Device for preparing paste filling material from red mud
The device for preparing paste filling material by pressure filtration dewatering and mixing solves the problem of the impact of soluble alkali and heavy metal ions in red mud on groundwater quality, and realizes safe downhole filling.
Patent Information
- Application Number
- CN202420422765.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-03-05
AI Technical Summary
Red mud contains a large amount of soluble alkali and heavy metal ions. Direct use in well filling may lead to alkali overflow and affect groundwater quality.
A red mud slurry dewatering mechanism, a dispersing and slurry preparation mechanism, and a batching and mixing system are used to remove soluble alkali and heavy metal ions through pressure filtration, and then mix it with materials such as cement and fly ash to prepare paste filling material.
It effectively reduces the content of soluble alkali and heavy metal ions in the filling material, avoids the impact on groundwater quality, and meets groundwater quality standards.
Smart Images

Figure CN221953574U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of mine filling, in particular to a device for preparing paste filling material by utilizing red mud slurry. Background Art
[0002] Red mud is a highly alkaline solid waste produced during the refining of alumina from bauxite. It is currently mainly stored on the surface, which will pollute the land and water sources during the storage process and has high safety hazards. Red mud slurry is mixed with cement, fly ash and other materials to prepare a high-concentration slurry in a paste state, which is then transported through a pipeline and filled into the underground goaf. On the one hand, it can reduce the surface stockpile volume, and on the other hand, the slurry can effectively support the roof and control ground pressure activities after solidification, achieving the purpose of "one waste to cure two harms". On the other hand, red mud slurry contains a large amount of soluble alkali and heavy metal ions. If it is directly used for underground filling, it is bound to cause "alkali overflow", which may affect the groundwater quality. In response to the above problems, the utility model proposes a device for preparing paste filling material using red mud slurry. Utility Model Content
[0003] The utility model aims to provide a device for preparing paste filling material by using red mud slurry, so as to solve the above-mentioned problems.
[0004] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0005] The utility model discloses a device for preparing paste filling material by using red mud slurry, comprising a red mud slurry pressure filtration and dehydration mechanism, a dispersing and slurrying mechanism and a batching and stirring system;
[0006] The red mud slurry filter pressing and dehydration mechanism comprises a pressure pump, and the red mud slurry in the external red mud slurry sedimentation tank is pumped into the diaphragm filter press by the pressure pump through a pipeline, and a belt conveyor is arranged at the lower discharge port of the diaphragm filter press;
[0007] The pulping mechanism comprises a rotary cutter and a dispersing machine connected to the belt conveyor 1, a belt conveyor 2 is arranged at the bottom discharge port of the rotary cutter and a high-speed stirring barrel is connected to the other end of the belt conveyor 2, and a bottom liquid outlet of the high-speed stirring barrel is connected to a feed pump;
[0008] The batching and mixing system includes a twin-shaft blade mixer connected to the feed pump, the feed port of the twin-shaft blade mixer is connected to the cement storage and addition system and the fly ash storage and addition system, and the discharge port of the twin-shaft blade mixer is connected to a double-screw mixing conveyor.
[0009] Furthermore, after the red mud slurry is filtered and dehydrated by the diaphragm filter press, the filter cake is sent to the rotary cutter for crushing via a belt conveyor, and then pre-pulped by a high-speed mixing barrel, and finally enters the batching and mixing system to prepare the paste.
[0010] Furthermore, the membrane filter press is connected to a clarification tank.
[0011] Furthermore, the high-speed stirring barrel is connected to a water supply system, and the water supply system is provided with a flow meter and an electric regulating valve.
[0012] Furthermore, a flow meter 2 and a concentration meter are provided on the pipeline connecting the feed pump and the twin-horizontal-shaft blade mixer.
[0013] Furthermore, the discharge port of the cement storage and addition system is provided with a cement storage and feeding system micro-powder scale feeding spiral structure, and the cement storage and feeding system micro-powder scale feeding spiral structure is driven by a variable frequency motor.
[0014] Furthermore, the discharge port of the fly ash storage and addition system is provided with a fly ash storage and feeding system micro-powder scale feeding spiral structure, and the fly ash storage and feeding system micro-powder scale feeding spiral structure is driven by a second variable frequency motor.
[0015] Compared with the prior art, the beneficial technical effects of the utility model are:
[0016] The utility model discloses a device for preparing a paste filling material from red mud slurry, firstly performs filter pressing and dehydration treatment on the red mud slurry to remove soluble alkali and heavy metal ions in the red mud attached liquid, then stirs the filter cake with new water to re-slurry, and finally mixes it evenly with cement, fly ash and other materials to prepare a paste with a designed proportion. The device can effectively reduce the content of soluble alkali and heavy metal ions in the filling material, and avoid the influence of the filling operation on the groundwater quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The utility model will be further described below in conjunction with the accompanying drawings.
[0018] Figure 1 This is a structural diagram of a device for preparing a paste filling material using red mud slurry according to the utility model;
[0019] Explanation of the reference numerals in the accompanying drawings: 1. Pressure pump; 2. Diaphragm filter press; 3. Belt conveyor 1; 4. Peeler; 5. Belt conveyor 2; 6. High-speed mixing barrel; 7. Feeding pump; 8. Twin-shaft blade mixer; 9. Twin-screw mixing conveyor; 10. Flow meter 1; 11. Electric regulating valve; 12. Flow meter 2; 13. Concentration meter; 14. Frequency conversion motor 1; 15. Frequency conversion motor 2. DETAILED DESCRIPTION
[0020] like Figure 1As shown, a device for preparing paste filling material using red mud slurry includes a red mud slurry pressure filtration and dehydration mechanism, a disintegrating slurry making mechanism and a batching and stirring system.
[0021] The red mud slurry filter pressing and dehydration mechanism comprises a pressure pump 1, and the red mud slurry in the external red mud slurry sedimentation tank is pumped into the diaphragm filter press 2 through a pipeline by the pressure pump 1, and a belt conveyor 3 is installed at the lower discharge port of the diaphragm filter press 2. The diaphragm filter press 2 is connected to the clarification tank.
[0022] Specifically, the red mud is the bottom sediment after separation and washing in the sedimentation tank, which is transported by the booster pump 1 through a pipeline to the membrane filter press 2 for filter pressing and dehydration, and the produced filter press water is sent to the clarification tank through a pipeline, and the red mud filter cake is transported to the rotary cutter 4 for crushing through a belt conveyor 3, and then pre-pulped by a high-speed mixing barrel 6, and finally enters the batching and mixing system to prepare the paste. Among them, the booster pump 1 is located at the bottom of the sedimentation tank, and its technical parameters such as rated pressure, flow, power, etc. must match the technical parameters of the membrane filter press.
[0023] The pulping mechanism includes a rotary cutter 4 connected to the belt conveyor 3, a belt conveyor 2 5 is installed at the bottom discharge port of the rotary cutter 4, and the other end of the belt conveyor 2 5 is connected to a high-speed stirring barrel 6, which plays the role of stirring, easing, storing and buffering. The bottom liquid outlet of the high-speed stirring barrel 6 is connected to a feed pump 7. The high-speed stirring barrel 6 is connected to a water supply system, and a flow meter 10 and an electric regulating valve 11 are provided on the water supply system.
[0024] Specifically, the red mud filter cake produced in the red mud slurry filter pressing and dewatering mechanism is transported to the rotary cutter disperser 4, and after being dispersed and crushed, it is transported to the high-speed mixing barrel 6 by the belt conveyor 2 5, and is mixed and stirred with new water added by the external water supply system to re-slurry.
[0025] The batching and mixing system includes a twin-shaft blade mixer 8 connected to the feed pump 7, which is used to preliminarily disperse and mix the red mud slurry, cement and fly ash. The feed port of the twin-shaft blade mixer 8 is connected to the cement storage and addition system and the fly ash storage and addition system, and the discharge port of the twin-shaft blade mixer 8 is connected to a double-screw mixing conveyor 9, which is used to further mix the mixed materials evenly.
[0026] The red mud slurry produced in the pulping mechanism is transported by the feed pump 7 through a pipeline to the twin-shaft blade mixer 8, preliminarily mixed with cement and fly ash, and then enters the double-screw mixing conveyor 9 for further mixing to prepare a paste filling material with a designed ratio.
[0027] A flow meter 12 and a concentration meter 13 are provided on the pipeline connecting the feed pump 7 and the twin-horizontal-shaft blade mixer 8 .
[0028] The discharge port of the cement storage and addition system is provided with a cement storage and feeding system micro-powder scale feeding spiral structure, and the cement storage and feeding system micro-powder scale feeding spiral structure is driven by a variable frequency motor 14.
[0029] The discharge port of the fly ash storage and addition system is provided with a fly ash storage and feeding system micro-powder scale feeding spiral structure, and the fly ash storage and feeding system micro-powder scale feeding spiral structure is driven by a variable frequency motor 15.
[0030] The mass of red mud solid material per unit time is calculated according to the monitoring values of flow meter 12 and concentration meter 13, and the amount of new water added per unit time is calculated according to the designed concentration and proportion of the paste filling material. The opening and closing of the electric regulating valve 11 is controlled by the monitoring data of flow meter 10 to achieve precise control of the amount of new water added. The amount of cement and fly ash added per unit time is calculated according to the designed proportion of the filling paste, and the frequency of the variable frequency motor 14 and the variable frequency motor 2 15 is adjusted to achieve precise control of the amount of cement and fly ash added.
[0031] Example
[0032] With a filling capacity of 90m 3 For example, the bauxite mine filling station with a capacity of 10000 tons / h directly uses the washed red mud in the sedimentation tank to prepare the paste filling material according to the design ratio of red mud: fly ash: cement = 6:4:1.1 and the paste mass concentration of 58%. In order to simulate the migration of suspended compounds or other impurity ions in the underground filling body under the action of surface water, the leaching test was carried out on the filling body test block. The pH values of the filling leaching water after 3 days, 7 days and 14 days were measured to be 9.42, 9.21 and 9.18 respectively, which did not meet the requirement of pH value less than 8.5 in the "Groundwater Quality Standard" GB14848-2017 (Class III standard), indicating that the filling operation has a certain negative impact on the groundwater quality. The filling process is optimized by the method provided by the utility model.
[0033] First, the red mud slurry in the sedimentation tank is filtered and dehydrated; a new filter press workshop is built with two diaphragm filter presses 2 (single unit processing capacity 40t / h). The red mud slurry in the sedimentation tank is filtered and dehydrated by a pressure pump 1 (diaphragm pump with a rated flow of 250m 3 / h, rated pressure 0.7~0.8Mpa. ) is sent to the membrane filter press for dehydration, and the filter cake is sent to the rotary cutter 4 through the belt conveyor 3 at the bottom of the filter press;
[0034] Secondly, the filter cake is broken up and pulped; the filter cake is sent to the rotary cutter 4 (processing capacity 100t / h) through the belt conveyor 3 for breaking up and crushing, and the broken red mud is transported to the high-speed mixing barrel 6 (processing capacity 100t / h, volume 8m) through the belt conveyor 25 at the bottom. 3) and the new water added to the water supply system to mix and slurry; the prepared red mud slurry is fed through a feed pump 7 (a diaphragm pump with a rated flow of 250m 3 / h) is pumped to the batching and mixing system through a pipeline;
[0035] Finally, the ingredients are mixed according to the designed ratio (red mud: fly ash: cement = 6:4:1.1, paste mass concentration 58%), and the newly mixed red mud slurry is sent to the twin-shaft blade mixer 8 (mixing capacity is 100m3 / h) through the pipeline feeding pump 7. At the same time, the cement and fly ash storage and adding system adds the designed amount of cement and fly ash to the twin-shaft blade mixer 8 through the micro powder scale. After the above three materials are initially mixed, they enter the double-screw mixing conveyor 9 (mixing capacity is 100m3 / h). 3 / h) and further mix evenly to prepare a qualified paste.
[0036] The above preparation process is monitored and automatically controlled in real time by the flow meter 10 on the new water supply pipeline, the electric regulating valve 11, the flow meter 2 12 on the outlet pipeline of the feed pump 7, the concentration meter 13, the variable frequency motor 14 and the variable frequency motor 2 15 of the feed screw of the micro powder scale of the cement and fly ash storage and addition system, which ensures the smooth operation of the filling system and the system preparation capacity is stable at 90m 3 / h or so.
[0037] Leaching tests were carried out on the paste filling material prepared by the above system, and the pH values of the filling leaching water after 3, 7 and 14 days were measured to be 8.46, 8.28 and 7.98, respectively, which met the relevant requirements of the "Groundwater Quality Standard" GB14848-2017 (Class III standard), proving that the method provided by the utility model can effectively reduce the alkali content in the filling material and avoid the impact of the filling operation on the groundwater quality.
[0038] The embodiments described above are only descriptions of the preferred methods of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should fall within the protection scope determined by the claims of the present invention.
Claims
1. A device for preparing a paste filling material using red mud slurry, characterized in that: It includes red mud slurry filter pressing and dewatering mechanism, disintegrating slurry making mechanism and batching and mixing system; The red mud slurry filter pressing and dehydration mechanism comprises a pressure pump (1), and the red mud slurry in the external red mud slurry sedimentation tank is pumped into the diaphragm filter press (2) through a pipeline by the pressure pump (1), and a belt conveyor (3) is arranged at the lower discharge port of the diaphragm filter press (2); The pulping mechanism comprises a rotary cutter (4) connected to the belt conveyor (3), a belt conveyor (5) is provided at the bottom discharge port of the rotary cutter (4), the other end of the belt conveyor (5) is connected to a high-speed stirring barrel (6), and the bottom liquid outlet of the high-speed stirring barrel (6) is connected to a feed pump (7); The batching and mixing system comprises a twin-shaft blade mixer (8) connected to the feed pump (7), the feed port of the twin-shaft blade mixer (8) is connected to a cement storage and addition system and a fly ash storage and addition system, and the discharge port of the twin-shaft blade mixer (8) is connected to a double-screw mixing conveyor (9).
2. The device for preparing a paste filling material using red mud slurry according to claim 1, characterized in that: After the red mud slurry is filtered and dehydrated by the membrane filter press (2), the filter cake produced is sent to the rotary cutter (4) for crushing via a belt conveyor (3), and then pre-pulped via a high-speed stirring barrel (6), and finally enters a batching and stirring system to prepare a paste.
3. The device for preparing a paste filling material using red mud slurry according to claim 1, characterized in that: The membrane filter press (2) is connected to a clarification tank.
4. The device for preparing a paste filling material using red mud slurry according to claim 1, characterized in that: The high-speed stirring barrel (6) is connected to a water supply system, and the water supply system is provided with a flow meter (10) and an electric regulating valve (11).
5. The device for preparing a paste filling material using red mud slurry according to claim 1, characterized in that: A flow meter 2 (12) and a concentration meter (13) are provided on the pipeline connecting the feed pump (7) and the twin-shaft blade mixer (8).
6. The device for preparing a paste filling material using red mud slurry according to claim 1, characterized in that: The discharge port of the cement storage and addition system is provided with a cement storage and feeding system micro-powder scale feeding spiral structure, and the cement storage and feeding system micro-powder scale feeding spiral structure is driven by a variable frequency motor (14).
7. The device for preparing a paste filling material using red mud slurry according to claim 1, characterized in that: The discharge port of the fly ash storage and addition system is provided with a fly ash storage and feeding system micro powder scale feeding spiral structure, and the fly ash storage and feeding system micro powder scale feeding spiral structure is driven by a second variable frequency motor (15).
Citation Information
Cited By
Preparation device and preparation method of red mud-based filling slurry
CN122499692A