Pressure relief construction structure of high-stress large-span underground cavern surrounding rock development weak broken zone

By setting pressure relief holes and drainage holes in high-stress large-span underground cave chambers, the stress distribution of rock mass is controlled and fixed connections are made, the extrusion deformation problem of weak crushed rock mass is solved, and the stability of surrounding rock and the support structure is improved. The safety of the company reduces construction difficulty and engineering costs.

CN222010222UActive Publication Date: 2024-11-15POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420820913.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-11-15
Estimated Expiration
2034-04-19

AI Technical Summary

Technical Problem

When excavating large-span underground cave chambers under high stress environments, the extrusion deformation of weak and broken rocks is difficult to control, resulting in damage to the support structure and instability of the surrounding rock after construction is completed, especially under the influence of groundwater.

Method used

By laying longitudinal and transverse construction branch holes above the roof arch of the cave chamber and setting pressure relief holes on both sides of the weak crushing belt, a pressure relief zone with low stress is formed through natural crack expansion or hydraulic fracturing to control the stress distribution of the rock mass. And drainage treatment to reduce the impact of groundwater. The concrete lining and prestressed anchor cables are then fixedly connected.

Benefits of technology

It effectively avoids the extrusion and deformation of weak rock mass, improves the stability of surrounding rock and the safety of support structure, reduces construction difficulty and project cost, and speeds up the project progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222010222U_ABST
    Figure CN222010222U_ABST
Patent Text Reader

Abstract

The utility model relates to a pressure relief construction structure of a high-stress large-span underground cavern surrounding rock development weak broken zone. The method is suitable for the technical field of rock underground engineering. According to the technical scheme, the method comprises the steps that a longitudinal construction adit is arranged in a rock mass above a cavern top arch and is parallel to the axis of a cavern; the two transverse construction adits are arranged on the front side and the rear side of the soft broken zone respectively and perpendicularly intersect with the longitudinal construction adits; the two rows of pressure relief holes are formed in the bottoms of the two transverse construction adits respectively, each row of pressure relief holes are arranged in the length direction of the transverse construction adits, all the pressure relief holes extend downwards, a certain distance is kept between the bottom ends of the pressure relief holes and the designed excavation contour line of the cavern, and the pressure relief holes in the same row communicate with one another through cracks of surrounding rock mass; the drainage holes extend upwards from the top arch and the side wall of the longitudinal construction adit into the rock mass of the soft broken zone; the notch grooves are formed in the soft broken zone rock mass on the inner wall of the periphery of the cavern; and the concrete lining is backfilled in the notch groove.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of rock underground engineering, in particular to a pressure relief construction structure for a high-stress, large-span underground cavern with a weak fracture zone developed in the surrounding rock. Background Art

[0002] In the construction of hydropower projects in the western region, it is often necessary to excavate large-span underground caverns. These underground caverns are generally located in high-stress rock environments and are affected by strong geological tectonic movements. The rock masses often develop weak and broken structures such as slate, mudstone or fault influence zones with low strength. These weak and broken rock masses may also have the characteristic of being easily softened when exposed to water, which is not conducive to the stability control of the cavern surrounding rock.

[0003] The greatest difficulty in excavating large-span underground caverns in soft and broken rock mass under high stress environment is that it is difficult to control the large compression deformation of the soft rock mass during construction, especially the cavern top arch, which is generally a stress concentration area. Under the action of high ground stress, even after the cavern is excavated and supported, the compression deformation of the soft and broken rock mass may continue to develop, especially under the influence of factors such as groundwater. Continuous compression deformation will lead to support structure damage (broken anchor rods and cables) and cracking of building structure in the cavern after construction.

[0004] For large-span underground caverns with weak and broken zones in the surrounding rock, it is necessary to control the stress distribution of the cavern roof rock mass through technical means before excavation of the cavern, so that a low-stress relief zone is formed in the rock mass within a certain range of the roof arch. This ensures that after the excavation and support of the cavern are completed, the weak and broken rock mass basically no longer produces extrusion deformation, reduces the later stress on the support structure, ensures the stability of the cavern surrounding rock, and increases the safety of the support structure. Utility Model Content

[0005] The purpose of the utility model is to overcome the deficiencies of the above-mentioned prior art and to provide a pressure relief construction structure for a high-stress, large-span underground cavern surrounding rock with developed soft and broken zones, thereby limiting the extrusion deformation of the soft and broken rock mass caused by high stress concentration and the deformation of the soft rock mass caused by weakening by water, thereby improving the stability of the surrounding rock and the safety of the cavern support structure.

[0006] The technical solution adopted by the utility model is as follows:

[0007] The decompression construction method for the surrounding rock of a high-stress large-span underground cavern with a weak fracture zone includes the following steps:

[0008] (1) A longitudinal branch tunnel parallel to the tunnel axis and two transverse branch tunnels perpendicular to the longitudinal branch tunnel are arranged in the rock mass above the tunnel arch. The two transverse branch tunnels are arranged on the front and rear sides of the weak fracture zone respectively.

[0009] (2) A row of downward pressure relief holes are arranged in the rock mass on both sides of the weak fracture zone through transverse branch tunnels, and the bottom of the pressure relief holes is kept at a certain distance from the designed excavation contour line of the cavern;

[0010] (3) Through the natural expansion of the rock cracks around the pressure relief holes, the pressure relief holes in the same row are interconnected through the surrounding cracks, thereby forming a pressure relief area with lower stress in the rock mass on both sides of the weak fracture zone;

[0011] (4) When the rock mass around the pressure relief holes is intact and has high strength, and the rock mass around the pressure relief holes will not relax and crack, and a pressure relief zone with low stress cannot be formed in the rock mass, high-pressure water is injected into the pressure relief holes to form cracks in the rock mass around the holes through hydraulic fracturing, and the cracks are expanded to connect the pressure relief holes in the same row to form a pressure relief zone with low stress;

[0012] (5) Drainage holes are constructed in the rock mass of the weak and fractured zone through the longitudinal construction branch holes to drain the groundwater in the rock mass of the weak and fractured zone into the longitudinal construction branch holes, and then discharged out of the cavern through the longitudinal construction branch holes;

[0013] (6) When the groundwater in the weak fractured zone rock mass is drained below the cavern floor, the pretreatment work of the project is completed, and then the underground cavern excavation construction is carried out according to conventional construction methods;

[0014] (7) After the excavation of the cavern is completed, grooves are cut into the soft and broken rock mass on the inner wall of the cavern. Then, concrete lining is backfilled in the grooves. Prestressed anchor cables are used to fix the concrete linings at the cavern top arch and the side walls to the intact rock mass on the front and back sides of the soft and broken rock mass.

[0015] A further solution is that in step (2), the pressure relief holes are arranged in parallel with the soft and broken rock mass.

[0016] A further solution is that in step (2), the bottom end of the pressure relief hole is kept 4 to 6 meters away from the designed excavation contour line of the cavern.

[0017] A further solution is that in step (2), the diameter of the pressure relief hole is 0.1 to 0.3 m, and the better the rock mass integrity, the larger the diameter.

[0018] A further solution is that in step (5), the drainage hole extends upward from the top arch and side wall of the longitudinal construction branch tunnel into the rock mass of the weak fracture zone, and a permeable pipe is arranged in the drainage hole.

[0019] A further solution is that in step (7), the groove depth is greater than 0.5m.

[0020] Another technical solution of the utility model is:

[0021] The pressure relief construction structure of the surrounding rock of high-stress and large-span underground caverns with weak fracture zones includes:

[0022] The longitudinal branch tunnel is arranged in the rock mass above the cavern top arch and parallel to the cavern axis;

[0023] Two transverse branch tunnels are arranged on the front and rear sides of the weak fracture zone, and both intersect the longitudinal branch tunnel perpendicularly.

[0024] Two rows of pressure relief holes are respectively set at the bottom of two horizontal construction branch holes. Each row of pressure relief holes is arranged along the length direction of the horizontal construction branch hole. Each pressure relief hole extends downward and the bottom end is kept at a certain distance from the designed excavation contour line of the cavern. The pressure relief holes in the same row are interconnected through the cracks in the surrounding rock mass, thereby forming a pressure relief area with lower stress on both sides of the weak fracture zone;

[0025] A number of drainage holes extend upward from the top arch and side walls of the longitudinal construction branch tunnel into the rock mass of the weak fracture zone, and are used to drain the groundwater in the rock mass of the weak fracture zone into the longitudinal construction branch tunnel, and then drain it out through the longitudinal construction branch tunnel;

[0026] Grooves are set on the weak and broken rock mass on the inner walls around the cavern;

[0027] The concrete lining is backfilled in the groove, and the concrete lining at the cavern top arch and the side walls is fixedly connected to the intact rock mass on the front and back sides of the weak fracture zone rock mass through prestressed anchor cables.

[0028] A further solution is that the pressure relief hole is arranged parallel to the soft and broken rock mass, with a hole diameter of 0.1 to 0.3 m. The better the integrity of the rock mass, the larger the hole diameter. The bottom of the pressure relief hole is kept 4 to 6 m away from the designed excavation contour line of the cavern.

[0029] A further solution is that a permeable pipe is arranged in the drainage hole, the drainage hole at the top arch of the longitudinal construction branch hole extends vertically upward, and the drainage hole at the side wall is an upward inclined drainage hole with an elevation angle of 20-30.

[0030] A further solution is that the groove depth is greater than 0.5m.

[0031] The utility model has the following beneficial effects: the utility model aims at the problem that weak fractured zones are developed in the surrounding rocks of high-stress and large-span underground caverns, which may cause large extrusion deformation of weak rock masses. The utility model controls the stress distribution of the cavern roof rock mass through pressure relief holes, and forms a low-stress pressure relief zone in the rock mass within a certain range on both sides of the fractured zone. On the one hand, a part of the elastic compression energy in the rock mass can be released in advance. More importantly, it can avoid large extrusion deformation of weak rock masses caused by stress concentration after the cavern excavation is completed. At the same time, through early drainage measures, softening of the rock mass in the weak fractured zone is avoided, thereby ensuring the stability of the surrounding rock and the safety of the support structure, reducing the construction difficulty and project cost, and accelerating the project progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a three-dimensional diagram of the pressure relief construction structure provided by the embodiment of the utility model.

[0033] Figure 2 It is a front view of the pressure relief construction structure provided by an embodiment of the utility model.

[0034] Figure 3 It is a side view of the pressure relief construction structure provided by an embodiment of the utility model.

[0035] Figure 4 It is a side view of the connection structure between the concrete lining and the prestressed anchor cable in an embodiment of the utility model.

[0036] Figure 5 It is a front view of the connection structure between the concrete lining and the prestressed anchor cable in an embodiment of the utility model.

[0037] Figure numerals: cavern 1, longitudinal construction branch tunnel 2, weak fracture zone 3, drainage hole 4, transverse construction branch tunnel 5, pressure relief hole 6, concrete lining 7, prestressed anchor cable 8. DETAILED DESCRIPTION

[0038] In order to enable ordinary technicians in the field to more clearly understand the purpose, technical solutions and advantages of the utility model, the utility model is further explained below in conjunction with the accompanying drawings and embodiments, but the utility model is not limited to the following embodiments.

[0039] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0040] This embodiment provides a pressure relief construction method for a high-stress, large-span underground cavern with a weak fracture zone in the surrounding rock, comprising the following steps:

[0041] (1) According to the design requirements, three pre-treatment construction branch holes are excavated in the rock mass above the top arch of the underground cavern, including one longitudinal construction branch hole parallel to the axis of the cavern and two transverse construction branch holes perpendicular to the axis of the cavern. The two transverse construction branch holes are arranged on both sides of the weak fracture zone and are formed by excavating the longitudinal construction branch holes to both sides;

[0042] (2) Through two horizontal branch tunnels, pressure relief holes with a diameter of 0.1 to 0.3 m are drilled in a row in the rock mass on both sides of the weak fracture zone. The better the integrity of the rock mass, the larger the hole diameter. For example, when the rock mass integrity is good, it is recommended that the pressure relief hole diameter be 0.3 m, and when the rock mass integrity is poor, it can be 0.1 m. The pressure relief holes are arranged parallel to the weak fractured rock mass, and the distance from the edge of the weak fracture zone should not be greater than 10 m. The length of the pressure relief holes is based on the principle that the bottom of the hole is 4 to 6 m from the designed excavation contour line of the underground cavern, and the center spacing of the pressure relief holes is designed to be 5 m.

[0043] (3) The cracks in the rock mass around the pressure relief holes are expanded naturally, so that the pressure relief holes in the same row are interconnected through the surrounding cracks, thereby forming a relatively large pressure relief area with low stress in the rock mass on both sides of the weak fracture zone;

[0044] (4) When the rock mass is intact and has high strength, the rock mass around the pressure relief holes will not relax and crack naturally, and a pressure relief zone with low stress cannot be formed in the rock mass, it is necessary to inject high-pressure water into the pressure relief holes to form cracks in the rock mass around the holes through hydraulic fracturing, and expand the cracks to connect the same row of pressure relief holes to form a pressure relief zone with low stress;

[0045] (5) Drain holes with a diameter of 100 mm are drilled in the rock mass of the weak fracture zone through the longitudinal construction branch tunnel. Three drainage holes are arranged on the top arch, left side wall and right side wall of the longitudinal construction branch tunnel. The top arch is a vertical drainage hole, and the side walls on both sides are inclined drainage holes with an elevation angle of 20-30°. Soft permeable pipes are installed in the drainage holes. The groundwater in the rock mass of the weak fracture zone is discharged into the longitudinal construction branch tunnel and discharged out of the cavern through the longitudinal construction branch tunnel.

[0046] (6) After a period of drainage, when the groundwater in the rock mass is drained below the cavern floor and no water flows out of the drainage holes, the pretreatment work of the project is completed and the underground cavern excavation construction can be carried out according to conventional construction methods;

[0047] (7) The underground caverns shall be excavated in stages according to the design plan. After the excavation of the caverns is completed, grooves shall be cut on the soft and broken rock mass on the inner walls around the caverns. The groove depth shall be greater than 0.5 m. The grooves shall be backfilled with concrete lining. When the concrete strength reaches the design standard, prestressed anchor cables shall be constructed on the concrete lining of the top arch and the side walls. The prestressed anchor cable holes shall be tilted and anchored into the intact rock mass on the front and rear sides. It shall be ensured that the anchoring section of the anchor cable is located in the intact rock mass.

[0048] Reference Figure 1 to Figure 3 This embodiment also provides a pressure relief construction structure for a high-stress, large-span underground cavern with a weak fracture zone in the surrounding rock, based on the above construction method, including:

[0049] A longitudinal branch tunnel 2 is arranged in the rock mass above the top arch of the cavern 1 and is parallel to the axis of the cavern 1;

[0050] Two transverse branch tunnels 5 are arranged at the front and rear sides of the weak fracture zone 3, and are formed by excavating the longitudinal branch tunnel 2 to both sides;

[0051] Two rows of pressure relief holes are respectively arranged at the bottom of two horizontal construction branch holes 5. Each row of pressure relief holes is arranged along the length direction of the horizontal construction branch hole 5. The diameter of the pressure relief hole 6 is 0.1-0.3m. The better the rock mass integrity, the larger the hole diameter. For example, when the rock mass integrity is good, it is recommended that the diameter of the pressure relief hole 6 be 0.3m, and when the rock mass integrity is poor, it can be 0.1m. The pressure relief holes 6 are arranged in parallel with the weak and broken rock mass, and the distance from the edge of the weak and broken zone 3 should not be greater than 10m. The length of the pressure relief holes 6 is based on the principle that the bottom of the hole is 4-6m away from the designed excavation contour line of the underground cavern 1, and the center spacing of the pressure relief holes 6 is designed to be 5m. The pressure relief holes in the same row are connected to each other through the cracks formed by the natural relaxation and rupture of the surrounding rock mass or the gaps formed by hydraulic fracturing, so as to form a pressure relief area with low stress on both sides of the weak and broken zone 3.

[0052] A plurality of drainage holes 4, each with a diameter of 100 mm, are arranged with three drainage holes 4 on the top arch, the left side wall and the right side wall of the longitudinal construction branch hole 2, so as to discharge the groundwater in the rock mass of the weak fracture zone 3 into the longitudinal construction branch hole 2, and then discharge it outside through the longitudinal construction branch hole 2; Figure 2 As shown, the drainage holes 4 at the top arch extend vertically upward into the rock mass of the weak fracture zone 3, and the drainage holes 4 at the side walls are inclined drainage holes 4 extending into the rock mass of the weak fracture zone 3, with an elevation angle of 20-30;

[0053] Grooves are set on the weak fracture zone 3 rock mass on the inner wall around the cave 1, and the depth of the grooves should be greater than 0.5m;

[0054] Concrete lining 7, reference Figure 4 , Figure 5 As shown, the backfill is in the groove, and the concrete lining 7 at the top arch and the side walls of the cavern 1 is fixedly connected to the intact rock mass on the front and rear sides of the weak fracture zone 3 through prestressed anchor cables 8.

[0055] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A pressure relief construction structure for high-stress, large-span underground caverns with weak fracture zones in the surrounding rock, characterized in that: include: A longitudinal branch tunnel (2) is arranged in the rock mass above the top arch of the cavern (1) and parallel to the axis of the cavern (1); Two transverse branch tunnels (5) are arranged at the front and rear sides of the weak fracture zone (3) respectively, and both intersect the longitudinal branch tunnel (2) perpendicularly; Two rows of pressure relief holes are respectively arranged at the bottom of two transverse construction branch holes (5), each row of pressure relief holes is arranged along the length direction of the transverse construction branch hole (5), each pressure relief hole extends downward and the bottom end is kept at a certain distance from the designed excavation contour line of the cavern (1), and the pressure relief holes in the same row are interconnected through the cracks in the surrounding rock mass, thereby forming a pressure relief area with lower stress on both sides of the weak fracture zone (3); A plurality of drainage holes (4) extend upward from the top arch and side walls of the longitudinal construction branch hole (2) into the rock mass of the weak fracture zone (3) and are used to drain groundwater in the rock mass of the weak fracture zone (3) into the longitudinal construction branch hole (2) and then drain it outward through the longitudinal construction branch hole (2); Grooves are provided in the rock mass of the weak fracture zone (3) on the inner wall around the cave (1); The concrete lining (7) is backfilled in the groove, and the concrete lining (7) at the top arch and the side walls of the cavern (1) is fixedly connected to the intact rock mass at the front and rear sides of the rock mass of the weak fracture zone (3) through prestressed anchor cables (8).

2. The pressure relief construction structure for high-stress, large-span underground cavern surrounding rock with developed weak fracture zones according to claim 1, characterized in that: The pressure relief hole (6) is arranged in parallel with the soft and broken rock mass, and has a hole diameter of 0.1 to 0.3 m. The better the integrity of the rock mass, the larger the hole diameter. The bottom end of the pressure relief hole (6) is kept 4 to 6 m away from the designed excavation contour line of the cavern (1).

3. The pressure relief construction structure for high-stress, large-span underground cavern surrounding rock with developed weak fracture zones according to claim 1, characterized in that: A water-permeable pipe is arranged in the drainage hole (4); the drainage hole (4) at the top arch of the longitudinal construction branch hole (2) extends vertically upward; the drainage hole (4) at the side wall is an upwardly inclined drainage hole (4) with an elevation angle of 20-30 degrees.

4. The pressure relief construction structure for high-stress, large-span underground cavern surrounding rock with developed weak fracture zones according to claim 1, characterized in that: The groove depth is greater than 0.5m.