Shaped pit top water interception and drainage device
Through the modular design and quick-installation connection of the standardized pit top water interception and drainage device, the problem of poor waterproof performance in the existing technology is solved, and efficient, safe, economical, and green pit top water interception and drainage effects are achieved. The risks of pit side support and mud and sand pollution are reduced.
Patent Information
- Application Number
- CN202420118591.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-17
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-01-17
AI Technical Summary
The existing construction technology has poor waterproofing performance when intercepting water and draining water at the top of the pit, which can easily lead to water leakage and pit side support failure. It is also inconvenient to set up sand settling wells, causing mud and sand to contaminate the municipal pipe network.
Design a standardized pit top water interception and drainage device, which adopts a modular assembled sand bucket and water tank structure. Through quick-installation connection and reinforced rib design, efficient water interception and drainage are achieved, and PVC materials are used to improve waterproof performance.
It achieves efficient water interception and drainage at the top of the pit, ensuring construction safety, reducing the risk of pit side support, and reducing mud and sand pollution. The device is reusable, economical, green and environmentally friendly.
Smart Images

Figure CN221919481U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a standardized pit top water interception and drainage device. Background Art
[0002] During the construction of building foundation pits, it is often necessary to intercept the surface water at the edge of the pit, and the water in the pit needs to be pumped out in time. Existing construction technology generally builds intercepting ditches and drainage grooves at the edge of the pit, and intercepting ditches and drainage grooves generally adopt processes such as digging trenches and then laying bricks and plastering or directly spraying cement mortar on the soil layer. However, due to the poor waterproof performance achieved by processes such as bricklaying and plastering or directly spraying cement mortar on the soil layer, it is easy to cause water on the top of the pit to leak into the pit, which will increase the workload of pumping water at the least, and cause the failure of the pit support at the edge to cause a safety accident of foundation pit collapse at the worst. At the same time, since it is inconvenient to set up a sand settling well, a large amount of mud and sand will inevitably be discharged directly into the municipal pipe network. Utility Model Content
[0003] The utility model aims to provide a standardized pit top water interception and drainage device, which can realize modular assembly, is convenient to construct, has good waterproof effect, can be reused, and achieves the purpose of safety, economy, and green environmental protection.
[0004] To achieve the above-mentioned purpose, the utility model provides a standardized pit top water interception and drainage device, including at least two sand settling barrels, and a transversely arranged water trough is provided between adjacent sand settling barrels; the end of the water trough is connected to the sand settling barrel through a quick-install structure, and the water trough is connected to the upper part of the inner cavity of the sand settling barrel.
[0005] As a further improvement of the utility model, the openings of both the sand settling bucket and the water tank are facing upward.
[0006] As a further improvement of the present invention, the quick-install structure includes a connecting groove arranged on the outer side wall of the sand settling bucket, and the end of the water trough is plugged into and matched with the connecting groove of the sand settling bucket.
[0007] As a further improvement of the present invention, the sand settling barrel comprises a first sand settling barrel and a corner sand settling barrel; the water tanks connected on both sides of the first sand settling barrel are located on the same straight line; the water tanks connected on both sides of the corner sand settling barrel form an angle with each other.
[0008] As a further improvement of the present invention, the bottom of the water tank is higher than the bottom of the inner cavity of the sand settling barrel.
[0009] As a further improvement of the utility model, the center line of the water trough and the center of the sand settling bucket are staggered, so that the water trough is biased toward the side where the pit edge is located.
[0010] As a further improvement of the present invention, reinforcing ribs are provided on the wall of the sand settling barrel.
[0011] As a further improvement of the utility model, a groove and at least two holes are provided on the upper edge of the sand settling bucket close to the pit edge.
[0012] Beneficial Effects
[0013] Compared with the prior art, the advantages of the standardized pit top water interception and drainage device of the utility model are:
[0014] 1. Use materials such as PVC with excellent waterproof performance to make each component easier to shape and finalize. The whole set of equipment materials are extremely waterproof, the joints can be sealed reliably with sealant, and the construction efficiency is very high. Since the sand bucket and the sink are detachable, the whole set of equipment can be reused. The inner surface of the sand bucket is smooth, and the sand in the sand bucket is easy to take out, achieving the purpose of safety, economy, and green environmental protection.
[0015] 2. The end of the water tank is plugged into the connecting groove of the sand bucket, which is quick to install and has a stable connection;
[0016] 3. The sand settling barrel includes the first sand settling barrel and the corner sand settling barrel. The corner sand settling barrel can be set at the corner of the top of the foundation pit, so that the entire edge of the foundation pit is surrounded by the water trough and the sand settling barrel, and the water interception and drainage effect is more thorough.
[0017] 4. Strengthening ribs can reduce the probability of deformation of the sand settling barrel, improve its structural rigidity and extend its service life.
[0018] 5. The outlet pipe of the water pump can be partially placed on the groove on the upper edge of the sand settling barrel, and the outlet pipe can be fixed by passing a steel wire through the hole to facilitate the installation and disassembly of the outlet pipe.
[0019] The present invention will become more clear through the following description in conjunction with the accompanying drawings, which are used to explain the embodiments of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0021] Figure 1 It is a three-dimensional diagram of the standardized pit top water interception and drainage device;
[0022] Figure 2 is a three-dimensional diagram of the first sand settling barrel;
[0023] Figure 3 This is the front view of the first sand settling barrel;
[0024] Figure 4 is a top view of the first sand settling barrel;
[0025] Figure 5 This is a three-dimensional diagram of a corner sand settling bucket;
[0026] Figure 6 This is a three-dimensional diagram of the sink. DETAILED DESCRIPTION
[0027] Embodiments of the present invention will now be described with reference to the accompanying drawings.
[0028] Example
[0029] The specific implementation of the utility model is as follows Figures 1 to 6 As shown, a standardized pit top water interception and drainage device includes at least two sand settling buckets, and a horizontally arranged water tank 4 is provided between adjacent sand settling buckets. The end of the water tank 4 is connected to the sand settling bucket through a quick-install structure, and the water tank 4 is connected to the upper part of the inner cavity of the sand settling bucket. The openings of both the sand settling bucket and the water tank 4 face upward.
[0030] The quick-install structure includes a connecting groove 3 provided on the outer wall of the sand settling bucket, and the end of the water trough 4 is plugged into the connecting groove 3 of the sand settling bucket. In this embodiment, the cross-section of the water trough 4 and the connecting groove 3 are both U-shaped, and the cross-sections of the two are adapted. The cross-section of the water trough 4 is smaller than the cross-section of the connecting groove 3 by one wall thickness, so that the water trough 4 and the connecting groove 3 can be connected on three sides. The water trough 4 is an elongated strip as a whole.
[0031] The sand settling bucket includes a first sand settling bucket 1 and a corner sand settling bucket 2, both of which are hollow conical barrel structures. The water tanks 4 connected to both sides of the first sand settling bucket 1 are located on the same straight line. The water tanks 4 connected to both sides of the corner sand settling bucket 2 are at an angle to each other, for example, perpendicular to each other. There are two connecting grooves 3 on the first sand settling bucket 1 and they are arranged symmetrically, and there are two connecting grooves 3 on the corner sand settling bucket 2 and they are arranged symmetrically.
[0032] The bottom of the water tank 4 is higher than the bottom of the inner cavity of the sand settling bucket.
[0033] The center line of the water tank 4 is staggered with the center of the sand settling bucket, so that the water tank 4 is biased toward the side where the pit edge is located, and more working surfaces can be reserved for the slope.
[0034] The wall of the sand bucket is provided with reinforcing ribs 7. In this embodiment, at least two reinforcing ribs 7 are provided on the outer circumference of the sand bucket. The upper and lower ends of the reinforcing ribs 7 are arranged adjacent to the top and the bottom of the sand bucket respectively.
[0035] The upper edge of the sand settling bucket near the pit edge is provided with a groove 5 and at least two holes 6. In this embodiment, there are two holes 6 and they are symmetrically arranged on the left and right sides of the groove 5.
[0036] During construction, a small excavator is used to dig a ditch for placing the water trough 3, a hole for placing the first sand settling bucket 1, and a hole for placing the corner sand settling bucket 2 on the top of the pit slope, roughly ensuring a slope of about 3% in the direction of the downstream water flow and the upper edge of the first sand settling bucket 1, the upper edge of the corner sand settling bucket 2, and the upper edge of the water trough 4 are slightly lower than the ground surface by about 10 mm. Then the first sand settling bucket 1 and the corner sand settling bucket 2 are buried, and the water trough 4 of appropriate length is cut. The water trough 4 is connected with each of the first sand settling bucket 1 and the corner sand settling bucket 3 with an adhesive to form a water interception and drainage device. The first sand settling bucket 1, the corner sand settling bucket 2 and the outer periphery of the water trough 4 are appropriately fixed with sand. The water pump outlet pipe (not shown in the figure) is placed in the groove 5 of the first sand settling bucket 1 and the corner sand settling bucket 2, and fixed with iron wire, etc. The iron wire passes through the holes 6 located on the left and right sides of the water outlet pipe. The surface water is intercepted by the device and no longer flows into the pit. The water in the pit is pumped into the device through the outlet pipe of the water pump and discharged. The sediment in the water is basically settled in the sand settling bucket. The sand in the sand settling bucket is removed from time to time to ensure that the water discharged to the municipal pipe network meets the discharge standards. The highest point of the water tank 4 is blocked with materials.
[0037] Specifically, the water outlet of the water pump is set according to the needs of the construction site.
[0038] The present invention is described above in conjunction with the best embodiments, but the present invention is not limited to the embodiments disclosed above, but should cover various modifications and equivalent combinations based on the essence of the present invention.
Claims
1. A standardized pit top water interception and drainage device, characterized in that: It comprises at least two sand settling barrels, wherein a water trough (4) is arranged transversely between adjacent sand settling barrels; the end of the water trough (4) is connected to the sand settling barrel via a quick-install structure, and the water trough (4) is communicated with the upper part of the inner cavity of the sand settling barrel.
2. A standardized pit top water interception and drainage device according to claim 1, characterized in that: The openings of the grit bucket and the water tank (4) are both facing upwards.
3. A standardized pit top water interception and drainage device according to claim 1, characterized in that: The quick-install structure comprises a connecting groove (3) arranged on the outer side wall of the sand settling bucket, and the end of the water trough (4) is plugged into and matched with the connecting groove (3) of the sand settling bucket.
4. A standardized pit top water interception and drainage device according to claim 1, 2 or 3, characterized in that: The sand settling bucket comprises a first sand settling bucket (1) and a corner sand settling bucket (2); the water tanks (4) connected to both sides of the first sand settling bucket (1) are located on the same straight line; and the water tanks (4) connected to both sides of the corner sand settling bucket (2) form an angle with each other.
5. A standardized pit top water interception and drainage device according to claim 1, characterized in that: The bottom of the water tank (4) is higher than the bottom of the inner cavity of the sand settling bucket.
6. A standardized pit top water interception and drainage device according to claim 1, characterized in that: The center line of the water trough (4) and the center of the sand settling bucket are staggered, so that the water trough (4) is biased towards the side where the pit edge is located.
7. A standardized pit top water interception and drainage device according to claim 1, characterized in that: Reinforcing ribs (7) are provided on the wall of the sand settling barrel.
8. A standardized pit top water interception and drainage device according to claim 1, characterized in that: The upper edge of the sand settling bucket close to the pit edge is provided with a groove (5) and at least two holes (6).
