Gas-liquid dust fall construction structure for down-the-hole hammer of multifunctional drilling machine
By adding an oil mist canister branch pipe and a water pump system to the down-the-hole hammer drill, the lubricating oil and liquid water are atomized. The high-pressure water mist carries the charge and combines with the dust, which solves the problem of dust pollution during construction and achieves the effect of reducing environmental pollution.
Patent Information
- Application Number
- CN202420305436.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-19
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-02-19
AI Technical Summary
The dust pollution problem generated by down-the-hole hammer drills during construction is difficult to solve effectively.
By adding a branch pipe at the outlet of the oil mist canister and using a water pump to deliver liquid water and high-speed airflow generated by an air compressor, the lubricating oil and liquid water are atomized to form a three-phase substance, which is then delivered to the top of the drill pipe. The water mist sprayed by the down-the-hole hammer carries positive and negative charges and combines with dust particles in the air, wetting the rock debris and soil. Finally, under high air pressure, the dust and debris are carried back to the borehole opening through the gap between the drill pipe and the casing, thus avoiding dust.
It effectively reduced dust pollution during construction and reduced environmental pollution.
Smart Images

Figure CN221957545U_ABST
Abstract
Description
Technical Field
[0001] The utility model patent relates to the technical field of down-the-hole hammer drilling rig construction structure, specifically, to a multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure. Background Art
[0002] The essence of a down-the-hole hammer drill is to make the impactor submerge into the hole during the rock drilling process to reduce the energy loss caused by the impact work transmitted by the drill rod, thereby reducing the influence of hole depth on the rock drilling efficiency. For geology with thick rock filling layers, the multi-functional drilling rig's inner power head is used to drive the down-the-hole hammer to impact and drill the rock, giving full play to the advantages of the down-the-hole hammer in efficiently breaking rocks and quickly and ahead of time to penetrate the rock filling layer.
[0003] However, during the construction process, the crushed rock debris and dust particles are often carried back to the hole mouth by high-pressure airflow and scattered everywhere, thus causing dust pollution. Utility Model Content
[0004] The utility model aims to provide a multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure, aiming to solve the problem of dust pollution easily caused during the construction process in the prior art.
[0005] The utility model is implemented as follows: a multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure comprises an air compressor unit, an air storage tank, a water pump and a drilling rig base, a drilling rig base is provided with a drilling rig column, an inner power head is connected to the drilling rig column, a drill rod is connected to the bottom of the inner power head, a down-the-hole hammer is connected to the bottom of the drill rod, an outer power head is connected to the drilling rig column, a sleeve is provided on the output end of the outer power head, the sleeve is sleeved on the outside of the drill rod, the input end of the air storage tank is connected to the output end of the air compressor unit through a connecting pipe, the output end of the air storage tank is connected to an oil mist tank through a connecting pipe, the output end of the oil mist tank is connected to the top of the drill rod through a connecting pipe, the input end of the water pump is connected to a water bucket through a connecting pipe, and the output end of the water pump is connected to the output end of the oil mist tank through a connecting pipe.
[0006] Preferably, the output end of the oil mist tank is connected to a three-way connector, and the output end of the water pump is connected to the interface of the three-way connector.
[0007] Preferably, the inner power head is arranged directly above the outer power head.
[0008] Preferably, the outer power head drives the sleeve to rotate in a counterclockwise direction, and an alloy cutting bit is installed at the bottom of the sleeve.
[0009] Preferably, the sleeve and the alloy cutting bit are integrally formed.
[0010] Preferably, the inner power head drives the drill rod and the down-the-hole hammer to rotate in a clockwise direction.
[0011] Preferably, a female connector is provided at the bottom of the outer power head, and a male connector matching the female connector is provided at the top of the sleeve.
[0012] Preferably, the inner wall of the female connector is evenly provided with four L-shaped connecting grooves along the circumferential direction, and the outer wall of the male connector is provided with four buckles matched with the connecting grooves at corresponding positions.
[0013] Preferably, four arc-shaped steel plates are welded at positions of the outer side wall of the female connector corresponding to the connecting grooves, and the four arc-shaped steel plates are staggered in a circumferential direction.
[0014] Preferably, a through hole penetrating the female connector is provided on the inner wall of the connecting groove of the female connector.
[0015] Compared with the prior art, the multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure provided by the utility model adds a branch pipe at the outlet of the oil mist tank and transports liquid water into the branch pipe through a water pump, so that the high-speed airflow generated by the air compressor can be collected to the air storage tank through the high-pressure air pipe and transported to the oil mist tank, the lubricating oil and liquid water are atomized, and the three-phase substances are jointly transported to the top of the drill pipe, and transported to the hammer head of the down-the-hole hammer along the drill pipe. Since the water mist sprayed by the down-the-hole hammer head at high pressure carries higher positive and negative charges, the water mist can be quickly combined with the dust particles suspended in the air through the comprehensive effect of diffusion, and the larger rock debris and soil debris are moistened at the same time. Finally, under the action of high wind pressure, the dust is carried back to the hole mouth through the gap between the drill pipe and the casing, thereby achieving the purpose of avoiding dust and reducing pollution to the environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall construction layout of the multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure provided by the utility model;
[0017] Figure 2 It is a structural schematic diagram of a male joint and a female joint of a multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure provided by the utility model.
[0018] Description of reference numerals:
[0019] 1. Drilling rig base; 2. Drilling rig column; 3. Inner power head; 4. Outer power head; 5. Casing; 6. Drill rod; 7. Water pump; 8. Water bucket; 9. Oil mist tank; 10. Air storage tank; 11. Air compressor unit; 12. Connectors; 13. Down-the-hole hammer; 14. Female connector; 15. Arc steel plate; 16. Male connector; 17. Buckle; 18. Connecting groove; 19. Through hole. DETAILED DESCRIPTION
[0020] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0021] The implementation of the present utility model is described in detail below in conjunction with specific embodiments.
[0022] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present utility model, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0023] Reference Figure 1-2 As shown, it is a preferred embodiment provided by the utility model.
[0024] The multifunctional drilling rig down-the-hole hammer 13 gas-liquid dust reduction construction structure comprises an air compressor unit 11, an air storage tank 10, a water pump 7 and a drilling rig base 1. A drilling rig base 1 is provided with a drilling rig column 2, an inner power head 3 is connected to the drilling rig column 2, a drill rod 6 is connected to the bottom of the inner power head 3, a down-the-hole hammer 13 is connected to the bottom of the drill rod 6, an outer power head 4 is connected to the drilling rig column 2, a sleeve is provided on the output end of the outer power head 4, and the sleeve is sleeved on the outside of the drill rod 6. The input end of the air storage tank 10 is connected to the output end of the air compressor unit 11 through a connecting pipe, the output end of the air storage tank 10 is connected to the oil mist tank 9 through a connecting pipe, the output end of the oil mist tank 9 is connected to the top of the drill rod 6 through a connecting pipe, the input end of the water pump 7 is connected to the water bucket 8 through a connecting pipe, and the output end of the water pump 7 is connected to the output end of the oil mist tank 9 through a connecting pipe.
[0025] By adding a branch pipe at the outlet of the oil mist tank 9 and conveying liquid water into the branch pipe through the water pump 7, the high-speed airflow generated by the air compressor can be collected into the air storage tank 10 through the high-pressure air pipe and conveyed to the oil mist tank 9, the lubricating oil and liquid water are atomized, and the three-phase substances are conveyed to the top of the drill pipe 6 together, so that they are conveyed to the hammer head of the down-the-hole hammer 13 along the drill pipe 6. Since the water mist sprayed out by the high-pressure head of the down-the-hole hammer 13 will carry higher positive and negative charges, the water mist can be quickly combined with the dust particles suspended in the air through the comprehensive effect of diffusion, and the larger rock debris and soil debris can be moistened at the same time. Finally, under the action of high wind pressure, the dust is carried back to the hole mouth through the gap between the drill pipe 6 and the casing 5, thereby achieving the purpose of avoiding dust and reducing pollution to the environment.
[0026] Specifically, in this embodiment, the output end of the oil mist tank 9 is connected to a three-way connector 12 , and the output end of the water pump 7 is connected to the interface of the three-way connector 12 .
[0027] The three-way connector 12 can facilitate the water pump 7 to transport the liquid water in the water bucket 8 to the output end of the oil mist tank 9, so that the liquid water can be mixed with the lubricating oil and atomized.
[0028] Specifically, in this embodiment, the inner power head 3 is arranged directly above the outer power head 4, the outer power head 4 drives the casing 5 to rotate in the counterclockwise direction, the bottom of the casing 5 is equipped with an alloy cutting bit, the casing 5 and the alloy cutting bit are integrated into one, and the inner power head 3 drives the drill rod 6 and the down-the-hole hammer 13 to rotate in the clockwise direction.
[0029] The alloy cutting bit at the bottom of the casing 5 is used to powerfully cut the formation. Since the casing 5 and the down-the-hole hammer 13 rotate in opposite directions, the drilling efficiency of the device can be improved. The casing 5 is used for advanced ring drilling and wall protection, and the down-the-hole hammer 13 follows the casing for punching and drilling. When encountering rock filling, boulders, and hard rock formations, the casing 5 cannot be pressed in. The down-the-hole hammer 13 is replaced for advanced punching and drilling, and the casing 5 follows the wall protection until the casing 5 is pressed into the top surface of the bearing rock formation, and the down-the-hole hammer 13 continues to break the rock to the final hole.
[0030] Specifically, in this embodiment, a female connector 14 is provided at the bottom of the outer power head 4, a male connector 16 matched with the female connector 14 is provided at the top of the sleeve 5, the inner wall of the female connector 14 is evenly provided with four L-shaped connecting grooves 18 along the circumferential direction, and the outer wall of the male connector 16 is provided with four buckles 17 matched with the connecting grooves 18 at corresponding positions.
[0031] By setting the male connector 16 and the female connector 14, when connecting the outer power head 4 and the sleeve 5, the outer power head 4 can be rotated to align the position of the female connector 14 with the male connector 16, and the buckle 17 on the outer wall of the male connector 16 is inserted into the initial connection groove 18 in the female connector 14, and the female connector 14 is rotated counterclockwise so that the buckle 17 is clamped in the connection groove 18, thereby completing the coupling connection of the male and female connectors 14.
[0032] Specifically, in this embodiment, four arc-shaped steel plates 15 are welded at positions of the outer wall of the female connector 14 corresponding to the connecting groove 18 , and the four arc-shaped steel plates 15 are staggered in the circumferential direction.
[0033] The arrangement of the arc-shaped steel plate 15 can ensure that the overall force of the sleeve body is balanced.
[0034] Specifically, in this embodiment, a through hole 19 penetrating the female connector 14 is formed on the inner wall of the connecting groove 18 of the female connector 14 .
[0035] By setting the through hole 19, after the coupling connection of the male and female connectors 14 is completed, the bar-shaped pin can be inserted into the through hole 19, so as to limit the buckle 17 in the docking groove 18, thereby achieving the purpose of locking and fixing the male and female connectors 14.
[0036] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. The multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure is characterized by: The invention comprises an air compressor unit, an air storage tank, a water pump and a drilling rig base, wherein a drilling rig column is arranged on the drilling rig base, an inner power head is connected to the drilling rig column, a drill rod is connected to the bottom of the inner power head, a down-the-hole hammer is connected to the bottom of the drill rod, an outer power head is connected to the drilling rig column, a sleeve is arranged on the output end of the outer power head, the sleeve is sleeved on the outside of the drill rod, the input end of the air storage tank is connected to the output end of the air compressor unit through a connecting pipe, the output end of the air storage tank is connected to an oil mist tank through a connecting pipe, and the output end of the oil mist tank is connected to At the top of the drill pipe, the input end of the water pump is connected to a water bucket through a connecting pipe, and the output end of the water pump is connected to the output end of the oil mist tank through a connecting pipe. A female joint is arranged at the bottom of the outer power head, and a male joint matched with the female joint is arranged at the top of the casing. The inner wall of the female joint is evenly provided with four L-shaped connecting grooves along the circumferential direction, and four buckles matched with the connecting grooves are arranged at corresponding positions on the outer wall of the male joint. Four arc-shaped steel plates are welded at positions on the outer wall of the female joint corresponding to the connecting grooves, and the four arc-shaped steel plates are staggered along the circumferential direction.
2. The multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure according to claim 1, characterized in that: The output end of the oil mist tank is connected with a three-way connector, and the output end of the water pump is connected to the interface of the three-way connector.
3. The multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure according to claim 1, characterized in that: The inner power head is arranged directly above the outer power head.
4. The multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure according to claim 1, characterized in that: The outer power head drives the sleeve to rotate in the counterclockwise direction, and an alloy cutting tool head is installed at the bottom of the sleeve.
5. The multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure as claimed in claim 4, characterized in that: The sleeve and the alloy cutting tool head are integrally formed.
6. The multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure according to claim 1, characterized in that: The inner power head drives the drill rod and the down-the-hole hammer to rotate in a clockwise direction.
7. The multifunctional drilling rig down-the-hole hammer gas-liquid dust reduction construction structure according to claim 1, characterized in that: A through hole penetrating the female connector is provided on the inner wall of the connecting groove of the female connector.