Water collecting pit arranged in foundation pit rich in underground water
By using caisson structures and temporary support components in the groundwater-rich foundation pit, the groundwater control problem is solved, and the smooth waterproof construction and bottom plate construction of the water collection pit is achieved, reducing the impact of groundwater rise, and improving construction efficiency and economic benefits.
Patent Information
- Application Number
- CN202420607078.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-27
AI Technical Summary
In the groundwater-rich foundation pit that has been excavated and adds water collection pits, due to the high groundwater level and difficulty in construction, the precipitation of vacuum light well points cannot effectively control the groundwater, resulting in the impact of the construction progress and quality.
Adopting a caisson structure, a caisson is set up in the foundation pit, and a gap is left around the caisson for concrete pouring. Waterproof coils are laid in the caisson, and the side plates are supported by temporary support components to avoid deformation, and filled with anti-floating materials to prevent the caisson from floating, realizing that Control of groundwater.
Effectively control groundwater, ensure the smooth progress of waterproof construction between the water collection pit and the foundation pit, reduce the damage to the waterproof layer by groundwater, improve construction efficiency and economic benefits, and is suitable for areas with difficult drainage of foundation pits with abundant groundwater.
Smart Images

Figure CN221989370U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, in particular to a water collection pit arranged in a foundation pit with abundant groundwater. Background Art
[0002] In a foundation pit that has been excavated and is rich in groundwater, due to the needs of the builder or the adjustments of the designer, it is necessary to add a collection pit in the foundation pit. Due to the influence of the high groundwater level, construction difficulties may occur.
[0003] Since the foundation pit has been excavated, the site no longer has the conditions to bring in large-diameter dewatering equipment for dewatering. The use of vacuum light well point dewatering around the sump often fails to achieve the ideal dewatering effect of dry trench construction. In addition, there are factors such as vacuum pump failure and power outages. After the vacuum pump stops, the groundwater will rise in a very short time. The control of groundwater at the sump location has become a key factor restricting progress and quality.
[0004] Therefore, there is an urgent need for a sump arranged in a foundation pit with abundant groundwater to solve the above technical problems. Utility Model Content
[0005] The utility model aims to solve the above-mentioned problems, thereby providing a sump arranged in a foundation pit with abundant groundwater, achieving water stopping through a caisson, and the caisson can both retain soil and ensure smooth pouring of concrete in the fertilizer trough area, i.e., the gap between the caisson and the foundation pit; it can reliably control the groundwater in the sump; it solves the technical problem of groundwater control after adding a sump in a foundation pit with abundant groundwater, and increases economic and social benefits; it is suitable for areas with abundant groundwater and difficult foundation pit drainage.
[0006] The utility model solves the above problems and adopts the following technical solutions:
[0007] A sump arranged in a foundation pit with abundant groundwater, the sump comprises a foundation pit, the foundation pit is arranged in the foundation pit, a caisson is arranged in the foundation pit, the volume of the caisson is smaller than the volume of the foundation pit, a gap is left around the caisson and between the foundation pit, concrete is poured in the gap, the caisson is fully paved with waterproofing membrane, the waterproofing membrane extends out of the caisson and is laid to the surface of the concrete and the foundation pit; the caisson is a cubic structure with an opening at the top, the caisson comprises four side panels, the four side panels are arranged in an enclosed manner and a bottom plate is commonly connected at the bottom of the four side panels; a plurality of groups of temporary support components are arranged between two side panels opposite to each other, the plurality of groups of temporary support components are arranged at intervals along the length direction of the side panels, the plurality of groups of temporary support components located in the caisson jointly form a grid structure, and each group of temporary support components is arranged along the height direction of the side panels.
[0008] As a preferred embodiment, a further technical solution of the utility model is:
[0009] Furthermore, each set of temporary support components includes U-shaped steel parts, which are fitted on the inner sides of two opposite side plates. The two U-shaped steel parts are arranged opposite to each other, and a supporting member is arranged between the two U-shaped steel parts. The supporting member is arranged at intervals up and down along the height direction of the U-shaped steel parts.
[0010] Furthermore, the supporting member comprises a hollow steel pipe, and steel pipe supporting wire supports are connected to both ends of the hollow steel pipe, and the bottoms of the two steel pipe supporting wire supports are both in contact with the U-shaped steel member.
[0011] Furthermore, the supporting member comprises a supporting square tube or a supporting angle steel, and two ends of the supporting square tube or the supporting angle steel are correspondingly welded to the inner side surfaces of two U-shaped steel members facing each other.
[0012] Furthermore, the caisson is filled with anti-floating materials, which are water, soil or waste sand and gravel.
[0013] Furthermore, tensioning structures are provided on the outer sides of the four side panels, and the tensioning structures are cast in concrete.
[0014] Furthermore, two temporary lifting ears are arranged on two side panels opposite to each other, and the two temporary lifting ears are arranged on the upper part of each side panel. The two temporary lifting ears on the same side panel are arranged at intervals from each other, and the two temporary lifting ears on the same side panel are arranged correspondingly to the two temporary lifting ears on the other side panel.
[0015] Furthermore, it also includes connecting angle braces, which are arranged between the angles of two adjacent side panels, and the connecting angle braces are arranged at intervals in the upper and lower directions along the height direction of the side panels.
[0016] Compared with the prior art, the utility model adopting the above technical solution has the following outstanding features:
[0017] The utility model digs a foundation pit in the foundation pit, places a caisson in the foundation pit, pours concrete in the gap between the caisson and the foundation pit to fix the caisson, and supports the four side plates on the caisson by arranging a temporary support assembly in the caisson, thereby preventing the four side plates from being squeezed and deformed by the concrete, and removing the temporary support assembly when the concrete solidifies, that is, the waterproof construction of the sump and other processes can be carried out in the caisson; water stopping is achieved by the caisson, and the caisson can not only retain soil, but also ensure smooth pouring of concrete in the fertilizer trough area, that is, the gap between the caisson and the foundation pit; it can reliably realize the control of groundwater in the sump; it solves the technical problem of groundwater control after adding a sump in a foundation pit rich in groundwater, not only can it ensure that the sump smoothly enters the waterproof construction and bottom plate construction processes, but also when the sump is carrying out the bottom plate construction, the caisson can reduce the influence of groundwater rise, thereby avoiding the damage of the groundwater to the waterproof layer; while ensuring the smooth construction of the sump, it also increases economic and social benefits; it is suitable for areas with abundant groundwater and difficult foundation pit drainage. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a schematic diagram of the caisson installation structure of the utility model. Figure 1 ;
[0019] Figure 2 It is a schematic diagram of the top view structure of the caisson of the utility model;
[0020] Figure 3 This is a schematic diagram of the caisson installation structure of the utility model. Figure 2 ;
[0021] In the figure: 1. foundation pit; 2. caisson; 3. concrete; 4. waterproof membrane; 5. side plate; 6. bottom plate; 7. temporary support assembly; 8. U-shaped steel; 9. support member; 10. hollow steel pipe; 11. steel pipe support wire bracket; 12. anti-floating material; 13. tension structure; 14. connecting angle brace. DETAILED DESCRIPTION
[0022] The following description of the embodiments will help the public better understand the present invention, but the specific embodiments given by the applicant cannot and should not be regarded as limitations on the technical solution of the present invention. Any changes to the definitions of components or technical features and / or formal rather than substantive changes to the overall structure should be regarded as the scope of protection defined by the technical solution of the present invention.
[0023] See also Figures 1 to 3 As shown, the technical solution of the utility model is as follows:
[0024] A sump is provided in a foundation pit with abundant groundwater. The sump comprises a foundation pit 1. The size of the foundation pit 1 is 4.0m*4.5m. The foundation pit 1 is provided in the foundation pit. The specification of the foundation pit 1 is determined according to the construction design requirements. A caisson 2 is provided in the foundation pit 1. The size of the caisson 2 is 3.4*4.0*1.5m. The groundwater in the foundation pit 1 is controlled by placing the caisson 2 in the foundation pit 1. The volume of the caisson 2 is smaller than the volume of the foundation pit 1. A gap is left around the caisson 2 and between the foundation pit 1. Concrete 3 is poured in the gap. The caisson 2 is fixed by the concrete 3 to prevent the caisson 2 from floating up due to the influence of groundwater. In addition, the concrete 3 also backfills the fertilizer trough area of the foundation pit 1, that is, the gap between the caisson 2 and the foundation pit 1. The caisson 2 is fully paved with a waterproof membrane 4. The waterproof membrane 4 extends out of the caisson 2 and is laid to the surface of the concrete 3 and the foundation pit, thereby realizing the construction of a waterproof layer for the sump.
[0025] The caisson 2 is a cubic structure with an opening at the top. The caisson 2 includes four side panels 5 and a bottom panel 6. The four side panels 5 are welded together and fixed together. The bottom panel 6 is welded and fixed to the bottom of the four side panels 5. The thickness of the four side panels 5 and the bottom panel 6 is 4.75 mm, and the height of the four side panels 5 is 1.5 m. Two groups of temporary support assemblies 7 are installed between two side panels 5 opposite to each other. The two groups of temporary support assemblies 7 are arranged at intervals along the length direction of the side panels 5. The four groups of temporary support assemblies 7 located in the caisson 2 form a grid structure together. Each group of temporary support assemblies 7 is arranged along the height direction of the side panels 5. The four side panels 5 of the caisson 2 are supported by the above-mentioned temporary support assemblies 7, thereby preventing the side panels 5 from being deformed by the lateral pressure exerted by the concrete 3 and ensuring the flatness of the side panels 5.
[0026] Each set of temporary support components 7 includes a U-shaped steel member 8, and the U-shaped steel members 8 are attached to the inner side surfaces of two opposite side panels 5. The two U-shaped steel members 8 are arranged opposite to each other, and a support member 9 is installed between the two U-shaped steel members 8. The support member 9 is arranged at intervals up and down along the height direction of the U-shaped steel member 8. The spacing between two adjacent upper and lower support members 9 is determined according to actual construction requirements. The two opposite side panels 5 are supported by the cooperation of the two U-shaped steel bars and the support member 9.
[0027] The supporting member 9 includes a hollow steel tube 10, the length of which is less than the spacing between the two U-shaped steel members 8. Steel tube support wire supports 11 are connected to the two ends of the hollow steel tube 10, and the bottoms of the two steel tube support wire supports 11 are both in contact with the U-shaped steel member 8. Through the cooperation of the hollow steel tube 10 and the two steel tube support wire supports 11, force is applied to the two U-shaped steel members 8, thereby supporting the two side panels 5 opposite to each other. At the same time, the use of the hollow steel tube 10 and the two wire supports is conducive to installation and disassembly, thereby improving construction efficiency.
[0028] The supporting member 9 includes a supporting square tube or a supporting angle steel, and the two ends of the supporting square tube or the supporting angle steel are correspondingly welded to the inner side surfaces of two U-shaped steel parts 8 opposite to each other; the supporting square tube or the supporting angle steel cooperates with the two U-shaped steel bars to apply force to the two U-shaped steel parts 8, thereby supporting the two side panels 5 opposite to each other.
[0029] The caisson 2 is also filled with anti-floating materials 12, which are water, soil or waste sand and gravel. By filling the caisson 2 with the anti-floating materials 12, the caisson 2 is fixed to prevent the caisson 2 from floating up due to the influence of groundwater.
[0030] Tension structures 13 are provided on the outer surfaces of the four side panels 5. The tension structures 13 are ribbed steel bars, which are vertically welded to the outer surfaces of the side panels 5. When pouring concrete 3 in the gap between the caisson 2 and the foundation pit 1, the tension structures 13 are poured into the concrete 3. The tension structures 13 enhance the bond strength with the concrete 3, thereby ensuring the fixing effect of the concrete 3 on the caisson 2.
[0031] Two temporary lifting ears are welded on two side panels 5 opposite to each other, and the two temporary lifting ears are welded on the upper part of each side panel 5. The two temporary lifting ears on the same side panel 5 are spaced apart from each other, and the two temporary lifting ears on the same side panel 5 are arranged correspondingly to the two temporary lifting ears on the other side panel 5. Through the above-mentioned four temporary lifting ears, the transportation efficiency of the caisson 2 is improved, and the caisson 2 can be conveniently lifted and transported, saving manpower and material resources.
[0032] It also includes a connecting angle brace 14, which is a square tube or angle steel. The connecting angle brace 14 is welded between the angles of two adjacent side panels 5. The connecting angle brace 14 is arranged at intervals up and down along the height direction of the side panel 5. The number of the connecting angle braces 14 is determined according to actual construction requirements. By fixing the connecting angle brace 14 between two adjacent side panels 5, the angle between the two adjacent side panels 5 is reinforced to avoid cracking due to stress.
[0033] During construction, the caisson 2 is first assembled and transported to the construction site, the temporary support assembly 7 is installed in the caisson 2, the foundation pit 1 is dug in the foundation pit at any time, the caisson 2 is lifted to the foundation pit 1 by a car crane, and then the anti-floating material 12 is filled into the caisson 2 to prevent the caisson 2 from floating up due to the influence of groundwater, and then the concrete 3 is poured. After the concrete 3 is solidified, the anti-floating material 12 in the caisson 2 is cleaned, and the waterproof membrane 4 is fully spread in the caisson 2, and the subsequent construction process can be carried out.
[0034] The utility model digs a foundation pit 1 in the foundation pit, places a caisson 2 in the foundation pit 1, pours concrete 3 in the gap between the caisson 2 and the foundation pit 1 to fix the caisson 2, and supports the four side plates 5 on the caisson 2 by arranging a temporary support assembly 7 in the caisson 2, thereby preventing the four side plates 5 from being squeezed and deformed by the concrete 3. When the concrete 3 solidifies, the temporary support assembly 7 is removed, and the waterproof construction of the water collection pit and other processes can be carried out in the caisson 2; water stopping is achieved by the caisson 2, and the caisson 2 can both retain soil and ensure that the fertilizer trough area, that is, the caisson 2 The concrete 3 in the gap between the sump and the foundation pit 1 can be poured smoothly; the groundwater in the sump can be reliably controlled; the technical problem of groundwater control after adding a sump in a foundation pit with abundant groundwater is solved, which not only ensures that the sump can smoothly enter the waterproof construction and the bottom plate 6 construction process, but also when the sump is carrying out the bottom plate 6 construction, the caisson 2 can reduce the impact of the rising groundwater, thereby avoiding the damage of the groundwater to the waterproof layer; while ensuring the smooth construction of the sump, it also increases the economic and social benefits; it is suitable for areas with abundant groundwater and difficult foundation pit drainage.
[0035] The above description is only a preferred feasible embodiment of the present utility model, and does not limit the scope of rights of the present utility model. All equivalent changes made using the contents of the present utility model specification and its drawings are included in the scope of rights of the present utility model.
Claims
1. A sump set in a foundation pit with abundant groundwater, characterized by: The sump includes a foundation pit, which is arranged in the foundation pit. A caisson is arranged in the foundation pit. The volume of the caisson is smaller than the volume of the foundation pit. A gap is left around the caisson and between the foundation pit. Concrete is poured in the gap. The caisson is fully covered with waterproof membrane, which extends out of the caisson and is laid to the surface of the concrete and the foundation pit. The caisson is a cube structure with an opening at the top. The caisson includes four side panels, which are enclosed and connected to a bottom plate at the bottom of the four side panels. Several groups of temporary support components are arranged between two side panels opposite to each other. Several groups of temporary support components are arranged at intervals along the length direction of the side panels. Several groups of temporary support components located in the caisson form a grid structure together. Each group of temporary support components is arranged along the height direction of the side panels.
2. The sump provided in a foundation pit with abundant groundwater according to claim 1, characterized in that: Each set of temporary support components includes U-shaped steel parts, which are fitted on the inner sides of two opposite side plates. The two U-shaped steel parts are arranged opposite to each other, and a supporting member is arranged between the two U-shaped steel parts. The supporting members are arranged at intervals up and down along the height direction of the U-shaped steel parts.
3. The sump provided in a foundation pit with abundant groundwater according to claim 2, characterized in that: The supporting component comprises a hollow steel pipe, and steel pipe supporting wire supports are connected to both ends of the hollow steel pipe, and the bottoms of the two steel pipe supporting wire supports are both in contact with the U-shaped steel piece.
4. The sump provided in a foundation pit with abundant groundwater according to claim 2, characterized in that: The supporting member comprises a supporting square tube or a supporting angle steel, and two ends of the supporting square tube or the supporting angle steel are correspondingly welded to the inner side surfaces of two U-shaped steel pieces facing each other.
5. The sump provided in a foundation pit with abundant groundwater according to claim 1, characterized in that: The caisson is also filled with anti-floating materials, which are water, soil or waste sand and gravel.
6. The sump provided in a foundation pit with abundant groundwater according to claim 1, characterized in that: Tension structures are provided on the outer sides of the four side panels and are cast in concrete.
7. The sump provided in a foundation pit with abundant groundwater according to claim 1, characterized in that: Two temporary lifting ears are provided on the two side panels opposite to each other. The two temporary lifting ears are provided on the upper part of each side panel. The two temporary lifting ears on the same side panel are spaced apart from each other, and the two temporary lifting ears on the same side panel are provided corresponding to the two temporary lifting ears on the other side panel.
8. The sump provided in a foundation pit with abundant groundwater according to claim 1, characterized in that: It also includes connecting angle braces, which are arranged between the angles of two adjacent side panels. The connecting angle braces are arranged at intervals up and down along the height direction of the side panels.