laying construction in the mountain section was solved and achieved High safety and low cost construction of cables.

CN221885995UActive Publication Date: 2024-10-22POWERCHINA HUADONG ENG CORP LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420027828.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-10-22
Estimated Expiration
2034-01-05

AI Technical Summary

Technical Problem

When laying cables in mountain sections, due to the large slope of the mountain and the long construction distance, it is difficult to achieve convenient and efficient cable laying with existing technology, and it is difficult to ensure a good operating environment for the cables.

Method used

Set up a concrete cushion and cover at the bottom of the cable trench to form a reserved space filled with soft soil or fine sand, and fix the cable through a full-length grounding body, combined with non-magnetic hoops and anti-loosening structures to ensure that the cable is buried deep in the mountain. .

Benefits of technology

It improves the operating environment and safety of the cable, shortens the construction period, reduces the construction cost, avoids the construction difficulty of cable trench pouring, and enhances the scientific nature and safety of the construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221885995U_ABST
    Figure CN221885995U_ABST
Patent Text Reader

Abstract

The utility model provides a 220kV power cable laying system suitable for a mountain section, a cable trench is dug in the original ground of a mountain along the cable laying direction, the bottom of the cable trench is provided with a concrete cushion layer, the surface of the concrete cushion layer is connected with a cover plate, and a reserved space for installing cables is formed between the cover plate and the concrete cushion layer. The cable is connected to the surface of the concrete cushion layer, the reserved space is filled with soft soil or fine sand, meanwhile, a full-length grounding body installed on the surface of the concrete cushion layer is further arranged in the reserved space, and the full-length grounding body is laid in the cable laying direction; landfill soil for backfilling and covering the concrete cushion layer and the cover plate is arranged in the cable trench, so that the cable is deeply buried in the mountain. According to the utility model, the cable burying depth is increased and the concrete cushion layer is arranged on the cable, so that the cable has an excellent operation environment and extremely high safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cable laying, in particular to a 220kV power cable laying system suitable for mountain sections. Background Art

[0002] Cable laying refers to the process of laying and installing cables along the surveyed route to form a cable line. Reasonable selection of cable laying methods is very important to ensure the transmission quality, reliability and construction and maintenance of the line. In order to ensure its safety and reliability, direct burial laying, pipeline laying, overhead laying and wall laying are generally adopted.

[0003] With the development of my country's offshore wind power industry, the offshore booster station is laid to the landing point through the submarine cable, and after being converted to the land cable through the submarine-land cable conversion well, it is often encountered that the land cable needs to be laid along the mountain to the onshore metering station. For the mountain section, the mountain slope is 20-30°, the plane length exceeds 500m, and the construction is difficult. Not only are the laying requirements for cables becoming higher and higher, but also the laying design of the actual conditions of the laying site is required to ensure that the cable laying construction can meet the requirements of various standards. In the above case, the existing laying method cannot be convenient and effective to construct and ensure that the cable has a good operating environment. Utility Model Content

[0004] The utility model aims to provide a power cable laying system which can reduce the construction difficulty of cable laying in mountain sections.

[0005] To this end, the utility model adopts the following technical solutions:

[0006] A 220kV power cable laying system suitable for mountain sections, wherein a cable trench is dug in the original ground of the mountain along the cable laying direction, a concrete cushion is arranged at the bottom of the cable trench, a cover plate is connected to the surface of the concrete cushion, a reserved space for installing cables is formed between the cover plate and the concrete cushion, the cable is connected to the surface of the concrete cushion, the reserved space is filled with soft soil or fine sand, and a through-length grounding body installed on the surface of the concrete cushion is also arranged in the reserved space, the through-length grounding body is laid along the cable laying direction; landfill soil covering the concrete cushion and the cover plate is backfilled in the cable trench, so that the cable is buried deep in the mountain.

[0007] Furthermore: the 220kV power cable also includes a return cable and an optical cable, and the return cable and the optical cable are installed in the reserved space.

[0008] Furthermore: the concrete cushion layer includes a crushed stone cushion layer and a direct buried section fixing layer, the crushed stone cushion layer is arranged at the bottom of the direct buried section fixing layer, and the cover plate is connected to the top of the direct buried section fixing layer.

[0009] Furthermore: the distance between the bottom elevation of the concrete cushion layer and the original ground elevation is not less than 2.25m.

[0010] Furthermore: the cable is fixed on the fixed layer of the direct buried section by a non-magnetic clamp.

[0011] Furthermore: the thickness of the reserved space is not less than 100 mm, so that the soft soil or fine sand can fill the reserved space and fill the surrounding and top of the cable.

[0012] Furthermore: the through-length grounding body is made of galvanized flat steel or copper.

[0013] Furthermore: the cover plate is connected to the fixing layer of the direct buried section via an anti-loosening structure.

[0014] Compared with the prior art, the utility model has the following beneficial effects:

[0015] The utility model increases the cable burial depth and sets a concrete cushion layer for the cable, so that the cable has an excellent operating environment and is extremely safe. It also has the advantages of short construction period, simple construction process and low construction cost. Compared with pouring cable trenches, the power cable laying system avoids the defect of difficult construction of cable trenches due to steep mountain slopes and long distances; compared with ordinary direct burial, the construction method is more scientific and greatly improves safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a cross-sectional view of the direct buried installation of a 220kV power cable of the utility model.

[0017] The markings in the attached figure are: 1-cable; 2-optical cable; 3-flat steel or copper material; 4-cover plate; 5-gravel cushion layer; 6-direct buried section fixing layer; 7-soft soil or fine sand; 8-landfill soil; 9-anti-loosening structure; 10-return cable. DETAILED DESCRIPTION

[0018] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0019] like Figure 1As shown, a 220kV power cable laying system suitable for mountain sections is provided. A cable trench is dug in the original ground of the mountain along the laying direction of the cable 1. A concrete cushion is arranged at the bottom of the cable trench, and the concrete cushion can be used as a fixing foundation for the cable 1. A cover plate 4 is connected to the surface of the concrete cushion, and the cover plate 4 is used as a protective device for the cable 1 in the mountain, and a reserved space for installing the cable 1 is formed between the cover plate 4 and the concrete cushion, and the cable 1 is connected to the surface of the concrete cushion by a non-magnetic clamp. The reserved space is filled with soft soil or fine sand 7. At the same time, a through-length grounding body installed on the surface of the concrete cushion is also provided in the reserved space, and the through-length grounding body is laid along the laying direction of the cable 1; landfill soil 8 covering the concrete cushion and the cover plate 4 is provided in the cable trench, so that the cable 1 is deeply buried in the mountain.

[0020] In this embodiment, the cable 1 in the 220kV power cable can be a plurality of single-core or multi-core cables 1. In this embodiment, three single-core cables 1 are used, and the cables 1 are laid in parallel. The center spacing between the cables 1 can be set to 250mm, and the spacing between the non-magnetic clamps can be set to 4m. At the same time, the 220kV power cable also includes a return cable 10 and an optical cable 2. The return cable 10 and the optical cable 2 are installed in the reserved space and fixed on the fixed layer 6 of the direct buried section.

[0021] Specifically, the concrete cushion layer includes a crushed stone cushion layer 5 and a direct buried section fixing layer 6, which are cast along the slope of the mountain; the crushed stone cushion layer 5 is arranged at the bottom of the direct buried section fixing layer 6, and the cover plate 4 is connected to the top of the direct buried section fixing layer 6, and the width of the crushed stone cushion layer 5 is preferably greater than the width of the direct buried section fixing layer 6.

[0022] In this embodiment, the bottom of the cable trench is a 2m wide 150mm thick gravel cushion layer 5, and above it is a 1.7m wide 250mm thick direct buried section fixing layer 6.

[0023] Specifically, the distance between the bottom elevation of the concrete cushion layer and the original ground elevation is not less than 2.25 m, so that the cable 1 between the concrete cushion layer and the cover plate 4 is less affected by the soil erosion of the surface soil.

[0024] The cable 1 is fixed on the direct buried section fixing layer 6 by a non-magnetic clamp.

[0025] Specifically, the thickness of the reserved space is not less than 100 mm, so that the soft soil or fine sand 7 fills the reserved space and fills around and above the cable 1. The backfill soil of the soft soil or fine sand 7 must be non-corrosive to the outer sheath of the cable 1, and the backfill soil and sand around the cable 1 are evenly compacted to prevent the cable 1 from radial expansion.

[0026] Specifically, the through-length grounding body can be made of galvanized flat steel or copper material and fixed on the concrete cushion layer by self-tapping screws, so that all metal objects laid along the cable 1 are connected to the through-length grounding body.

[0027] Specifically, the cover plate 4 is connected to the direct buried section fixing layer 6 via an anti-loosening structure 9, and the anti-loosening structure 9 may be formed by using M20 anchor bolts in combination with anti-loosening double nuts.

[0028] In this embodiment, the cover plate 4 adopts a prefabricated reinforced concrete structure, and the shape of the cover plate 4 is as follows: Figure 1 As shown in , the cover plate 4 covers the upper aperture and the side aperture of the cable 1, and is securely fixed by anchor bolts pre-buried in the fixing layer 6 of the direct buried section, and is locked with anti-loosening double nuts.

[0029] See also Figure 1 When the 220kV power cable laying system is laid in the mountain section, the specific contents are as follows:

[0030] The cable trough is excavated in advance, and the crushed stone cushion layer 5 and the direct buried section fixing layer 6 are laid in sequence from the inside to the outside. Three single-core cables 1 are laid in parallel through non-magnetic clamps and fixed on the 250mm thick direct buried section fixing layer 6. The optical cable 2 is also fixed on the direct buried section fixing layer 6 through the protective tube, and then the cover plate 4 is fixed on the direct buried section fixing layer 6 through the anti-loosening structure 9, and soft soil or fine sand 7 is filled in the meantime. After the cable 1 and the cover plate 4 are installed, the landfill soil 8 obtained by excavating the cable trough is used for backfilling.

[0031] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.

Claims

1. A 220kV power cable laying system suitable for mountain sections, characterized by: A cable trench is excavated in the original ground of the mountain along the laying direction of the cable (1); a concrete cushion layer is arranged at the bottom of the cable trench; a cover plate (4) is connected to the surface of the concrete cushion layer; a reserved space for installing the cable (1) is formed between the cover plate (4) and the concrete cushion layer; the cable (1) is connected to the surface of the concrete cushion layer; the reserved space is filled with soft soil or fine sand (7); and a through-length grounding body installed on the surface of the concrete cushion layer is also arranged in the reserved space; the through-length grounding body is laid along the laying direction of the cable (1); The cable trench is provided with backfill soil (8) covering the concrete cushion layer and the cover plate (4) so ​​that the cable (1) is deeply buried in the mountain.

2. A 220kV power cable laying system suitable for mountain sections according to claim 1, characterized in that: The 220 kV power cable further comprises a return cable (10) and an optical cable (2), and the return cable (10) and the optical cable (2) are installed in the reserved space.

3. A 220kV power cable laying system suitable for mountain sections according to claim 1, characterized in that: The concrete cushion layer comprises a crushed stone cushion layer (5) and a directly buried section fixing layer (6); the crushed stone cushion layer (5) is arranged at the bottom of the directly buried section fixing layer (6); and the cover plate (4) is connected to the top of the directly buried section fixing layer (6).

4. A 220kV power cable laying system suitable for mountain sections according to claim 1 or 3, characterized in that: The distance between the bottom elevation of the concrete cushion layer and the original ground elevation shall not be less than 2.25m.

5. A 220kV power cable laying system suitable for mountain sections according to claim 3, characterized in that: The cable (1) is fixed on the direct buried section fixing layer (6) via a non-magnetic clamp.

6. A 220kV power cable laying system suitable for mountain sections according to claim 1, characterized in that: The thickness of the reserved space is not less than 100 mm, so that the soft soil or fine sand (7) can fill the reserved space and fill the periphery and top of the cable (1).

7. A 220kV power cable laying system suitable for mountain sections according to claim 1, characterized in that: The through-length grounding body is made of galvanized flat steel or copper.

8. The 220kV power cable laying system suitable for mountain sections according to claim 3 is characterized in that: The cover plate (4) is connected to the directly buried section fixing layer (6) via an anti-loosening structure (9).