Non-coaxial filling degree enhancing device with slurry observation mechanism and double exhaust pipes

By using a non-coaxial filling degree enhancement device with a slurry observation mechanism and dual exhaust pipes in the construction of prestressed concrete structure bridges, the problem of insufficient slurry filling degree in the prestressed pipes is solved and a higher bridge load-bearing capacity is achieved strength and service life, ensuring the integrity and safety of the grouting process.

CN221918975UActive Publication Date: 2024-10-29HUBEI HUATOU LVZHI ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202122651640.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2021-11-02
Publication Date
2024-10-29
Estimated Expiration
2031-11-02

AI Technical Summary

Technical Problem

During the construction process of prestressed concrete structure bridges, insufficient filling of the cement-based grouting slurry in the prestressed pipes leads to corrosion of the steel bars, thereby reducing the bearing capacity and service life of the bridge. It is also difficult to visually judge whether the air in the pipes is completely discharged and the grouting Whether the body is completely full.

Method used

Design a non-coaxial filling degree enhancement device with a slurry observation mechanism and dual exhaust pipes. By adding exhaust structures at the slurry inlet end and slurry outlet end at both ends of the beam body, the slurry inlet end and slurry outlet end are used for exhaust. The air pipe and probe head observe the grouting process in real time to ensure that the air in the prestressed pipe is completely discharged and the grout is completely filled.

Benefits of technology

By intuitively judging whether the air in the prestressed pipe is completely discharged and whether the slurry is completely filled, the overall bearing capacity and service life of the prestressed concrete structure bridge is significantly improved, the corrosion of the steel bars is prevented, and the integrity of the grouting process is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221918975U_ABST
    Figure CN221918975U_ABST
Patent Text Reader

Abstract

A non-coaxial filling degree enhancing device with a slurry observation mechanism and double exhaust pipes comprises a slurry inlet end exhaust mechanism, the slurry inlet end exhaust mechanism and a slurry inlet valve are arranged in a staggered mode, the slurry inlet end exhaust mechanism comprises a slurry inlet end connecting pipe, a slurry inlet end exhaust pipe is inserted into the slurry inlet end connecting pipe, and a first ball valve is arranged outside the slurry inlet end exhaust pipe in a sleeving mode; a slurry inlet end slurry observation mechanism is arranged at the insertion end of the first ball valve, the slurry inlet end slurry observation mechanism comprises a slurry inlet end detection head, and the slurry inlet end detection head is movably inserted into the first ball valve and can extend into the prestressed pipeline of the beam body; the grout outlet end exhaust mechanism comprises a grout outlet end connecting pipe, a grout outlet end exhaust pipe is inserted into the exhaust end of the grout outlet end connecting pipe, the grout outlet end exhaust pipe sequentially penetrates through the grout outlet end connecting pipe and the grout outlet end anchor bearing plate and extends into the prestressed pipeline of the beam body, and the grout outlet end exhaust pipe is sleeved with a second ball valve. The method is suitable for bridge construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a non-coaxial filling degree enhancement device with a slurry observation mechanism and double exhaust pipes. Background Art

[0002] At present, the damage of prestressed concrete bridges manifests itself in various forms, such as prestress loss, concrete damage and cracking, steel corrosion and support hollowing, etc. These damages will lead to a decrease in the overall stiffness and bearing capacity of prestressed concrete bridges, and are an important cause of prestressed concrete bridge diseases. Among them, steel corrosion is caused by the low filling degree of cement-based grouting material in the prestressed pipe (corrugated pipe) during construction.

[0003] Specifically, during the construction of prestressed concrete structure bridges, cement-based grouting slurry will be filled into the prestressed pipe (corrugated pipe) in the beam body through the grouting valve, so that the cement-based grouting slurry completely wraps the steel strands, thereby protecting the prestressed steel strands and enabling the prestressed steel strands to fully play their role, thereby improving the bearing capacity and service life of the prestressed concrete structure bridge.

[0004] However, in the actual construction process, since the prestressed pipe (corrugated pipe) in the beam body is curved and long, it will result in that when filling the cement-based grouting slurry, it is impossible to intuitively judge whether the air in the prestressed pipe is completely discharged, that is, whether the prestressed pipe is completely filled with cement-based grouting slurry. Once the filling degree of the cement-based grouting slurry in the prestressed pipe (corrugated pipe) is low, after the cement-based grouting slurry solidifies, part of the prestressed steel strands in the prestressed pipe will be directly exposed to the air. Over time, the prestressed steel strands exposed to the air will gradually rust, thereby greatly reducing the overall bearing capacity and service life of the prestressed concrete structure bridge. Utility Model Content

[0005] The purpose of the utility model is to provide a non-coaxial filling enhancement device with a slurry observation mechanism and double exhaust pipes to solve the problems raised in the above-mentioned background technology.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A non-coaxial fullness enhancement device with a slurry observation mechanism and double exhaust pipes, comprising a slurry inlet end exhaust mechanism connected to a slurry inlet end anchor plate at a slurry inlet end of a beam body, and a slurry outlet end exhaust mechanism connected to a slurry outlet end anchor plate at a slurry outlet end of the beam body, wherein the slurry inlet end exhaust mechanism and the slurry inlet valve on the slurry inlet end anchor plate are arranged in a staggered manner; the slurry inlet end exhaust mechanism comprises a slurry inlet end connecting pipe sealedly connected to the slurry inlet end anchor plate, a slurry inlet end exhaust pipe is inserted in the slurry inlet end connecting pipe, the slurry inlet end exhaust pipe passes through the slurry inlet end anchor plate and extends to the prestressed pipe of the beam body, and a first ball valve is sleeved on the slurry inlet end exhaust pipe The insertion end of the first ball valve is provided with a slurry inlet end slurry observation mechanism, and the slurry inlet end slurry observation mechanism includes a slurry inlet end detection head, and the slurry inlet end detection head is movably inserted in the first ball valve, and the slurry inlet end detection head can be extended to the prestressed pipe of the beam body; the slurry outlet end exhaust mechanism includes a slurry outlet end connecting pipe sealed with the slurry outlet end anchor plate, and a slurry outlet end exhaust pipe is inserted in the exhaust end of the slurry outlet end connecting pipe, and the slurry outlet end exhaust pipe passes through the slurry outlet end connecting pipe and the slurry outlet end anchor plate in sequence and extends to the prestressed pipe of the beam body, and a second ball valve is sheathed on the slurry outlet end exhaust pipe.

[0008] Compared with the prior art, the beneficial effects of the utility model are:

[0009] 1. By adding exhaust structures at both ends of the beam body, during the grouting process, by observing whether there is still gas discharged from the exhaust mechanism, it is possible to visually judge whether the air in the prestressed pipe is completely exhausted. When used specifically, grouting is performed into the beam body through the grouting valve. During the grouting process, as the slurry in the prestressed pipe increases, the gas in the prestressed pipe will be discharged through the exhaust pipe at the slurry inlet end and the exhaust pipe at the slurry outlet end. By observing whether there is still gas discharged from the exhaust pipe at the slurry inlet end and the exhaust pipe at the slurry outlet end, it is possible to visually judge whether the air in the prestressed pipe is completely exhausted, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge;

[0010] 2. The grouting process can be observed more intuitively through the added slurry observation mechanism at the slurry inlet end, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. When in use, first insert the slurry inlet end detection head into the prestressed pipe through the first ball valve and the slurry inlet end exhaust pipe, and then slowly pull back the slurry inlet end detection head as the slurry increases, so as to observe the entire grouting process in real time;

[0011] 3. By adding a sealing ring of the exhaust pipe at the inlet end to the position of the exhaust pipe at the inlet end in the connecting pipe at the inlet end, gas and slurry can be prevented from leaking;

[0012] 4. By adding a discharge observation mechanism to the discharge end of the discharge pipe, it is possible to more intuitively observe whether there is gas discharged from the discharge pipe. When in use, first fill the discharge tank with foam balls. In this way, during the exhaust process, by observing whether the foam balls jump, it is possible to intuitively determine whether there is gas discharged from the discharge pipe;

[0013] 5. When using, first fill the liquid storage tank at the slurry outlet with transparent liquid. In this way, during the exhaust process, by observing whether there are bubbles in the transparent liquid, you can intuitively judge whether there is gas discharged from the exhaust pipe at the slurry outlet;

[0014] 6. By adding a third three-way pipe joint between the one-way valve at the slurry outlet end and the exhaust pipe at the slurry outlet end, and connecting the air inlet end of the third three-way pipe joint with the exhaust end of the exhaust pipe at the slurry outlet end, and connecting the exhaust end of the third three-way pipe joint with the one-way valve at the slurry outlet end, and then adding a fourth ball valve at the insertion end of the third three-way pipe joint, a detection head can be inserted into the prestressed pipe through the fourth ball valve, the third three-way pipe joint and the exhaust pipe at the slurry outlet end, which provides conditions for more intuitive observation of the grouting process;

[0015] 7. The grouting process can be observed more intuitively through the added slurry observation mechanism at the slurry outlet, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. When in use, first insert the slurry outlet probe into the prestressed pipe through the fourth ball valve, the third three-way pipe joint and the slurry outlet exhaust pipe, and then slowly pull back the slurry outlet probe as the slurry increases, so as to observe the entire grouting process in real time;

[0016] 8. The additional sealing ring of the slurry outlet detection head can prevent gas and slurry from leaking from the slurry outlet detection head, making it inconvenient to observe the discharge of gas and slurry;

[0017] 9. By designing the outer diameter of the detection head at the slurry inlet end to be the smallest, it is easier to discharge the air in the prestressed pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of a non-coaxial filling enhancement device with a slurry observation mechanism and dual exhaust pipes;

[0019] Figure 2 for Figure 1 A schematic diagram of a local enlarged structure;

[0020] Figure 3 for Figure 1 Another partially enlarged structural schematic diagram of . DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1 In an embodiment of the utility model, a non-coaxial fullness enhancement device with a slurry observation mechanism and a double exhaust pipe comprises an inlet end exhaust mechanism 1 connected to an inlet end anchor plate a1 of a slurry inlet end of a beam body a, and an outlet end exhaust mechanism 2 connected to an outlet end anchor plate a2 of an outlet end of a beam body a, wherein the inlet end exhaust mechanism 1 is staggered with an inlet valve b on the inlet end anchor plate a1; the inlet end exhaust mechanism 1 comprises an inlet end connecting pipe 1a sealed with the inlet end anchor plate a1, an inlet end exhaust pipe 1b is inserted in the inlet end connecting pipe 1a, the inlet end exhaust pipe 1b penetrates the inlet end anchor plate a1 and extends to the prestressed pipe a3 of the beam body a, and the inlet end exhaust pipe 1b is sheathed with a first ball Valve 1d; the insertion end of the first ball valve 1d is provided with a slurry inlet end slurry observation mechanism 3, the slurry inlet end slurry observation mechanism 3 includes a slurry inlet end detection head 3a, the slurry inlet end detection head 3a is movably inserted in the first ball valve 1d, and the slurry inlet end detection head 3a can be extended to the prestressed pipe a3 of the beam body a; the slurry outlet end exhaust mechanism 2 includes a slurry outlet end connecting pipe 2a sealed with the slurry outlet end anchor plate a2, a slurry outlet end exhaust pipe 2b is inserted in the exhaust end of the slurry outlet end connecting pipe 2a, the slurry outlet end exhaust pipe 2b passes through the slurry outlet end connecting pipe 2a and the slurry outlet end anchor plate a2 in sequence and extends to the prestressed pipe a3 of the beam body a, and the slurry outlet end exhaust pipe 2b is sheathed with a second ball valve 2c.

[0023] By adding exhaust structures at both ends of the beam body a, in this way, during the grouting process, by observing whether there is still gas discharged from the exhaust mechanism, it is possible to intuitively judge whether the air in the prestressed pipe is completely discharged. When used specifically, grouting is performed in the beam body a through the grouting valve b. During the grouting process, as the slurry in the prestressed pipe a3 increases, the gas in the prestressed pipe a3 will be discharged through the slurry inlet end exhaust pipe 1b and the slurry outlet end exhaust pipe 2b. In this way, by observing whether there is still gas discharged from the slurry inlet end exhaust pipe 1b and the slurry outlet end exhaust pipe 2b, it is possible to intuitively judge whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. The slurry inlet end exhaust pipe 1b and the slurry outlet end exhaust pipe 2b are hoses with a certain rigidity, such as hard polyethylene hoses. The surfaces of the slurry inlet end exhaust pipe 1b and the slurry outlet end exhaust pipe 2b extending into the beam body a are provided with through holes, which facilitates gas discharge.

[0024] The grouting process can be observed more intuitively by the added slurry observation mechanism 3 at the slurry inlet end, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. When in use, first insert the slurry inlet end detection head 3a into the prestressed pipe a3 through the first ball valve 1d and the slurry inlet end exhaust pipe 1b, and then slowly pull back the slurry inlet end detection head 3a as the slurry increases, so as to observe the entire grouting process in real time. The slurry inlet end slurry observation mechanism 3 can use an endoscope, and the slurry inlet end detection head 3a is the detection head of the endoscope. Since this structure is a mature technology, it will not be repeated here.

[0025] The outer diameter of the exhaust pipe 1b at the inlet end is smaller than the inner diameter of the connecting pipe 1a at the inlet end, and a sealing ring 1c of the exhaust pipe at the inlet end is provided in the connecting pipe 1a at a position corresponding to the exhaust pipe 1b at the inlet end. By adding a sealing ring 1c of the exhaust pipe at the inlet end to the connecting pipe 1a at a position corresponding to the exhaust pipe 1b at the inlet end, leakage of gas and slurry can be prevented. The outer diameter of the exhaust pipe 2b at the outlet end is smaller than the inner diameter of the connecting pipe 2a at the outlet end, and a sealing ring 2d of the exhaust pipe at the outlet end is provided in the connecting pipe 2a at a position corresponding to the exhaust pipe 2b at the outlet end.

[0026] The exhaust end of the slurry outlet exhaust pipe 2b is connected to a slurry outlet exhaust observation mechanism 5, which includes a slurry outlet liquid storage tank 5a with an exhaust port, and the slurry outlet liquid storage tank 5a is connected to the exhaust end of the slurry outlet exhaust pipe 2b. By adding the slurry outlet exhaust observation mechanism 5 to the exhaust end of the slurry outlet exhaust pipe 2b, it is possible to more intuitively observe whether there is gas discharged from the slurry outlet exhaust pipe 2b. When in use, first fill the slurry outlet liquid storage tank 5a with foam balls, so that during the exhaust process, by observing whether the foam balls jump, it is possible to intuitively judge whether there is gas discharged from the slurry outlet exhaust pipe 2b. The slurry outlet liquid storage tank 5a is connected to the exhaust end of the slurry outlet exhaust pipe 2b through the slurry outlet one-way valve 5b. When in use, first fill the slurry outlet liquid storage tank 5a with transparent liquid, so that during the exhaust process, by observing whether bubbles emerge from the transparent liquid, it is possible to intuitively judge whether there is gas discharged from the slurry outlet exhaust pipe 2b.

[0027] A third three-way pipe joint 5c is provided between the one-way valve 5b at the slurry outlet end and the exhaust pipe 2b at the slurry outlet end, the air inlet end of the third three-way pipe joint 5c is connected to the exhaust end of the exhaust pipe 2b at the slurry outlet end, the exhaust end of the third three-way pipe joint 5c is connected to the one-way valve 5b at the slurry outlet end, and the insertion end of the third three-way pipe joint 5c is connected to the fourth ball valve 5d. By adding a third three-way pipe joint 5c between the one-way valve 5b at the slurry outlet end and the exhaust pipe 2b at the slurry outlet end, and making the air inlet end of the third three-way pipe joint 5c connected to the exhaust end of the exhaust pipe 2b at the slurry outlet end, the exhaust end of the third three-way pipe joint 5c is connected to the one-way valve 5b at the slurry outlet end, and then adding a fourth ball valve 5d to the insertion end of the third three-way pipe joint 5c, a detection head can be inserted into the prestressed pipe a3 through the fourth ball valve 5d, the third three-way pipe joint 5c and the exhaust pipe 2b at the slurry outlet end, providing conditions for more intuitive observation of the grouting process. The insertion end of the fourth ball valve 5d is provided with a slurry observation mechanism 6 at the slurry outlet end, and the slurry observation mechanism 6 at the slurry outlet end includes a slurry outlet end detection head 6a, which is movably inserted in the fourth ball valve 5d and can be extended into the prestressed pipe a3 of the beam body a. The slurry observation mechanism 6 at the slurry outlet end can be more intuitively observed through the additional slurry observation mechanism 6 at the slurry outlet end, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge.

[0028] When in use, first insert the slurry outlet probe 6a into the prestressed pipe a3 through the fourth ball valve 5d, the third three-way pipe joint 5c and the slurry outlet exhaust pipe 2b, and then slowly pull back the slurry outlet probe 6a as the slurry increases, so as to observe the entire grouting process in real time. The slurry outlet observation mechanism 6 can use an endoscope, and the slurry outlet probe 6a is the probe of the endoscope. Since this structure is a mature technology, it will not be repeated here. The fourth ball valve 5d is provided with a slurry outlet probe sealing ring 6b. The additional slurry outlet probe sealing ring 6b can prevent gas and slurry from leaking from the slurry outlet probe 6a, making it inconvenient to observe the discharge of gas and slurry.

[0029] The outer diameter of the inlet end probe 3a is smaller than the inner diameter of the first ball valve 1d, the outer diameter of the inlet end probe 3a is smaller than the inner diameter of the inlet end connecting pipe 1a, and the outer diameter of the inlet end probe 3a is smaller than the inner diameter of the inlet end exhaust pipe 1b. By designing the outer diameter of the inlet end probe 3a to be the smallest, it is convenient to discharge the air in the prestressed pipe.

[0030] The usage process of this embodiment is as follows:

[0031] Grouting is performed into the beam body a through the grouting valve b. During the grouting process, as the slurry in the prestressed pipe a3 increases, the gas in the prestressed pipe a3 is discharged through the slurry inlet end exhaust pipe 1b and the slurry outlet end exhaust pipe 2b. In this way, by observing whether there is still gas discharged from the slurry inlet end exhaust pipe 1b and the slurry outlet end exhaust pipe 2b, it can be intuitively judged whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry;

[0032] At the same time, the slurry inlet end detection head 3a is inserted into the prestressed pipe a3 through the first ball valve 1d and the slurry inlet end exhaust pipe 1b, and then the slurry inlet end detection head 3a is slowly pulled back as the slurry increases, so as to observe the entire grouting process in real time; in addition, during the grouting process, by observing whether there are bubbles in the transparent liquid, it can be intuitively judged whether there is gas discharged in the slurry outlet end exhaust pipe 2b;

[0033] In addition, the slurry outlet detection head 6a is inserted into the prestressed pipe a3 through the fourth ball valve 5d, the third three-way pipe joint 5c and the slurry outlet exhaust pipe 2b, and then the slurry outlet detection head 6a is slowly pulled back as the slurry increases, so as to observe the entire grouting process in real time;

[0034] After grouting is completed, close the first ball valve 1d and the second ball valve 2c, start to maintain pressure, and after the pressure maintenance is completed, close the slurry inlet valve b, remove the accessories for cleaning and standby.

[0035] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A non-coaxial filling enhancement device with a slurry observation mechanism and a double exhaust pipe, characterized in that: The invention comprises an exhaust mechanism (1) at the inlet end connected to an anchor plate (a1) at the inlet end of a beam body (a), and an exhaust mechanism (2) at the outlet end connected to an anchor plate (a2) at the outlet end of the beam body (a), wherein the exhaust mechanism (1) at the inlet end is arranged in a staggered manner with an inlet valve (b) on the anchor plate (a1) at the inlet end; the exhaust mechanism (1) at the inlet end comprises an inlet end connecting pipe (1a) sealed with the anchor plate (a1) at the inlet end, an exhaust pipe (1b) at the inlet end is inserted in the inlet end connecting pipe (1a), the exhaust pipe (1b) at the inlet end passes through the anchor plate (a1) at the inlet end and extends to the prestressed pipe (a3) ​​of the beam body (a), and a first ball valve (1d) is sheathed on the inlet end exhaust pipe (1b); the insertion end of the first ball valve (1d) is provided with a A slurry observation mechanism (3) at the slurry inlet end, the slurry observation mechanism (3) at the slurry inlet end comprises a slurry inlet end detection head (3a), the slurry inlet end detection head (3a) is movably inserted into the first ball valve (1d), and the slurry inlet end detection head (3a) can be extended to the prestressed pipe (a3) ​​of the beam body (a); the slurry outlet end exhaust mechanism (2) comprises a slurry outlet end connecting pipe (2a) sealedly connected to the slurry outlet end anchor plate (a2), a slurry outlet end exhaust pipe (2b) is inserted into the exhaust end of the slurry outlet end connecting pipe (2a), the slurry outlet end exhaust pipe (2b) passes through the slurry outlet end connecting pipe (2a) and the slurry outlet end anchor plate (a2) in sequence and extends to the prestressed pipe (a3) ​​of the beam body (a), and a second ball valve (2c) is sheathed on the slurry outlet end exhaust pipe (2b).

2. A non-coaxial fullness enhancement device with a slurry observation mechanism and dual exhaust pipes according to claim 1, characterized in that: The outer diameter of the pulp inlet end exhaust pipe (1b) is smaller than the inner diameter of the pulp inlet end connecting pipe (1a), and a pulp inlet end exhaust pipe sealing ring (1c) is provided in the pulp inlet end connecting pipe (1a) at a position corresponding to the pulp inlet end exhaust pipe (1b).

3. A non-coaxial fullness enhancement device with a slurry observation mechanism and dual exhaust pipes according to claim 1, characterized in that: The outer diameter of the slurry outlet exhaust pipe (2b) is smaller than the inner diameter of the slurry outlet connecting pipe (2a), and a slurry outlet exhaust pipe sealing ring (2d) is provided in the slurry outlet connecting pipe (2a) at a position corresponding to the slurry outlet exhaust pipe (2b).

4. A non-coaxial fullness enhancement device with a slurry observation mechanism and dual exhaust pipes according to claim 1, characterized in that: The exhaust end of the slurry outlet exhaust pipe (2b) is connected to a slurry outlet exhaust observation mechanism (5), and the slurry outlet exhaust observation mechanism (5) comprises a slurry outlet liquid storage tank (5a) with an exhaust port, and the slurry outlet liquid storage tank (5a) is connected to the exhaust end of the slurry outlet exhaust pipe (2b).

5. A non-coaxial fullness enhancement device with a slurry observation mechanism and dual exhaust pipes according to claim 4, characterized in that: The slurry outlet end liquid storage tank (5a) is connected to the exhaust end of the slurry outlet end exhaust pipe (2b) via a slurry outlet end one-way valve (5b).

6. A non-coaxial fullness enhancement device with a slurry observation mechanism and dual exhaust pipes according to claim 5, characterized in that: A third three-way pipe joint (5c) is provided between the one-way valve (5b) at the slurry outlet end and the exhaust pipe (2b) at the slurry outlet end; the air inlet end of the third three-way pipe joint (5c) is connected to the exhaust end of the exhaust pipe (2b) at the slurry outlet end; the exhaust end of the third three-way pipe joint (5c) is connected to the one-way valve (5b) at the slurry outlet end; and the insertion end of the third three-way pipe joint (5c) is connected to a fourth ball valve (5d).

7. A non-coaxial fullness enhancement device with a slurry observation mechanism and dual exhaust pipes according to claim 6, characterized in that: The insertion end of the fourth ball valve (5d) is provided with a slurry outlet end slurry observation mechanism (6), and the slurry outlet end slurry observation mechanism (6) includes a slurry outlet end detection head (6a), and the slurry outlet end detection head (6a) is movably inserted in the fourth ball valve (5d), and the slurry outlet end detection head (6a) can be extended to the prestressed pipe (a3) ​​of the beam body (a).

8. A non-coaxial fullness enhancement device with a slurry observation mechanism and dual exhaust pipes according to claim 7, characterized in that: The fourth ball valve (5d) is provided with a slurry outlet detection head sealing ring (6b).

9. The non-coaxial fullness enhancement device with a slurry observation mechanism and dual exhaust pipes according to claim 1, characterized in that: The outer diameter of the slurry inlet end detection head (3a) is smaller than the inner diameter of the first ball valve (1d), the outer diameter of the slurry inlet end detection head (3a) is smaller than the inner diameter of the slurry inlet end connecting pipe (1a), and the outer diameter of the slurry inlet end detection head (3a) is smaller than the inner diameter of the slurry inlet end exhaust pipe (1b).