Filling degree enhancing device with slurry storage pipe and slurry observation mechanism
By using a filling degree enhancement device with a slurry storage pipe and a slurry observation mechanism in the construction of a prestressed concrete structure bridge, the problem of difficulty in judging the slurry filling degree in the prestressed pipe is solved, ensuring the efficient filling and long-term use of the bridge.
Patent Information
- Application Number
- CN202122655562.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-02
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2031-11-02
AI Technical Summary
During the construction process of prestressed concrete structure bridges, it is difficult to visually judge the fullness of the cement-based grouting slurry in the prestressed pipes, causing corrosion of the steel strands and reducing the bridge's bearing capacity and service life.
Design a filling degree enhancement device with a slurry storage pipe and a slurry observation mechanism. By adding an exhaust structure and a slurry observation mechanism at both ends of the beam body, the tee joints, ball valves and Exhaust pipe, ensure that the air in the prestressed pipe is completely exhausted and observe the grouting process to prevent backflow and waste of slurry.
It realizes the intuitive judgment of the filling situation in the prestressed pipe, ensures that the cement-based grouting material is completely filled, improves the bearing capacity and service life of the prestressed concrete structure bridge, and reduces the loss of slurry and cost.
Smart Images

Figure CN221918976U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a filling degree enhancing device with a slurry storage pipe and a slurry observation mechanism. Background Art
[0002] At present, the damage of prestressed concrete bridges manifests itself in various forms, such as prestress loss, concrete damage and cracking, steel corrosion and support hollowing, etc. These damages will lead to a decrease in the overall stiffness and bearing capacity of prestressed concrete bridges, and are an important cause of prestressed concrete bridge diseases. Among them, steel corrosion is caused by the low filling degree of cement-based grouting material in the prestressed pipe (corrugated pipe) during construction.
[0003] Specifically, during the construction of prestressed concrete structure bridges, cement-based grouting slurry will be filled into the prestressed pipe (corrugated pipe) inside the beam body so that the cement-based grouting slurry completely wraps the steel strands, thereby protecting the prestressed steel strands and enabling the prestressed steel strands to fully play their role, thereby improving the bearing capacity and service life of the prestressed concrete structure bridge.
[0004] However, in the actual construction process, since the prestressed pipe (corrugated pipe) in the beam body is curved and long, it will result in that when filling the cement-based grouting slurry, it is impossible to intuitively judge whether the air in the prestressed pipe is completely discharged, that is, whether the prestressed pipe is completely filled with cement-based grouting slurry. Once the filling degree of the cement-based grouting slurry in the prestressed pipe (corrugated pipe) is low, after the cement-based grouting slurry solidifies, part of the prestressed steel strands in the prestressed pipe will be directly exposed to the air. Over time, the prestressed steel strands exposed to the air will gradually rust, thereby greatly reducing the overall bearing capacity and service life of the prestressed concrete structure bridge. Utility Model Content
[0005] The utility model aims to provide a filling enhancement device with a slurry storage pipe and a slurry observation mechanism to solve the problems raised in the above-mentioned background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A filling degree enhancement device with a slurry storage pipe and a slurry observation mechanism, comprising a slurry inlet end exhaust mechanism connected to a slurry inlet end anchor pad of a beam body slurry inlet end, and a slurry outlet end exhaust mechanism connected to a slurry outlet end anchor pad of a beam body slurry outlet end; the slurry inlet end exhaust mechanism comprises a slurry inlet end connecting pipe sealedly connected to the slurry inlet end anchor pad, the slurry inlet end of the slurry inlet end connecting pipe is connected to a first three-way pipe joint, the slurry inlet end of the first three-way pipe joint is provided with a slurry inlet valve, the slurry inlet end exhaust pipe is inserted in the exhaust end of the first three-way pipe joint, the slurry inlet end exhaust pipe passes through the first three-way pipe joint and the slurry inlet end anchor pad in sequence The backing plate extends into the prestressed pipe of the beam body, the exhaust end of the exhaust pipe at the slurry inlet end is connected with the slurry inlet end storage pipe, and the exhaust end of the slurry inlet end storage pipe is connected with a first ball valve; the exhaust mechanism at the slurry outlet end includes a slurry outlet end connecting pipe sealed with the slurry outlet end anchor pad, a slurry outlet end exhaust pipe is inserted in the exhaust end of the slurry outlet end connecting pipe, the slurry outlet end exhaust pipe passes through the slurry outlet end connecting pipe and the slurry outlet end anchor pad in sequence and extends into the prestressed pipe of the beam body, a second ball valve is sheathed on the slurry outlet end exhaust pipe, and a slurry outlet end slurry observation mechanism is provided in the exhaust end of the second ball valve.
[0008] Compared with the prior art, the beneficial effects of the utility model are:
[0009] 1. By adding exhaust structures at both ends of the beam body, during the grouting process, by observing whether there is still gas discharged from the exhaust mechanism, it is possible to intuitively judge whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge.
[0010] When in use, grouting is performed into the first three-way pipe joint through the grout inlet valve, and the grout will enter the prestressed pipe of the beam body along the gap between the grout inlet end connecting pipe and the grout inlet end exhaust pipe. During the grouting process, as the slurry in the prestressed pipe increases, the gas in the prestressed pipe will be discharged through the first ball valve and the second ball valve. In this way, by observing whether there is still gas discharged from the first ball valve and the second ball valve, it can be intuitively judged whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge;
[0011] 2. The grouting process can be observed more intuitively through the added slurry observation mechanism at the slurry outlet, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge;
[0012] 3. By adding a slurry inlet exhaust pipe sealing ring at a position corresponding to the slurry inlet exhaust pipe in the first three-way pipe joint, and arranging the slurry inlet exhaust pipe sealing ring in the exhaust end of the first three-way pipe joint, the slurry can be prevented from flowing back to the first ball valve;
[0013] 4. By arranging the slurry storage pipe at the slurry inlet end vertically and making the height of the first ball valve higher than the highest height of the prestressed pipe of the beam body, it can be ensured that the air in the prestressed pipe can be completely discharged;
[0014] 5. By adding a slurry filter at the upper end of the slurry storage pipe at the slurry inlet end, the loss of slurry can be reduced during the exhaust process, thereby reducing waste and reducing costs;
[0015] 6. By adding an exhaust observation mechanism at the slurry inlet end to the exhaust end of the first ball valve, it is possible to more intuitively observe whether there is gas discharged from the first ball valve. When in use, first fill the foam ball into the liquid storage tank at the slurry inlet end. In this way, during the exhaust process, by observing whether the foam ball jumps, it can be intuitively judged whether there is gas discharged from the first ball valve;
[0016] 7. When in use, first fill the liquid storage tank at the slurry inlet end with transparent liquid. In this way, during the exhaust process, by observing whether there are bubbles in the transparent liquid, you can intuitively judge whether there is gas discharged in the first ball valve;
[0017] 8. When in use, first insert the slurry outlet probe into the prestressed pipe through the second ball valve and the slurry outlet exhaust pipe, and then slowly pull back the slurry outlet probe as the slurry increases, so as to observe the entire grouting process in real time;
[0018] 9. By designing the outer diameter of the detection head at the slurry outlet end to be the smallest, it is easier to discharge the air in the prestressed pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of a filling enhancement device with a slurry storage pipe and a slurry observation mechanism;
[0020] Figure 2 for Figure 1 A schematic diagram of a local enlarged structure;
[0021] Figure 3 for Figure 1 Another partially enlarged structural schematic diagram of . DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] See also Figure 1 In an embodiment of the utility model, a filling degree enhancement device with a slurry storage pipe and a slurry observation mechanism comprises a slurry inlet end exhaust mechanism 1 connected to a slurry inlet end anchor plate a1 of a slurry inlet end of a beam body a, and a slurry outlet end exhaust mechanism 2 connected to a slurry outlet end anchor plate a2 of a slurry outlet end of a beam body a; the slurry inlet end exhaust mechanism 1 comprises a slurry inlet end connecting pipe 1a sealedly connected to the slurry inlet end anchor plate a1, the slurry inlet end of the slurry inlet end connecting pipe 1a is connected to a first three-way pipe joint 1b, the slurry inlet end of the first three-way pipe joint 1b is provided with a slurry inlet valve 1c, the exhaust end of the first three-way pipe joint 1b is inserted with a slurry inlet end exhaust pipe 1e, the slurry inlet end exhaust pipe 1e passes through the first three-way pipe joint 1b and the slurry inlet end in sequence. The anchor plate a1 extends into the prestressed pipe a3 of the beam body a, the exhaust end of the slurry inlet end exhaust pipe 1e is connected with the slurry inlet end storage pipe 1d, and the exhaust end of the slurry inlet end storage pipe 1d is connected with the first ball valve 1g; the slurry outlet end exhaust mechanism 2 includes a slurry outlet end connecting pipe 2a which is sealed with the slurry outlet end anchor plate a2, a slurry outlet end exhaust pipe 2b is inserted into the exhaust end of the slurry outlet end connecting pipe 2a, the slurry outlet end exhaust pipe 2b passes through the slurry outlet end connecting pipe 2a and the slurry outlet end anchor plate a2 in sequence and extends into the prestressed pipe a3 of the beam body a, the slurry outlet end exhaust pipe 2b is sheathed with a second ball valve 2c, and a slurry outlet end slurry observation mechanism 4 is provided in the exhaust end of the second ball valve 2c.
[0024] By adding exhaust structures at both ends of the beam body a, during the grouting process, by observing whether there is still gas discharged from the exhaust mechanism, it is possible to visually judge whether the air in the prestressed pipe is completely exhausted, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. The grouting process can be more intuitively observed through the added slurry observation mechanism 4 at the slurry outlet end, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. When in use, grouting is performed into the first three-way pipe joint 1b through the grouting valve 1c, and the grouting will enter the prestressed pipe a3 of the beam body a along the gap between the grouting end connecting pipe 1a and the grouting end exhaust pipe 1e. During the grouting process, as the slurry in the prestressed pipe a3 increases, the gas in the prestressed pipe a3 will be discharged through the first ball valve 1g and the second ball valve 2c. In this way, by observing whether there is still gas discharged from the first ball valve 1g and the second ball valve 2c, it is possible to intuitively judge whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. The grouting end exhaust pipe 1e and the grouting end exhaust pipe 2b are hoses with a certain rigidity, such as hard polyethylene hoses. The surfaces of the grouting end exhaust pipe 1e and the grouting end exhaust pipe 2b extending into the beam body a are provided with through holes, which facilitates the discharge of gas.
[0025] The outer diameter of the slurry inlet end exhaust pipe 1e is smaller than the inner diameter of the first three-way pipe joint 1b, and the outer diameter of the slurry inlet end exhaust pipe 1e is smaller than the inner diameter of the slurry inlet end connecting pipe 1a. A slurry inlet end exhaust pipe sealing ring 1f is provided at a position corresponding to the slurry inlet end exhaust pipe 1e in the first three-way pipe joint 1b, and the slurry inlet end exhaust pipe sealing ring 1f is located in the exhaust end of the first three-way pipe joint 1b. By adding a slurry inlet end exhaust pipe sealing ring 1f at a position corresponding to the slurry inlet end exhaust pipe 1e in the first three-way pipe joint 1b, and arranging the slurry inlet end exhaust pipe sealing ring 1f in the exhaust end of the first three-way pipe joint 1b, it can ensure that the slurry can flow smoothly into the prestressed pipe a3, and prevent the slurry from flowing back to the first ball valve 1g, and also make the structure of the device more compact.
[0026] The slurry storage pipe 1d at the inlet end is arranged vertically, the lower end of the slurry storage pipe 1d at the inlet end is connected to the slurry exhaust pipe 1e at the inlet end, and the upper end of the slurry storage pipe 1d at the inlet end is connected to the first ball valve 1g, and the height of the first ball valve 1g is higher than the highest height of the prestressed pipe a3 of the beam body a. By arranging the slurry storage pipe 1d at the inlet end vertically and making the height of the first ball valve 1g higher than the highest height of the prestressed pipe a3 of the beam body a, it can be ensured that the air in the prestressed pipe a3 can be completely discharged. A slurry filter 1h is provided inside the upper end of the slurry storage pipe 1d at the inlet end. By adding a slurry filter 1h at the inlet end to the upper end of the slurry storage pipe 1d at the inlet end, the loss of slurry can be reduced during the exhaust process, thereby reducing waste and reducing costs.
[0027] The exhaust end of the first ball valve 1g is connected to the slurry inlet exhaust observation mechanism 3, and the slurry inlet exhaust observation mechanism 3 includes a slurry inlet liquid storage tank 3a with an exhaust port, and the slurry inlet liquid storage tank 3a is connected to the exhaust end of the first ball valve 1g. By adding the slurry inlet exhaust observation mechanism 3 to the exhaust end of the first ball valve 1g, it is possible to more intuitively observe whether there is gas discharged from the first ball valve 1g. When in use, first fill the slurry inlet liquid storage tank 3a with foam balls, so that during the exhaust process, by observing whether the foam balls jump, it is possible to intuitively judge whether there is gas discharged from the first ball valve 1g. The slurry inlet liquid storage tank 3a is connected to the exhaust end of the first ball valve 1g through the slurry inlet one-way valve 3b. When in use, first fill the slurry inlet liquid storage tank 3a with transparent liquid, so that during the exhaust process, by observing whether bubbles emerge from the transparent liquid, it is possible to intuitively judge whether there is gas discharged from the first ball valve 1g.
[0028] The outer diameter of the slurry outlet exhaust pipe 2b is smaller than the inner diameter of the slurry outlet connecting pipe 2a, and the slurry outlet connecting pipe 2a is provided with a slurry outlet exhaust pipe sealing ring 2d that matches the slurry outlet exhaust pipe 2b. The slurry outlet slurry observation mechanism 4 includes a slurry outlet detection head 4a, which is movably inserted in the second ball valve 2c, and the slurry outlet detection head 4a can be extended to the prestressed pipe a3 of the beam body a. When in use, the slurry outlet detection head 4a is first inserted into the prestressed pipe a3 through the second ball valve 2c and the slurry outlet exhaust pipe 2b, and then the slurry outlet detection head 4a is slowly pulled back as the slurry increases, so as to observe the entire grouting process in real time. The slurry outlet slurry observation mechanism 4 can use an endoscope, and the slurry outlet detection head 4a is the detection head of the endoscope. Since this structure is a mature technology, it will not be repeated here. The outer diameter of the slurry outlet probe 4a is smaller than the inner diameter of the slurry outlet exhaust pipe 2b, and the outer diameter of the slurry outlet probe 4a is smaller than the inner diameter of the second ball valve 2c. By designing the outer diameter of the slurry outlet probe 4a to be the smallest, it is convenient to discharge the air in the prestressed pipe.
[0029] The usage process of this embodiment is as follows:
[0030] Grouting is performed into the first three-way pipe joint 1b through the grout inlet valve 1c, and the grout will enter the prestressed pipe a3 of the beam body a along the gap between the grout inlet end connecting pipe 1a and the grout inlet end exhaust pipe 1e. During the grouting process, as the slurry in the prestressed pipe a3 increases, the gas in the prestressed pipe a3 will be discharged through the first ball valve 1g and the second ball valve 2c. In this way, by observing whether there is still gas discharged from the first ball valve 1g and the second ball valve 2c, it can be intuitively judged whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge;
[0031] Before use, first fill the slurry inlet end storage tank 3a with transparent liquid, so that during the exhaust process, by observing whether there are bubbles in the transparent liquid, it can be intuitively judged whether there is gas discharged in the first ball valve 1g;
[0032] At the same time, the slurry outlet detection head 4a is inserted into the prestressed pipe a3 through the second ball valve 2c and the slurry outlet exhaust pipe 2b, and then the slurry outlet detection head 4a is slowly pulled back as the slurry increases, so as to observe the entire grouting process in real time;
[0033] After grouting is completed, close the first ball valve 1g and the second ball valve 2c, start to maintain pressure, and after the pressure maintenance is completed, close the slurry inlet valve 1c, remove the accessories for cleaning and standby.
[0034] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims
1. A filling enhancement device with a slurry storage pipe and a slurry observation mechanism, characterized in that: The invention comprises a slurry inlet end exhaust mechanism (1) connected to a slurry inlet end anchor plate (a1) at a slurry inlet end of a beam body (a), and a slurry outlet end exhaust mechanism (2) connected to a slurry outlet end anchor plate (a2) at a slurry outlet end of the beam body (a); the slurry inlet end exhaust mechanism (1) comprises a slurry inlet end connecting pipe (1a) sealedly connected to the slurry inlet end anchor plate (a1), the slurry inlet end of the slurry inlet end connecting pipe (1a) is connected to a first three-way pipe joint (1b), the slurry inlet end of the first three-way pipe joint (1b) is provided with a slurry inlet valve (1c), the exhaust end of the first three-way pipe joint (1b) is inserted with a slurry inlet end exhaust pipe (1e), the slurry inlet end exhaust pipe (1e) passes through the first three-way pipe joint (1b) and the slurry inlet end anchor plate (a1) in sequence and extends to the pre-slurry outlet of the beam body (a). In the stress pipe (a3), the exhaust end of the slurry inlet end exhaust pipe (1e) is connected to the slurry inlet end storage pipe (1d), and the exhaust end of the slurry inlet end storage pipe (1d) is connected to the first ball valve (1g); the slurry outlet end exhaust mechanism (2) includes a slurry outlet end connecting pipe (2a) sealed with the slurry outlet end anchor plate (a2), and a slurry outlet end exhaust pipe (2b) is inserted into the exhaust end of the slurry outlet end connecting pipe (2a), and the slurry outlet end exhaust pipe (2b) passes through the slurry outlet end connecting pipe (2a) and the slurry outlet end anchor plate (a2) in sequence and extends to the prestressed pipe (a3) of the beam body (a), and a second ball valve (2c) is sheathed on the slurry outlet end exhaust pipe (2b), and a slurry outlet end slurry observation mechanism (4) is provided in the exhaust end of the second ball valve (2c).
2. A filling enhancement device with a slurry storage pipe and a slurry observation mechanism according to claim 1, characterized in that: The outer diameter of the slurry inlet end exhaust pipe (1e) is smaller than the inner diameter of the first three-way pipe joint (1b), and the outer diameter of the slurry inlet end exhaust pipe (1e) is smaller than the inner diameter of the slurry inlet end connecting pipe (1a). A slurry inlet end exhaust pipe sealing ring (1f) is provided at a position corresponding to the slurry inlet end exhaust pipe (1e) in the first three-way pipe joint (1b), and the slurry inlet end exhaust pipe sealing ring (1f) is located in the exhaust end of the first three-way pipe joint (1b).
3. The filling enhancement device with a slurry storage pipe and a slurry observation mechanism according to claim 1, characterized in that: The slurry storage pipe (1d) at the slurry inlet end is arranged vertically, the lower end of the slurry storage pipe (1d) at the slurry inlet end is connected to the slurry inlet end exhaust pipe (1e), and the upper end of the slurry storage pipe (1d) at the slurry inlet end is connected to the first ball valve (1g), and the height of the first ball valve (1g) is higher than the highest height of the prestressed pipe (a3) of the beam body (a).
4. The filling enhancement device with a slurry storage pipe and a slurry observation mechanism according to claim 3, characterized in that: A slurry filter screen (1h) is provided inside the upper end of the slurry storage pipe (1d) at the slurry inlet end.
5. The filling enhancement device with a slurry storage pipe and a slurry observation mechanism according to claim 1, characterized in that: The exhaust end of the first ball valve (1g) is connected to a slurry inlet exhaust observation mechanism (3), and the slurry inlet exhaust observation mechanism (3) comprises a slurry inlet liquid storage tank (3a) with an exhaust port, and the slurry inlet liquid storage tank (3a) is connected to the exhaust end of the first ball valve (1g).
6. The device for enhancing the filling degree with a slurry storage pipe and a slurry observation mechanism according to claim 5, characterized in that: The slurry inlet end liquid storage tank (3a) is connected to the exhaust end of the first ball valve (1g) through the slurry inlet end one-way valve (3b).
7. The filling enhancement device with a slurry storage pipe and a slurry observation mechanism according to claim 1, characterized in that: The outer diameter of the slurry outlet exhaust pipe (2b) is smaller than the inner diameter of the slurry outlet connecting pipe (2a), and a slurry outlet exhaust pipe sealing ring (2d) matching the slurry outlet exhaust pipe (2b) is provided in the slurry outlet connecting pipe (2a).
8. The filling enhancement device with a slurry storage pipe and a slurry observation mechanism according to claim 1, characterized in that: The slurry outlet end slurry observation mechanism (4) comprises a slurry outlet end detection head (4a), the slurry outlet end detection head (4a) is movably inserted into the second ball valve (2c), and the slurry outlet end detection head (4a) can be extended into the prestressed pipe (a3) of the beam body (a).
9. The filling enhancement device with a slurry storage pipe and a slurry observation mechanism according to claim 8, characterized in that: The outer diameter of the slurry outlet detection head (4a) is smaller than the inner diameter of the slurry outlet exhaust pipe (2b), and the outer diameter of the slurry outlet detection head (4a) is smaller than the inner diameter of the second ball valve (2c).