Steel box girder hoisting structure

By incorporating internal and auxiliary components, the buffering performance and stability of the bridge steel box girder hoisting structure are enhanced, solving the problems of vibration and swaying during the suspension process and extending its service life.

CN221971013UActive Publication Date: 2024-11-08TIANYUAN CONSTR GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420000995.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-11-08
Estimated Expiration
2034-01-02

AI Technical Summary

Technical Problem

The existing steel box girder hoisting structure for bridges has poor buffering performance during suspension, resulting in large vibration amplitude and low stability, making it prone to breakage and swaying, thus affecting its service life.

Method used

By incorporating internal and auxiliary components, including hollow cylinders, circular covers, suspension components, dampers, and locking components, the cushioning performance and stability are enhanced, and the contact area and connection strength are increased.

Benefits of technology

It effectively buffers the lifting force, improves the stability of the bridge steel box girder lifting structure, reduces swaying, and extends service life.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221971013U_ABST
    Figure CN221971013U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel box girder hoisting structure, and relates to the technical field of bridge engineering. The device comprises auxiliary assemblies, an external assembly and an internal assembly, the auxiliary assemblies are distributed on the periphery of the external assembly in an annular array mode, a movable assembly is connected in the external assembly, the internal assembly is connected to the upper side in the movable assembly, and the lower side of the internal assembly is connected with the lower side in the external assembly. According to the steel box girder hoisting structure, the internal components are arranged, so that the buffering performance of the steel box girder hoisting structure on suspension force is effectively improved, the hoisting capacity of the steel box girder hoisting structure is further effectively improved, the steel box girder hoisting structure can hoist a bridge steel box girder with larger gravity, and the auxiliary components are arranged, so that the hoisting efficiency is improved. The contact surface between the steel box girder hoisting structure and the bridge steel box girder is increased, so that the suspension force distribution of the steel box girder hoisting structure on the bridge steel box girder is more reasonable, and the stability of the bridge steel box girder in the hoisting process is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridge engineering, in particular to a steel box beam hoisting structure. Background Art

[0002] Bridge engineering refers to the process in which staff conduct a series of work such as surveying, designing, constructing, maintaining and verifying the bridge. As the bridge is erected on a wide river surface, it is convenient for drivers to drive vehicles across the wide river surface on the bridge, and the distance driven by drivers is greatly reduced, thereby saving energy and greatly improving the transportation efficiency of goods. At present, bridge construction workers use bridge steel box girders in the process of building bridges. Due to the large gravity of bridge steel box girders, bridge construction workers control the crane to adjust the position of the bridge steel box girder. In order to facilitate the lifting of the bridge steel box girder by construction workers, construction workers install a bridge steel box girder lifting structure on the upper surface of the bridge steel box girder. Users use the hook on the control crane to connect with the bridge steel box girder lifting structure, and then control the crane to lift the bridge steel box girder.

[0003] After searching, a patent document with patent announcement number CN218478428U discloses a bridge steel box girder lifting structure, including a lifting column for welding on the bridge steel box girder, a vertically arranged threaded blind hole is opened in the middle position of the upper surface of the lifting column, a threaded column is threadedly connected in the threaded blind hole, a lifting ring is fixedly connected to the upper end of the threaded column, a threaded disk is threadedly connected at the lowermost side of the threaded blind hole, a spring is fixedly connected to the upper surface of the threaded disk, a plug for blocking the open end of the threaded blind hole is fixedly connected to the upper end of the spring, the plug is slidably installed in the threaded blind hole, a vertically arranged circular hole is opened in the middle position of the upper surface of the plug, a transmission column for twisting the threaded disk is inserted in the circular hole, a square head is fixedly connected to the lower end of the transmission column, and the upper surface of the threaded disk is recessed downward to form a square groove. The utility model has the following beneficial effects: it realizes real-time blocking of the threaded lines in the connection structure to prevent small debris from entering the threaded lines in the connection structure.

[0004] However, it still has the following disadvantages in actual use:

[0005] A bridge steel box girder hoisting structure disclosed in the patent document with patent publication number CN218478428U has poor buffering performance against tension during use, resulting in a large vibration amplitude of the bridge steel box girder during the suspension process due to the influence of the bridge steel box girder's own gravity, and even causing the bridge steel box girder hoisting structure to break during use;

[0006] A bridge steel box girder lifting structure disclosed in the patent document with patent announcement number CN218478428U, during use, is connected to the middle part of the bridge steel box girder by only lifting columns, which results in a small contact area between the bridge steel box girder lifting structure and the bridge steel box girder. As a result, during the process of lifting the bridge steel box girder, the suspension force on the bridge steel box girder is too concentrated, causing the bridge steel box girder lifting structure to shake during the lifting process, thereby reducing the stability of the bridge steel box girder lifting structure during the lifting process, and even causing the bridge steel box girder to collide with external objects, and even reducing the service life of the bridge steel box girder.

[0007] Therefore, a bridge steel box girder hoisting structure disclosed in the patent document with patent announcement number CN218478428U cannot meet the needs in actual use, so there is an urgent need for improved technology on the market to solve the above problems. Utility Model Content

[0008] The purpose of the utility model is to provide a steel box girder hoisting structure, which solves the problems of poor buffering performance and poor stability during operation in a bridge steel box girder hoisting structure disclosed in the patent document with patent announcement number CN218478428U by arranging internal components and auxiliary components.

[0009] In order to solve the above technical problems, the utility model is realized by the following technical solutions:

[0010] The utility model is a steel box girder hoisting structure, comprising an auxiliary component, an external component and an internal component, wherein the auxiliary components are distributed in a ring array on the periphery of the external component, a movable component is connected inside the external component, the upper side of the movable component is connected to the internal component, and the lower side of the internal component is connected to the lower side of the external component.

[0011] Furthermore, the external component includes a hollow cylinder and a circular cover; the inner wall of the hollow cylinder is provided with a U-shaped slide groove in a circular array, the lower side of the hollow cylinder is connected to the circular cover, the lower side of the circular cover is threadedly connected with countersunk screws in a circular array, the middle part of the upper side of the circular cover is connected to a second externally threaded cam, the lower side of the outer periphery of the circular cover is connected to an annular plate, and the upper side of the annular plate is threadedly connected with a second bolt in a circular array.

[0012] Furthermore, the movable component includes a lower opening tube and an internal threaded sleeve; the lower opening tube is located inside the hollow tube, and a ring array is distributed on the lower outer circumference of the lower opening tube. The protrusions are slidably connected to the U-shaped slide groove, and the upper side of the lower opening tube is connected to the internal threaded sleeve.

[0013] Furthermore, the internal component includes a second spring and a damper; an upper circular block is connected to the upper side of the damper, the upper circular block is connected to the upper side of the lower opening tube, the lower side of the damper is connected to the lower circular block, a second internal threaded hole groove is provided on the lower side of the lower circular block, the second internal threaded hole groove is threadedly connected to the second external threaded convex shaft, a second spring is connected to the outer periphery of the damper, and the upper and lower sides of the second spring are respectively connected to the lower side of the upper circular block and the upper side of the lower circular block.

[0014] Furthermore, a suspension assembly is connected to the upper side of the movable assembly, and the suspension assembly includes an externally threaded shaft and an earring seat; the externally threaded shaft at the lower side of the earring seat is threadedly connected to the internally threaded sleeve.

[0015] Furthermore, a connecting component is distributed in a circular array on the upper side of the outer periphery of the external component, and the connecting component includes a second connecting block and a U-shaped seat; three U-shaped seats are distributed in a circular array on the upper side of the outer periphery of the hollow cylinder, the U-shaped seat is symmetrically connected to the second damping bearing front and back, the second ear seat on the upper side of the second connecting block is symmetrically connected to the second shaft pin front and back, the second shaft pin is rotatably connected to the second damping bearing, and a first internal threaded hole groove is symmetrically opened on the lower side of the second connecting block.

[0016] Furthermore, the auxiliary component includes a first spring, a hollow shaft, a movable shaft and a first connecting block; the first connecting block is located directly below the second connecting block, the hollow shaft is symmetrically connected to the upper side of the first connecting block, the inner wall of the hollow shaft is provided with U-shaped through grooves in a circular array, sliding rods are distributed in a circular array on the outer periphery of the movable shaft, the sliding rods are slidably connected to the U-shaped through grooves, the upper end of the movable shaft is connected to a first externally threaded convex shaft, the first externally threaded convex shaft is threadedly connected to the first internally threaded hole groove, the outer side of the first connecting block is connected to a first ear seat, the first ear seat is symmetrically connected to the first shaft pin front and back, and the outer periphery of the hollow shaft is sleeved with a first spring.

[0017] Furthermore, a locking assembly is connected to the lower outer side of the auxiliary assembly, and the locking assembly includes an ear block and an ear plate; the ear plate is located on the outer side of the first connecting block, and the inner side of the ear plate is symmetrically connected to the first damping bearing front and back, the first damping bearing is rotatably connected to the first shaft pin, and the upper side of the ear plate is threaded with first bolts at equal intervals.

[0018] The utility model has the following beneficial effects:

[0019] The utility model improves the buffering performance of the steel box girder lifting structure to the lifting force by arranging internal components, so that the steel box girder lifting structure can effectively buffer the force during the process of lifting the bridge steel box girder, thereby solving the problem of poor buffering performance of a bridge steel box girder lifting structure disclosed in the patent document with patent announcement number CN218478428U.

[0020] The utility model provides an auxiliary component, and the user assembles the auxiliary component and connects the auxiliary component to the bridge steel box girder through a locking component, thereby increasing the contact area between the steel box girder lifting structure and the bridge steel box girder, thereby effectively improving the stability of the steel box girder lifting structure when lifting the bridge steel box girder, thereby improving the stability of the bridge steel box girder during movement, thereby solving the problem of poor stability during operation of a bridge steel box girder lifting structure disclosed in the patent document with patent announcement number CN218478428U. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 It is a structural schematic diagram of a steel box girder hoisting structure;

[0023] Figure 2 is a schematic diagram of the structure of the external components;

[0024] Figure 3 Exploded diagram of the connection between suspension components, movable components and internal components Figure 1 ;

[0025] Figure 4 Exploded diagram of the connection between suspension components, movable components and internal components Figure 2 ;

[0026] Figure 5 is a schematic diagram of the structure of the connection components;

[0027] Figure 6 A schematic diagram of the connection between auxiliary components and connecting components;

[0028] Figure 7 It is an exploded schematic diagram of the connection between the hollow shaft, the movable shaft and the second connecting block;

[0029] Figure 8 It is a connection diagram of the first connection block and the locking assembly.

[0030] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0031] 1. Suspension assembly; 11. Externally threaded shaft; 12. Earring seat; 2. Movable assembly; 21. Lower opening tube; 22. Internally threaded sleeve; 23. Protrusion; 3. Auxiliary assembly; 31. First spring; 32. Hollow shaft; 33. Movable shaft; 34. First connecting block; 35. First ear seat; 36. First externally threaded protruding shaft; 37. Sliding rod; 38. U-shaped through groove; 39. First shaft pin; 4. Locking assembly; 41. Ear block; 42. First damping bearing; 43. First bolt; 44. Ear plate; 5. External component; 51, annular plate; 52, hollow cylinder; 53, second bolt; 54, countersunk screw; 55, circular cover; 56, second external threaded cam; 57, U-shaped slide groove; 6, connecting component; 61, second ear seat; 62, second connecting block; 63, second shaft pin; 64, second damping bearing; 65, U-shaped seat; 66, first internal threaded hole groove; 7, internal component; 71, second spring; 72, lower circular block; 73, second internal threaded hole groove; 74, damper; 75, upper circular block. DETAILED DESCRIPTION

[0032] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0033] See also Figures 1 to 8 As shown, the utility model is a steel box girder lifting structure, including an auxiliary component 3, an external component 5 and an internal component 7. The auxiliary components 3 are distributed in a ring array on the periphery of the external component 5, the external component 5 is connected with a movable component 2, the upper side of the movable component 2 is connected with the internal component 7, and the lower side of the internal component 7 is connected to the lower side of the external component 5.

[0034] The steps for using the steel box girder lifting structure in bridge engineering are as follows: the user locks and connects the lower side of the external component 5 to the middle of the upper surface of the bridge steel box girder, unfolds the auxiliary component 3, and locks and connects the three locking components 4 in a circular array to the upper surface of the bridge steel box girder. The user controls the hook on the crane to hang with the suspension component 1, starts the crane, the suspension component 1 moves upward, the movable component 2 moves upward, the internal component 7 extends, the connecting component 6 and the auxiliary component 3 move upward, the external component 5 and the locking component 4 move upward, and the bridge steel box girder moves upward, that is, the bridge steel box girder is gradually suspended, the crane is controlled to move the bridge steel box girder above the working position, and the crane is controlled to gradually place the bridge steel box girder on the working position.

[0035] Among them Figure 1 , 2As shown, the external component 5 includes a hollow cylinder 52 and a circular cover 55; the inner wall of the hollow cylinder 52 is provided with a U-shaped slide groove 57 in a circular array, the lower side of the hollow cylinder 52 is connected to the circular cover 55, the lower side of the circular cover 55 is threadedly connected with a countersunk screw 54 in a circular array, the middle part of the upper side of the circular cover 55 is connected to a second externally threaded cam 56, the lower side of the outer periphery of the circular cover 55 is connected to an annular plate 51, and the upper side of the annular plate 51 is threadedly connected with a second bolt 53 in a circular array.

[0036] The user places the annular plate 51 on the upper surface of the bridge steel box girder, and the user rotates the second bolt 53, so that the annular plate 51 is locked and connected to the upper surface of the bridge steel box girder, and the external component 5 is locked and connected to the upper surface of the bridge steel box girder.

[0037] Among them Figure 1 , 3 As shown in , 4, the movable component 2 includes a lower opening tube 21 and an internal threaded sleeve 22; the lower opening tube 21 is located inside the hollow tube 52, and the lower outer periphery of the lower opening tube 21 is provided with protrusions 23 in a ring array, the protrusions 23 are slidably connected to the U-shaped slide groove 57, and the upper side of the lower opening tube 21 is connected to the internal threaded sleeve 22.

[0038] The internal component 7 includes a second spring 71 and a damper 74; an upper circular block 75 is connected to the upper side of the damper 74, and the upper circular block 75 is connected to the upper side of the lower opening tube 21; a lower circular block 72 is connected to the lower side of the damper 74, and a second internal threaded hole groove 73 is provided on the lower side of the lower circular block 72, and the second internal threaded hole groove 73 is threadedly connected to the second external threaded cam 56; a second spring 71 is connected to the outer periphery of the damper 74, and the upper and lower sides of the second spring 71 are respectively connected to the lower side of the upper circular block 75 and the upper side of the lower circular block 72.

[0039] The upper side of the movable component 2 is connected to the suspension component 1 , and the suspension component 1 includes an externally threaded shaft 11 and an earring seat 12 ; the externally threaded shaft 11 at the lower side of the earring seat 12 is threadedly connected to the internally threaded sleeve 22 .

[0040] The user hooks the hook on the crane with the earring seat 12 and starts the crane. The earring seat 12 moves upward, the lower opening tube 21 moves upward, the second spring 71 stretches, the circular cover 55 moves upward, the hollow tube 52 moves upward, the annular plate 51 moves upward, and the bridge steel box girder moves upward. The user controls the crane to move the bridge steel box girder above the working position and controls the crane to place the bridge steel box girder on the working position. When the bridge steel box girder contacts the working surface, the second spring 71 gradually contracts to its original state.

[0041] Among them Figure 1 , 5As shown in Figures 6, 7 and 8, the connecting components 6 are distributed in a circular array on the upper side of the outer periphery of the external component 5, and the connecting components 6 include a second connecting block 62 and a U-shaped seat 65; three U-shaped seats 65 are distributed in a circular array on the upper side of the outer periphery of the hollow cylinder 52, and the U-shaped seat 65 is symmetrically connected to the second damping bearing 64 front and back, and the second ear seat 61 on the upper side of the second connecting block 62 is symmetrically connected to the second shaft pin 63 front and back, and the second shaft pin 63 is rotatably connected to the second damping bearing 64, and the lower side of the second connecting block 62 is symmetrically provided with a first internal threaded hole groove 66.

[0042] The auxiliary component 3 includes a first spring 31, a hollow shaft 32, a movable shaft 33 and a first connecting block 34; the first connecting block 34 is located directly below the second connecting block 62, the hollow shaft 32 is symmetrically connected to the upper side of the first connecting block 34, the inner wall of the hollow shaft 32 is provided with U-shaped through grooves 38 in a ring array, and sliding rods 37 are distributed in a ring array on the outer periphery of the movable shaft 33, the sliding rods 37 are slidably connected to the U-shaped through grooves 38, the upper end of the movable shaft 33 is connected to a first externally threaded protrusion 36, the first externally threaded protrusion 36 is threadedly connected to the first internally threaded hole groove 66, the outer side of the first connecting block 34 is connected to a first ear seat 35, the first ear seat 35 is symmetrically connected to the first shaft pin 39 in the front and back, and the outer periphery of the hollow shaft 32 is sleeved with a first spring 31.

[0043] The lower outer side of the auxiliary component 3 is connected to a locking component 4, which includes an ear block 41 and an ear plate 44; the ear plate 44 is located on the outer side of the first connecting block 34, and the inner side of the ear plate 44 is symmetrically connected to a first damping bearing 42, the first damping bearing 42 is rotatably connected to the first shaft pin 39, and the upper side of the ear plate 44 is threaded with a first bolt 43 at equal intervals.

[0044] The user applies an external force to the auxiliary component 3 in a direction away from the external component 5, the second axle pin 63 rotates on the U-shaped seat 65 through the second damping bearing 64, the second ear seat 61 moves in a circular arc with the second axle pin 63 as the axis, the second connecting block 62 moves with the movement of the second ear seat 61, and the auxiliary component 3 gradually unfolds until the angle between the auxiliary component 3 and the external component 5 is adjusted to the working position, the user applies a pulling force to the first connecting block 34, the first spring 31 stretches, and the hollow shaft 32 moves in a direction away from the movable shaft 33 until the length dimensions of the hollow shaft 32 and the movable shaft 33 meet the working value, the user applies an external force to the ear plate 44, and the ear block 41 moves in a circular arc with the first axle pin 39 as the axis until the ear plate 44 is adjusted to be parallel to the upper surface of the bridge steel box girder, the user rotates the first bolt 43, the ear plate 44 is locked and connected to the upper surface of the bridge steel box girder, and the auxiliary component 3 is connected to the upper surface of the bridge steel box girder.

[0045] The above are only preferred embodiments of the present invention and do not limit the present invention. Any modification to the technical solutions recorded in the aforementioned embodiments and any equivalent replacement of some of the technical features therein, any modification, equivalent replacement, and improvement made are all within the protection scope of the present invention.

Claims

1. A steel box girder hoisting structure, comprising an auxiliary component (3), an external component (5) and an internal component (7), characterized in that: The external component (5) has auxiliary components (3) distributed in a ring array on its periphery, the external component (5) is internally connected to a movable component (2), the upper side of the movable component (2) is connected to an internal component (7), and the lower side of the internal component (7) is connected to the lower side of the internal part of the external component (5).

2. A steel box girder hoisting structure according to claim 1, characterized in that: The external component (5) comprises a hollow cylinder (52) and a circular cover (55); the inner wall of the hollow cylinder (52) is provided with U-shaped sliding grooves (57) in an annular array; the lower side of the hollow cylinder (52) is connected to the circular cover (55); the lower side of the circular cover (55) is threadedly connected to countersunk screws (54) in an annular array; the middle part of the upper side of the circular cover (55) is connected to a second externally threaded convex shaft (56); the lower side of the outer periphery of the circular cover (55) is connected to an annular plate (51); the upper side of the annular plate (51) is threadedly connected to a second bolt (53) in an annular array.

3. The steel box girder hoisting structure according to claim 1, characterized in that: The movable component (2) comprises a lower opening cylinder (21) and an internally threaded sleeve (22); the lower opening cylinder (21) is located inside the hollow cylinder (52); protrusions (23) are distributed in a ring array at the lower part of the outer circumference of the lower opening cylinder (21); the protrusions (23) are slidably connected to the U-shaped sliding groove (57); and the upper side of the lower opening cylinder (21) is connected to the internally threaded sleeve (22).

4. The steel box girder hoisting structure according to claim 1, characterized in that: The internal component (7) comprises a second spring (71) and a damper (74); an upper circular block (75) is connected to the upper side of the damper (74), and the upper circular block (75) is connected to the upper side of the lower opening tube (21); a lower circular block (72) is connected to the lower side of the damper (74), and a second internal threaded hole (73) is formed on the lower side of the lower circular block (72), and the second internal threaded hole (73) is threadedly connected to the second external threaded convex shaft (56); the outer periphery of the damper (74) is connected to the second spring (71), and the upper and lower sides of the second spring (71) are respectively connected to the lower side of the upper circular block (75) and the upper side of the lower circular block (72).

5. The steel box girder hoisting structure according to claim 3 is characterized in that: The upper side of the movable component (2) is connected to a suspension component (1), and the suspension component (1) comprises an externally threaded shaft (11) and an earring seat (12); the externally threaded shaft (11) is threadedly connected to an internally threaded sleeve (22) at the lower side of the earring seat (12).

6. The steel box girder hoisting structure according to claim 1, characterized in that: A connecting component (6) is distributed in an annular array on the upper side of the outer circumference of the external component (5), and the connecting component (6) includes a second connecting block (62) and a U-shaped seat (65); three U-shaped seats (65) are distributed in an annular array on the upper side of the outer circumference of the hollow cylinder (52), and the U-shaped seat (65) is symmetrically connected to a second damping bearing (64) in front and back; a second ear seat (61) on the upper side of the second connecting block (62) is symmetrically connected to a second shaft pin (63) in front and back; the second shaft pin (63) is rotatably connected to the second damping bearing (64); and a first internal threaded hole groove (66) is symmetrically opened on the lower side of the second connecting block (62).

7. The steel box girder hoisting structure according to claim 1, characterized in that: The auxiliary component (3) comprises a first spring (31), a hollow shaft (32), a movable shaft (33) and a first connecting block (34); the first connecting block (34) is located directly below the second connecting block (62); the upper side of the first connecting block (34) is symmetrically connected to the hollow shaft (32) in front and back; the inner side wall of the hollow shaft (32) is provided with U-shaped through grooves (38) in an annular array; the outer periphery of the movable shaft (33) is provided with sliding rods (37) in an annular array; the sliding rods (37) are slidably connected to the U-shaped through grooves (38); the upper end of the movable shaft (33) is connected to a first externally threaded protruding shaft (36); the first externally threaded protruding shaft (36) is threadedly connected to a first internally threaded hole groove (66); the outer side of the first connecting block (34) is connected to a first ear seat (35); the first ear seat (35) is symmetrically connected to a first shaft pin (39) in front and back; and the outer periphery of the hollow shaft (32) is sleeved with the first spring (31).

8. The steel box girder hoisting structure according to claim 7, characterized in that: A locking assembly (4) is connected to the lower outer side of the auxiliary assembly (3), and the locking assembly (4) comprises an ear block (41) and an ear plate (44); the ear plate (44) is located outside the first connecting block (34), and a first damping bearing (42) is symmetrically connected to the inner side of the ear plate (44) in a front-to-back manner, and the first damping bearing (42) is rotatably connected to the first shaft pin (39), and a first bolt (43) is threadedly connected to the upper side of the ear plate (44) at equal intervals.