Non-coaxial filling degree enhancing device with double exhaust pipes and slurry observation mechanism

By using a non-coaxial filling degree enhancement device with dual exhaust pipes and a slurry observation mechanism in the construction of prestressed concrete structure bridges, the problem of difficulty in judging the filling degree in the prestressed pipe is solved, and a higher filling degree is achieved. Extends the service life and bearing capacity of the bridge.

CN221918977UActive Publication Date: 2024-10-29HUBEI HUATOU LVZHI ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202122656070.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2021-11-02
Publication Date
2024-10-29
Estimated Expiration
2031-11-02

AI Technical Summary

Technical Problem

During the construction process of prestressed concrete structure bridges, it is difficult to visually judge the fullness of the cement-based grouting material in the prestressed pipes, causing corrosion of the steel strands and reducing the bridge's bearing capacity and service life.

Method used

Design a non-coaxial filling enhancement device with dual exhaust pipes and a slurry observation mechanism. By adding an exhaust structure and a slurry observation mechanism at both ends of the beam body, it ensures that the air in the prestressed pipe is completely exhausted and filled with cement. Basic grouting material, including exhaust pipes, ball valves and detectors at the grout inlet and outlet ends, to observe the grouting process in real time.

Benefits of technology

By intuitively judging whether the air in the prestressed pipe is completely exhausted to ensure fullness, the bearing capacity and service life of the prestressed concrete structure bridge are significantly improved, and the steel strands are prevented from rusting.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221918977U_ABST
    Figure CN221918977U_ABST
Patent Text Reader

Abstract

A non-coaxial filling degree enhancing device with double exhaust pipes and a slurry observation mechanism comprises a slurry inlet end exhaust mechanism connected with a slurry inlet end anchor bearing plate at the slurry inlet end of a beam body and a slurry outlet end exhaust mechanism connected with a slurry outlet end anchor bearing plate at the slurry outlet end of the beam body. The slurry inlet end exhaust mechanism and the slurry inlet valve on the slurry inlet end anchor bearing plate are arranged in a staggered manner; the grout outlet end exhaust mechanism comprises a grout outlet end connecting pipe connected with the grout outlet end anchor bearing plate in a sealed mode, a grout outlet end exhaust pipe is inserted into the exhaust end of the grout outlet end connecting pipe, and the grout outlet end exhaust pipe penetrates through the grout outlet end anchor bearing plate and extends into a prestressed pipeline of the beam body. The slurry outlet end exhaust pipe is sleeved with a second ball valve, and a slurry outlet end slurry observation mechanism is arranged in the exhaust end of the second ball valve. The method is suitable for bridge construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a non-coaxial filling degree enhancement device with double exhaust pipes and a slurry observation mechanism. Background Art

[0002] At present, the damage of prestressed concrete bridges manifests itself in various forms, such as prestress loss, concrete damage and cracking, steel corrosion and support hollowing, etc. These damages will lead to a decrease in the overall stiffness and bearing capacity of prestressed concrete bridges, and are an important cause of prestressed concrete bridge diseases. Among them, steel corrosion is caused by the low filling degree of cement-based grouting material in the prestressed pipe (corrugated pipe) during construction.

[0003] Specifically, during the construction of prestressed concrete structure bridges, cement-based grouting slurry will be filled into the prestressed pipe (corrugated pipe) in the beam body through the grouting valve, so that the cement-based grouting slurry completely wraps the steel strands, thereby protecting the prestressed steel strands and enabling the prestressed steel strands to fully play their role, thereby improving the bearing capacity and service life of the prestressed concrete structure bridge.

[0004] However, in the actual construction process, since the prestressed pipe (corrugated pipe) in the beam body is curved and long, it will result in that when filling the cement-based grouting slurry, it is impossible to intuitively judge whether the air in the prestressed pipe is completely discharged, that is, whether the prestressed pipe is completely filled with cement-based grouting slurry. Once the filling degree of the cement-based grouting slurry in the prestressed pipe (corrugated pipe) is low, after the cement-based grouting slurry solidifies, part of the prestressed steel strands in the prestressed pipe will be directly exposed to the air. Over time, the prestressed steel strands exposed to the air will gradually rust, thereby greatly reducing the overall bearing capacity and service life of the prestressed concrete structure bridge. Utility Model Content

[0005] The purpose of the utility model is to provide a non-coaxial fullness enhancement device with double exhaust pipes and a slurry observation mechanism to solve the problems raised in the above-mentioned background technology.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A non-coaxial fullness enhancement device with double exhaust pipes and a slurry observation mechanism, comprising a slurry inlet end exhaust mechanism connected to a slurry inlet end anchor plate at a slurry inlet end of a beam body, and a slurry outlet end exhaust mechanism connected to a slurry outlet end anchor plate at a slurry outlet end of the beam body, wherein the slurry inlet end exhaust mechanism and the slurry inlet valve on the slurry inlet end anchor plate are staggered; the slurry outlet end exhaust mechanism comprises a slurry outlet end connecting pipe sealedly connected to the slurry outlet end anchor plate, a slurry outlet end exhaust pipe is inserted in the exhaust end of the slurry outlet end connecting pipe, the slurry outlet end exhaust pipe passes through the slurry outlet end connecting pipe and the slurry outlet end anchor plate in sequence and extends to the prestressed pipe of the beam body, a second ball valve is sheathed on the slurry outlet end exhaust pipe, and a slurry outlet end slurry observation mechanism is provided in the exhaust end of the second ball valve.

[0008] In the above scheme, the slurry inlet end exhaust mechanism includes a slurry inlet end connecting pipe sealedly connected to the slurry inlet end anchor plate, a slurry inlet end exhaust pipe is inserted in the slurry inlet end connecting pipe, the slurry inlet end exhaust pipe passes through the slurry inlet end anchor plate and extends to the prestressed pipe of the beam body, and a first ball valve is installed on the outside of the slurry inlet end exhaust pipe.

[0009] Compared with the prior art, the beneficial effects of the utility model are:

[0010] 1. By adding exhaust structures at both ends of the beam body, during the grouting process, by observing whether there is still gas discharged from the exhaust mechanism, it is possible to intuitively judge whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge;

[0011] 2. The grouting process can be observed more intuitively through the added slurry observation mechanism at the slurry outlet, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge;

[0012] 3. When in use, grouting is performed into the beam body through the grout inlet valve. During the grouting process, as the slurry in the prestressed pipe increases, the gas in the prestressed pipe will be discharged through the first ball valve and the second ball valve. By observing whether there is still gas discharged from the first ball valve and the second ball valve, it can be intuitively judged whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge;

[0013] 4. By adding a sealing ring of the exhaust pipe at the inlet end to the position of the exhaust pipe at the inlet end in the connecting pipe at the inlet end, gas and slurry can be prevented from leaking;

[0014] 5. By adding an exhaust observation mechanism at the exhaust end of the exhaust pipe at the slurry inlet end, it is possible to more intuitively observe whether there is gas discharged from the exhaust pipe at the slurry inlet end. When in use, first fill the foam ball into the liquid storage tank at the slurry inlet end. In this way, during the exhaust process, by observing whether the foam ball jumps, it can be intuitively judged whether there is gas discharged from the exhaust pipe at the slurry inlet end;

[0015] 6. When using, first fill the liquid storage tank at the pulp inlet end with transparent liquid. In this way, during the exhaust process, by observing whether there are bubbles in the transparent liquid, you can intuitively judge whether there is gas discharged in the exhaust pipe at the pulp inlet end;

[0016] 7. By adding a second three-way pipe joint between the one-way valve at the slurry inlet end and the exhaust pipe at the slurry inlet end, and connecting the air inlet end of the second three-way pipe joint with the exhaust end of the exhaust pipe at the slurry inlet end, and connecting the exhaust end of the second three-way pipe joint with the one-way valve at the slurry inlet end, and then adding a third ball valve at the insertion end of the second three-way pipe joint, a detection head can be inserted into the prestressed pipe through the third ball valve, the second three-way pipe joint and the exhaust pipe at the slurry inlet end, which provides conditions for more intuitive observation of the grouting process;

[0017] 8. The grouting process can be observed more intuitively through the added slurry observation mechanism at the slurry inlet end, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. When in use, first insert the slurry inlet end detection head into the prestressed pipe through the third ball valve, the second three-way pipe joint and the slurry inlet end exhaust pipe, and then slowly pull back the slurry inlet end detection head as the slurry increases, so as to observe the entire grouting process in real time;

[0018] 9. The additional sealing ring of the slurry inlet end detector can prevent gas and slurry from leaking from the slurry inlet end detector, making it inconvenient to observe the discharge of gas and slurry;

[0019] 10. When in use, first insert the slurry outlet probe into the prestressed pipe through the second ball valve and the slurry outlet exhaust pipe, and then slowly pull back the slurry outlet probe as the slurry increases, so as to observe the entire grouting process in real time;

[0020] 11. By designing the outer diameter of the detection head at the slurry outlet end to be the smallest, it is easier to discharge the air in the prestressed pipe. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a structural schematic diagram of a non-coaxial filling enhancement device with dual exhaust pipes and a slurry observation mechanism;

[0022] Figure 2 for Figure 1 A schematic diagram of a local enlarged structure;

[0023] Figure 3 for Figure 1 Another partially enlarged structural schematic diagram of . DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1 In an embodiment of the utility model, a non-coaxial fullness enhancement device with double exhaust pipes and a slurry observation mechanism comprises an inlet end exhaust mechanism 1 connected to an inlet end anchor plate a1 of a slurry inlet end of a beam body a, and an outlet end exhaust mechanism 2 connected to an outlet end anchor plate a2 of a slurry outlet end of a beam body a, wherein the inlet end exhaust mechanism 1 is staggered with an inlet valve b on the inlet end anchor plate a1; the outlet end exhaust mechanism 2 comprises an outlet end connecting pipe 2a sealed with the outlet end anchor plate a2, an outlet end exhaust pipe 2b is inserted in the exhaust end of the outlet end connecting pipe 2a, the outlet end exhaust pipe 2b passes through the outlet end connecting pipe 2a and the outlet end anchor plate a2 in sequence and extends to the prestressed pipe a3 of the beam body a, a second ball valve 2c is sheathed on the outlet end exhaust pipe 2b, and an outlet end slurry observation mechanism 5 is provided in the exhaust end of the second ball valve 2c. By adding exhaust structures at both ends of the beam body a, during the grouting process, by observing whether there is still gas discharged from the exhaust mechanism, it is possible to visually judge whether the air in the prestressed pipe is completely exhausted, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. The grouting process can be more intuitively observed through the added slurry observation mechanism 5 at the slurry outlet end, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge.

[0026] The above-mentioned grouting end exhaust mechanism 1 includes a grouting end connecting pipe 1a which is sealed and connected to the grouting end anchor plate a1, a grouting end exhaust pipe 1b is inserted in the grouting end connecting pipe 1a, the grouting end exhaust pipe 1b passes through the grouting end anchor plate a1 and extends to the prestressed pipe a3 of the beam body a, and the grouting end exhaust pipe 1b is sheathed with a first ball valve 1d. When in use, grouting is performed into the beam body a through the grouting valve b. During the grouting process, as the slurry in the prestressed pipe a3 increases, the gas in the prestressed pipe a3 will be discharged through the first ball valve 1d and the second ball valve 2c. In this way, by observing whether there is still gas discharged from the first ball valve 1d and the second ball valve 2c, it can be intuitively judged whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge. The exhaust pipe 1b at the inlet end and the exhaust pipe 2b at the outlet end are flexible pipes with certain rigidity, such as hard polyethylene hoses, etc. The surfaces of the exhaust pipes 1b at the inlet end and the exhaust pipes 2b at the outlet end extending into the beam body a are provided with through holes, which facilitates gas discharge.

[0027] The outer diameter of the slurry inlet exhaust pipe 1b is smaller than the inner diameter of the slurry inlet connecting pipe 1a, and a slurry inlet exhaust pipe sealing ring 1c is provided in the slurry inlet connecting pipe 1a at a position corresponding to the slurry inlet exhaust pipe 1b; the outer diameter of the slurry outlet exhaust pipe 2b is smaller than the inner diameter of the slurry outlet connecting pipe 2a, and a slurry outlet exhaust pipe sealing ring 2d is provided in the slurry outlet connecting pipe 2a. By adding the slurry inlet exhaust pipe sealing ring 1c in the position corresponding to the slurry inlet exhaust pipe 1b in the slurry inlet connecting pipe 1a, gas and slurry can be prevented from leaking.

[0028] The exhaust end of the slurry inlet end exhaust pipe 1b extends outward and is connected to the slurry inlet end exhaust observation mechanism 3, which includes a slurry inlet end liquid storage tank 3a with an exhaust port, and the slurry inlet end liquid storage tank 3a is connected to the exhaust end of the slurry inlet end exhaust pipe 1b. By adding the slurry inlet end exhaust observation mechanism 3 to the exhaust end of the slurry inlet end exhaust pipe 1b, it is possible to more intuitively observe whether there is gas discharged from the slurry inlet end exhaust pipe 1b. When in use, first fill the slurry inlet end liquid storage tank 3a with foam balls, so that during the exhaust process, by observing whether the foam balls jump, it is possible to intuitively judge whether there is gas discharged from the slurry inlet end exhaust pipe 1b. The slurry inlet end liquid storage tank 3a is connected to the exhaust end of the slurry inlet end exhaust pipe 1b through the slurry inlet end one-way valve 3b. When in use, first fill the slurry inlet end liquid storage tank 3a with transparent liquid, so that during the exhaust process, by observing whether bubbles emerge from the transparent liquid, it is possible to intuitively judge whether there is gas discharged from the slurry inlet end exhaust pipe 1b.

[0029] A second three-way pipe joint 3c is provided between the one-way valve 3b at the inlet end and the exhaust pipe 1b at the inlet end, the air inlet end of the second three-way pipe joint 3c is connected to the exhaust end of the exhaust pipe 1b at the inlet end, the exhaust end of the second three-way pipe joint 3c is connected to the one-way valve 3b at the inlet end, and the insertion end of the second three-way pipe joint 3c is connected to the third ball valve 3d. By adding a second three-way pipe joint 3c between the one-way valve 3b at the inlet end and the exhaust pipe 1b at the inlet end, and making the air inlet end of the second three-way pipe joint 3c connected to the exhaust end of the exhaust pipe 1b at the inlet end, the exhaust end of the second three-way pipe joint 3c is connected to the one-way valve 3b at the inlet end, and then adding a third ball valve 3d to the insertion end of the second three-way pipe joint 3c, a detection head can be inserted into the prestressed pipe a3 through the third ball valve 3d, the second three-way pipe joint 3c and the exhaust pipe 1b at the inlet end, which provides conditions for more intuitive observation of the grouting process. The insertion end of the third ball valve 3d is provided with a slurry inlet end slurry observation mechanism 4, and the slurry inlet end slurry observation mechanism 4 includes a slurry inlet end detection head 4a, and the slurry inlet end detection head 4a is movably inserted in the third ball valve 3d, and the slurry inlet end detection head 4a can be extended to the prestressed pipe a3 of the beam body a. The grouting process can be observed more intuitively by the additional slurry inlet end slurry observation mechanism 4, so as to further ensure that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge.

[0030] When in use, first insert the slurry inlet end probe 4a into the prestressed pipe a3 through the third ball valve 3d, the second three-way pipe joint 3c and the slurry inlet end exhaust pipe 1b, and then slowly pull back the slurry inlet end probe 4a as the slurry increases, so as to observe the entire grouting process in real time. The slurry inlet end slurry observation mechanism 4 can use an endoscope, and the slurry inlet end probe 4a is the probe of the endoscope. Since this structure is a mature technology, it will not be repeated here.

[0031] The third ball valve 3d is provided with a slurry inlet end detection head sealing ring 4b. The additional slurry inlet end detection head sealing ring 4b can prevent gas and slurry from leaking from the slurry inlet end detection head 4a, thereby making it inconvenient to observe the discharge of gas and slurry.

[0032] The slurry observation mechanism 5 at the slurry outlet includes a slurry outlet probe 5a, which is movably inserted into the second ball valve 2c, and the slurry outlet probe 5a can be extended into the prestressed pipe a3 of the beam body a. When in use, the slurry outlet probe 5a is first inserted into the prestressed pipe a3 through the second ball valve 2c and the slurry outlet exhaust pipe 2b, and then the slurry outlet probe 5a is slowly pulled back as the slurry increases, so as to observe the entire grouting process in real time. The slurry outlet slurry observation mechanism 5 can use an endoscope, and the slurry outlet probe 5a is the probe of the endoscope. Since this structure is a mature technology, it will not be repeated here. The outer diameter of the slurry outlet probe 5a is smaller than the inner diameter of the slurry outlet exhaust pipe 2b, and the outer diameter of the slurry outlet probe 5a is smaller than the inner diameter of the second ball valve 2c. By designing the outer diameter of the slurry outlet probe 5a to be the smallest, it is convenient to discharge the air in the prestressed pipe.

[0033] The usage process of this embodiment is as follows:

[0034] Grouting is performed into the beam body a through the grout inlet valve b. During the grouting process, as the slurry in the prestressed pipe a3 increases, the gas in the prestressed pipe a3 is discharged through the first ball valve 1d and the second ball valve 2c. In this way, by observing whether there is still gas discharged from the first ball valve 1d and the second ball valve 2c, it can be intuitively judged whether the air in the prestressed pipe is completely discharged, thereby ensuring that the prestressed pipe is completely filled with cement-based grouting slurry, thereby greatly improving the overall bearing capacity and service life of the prestressed concrete structure bridge;

[0035] Before use, first fill the liquid storage tank 3a at the pulp inlet end with transparent liquid, so that during the exhaust process, by observing whether there are bubbles in the transparent liquid, you can intuitively judge whether there is gas discharged from the exhaust pipe 1b at the pulp inlet end;

[0036] At the same time, the slurry inlet end detection head 4a is inserted into the prestressed pipe a3 through the third ball valve 3d, the second three-way pipe joint 3c and the slurry inlet end exhaust pipe 1b, and then the slurry inlet end detection head 4a is slowly pulled back as the slurry increases, so as to observe the entire grouting process in real time;

[0037] In addition, the slurry outlet detection head 5a is inserted into the prestressed pipe a3 through the second ball valve 2c and the slurry outlet exhaust pipe 2b, and then the slurry outlet detection head 5a is slowly pulled back as the slurry increases, so as to observe the entire grouting process in real time;

[0038] After grouting is completed, close the first ball valve 1d and the second ball valve 2c, start to maintain pressure, and after the pressure maintenance is completed, close the slurry inlet valve b, remove the accessories for cleaning and standby.

[0039] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A non-coaxial filling enhancement device with dual exhaust pipes and a slurry observation mechanism, characterized in that: The invention comprises a slurry inlet end exhaust mechanism (1) connected to a slurry inlet end anchor pad (a1) at a slurry inlet end of a beam body (a), and a slurry outlet end exhaust mechanism (2) connected to a slurry outlet end anchor pad (a2) at a slurry outlet end of the beam body (a), wherein the slurry inlet end exhaust mechanism (1) and a slurry inlet valve (b) on the slurry inlet end anchor pad (a1) are arranged in a staggered manner; the slurry outlet end exhaust mechanism (2) comprises a slurry outlet end connecting pipe (2a) sealedly connected to the slurry outlet end anchor pad (a2) A slurry outlet exhaust pipe (2b) is inserted into the exhaust end of the slurry outlet connecting pipe (2a), and the slurry outlet exhaust pipe (2b) sequentially passes through the slurry outlet connecting pipe (2a) and the slurry outlet anchor plate (a2) and extends to the prestressed pipe (a3) ​​of the beam body (a). A second ball valve (2c) is sheathed on the slurry outlet exhaust pipe (2b), and a slurry outlet slurry observation mechanism (5) is provided in the exhaust end of the second ball valve (2c).

2. A non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 1, characterized in that: The slurry inlet end exhaust mechanism (1) comprises a slurry inlet end connecting pipe (1a) sealedly connected to the slurry inlet end anchor plate (a1), a slurry inlet end exhaust pipe (1b) is inserted into the slurry inlet end connecting pipe (1a), the slurry inlet end exhaust pipe (1b) passes through the slurry inlet end anchor plate (a1) and extends to the prestressed pipe (a3) ​​of the beam body (a), and a first ball valve (1d) is sheathed on the outside of the slurry inlet end exhaust pipe (1b).

3. A non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 2, characterized in that: The outer diameter of the slurry inlet end exhaust pipe (1b) is smaller than the inner diameter of the slurry inlet end connecting pipe (1a), and a slurry inlet end exhaust pipe sealing ring (1c) is provided in the slurry inlet end connecting pipe (1a) at a position corresponding to the slurry inlet end exhaust pipe (1b); the outer diameter of the slurry outlet end exhaust pipe (2b) is smaller than the inner diameter of the slurry outlet end connecting pipe (2a), and a slurry outlet end exhaust pipe sealing ring (2d) is provided in the slurry outlet end connecting pipe (2a).

4. The non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 2, characterized in that: The exhaust end of the slurry inlet end exhaust pipe (1b) extends outwardly and is connected to a slurry inlet end exhaust observation mechanism (3), and the slurry inlet end exhaust observation mechanism (3) comprises a slurry inlet end liquid storage tank (3a) with an exhaust port, and the slurry inlet end liquid storage tank (3a) is connected to the exhaust end of the slurry inlet end exhaust pipe (1b).

5. A non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 4, characterized in that: The slurry inlet end liquid storage tank (3a) is connected to the exhaust end of the slurry inlet end exhaust pipe (1b) via a slurry inlet end one-way valve (3b).

6. A non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 5, characterized in that: A second three-way pipe joint (3c) is provided between the one-way valve (3b) at the inlet end and the exhaust pipe (1b) at the inlet end, the air inlet end of the second three-way pipe joint (3c) is connected to the exhaust end of the exhaust pipe (1b) at the inlet end, the exhaust end of the second three-way pipe joint (3c) is connected to the one-way valve (3b) at the inlet end, and the insertion end of the second three-way pipe joint (3c) is connected to a third ball valve (3d).

7. A non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 6, characterized in that: The insertion end of the third ball valve (3d) is provided with a slurry inlet end slurry observation mechanism (4), and the slurry inlet end slurry observation mechanism (4) includes a slurry inlet end detection head (4a), and the slurry inlet end detection head (4a) is movably inserted in the third ball valve (3d), and the slurry inlet end detection head (4a) can be extended into the prestressed pipe (a3) ​​of the beam body (a).

8. The non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 7, characterized in that: The third ball valve (3d) is provided with a slurry inlet end detection head sealing ring (4b).

9. The non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 1, characterized in that: The slurry discharge end slurry observation mechanism (5) comprises a slurry discharge end detection head (5a), the slurry discharge end detection head (5a) is movably inserted into the second ball valve (2c), and the slurry discharge end detection head (5a) can be extended into the prestressed pipe (a3) ​​of the beam body (a).

10. A non-coaxial fullness enhancement device with dual exhaust pipes and slurry observation mechanism according to claim 9, characterized in that: The outer diameter of the slurry outlet detection head (5a) is smaller than the inner diameter of the slurry outlet exhaust pipe (2b), and the outer diameter of the slurry outlet detection head (5a) is smaller than the inner diameter of the second ball valve (2c).